Contracts - AWARD SUMMARY
ULTIMATE CONCRETE, L.L.C.
Sunland Park Levee improvements consist of 1) raising the top-of-the levee elevation, 2) providing seepage control structures as required, and 3) rehabilitationg existing pipeline/culvert structures and appurtenances located within the levees by modifying them to be in accordance with the raised levee cross section, repairing gates and gate-wells as required, and adding gates to un-grated structures. Ultimate shall construct the rehabilitation improvements for the existing levee and modifications to affected structures as per design and specifications.
Choose a quarter and click "Go."
| AWARD OVERVIEW |
| Award Number |
IBM10C0018 |
Funding Agency |
Department of State |
| Total Award Amount |
$9,249,622 |
Project Location - City |
El Paso |
| Award Date |
09/10/2010 |
Project Location - State |
TX |
| Project Status |
More than 50% Completed |
Project Location - Zip |
79932-1124
|
| Jobs Reported |
0.00 |
Congressional District |
16 |
| Project Location - Country |
US |
|
|
Recipient Information
(Contracts)
| Recipient Information (Contracts) |
|
Recipient Name
|
ULTIMATE CONCRETE, L.L.C. |
| Recipient DUNS Number |
829034136
|
| Recipient Address |
3465 LEE BLVD STE 244 |
| Recipient City |
EL PASO |
| Recipient State |
Texas |
| Recipient Zip |
79936-1475 |
| Recipient Congressional District |
16 |
| Recipient Country |
USA |
Required to Report Top 5 Highly Compensated Officials |
No |
Projects and Jobs Information
| Projects and Jobs Information |
| Project Title |
Federal Contract |
| Project Status |
More than 50% Completed |
| Final Project Report Submitted |
No |
| Project Activities Description |
Other Heavy and Civil Engineering Construction |
| Quarterly Activities/Project Description |
Work Completed This Quarter: Temp Erosion Contro-Silt Fencel 92%, Temp Erosion Control-Consturction Exit 100%, Mobilization 90%, Prep Right of Way 100%, Removal/Stockpile-Exist Gravel 100%, Clean Existing Channel 100%, Raise Levee-Bench Excavation 94%, Raise Levee-Embankment 95%, Rip Rap Concrete 100%, Toe Drain 96%, Retaining Wall 100%, Structure Approach Slab 100%, Rail-T221 100%, Rail-T223 100%, Rail-T551 100%, Rail T-552 100%, Crash Cushion Attenuators 50%, RC Pipe-CL III 48" 100%, RC Pipe-CL 30" 100%, Conc Headwall 48" 100%, Conc Headwall 30" 100%, Sluice Gate-30" 90%, Sluice Gate-48" 90%, Flap Gates Various Sizes 75%, Auto Floodgate 2.67x'x48' 100%, Auto Floodgate 2'x50' 100%, Remove Str-Conc Headwall 60%, Vehicular Gate 100%, Remove/Relocate Exist Fence 100%, Remove & Reinstall Traffic Signs 100%, Provide & Install New Traffic Signs 100%, Concrete Headwall-Raise 100%, Remove Refurb Reinstall HD Veh GT 100%, Boulders 100%. |
| Jobs Created |
0.00 |
| Description of Jobs Created |
The project Sunland Park Canutillo Levee Segment is a predominantly dirt concrete project. Ultimate Concrete will increase its cement work load to reflect the following increase in manpower. A) 10 equipment operators to help with the multitasking of excavation. B) 8 concrete finishers to maintain a crew doing walls and a crew placing walls. C) 15 truck drivers to haul material to the different locations. All in all Ultimate Concrete projects and increase in manpower of approximately 33 to 35 individuals/ |
Purchaser Information
(Contracts)
| Purchaser Information |
| Contracting Office ID |
IBWC |
| Contracting Office Name |
Not Available |
| Contracting Office Region |
Not Available |
| TAS Major Program |
19-1079 |
| Award Information |
| Award Date |
09/10/2010 |
| Award Number |
IBM10C0018 |
| Order Number |
|
| Award Type |
Contracts |
| Funding Agency ID |
19 |
| Funding Agency Name |
Department of State |
| Funding Office Name |
Not Available |
| Awarding Agency ID |
19 |
| Awarding Agency Name |
Department of State |
| Amount of Award |
$9,249,622 |
| Funds Invoiced/Received |
$8,009,209 |
| Expenditure Amount |
$0 |
| Infrastructure Expenditure Amount |
$0 |
| Infrastructure Purpose and Rationale |
Not Reported |
| Infrastructure Point of Contact Name |
Not Reported |
| Infrastructure Point of Contact Email |
Not Reported |
| Infrastructure Point of Contact Phone |
Not Reported |
| Infrastructure Point of Contact Address |
Not Reported |
| Infrastructure Point of Contact City |
Not Reported |
| Infrastructure Point of Contact State |
Not Reported |
| Infrastructure Point of Contact Zip |
Not Reported |
Product or Service Information
(Contracts)
| Product or Service Information |
| Primary Activity Code |
237990 |
| Activity Description |
Other Heavy and Civil Engineering Construction |
| Sub-Awards Information |
| Sub-awards to Organizations |
1 |
| Sub-award Amounts to Organizations |
$43,218 |
| Sub-Awards to Individuals |
0 |
| Sub-Award Amounts to Individuals |
$0 |
| Number of Sub-awards less than $25,000/award |
1 |
| Amount of Sub-awards less than $25,000/award |
$3,685 |
| Number of payments to vendors greater than $25,000 |
0 |
| Total Amount of payments to vendors greater than $25,000/award |
$0 |
| Number of payments to vendors less than $25,000/award |
0 |
| Total Amount of payments to vendors less than $25,000/award |
$0 |
Sub-award IBM10C0018-001 - Rodriguez A Trucking
| Sub-Award Amount |
$43,218 |
| Sub-Award Date |
10/18/2010 |
| Sub-Awards Disbursed |
$0.00 |
| Project Location - City |
Horizon City |
| Project Location - State |
TX |
| Project Location - Zip Code |
79928-7418 |
| Project Location - Congressional District |
23 |
| Sub-Recipient DUNS Number |
962866807
|
| Sub-Recipient Address |
631 Danube Dr |
| Sub-Recipient City |
Horizon City |
| Sub-Recipient State |
TX |
| Sub-Recipient Zip Code |
79928 |
| Sub-Recipient Congressional District |
23 |
Required To Report Top 5 Highly Compensated Officials |
No |
| Location Information |
| Latitude, Longitude |
31º 53' 8",
-106º 36' 20" |
| Congressional District |
16 |
| Address 1 |
6297 Strahan Rd |
| Address 2 |
|
| City |
El Paso |
| County |
El Paso |
| State |
TX |
| Zip |
79932-1124 |
|
 |