ED INTERIORS CONTRACTOR, INC.
RECOVERY - CIM-1201-05F IITF Deferred Maintenance - Construction, Rio Piedras, PR
Consist in Repair exterior stairs, Painting of Entire building roof waterproofing andinsulation, replacement if Air Consitioning Units; Replace of Lighting fixtures; upgrade electrical system and install high quality occupancy senor light switches to reduce energy consumption, Installation of exhaust fan , upgrade electrical system, Install high quality occupancy sensor light switches to reduce energy consumption, Repair metal trellis, cover trellis with clear material, Replace storage room door, and exhaust fan at the restroom and shower area.