Contracts - AWARD SUMMARY
HDR/CDM, A JOINT VENTURE
Recovery Project Number 016350. SANTA PAULA CREEK, CATHE ARCHITECT-ENGINEER (A-E) SHALL PREPARE A HYDROLOGY, HYDRAULICS, AND SEDIMENTATION APPENDIX, A GEOTECHNICAL FIELD INVESTIGATION AND REPORT, AND AN ENVIRONMENTAL ASSESSMENT (EA) TO SUPPORT DESIGN SOLUTIONS FOR SCOUR AND OVERTOPPING ISSUES, PREPARE A DESIGN DOCUMENTATION REPORT (DDR), AND PREPARE A BIOLOGICAL ASSESSMENT (BA) IN SUPPORT OF 90% CONSTRUCTION DRAWINGS AND SPECIFICATIONS FOR THE SANTA PAULA CREEK FLOOD CONTROL PROJECT LOCATED IN THE CITY OF SANTA PAULA.THE A-E SHALL INCORPORATE PROPOSED PROJECT INLET AND FISH LADDER DESIGN, AS DESCRIBED IN THE FIELD CHANGE REPORT, AND DEVELOP DESIGN SOLUTIONS RESOLVING BOTH THE TOE PROTECTION (SCOUR) ISSUE THROUGH THE UPPER REACHES OF THE PROJECT, AS WELL AS THE DOWNSTREAM OVERTOPPING ISSUES THAT WERE IDENTIFIED IN THE PRIOR WORK. THE SCOUR PROBLEM EXTENDS FROM IMMEDIATELY BELOW THE PROJECT INLET TO UPSTREAM OF THE RAILROAD BRIDGE. THE OVERTOPPING ISSUE FOR THE 28,000 CFS EVENT EXTENDS FROM THE VICINITY OF THE HIGHWAY 126 BRIDGES TO THE DOWNSTREAM END OF THE PROJECT ON BOTH SIDES OF THE CHANNEL.FINAL DESIGN MATERIAL WILL CONSIST OF CONTRACT DRAWINGS, SPECIFICATIONS, DESIGN BACKUP/CALCULATIONS, COST ESTIMATE, QUANTITY ESTIMATES, AND ENGINEERING CONSIDERATIONS AND INSTRUCTIONS FOR FIELD PERSONNEL (ECIFP). THE ABOVE DESIGN MATERIAL SHALL BE PREPARED IN ACCORDANCE WITH SOUND ENGINEERING JUDGMENT, ENGINEERING CRITERIA (FEDERAL, STATE AND LOCAL), US ARMY CORPS OF ENGINEERS (USACE, CORPS) POLICY, AND SHALL FOLLOW PROCEDURES OUTLINED IN THIS SCOPE OF WORK. IN ADDITION, THE WORK AND SERVICES SHALL INCLUDE ALL MANAGEMENT AND DOCUMENTATION OF COORDINATION ACTIVITIES REQUIRED TO SUCCESSFULLY PRODUCE ALL WORK IN ACCORDANCE WITH THIS SCOPE.
Choose a quarter and click "Go."
| AWARD OVERVIEW |
| Award Number |
W912PL-09-D-0033 |
Funding Agency |
Corps of Engineers |
| Total Award Amount |
$1,107,500 |
Project Location - City |
Santa Paula |
| Award Date |
09/20/2010 |
Project Location - State |
CA |
| Project Status |
More than 50% Completed |
Project Location - Zip |
93060-2321
|
| Jobs Reported |
0.17 |
Congressional District |
26 |
| Project Location - Country |
US |
|
|
Recipient Information
(Contracts)
| Recipient Information (Contracts) |
|
Recipient Name
|
HDR/CDM, A JOINT VENTURE |
| Recipient DUNS Number |
831040378
|
| Recipient Address |
3230 EL CAMINO REAL STE 200 |
| Recipient City |
IRVINE |
| Recipient State |
California |
| Recipient Zip |
92602-1333 |
| Recipient Congressional District |
45 |
| Recipient Country |
USA |
Required to Report Top 5 Highly Compensated Officials |
No |
Projects and Jobs Information
| Projects and Jobs Information |
| Project Title |
Federal Contract |
| Project Status |
More than 50% Completed |
| Final Project Report Submitted |
No |
| Project Activities Description |
Engineering Services |
| Quarterly Activities/Project Description |
Submitted the final Santa Paula Creek Flood Control Project environmental documents, final ready-to-advertise (RTA) construction documents and draft 100% Design Documentation Report (DDR) to USACE |
| Jobs Created |
0.17 |
| Description of Jobs Created |
ARRA funding impacted the following positions: Administrative Assistant; Civil Engineer; Sr. Water Resources Engineer; Project Manager; Area Business Class Leader; Quality Control Reviewer. |
Purchaser Information
(Contracts)
| Purchaser Information |
| Contracting Office ID |
W912PL |
| Contracting Office Name |
Not Available |
| Contracting Office Region |
Not Available |
| TAS Major Program |
96-3134 |
| Award Information |
| Award Date |
09/20/2010 |
| Award Number |
W912PL-09-D-0033 |
| Order Number |
0015 |
| Award Type |
Contracts |
| Funding Agency ID |
96 |
| Funding Agency Name |
Corps of Engineers |
| Funding Office Name |
Not Available |
| Awarding Agency ID |
96 |
| Awarding Agency Name |
Corps of Engineers |
| Amount of Award |
$1,107,500 |
| Funds Invoiced/Received |
$809,418 |
| Expenditure Amount |
$0 |
| Infrastructure Expenditure Amount |
$0 |
| Infrastructure Purpose and Rationale |
Not Reported |
| Infrastructure Point of Contact Name |
Not Reported |
| Infrastructure Point of Contact Email |
Not Reported |
| Infrastructure Point of Contact Phone |
Not Reported |
| Infrastructure Point of Contact Address |
Not Reported |
| Infrastructure Point of Contact City |
Not Reported |
| Infrastructure Point of Contact State |
Not Reported |
| Infrastructure Point of Contact Zip |
Not Reported |
Product or Service Information
(Contracts)
| Product or Service Information |
| Primary Activity Code |
541330 |
| Activity Description |
Engineering Services |
| Sub-Awards Information |
| Sub-awards to Organizations |
1 |
| Sub-award Amounts to Organizations |
$36,446 |
| Sub-Awards to Individuals |
1 |
| Sub-Award Amounts to Individuals |
$6,250 |
| Number of Sub-awards less than $25,000/award |
2 |
| Amount of Sub-awards less than $25,000/award |
$14,041 |
| Number of payments to vendors greater than $25,000 |
0 |
| Total Amount of payments to vendors greater than $25,000/award |
$0 |
| Number of payments to vendors less than $25,000/award |
0 |
| Total Amount of payments to vendors less than $25,000/award |
$0 |
Sub-award Cascade - CASCADE DRILLING, L.P.
| Sub-Award Amount |
$36,446 |
| Sub-Award Date |
11/11/2010 |
| Sub-Awards Disbursed |
$0.00 |
| Project Location - City |
Santa Paula |
| Project Location - State |
CA |
| Project Location - Zip Code |
93060-2221 |
| Project Location - Congressional District |
26 |
| Sub-Recipient DUNS Number |
832525740
|
| Sub-Recipient Address |
19404 SE WOODINVILLE-SNOHOMISH RD |
| Sub-Recipient City |
WOODINVILLE |
| Sub-Recipient State |
Washington |
| Sub-Recipient Zip Code |
98072-8454 |
| Sub-Recipient Congressional District |
01 |
Required To Report Top 5 Highly Compensated Officials |
No |
| Location Information |
| Latitude, Longitude |
34º 21' 46",
-119º 3' 17" |
| Congressional District |
26 |
| Address 1 |
|
| Address 2 |
|
| City |
Santa Paula |
| County |
Ventura |
| State |
CA |
| Zip |
93060-2321 |
|
 |