Grants - AWARD SUMMARY


COMMONWEALTH UTILITIES CORPORATION


The project is the Rehabilitation of the Sadog Tasi Wastewater Treatment Plant. The plant has a 4.0MGD capacity and was built 1993. There has been no major repair or rehabilitation that was done since it was built. The equipment has become obliterated through the years. Extensive corrosion has eaten most of the structural steel that holds up the aeration tanks due to the tropical corrosive environment. Oftentimes, the pumps, belt filter press, experiences downtimes due to dilapidated rickety old condition. The air diffusers at the bottom shows major breaks in the pipe network The scope of work is inclusive of replacement of the corrosive structural steel parts of the basins, rehabilitation of the belt filter press equipment, which processes the sludge, replacement of the aeration diffuser network into floating aerator system, replacement and upgrade of wet well pits and pumps.

Clarification of Codes

Choose a quarter and click "Go."


AWARD OVERVIEW

AWARD OVERVIEW
Award Number 69926301 Funding Agency Environmental Protection Agency
Total Award Amount $1,101,700 Project Location - City Saipan
Award Date 08/13/2009 Project Location - State MP
Project Status Completed Project Location - Zip 96950-1220
Jobs Reported 0.00 Congressional District 98
Project Location - Country MP

Recipient Information (Grants)

Recipient Information (Grants)
Recipient Name COMMONWEALTH UTILITIES CORPORATION
Recipient DUNS Number 854851177
Recipient Address L 3 JOETEN DANDAN BUILDING
Recipient City SAIPAN
Recipient State Northern Mariana Islands
Recipient Zip 96950-1220
Recipient Congressional District 98
Recipient Country USA
Required to Report Top 5
Highly Compensated Officials
No

Projects and Jobs Information

Projects and Jobs Information
Project Title ARRA-WASTEWATER TREATMENT CONSTRUCTION PROGRAMS
Project Status Completed
Final Project Report Submitted Yes
Project Activities Description Sewage Treatment Facilities
Quarterly Activities/Project Description The project 100% completed and the plant is currently online. Final inspections and turn over on all equipment and work items covered under this grant has been made. Final payment application in the amount of $ 124,854.53 was processed during this quarter. Close-out documents has been submitted by the contractor for the part of EPA-ARRA funded scope of work only. This will be the FINAL REPORT for this project.
Jobs Created 0.00
Description of Jobs Created No manhours were spent by the contractor from this quarter. Close out documents are being prepared. No jobs were created/maintained by contractor based on a 40hour/week for 12 weeks.


Purchaser Information (Grants)

Purchaser Information
Contracting Office ID Not Reported
Contracting Office Name Not Available
Contracting Office Region Not Available
TAS Major Program 68-0108

Award Information

Award Information
Award Date 08/13/2009
Award Number 69926301
Order Number
Award Type Grants
Funding Agency ID 68
Funding Agency Name Environmental Protection Agency
Funding Office Name Not Available
Awarding Agency ID 68
Awarding Agency Name Environmental Protection Agency
Amount of Award $1,101,700
Funds Invoiced/Received $1,101,700
Expenditure Amount $1,101,700
Infrastructure Expenditure Amount $1,101,700
Infrastructure Purpose and Rationale The Sadog Tasi Wastewater Treatment Facility (WWTF) is the largest of two WWTF on Saipan. The treatment type is known as a Complete Mix Activated Sludge facility. The mixing is carried out by aerators where aerators are utilized to both provide oxygen for accelerated micro-organism activity, and provide energy for mixing. The existing aeration system is difficult to adequately operate and maintain. There are thousands of underwater diffusers and piping on the floor of each of the 3-aeration tanks and the digesters. The piping and diffusers periodically fail (break) and air leaks occur underwater. These air leaks are extremely difficult to repair as complete draining and cleaning of the tank contents is required. The original design had drain valves that theoretically would make tank draining easier, however many of these slide gate valves have failed and are seized in either the closed or partially open position. The drain piping all converged into the Sludge/recycle Drain Pit (SRDP). With multiple failed valves (partially open) the ndividual tanks cannot be drained without first draining all aeration tanks with partially opened and failed valves. Three separate valves were failed prior to commencing the work on this project esulting in the requirement that 4-separate tanks had to be drained simultaneous. This project will eliminate these valves which are considered an O&M burden. The Clarifier has a rotating assembly that draws sludge off the bottom of the clarifier to either be recirculated as Return Activated Sludge (RAS) or wasted as Waste Activated Sludge (WAS). The sludge suction piping has a significant structural truss assembly to support the suction piping. A sludge scum arm are also inherent portions of the rotating assembly. The sludge suction arm has corroded to a degree that it is not functional. Additionally the entire rotating assembly has seized up and no longer rotates. Draining and repair of the clarifier is necessary for future proper operation which will be performed under the contract. At the completion of this project the facilities should be in like new condition.
Infrastructure Point of Contact Name Birhen Martinez
Infrastructure Point of Contact Email birhen_martinez@cucgov.net
Infrastructure Point of Contact Phone 6-702-357-025-7032 x141
Infrastructure Point of Contact Address P.O. Box 501220
Infrastructure Point of Contact City Saipan
Infrastructure Point of Contact State MP
Infrastructure Point of Contact Zip 96950-1220

Product or Service Information (Grants)

Product or Service Information
Primary Activity Code 221320
Activity Description Sewage Treatment Facilities

Sub-Awards Information

Sub-Awards Information
Sub-awards to Organizations 0
Sub-award Amounts to Organizations $0
Sub-Awards to Individuals 0
Sub-Award Amounts to Individuals $0
Number of Sub-awards less than $25,000/award 0
Amount of Sub-awards less than $25,000/award $0
Number of payments to vendors greater than $25,000 1
Total Amount of payments to vendors greater than $25,000/award $976,845
Number of payments to vendors less than $25,000/award 3
Total Amount of payments to vendors less than $25,000/award $27,755




Vendor Transactions

GPPC, Inc. - Award Number 69926301 - GPPC, Inc.

Award Number 69926301
Sub-Award Number N/A
Vendor DUNS Number Not reported
Vendor HQ Zip Code + 4 96950-4357
Vendor Name GPPC, Inc.
Product and Service Description GPPC, Inc. performs the construction of this project.
Payment Amount $976,845



Project Location Detail

Location Information
Latitude, Longitude -20º 9' 54", 57º 29' 45"
Congressional District 98
Address 1 P.O. Box 501220
Address 2
City Saipan
County 0
State MP
Zip 96950-1220
Submit Feedback/Comments: Provide feedback or comments on the performance and progress of awards.