TRANSPORTATION, WASHINGTON STATE DEPARTMENT OF
The following describes the Pacific NW Rail Program's major tasks including the anticipated activities and phases of each task. The scope of the Program is subject to refinement and revision with the concurrence of FRA, as needed, due to environmental approvals under the National Environmental Policy Act (NEPA), operations modeling, cost and schedule refinements and other information or conditions that necessitate a scope adjustment.
PROGRAM SUMMARY
Infrastructure Improvements
*Task 1-Tacoma-D to M St. Connection: Construct 1.4 miles of new passenger rail track between D St. and M St. in downtown Tacoma, WA.
*Task 2-Tacoma-Point Defiance Bypass: Prepare a project-level NEPA review and documentation, preliminary engineering (PE), and final design (FD) documents and construct infrastructure improvements on a 19.5-mile inland bypass route between Tacoma and Nisqually.
*Task 3-Vancouver Rail Bypass: Obtain a project-level NEPA decision and PE approval, prepare FD, and construct a freight bypass track on the eastern side of BNSF's Vancouver Yard. The bypass track will separate freight and passenger services.
*Task 4-Kelso Martins Bluff-Toteff Siding: Prepare project-level NEPA review and documentation, PE and FD, and construct improvements to extend a signaled siding track approx. 1 mile near the south end of the Port of Kalama. The existing Toteff Road at-grade crossing will be eliminated by the construction of a new highway overpass.
*Task 5-Kelso Martins Bluff-New Siding: Prepare project-level NEPA review and documentation, PE and FD, and construct a new signaled siding track near the Port of Kalama.
*Task 6-Kelso Martins Bluff-Kelso to Longview Jct.: Prepare project-level NEPA review and documentation, PE and FD, and construct 5.3 miles of new signaled main track near the rail yard serving the Port of Longview, WA.
*Task 7-Everett Storage Tracks: Obtain project-level NEPA decision and PE approval, prepare FD, and construct two new departure/receiving tracks and associated signal improvements on an alignment parallel to the existing Delta Yard tracks in Everett, WA.
*Task 8-Corridor Reliability Upgrades-South: Prepare PE and FD, and construct infrastructure upgrades from Nisqually Jct. to the Columbia River Bridge at Vancouver, WA on the BNSF Railway Seattle Subdivision.
*Task 9-Advanced Wayside Signal System: Prepare PE and FD, and construct signal system improvements to upgrade the current analog signal system to an Advanced Wayside Signal System with state-of-the-art digital circuitry.
*Task 10-King Street Station Tracks: Prepare project-level NEPA documentation, PE and FD, and construct track, signal and station improvements at King Street Station in Seattle, WA.
*Task 11-Equip. Acq.-New Train Set: Procure one new train set to be used for Amtrak Cascades passenger service.
*Task 12-Program Management and Administration: Conduct all programmatic activities for the PNWRC Development Program necessary for the completion of the Program.
*Task 13-Corridor Reliability Upgrades-North: Prepare FRA project-level NEPA, PE and FD, and construct infrastructure upgrades from Everett-PA Jct. to the Canadian border at Blaine, WA on the BNSF Bellingham Subdivision.
*Task 14-Vancouver New Middle Lead: Prepare FRA project-level NEPA, secure PE approval, prepare FD, and construct a 2nd connecting track located approx. between MP 135.9 on BNSF's Seattle Sub. and extending to about 1,300 ft. to approx. MP 10.2 on BNSF's Fallbridge Sub.
*Task 15-Blaine-Swift Customs Facility: Prepare project-level NEPA document and secure PE approval, prepare FD to construct a new main track, and convert the existing main track to a 2nd siding track located approx. between mileposts MP 114.9 and 116.9 on BNSF's Bellingham Sub.
*Task 16-Equip Acq.-New Locomotives: Procure eight new locomotives to be used for Amtrak Cascades passenger service.
*Task 17-Corridor Reliability Supplemental Work: Prepare project-level NEPA, PE & FD, and construct improvements.
| AWARD OVERVIEW |
| Award Number |
FR-HSR-0017-11-01 |
Funding Agency |
Department of Transportation |
| Total Award Amount |
$751,575,100 |
Project Location - City |
Olympia |
| Award Date |
02/26/2011 |
Project Location - State |
WA |
| Project Status |
Less Than 50% Completed |
Project Location - Zip |
98501-2348
|
| Jobs Reported |
53.69 |
Congressional District |
10 |
| Project Location - Country |
US |
|
|
Recipient Information
(Grants)
| Recipient Information (Grants) |
|
Recipient Name
|
TRANSPORTATION, WASHINGTON STATE DEPARTMENT OF |
| Recipient DUNS Number |
808883995
|
| Recipient Address |
310 MAPLE PARK AVE SE |
| Recipient City |
OLYMPIA |
| Recipient State |
Washington |
| Recipient Zip |
98501-2361 |
| Recipient Congressional District |
10 |
| Recipient Country |
USA |
Required to Report Top 5 Highly Compensated Officials |
No |
Projects and Jobs Information
| Projects and Jobs Information |
| Project Title |
Pacific Northwest Rail Corridor Program |
| Project Status |
Less Than 50% Completed |
| Final Project Report Submitted |
No |
| Project Activities Description |
Line-Haul Railroads |
| Quarterly Activities/Project Description |
In order to achieve two additional daily round trips between Seattle and Portland (for a total of six daily round trips), reduce travel time, and improve on-time performance, the Pacific Northwest Rail Program will improve rail corridor infrastructure, purchase property, acquire new rolling stock, and manage the overall program.
Project activities accomplished this quarter include:
1) Task 2–Point Defiance Bypass: FRA issued the NEPA decision document (FONSI) March 1, 2013. Preliminary Engineering activities initiated on Amtrak Station relocation and Track/Signal Work.
2) Task 3 – Vancouver Yard Bypass: Construction initiated for Tract A - Mechanical Building and Turntable relocation.
3) Task 7–Everett Storage Tracks: Construction completed. Proceeding with closeout.
4) Task 8–Corridor Reliability South: FRA authorized construction of Tract B Segment A no. 11 turnouts.
5) FRA approved the following:
a. Task 3–Vancouver Rail Yard Bypass: PE/FD package and CN initiation for Tract A – Mechanical Building and Turntable
b. Task 8–Corridor Reliability Upgrades South: NEPA CE for Tract B, Segment B; FD/CN Initiation Packages for Tract B, Segment A & Tract B,
Segment B; FD for Track B, Segment A; PE Package
c. Task 9–Advance Wayside Signal System: PE/FD Initiation Package and Detailed Work Plan
d. Task 12–Program Management: Annual Program Mgt. Plan and Financial Plan, Cooperative Agreement Amendment No. 3
e. Task 13 – Corridor Reliability North – PE/NEPA/FD initiation package
f. Task 14–Vancouver New Middle Lead: Preliminary Engineering plans
g. Task 17–Corridor Reliability Supplemental Work: Scoping Documents
6) Continued development of Sound Transit Service Outcome, Stakeholder and Maintenance Agreements. |
| Jobs Created |
53.69 |
| Description of Jobs Created |
People employed for this work includes the following: administrative and management, environmental, communication, scheduling and engineering staff, surveyors, geotech drillers, and flagmen. |
Purchaser Information
(Grants)
| Purchaser Information |
| Contracting Office ID |
Not Reported |
| Contracting Office Name |
Not Available |
| Contracting Office Region |
Not Available |
| TAS Major Program |
69-0718 |
| Award Information |
| Award Date |
02/26/2011 |
| Award Number |
FR-HSR-0017-11-01 |
| Order Number |
|
| Award Type |
Grants |
| Funding Agency ID |
69 |
| Funding Agency Name |
Department of Transportation |
| Funding Office Name |
Not Available |
| Awarding Agency ID |
69 |
| Awarding Agency Name |
Department of Transportation |
| Amount of Award |
$751,575,100 |
| Funds Invoiced/Received |
$9,379,411 |
| Expenditure Amount |
$14,724,843 |
| Infrastructure Expenditure Amount |
$9,355,620 |
| Infrastructure Purpose and Rationale |
Project creates and supports jobs and provides economic benefit. Significant investment that builds and preserves passenger rail system infrastructure. To preserve and create jobs and promote economic recovery. To invest in transportation, environmental protection, and other infrastructure that will provide long-term economic benefits. |
| Infrastructure Point of Contact Name |
David Smelser |
| Infrastructure Point of Contact Email |
smelsed@wsdot.wa.gov |
| Infrastructure Point of Contact Phone |
3607056916 |
| Infrastructure Point of Contact Address |
310 Maple Park Ave SE |
| Infrastructure Point of Contact City |
Olympia |
| Infrastructure Point of Contact State |
WA |
| Infrastructure Point of Contact Zip |
98501-2348 |
Product or Service Information
(Grants)
| Product or Service Information |
| Primary Activity Code |
482111 |
| Activity Description |
Line-Haul Railroads |
| Sub-Awards Information |
| Sub-awards to Organizations |
0 |
| Sub-award Amounts to Organizations |
$0 |
| Sub-Awards to Individuals |
0 |
| Sub-Award Amounts to Individuals |
$0 |
| Number of Sub-awards less than $25,000/award |
0 |
| Amount of Sub-awards less than $25,000/award |
$0 |
| Number of payments to vendors greater than $25,000 |
15 |
| Total Amount of payments to vendors greater than $25,000/award |
$10,187,186 |
| Number of payments to vendors less than $25,000/award |
3 |
| Total Amount of payments to vendors less than $25,000/award |
$57,386 |
Bartlett & West, Inc. - Award Number FR-HSR-0017-11-01 - Bartlett & West, Inc.
| Award Number |
FR-HSR-0017-11-01 |
| Sub-Award Number |
N/A |
| Vendor DUNS Number |
052296357 |
| Vendor HQ Zip Code + 4 |
66615-3853 |
| Vendor Name |
Bartlett & West, Inc. |
| Product and Service Description |
Maps and records. |
| Payment Amount |
$34,488 |
BNSF RAILWAY COMPANY - Award Number FR-HSR-0017-11-01 - BNSF RAILWAY COMPANY
| Award Number |
FR-HSR-0017-11-01 |
| Sub-Award Number |
N/A |
| Vendor DUNS Number |
063624324 |
| Vendor HQ Zip Code + 4 |
76131-2830 |
| Vendor Name |
BNSF RAILWAY COMPANY |
| Product and Service Description |
Development of Preliminary Engineering and Final Design documents, surveying, geotech drilling, GIS and information managment, and construction of projects. |
| Payment Amount |
$6,374,168 |
HANSON PROFESSIONAL SERVICES INC. - Award Number FR-HSR-0017-11-01 - HANSON PROFESSIONAL SERVICES INC.
| Award Number |
FR-HSR-0017-11-01 |
| Sub-Award Number |
N/A |
| Vendor DUNS Number |
044229284 |
| Vendor HQ Zip Code + 4 |
62703-2801 |
| Vendor Name |
HANSON PROFESSIONAL SERVICES INC. |
| Product and Service Description |
Engineering Services |
| Payment Amount |
$317,729 |
HDR ENGINEERING, INC. - Award Number FR-HSR-0017-11-01 - HDR ENGINEERING, INC.
| Award Number |
FR-HSR-0017-11-01 |
| Sub-Award Number |
N/A |
| Vendor DUNS Number |
187294624 |
| Vendor HQ Zip Code + 4 |
68114-4049 |
| Vendor Name |
HDR ENGINEERING, INC. |
| Product and Service Description |
Traffic Analysis, Engineering support, preparation of initiation packages, review of Rail Traffic Controller modeling for the PNWRC Program, . |
| Payment Amount |
$1,206,753 |
HNTB CORPORATION - Award Number FR-HSR-0017-11-01 - HNTB CORPORATION
| Award Number |
FR-HSR-0017-11-01 |
| Sub-Award Number |
N/A |
| Vendor DUNS Number |
041601790 |
| Vendor HQ Zip Code + 4 |
64105-1310 |
| Vendor Name |
HNTB CORPORATION |
| Product and Service Description |
Engineering services, surveying, geotechnical engineering. |
| Payment Amount |
$173,129 |
Holland L P - Award Number FR-HSR-0017-11-01 - Holland L P
| Award Number |
FR-HSR-0017-11-01 |
| Sub-Award Number |
N/A |
| Vendor DUNS Number |
044223139 |
| Vendor HQ Zip Code + 4 |
60417-2120 |
| Vendor Name |
Holland L P |
| Product and Service Description |
In-track welding. |
| Payment Amount |
$137,564 |
J.L. Patterson & Associates, Inc. - Award Number FR-HSR-0017-11-01 - J.L. Patterson & Associates, Inc.
| Award Number |
FR-HSR-0017-11-01 |
| Sub-Award Number |
N/A |
| Vendor DUNS Number |
783117302 |
| Vendor HQ Zip Code + 4 |
92868-4703 |
| Vendor Name |
J.L. Patterson & Associates, Inc. |
| Product and Service Description |
Engineering and surveying services. |
| Payment Amount |
$423,200 |
JACOBS ENGINEERING GROUP INC. - Award Number FR-HSR-0017-11-01 - JACOBS ENGINEERING GROUP INC.
| Award Number |
FR-HSR-0017-11-01 |
| Sub-Award Number |
N/A |
| Vendor DUNS Number |
074103508 |
| Vendor HQ Zip Code + 4 |
91105-3254 |
| Vendor Name |
JACOBS ENGINEERING GROUP INC. |
| Product and Service Description |
Development of draft initial Program Management Plan and project management/oversight for three rail projects. |
| Payment Amount |
$752,398 |
Landau Associates, Inc. - Award Number FR-HSR-0017-11-01 - Landau Associates, Inc.
| Award Number |
FR-HSR-0017-11-01 |
| Sub-Award Number |
N/A |
| Vendor DUNS Number |
139399745 |
| Vendor HQ Zip Code + 4 |
98020-3512 |
| Vendor Name |
Landau Associates, Inc. |
| Product and Service Description |
Preparation of geology and soils discipline report for the Pt. Defiance Bypass project. |
| Payment Amount |
$39,135 |
Parametrix, Inc. - Award Number FR-HSR-0017-11-01 - Parametrix, Inc.
| Award Number |
FR-HSR-0017-11-01 |
| Sub-Award Number |
N/A |
| Vendor DUNS Number |
069569168 |
| Vendor HQ Zip Code + 4 |
98001-6502 |
| Vendor Name |
Parametrix, Inc. |
| Product and Service Description |
Preparation of a Visual Impacts Discipline Report; Transportation Discipline Report; Social, Economic, Environmental Justice, Relocation & Disruption Discipline report & Section 4(f)/6(f) Evaluation; Public Services & Utilities Discipline Report |
| Payment Amount |
$451,421 |
Pb Americas, Inc. - Award Number FR-HSR-0017-11-01 - Pb Americas, Inc.
| Award Number |
FR-HSR-0017-11-01 |
| Sub-Award Number |
N/A |
| Vendor DUNS Number |
093690436 |
| Vendor HQ Zip Code + 4 |
98104-4044 |
| Vendor Name |
Pb Americas, Inc. |
| Product and Service Description |
Preparation of the Noise and Vibration Discipline report for the Pt. Defiance Bypass project. |
| Payment Amount |
$104,784 |
Progress Rail Services Corporation - Award Number FR-HSR-0017-11-01 - Progress Rail Services Corporation
| Award Number |
FR-HSR-0017-11-01 |
| Sub-Award Number |
N/A |
| Vendor DUNS Number |
174901504 |
| Vendor HQ Zip Code + 4 |
35950-8545 |
| Vendor Name |
Progress Rail Services Corporation |
| Product and Service Description |
Welding Equipment |
| Payment Amount |
$25,160 |
Statistical Research, Inc. - Award Number FR-HSR-0017-11-01 - Statistical Research, Inc.
| Award Number |
FR-HSR-0017-11-01 |
| Sub-Award Number |
N/A |
| Vendor DUNS Number |
148927247 |
| Vendor HQ Zip Code + 4 |
85712-5124 |
| Vendor Name |
Statistical Research, Inc. |
| Product and Service Description |
Preparation of Section 106 Survey Report & Historic, Cultural, and Archaeological Resources summary for the Pt. Defiance Bypass project. |
| Payment Amount |
$84,354 |
The Transpo Group Incorporated - Award Number FR-HSR-0017-11-01 - The Transpo Group Incorporated
| Award Number |
FR-HSR-0017-11-01 |
| Sub-Award Number |
N/A |
| Vendor DUNS Number |
020251088 |
| Vendor HQ Zip Code + 4 |
98034-7125 |
| Vendor Name |
The Transpo Group Incorporated |
| Product and Service Description |
Traffic forecasting for preliminary engineering and NEPA. |
| Payment Amount |
$32,161 |
URS Group, Inc. - Award Number FR-HSR-0017-11-01 - URS Group, Inc.
| Award Number |
FR-HSR-0017-11-01 |
| Sub-Award Number |
N/A |
| Vendor DUNS Number |
198581931 |
| Vendor HQ Zip Code + 4 |
98101-3655 |
| Vendor Name |
URS Group, Inc. |
| Product and Service Description |
GIS Support services for NEPA/SEPA environmental documents. |
| Payment Amount |
$30,743 |
| Location Information |
| Latitude, Longitude |
47º 2' 2",
-122º 53' 49" |
| Congressional District |
10 |
| Address 1 |
310 Maple Park Ave SE |
| Address 2 |
|
| City |
Olympia |
| County |
Thurston |
| State |
WA |
| Zip |
98501-2348 |
|
 |