EMCOR GOVERNMENT SERVICES, INC.
Installing piping for three (3) new fan coil units. Contractor will drain down column to column In 3 locations on the 10th Floor of the building Install 3 connection tees and isolation ball valves at each tee. Pipe, hang, insulate and fire stop supply and return lines to three new fan coil units on the 11th floor. Fill and complete a pressure test.