VANGUARD CONSTRUCTION, INC.
Recovery - Repair Energy Cool Roof B3510. The contractor shall furnish all labor, material, equipment, and transportation to perform all work in accordance with the requirements specified in the scope of work. The work consists of, but is not limited to, furnishing all labor, materials, equipment, and supervision required to repair the built-up roof Bldg 3510. Install 1/4" dense deck and single ply roofing system throughout entire roof including lower office area. Replace metal flashings, drip edges and rain gutters/downspouts. Install walkpads to equipment from roof access. Paint rooftop equipment. This facility is located at Edwards Air Force Base, California.