Contracts - AWARD SUMMARY
TODD CONSTRUCTION, INC.
The work to be performed under this project consists of providing the labor, equipment, and materials for mandatory, and optional items as shown on the Contract Documents. The mandatory work includes the removal and disposal of the 7 remaining Submerged Traveling Screens from the First Powerhouse Intake Deck, removal and disposal of the 6 Vertical Barrier Screens from Units 1 and 2 at the Bonneville First Powerhouse and removal and disposal of the Vertical Barrier Screen brackets within the intakes of all 10 Units of the Bonneville First Powerhouse. Mandatory work also includes demolition of the Juvenile Bypass System and it?s components from the Bonneville First Powerhouse. The demolition includes but is not limited to the removal of the orifice gates transportation channel end gate, dewatering screens, fish sampler, sections of the outfall pipe, emergency relief conduit, and pumps including the salvage of equipment that is listed in the demolition specification. The concrete demolition includes but is not limited to the removal of the Juvenile Bypass System wall in the Ice and Trash Sluiceway channel. Once the concrete has been removed, new concrete will be placed to provide better transportation channel conditions for downstream migrants. Other new concrete includes the fabrication of the concrete fill block (off site), and filling in the openings in the intake deck along with wall and floor penetrations in the pumphouse and fishladder.
| AWARD OVERVIEW |
| Award Number |
W9127N-09-C0033 |
Funding Agency |
Corps of Engineers |
| Total Award Amount |
$2,168,970 |
Project Location - City |
Cascade Locks |
| Award Date |
08/21/2009 |
Project Location - State |
OR |
| Project Status |
Completed |
Project Location - Zip |
97014-0150
|
| Jobs Reported |
5.74 |
Congressional District |
02 |
| Project Location - Country |
US |
|
|
Recipient Information
(Contracts)
| Recipient Information (Contracts) |
|
Recipient Name
|
TODD CONSTRUCTION, INC. |
| Recipient DUNS Number |
161511910
|
| Recipient Address |
18407 SW BOONES FERRY RD |
| Recipient City |
TIGARD |
| Recipient State |
Oregon |
| Recipient Zip |
97224-7675 |
| Recipient Congressional District |
01 |
| Recipient Country |
USA |
Required to Report Top 5 Highly Compensated Officials |
No |
Projects and Jobs Information
| Projects and Jobs Information |
| Project Title |
Federal Contract |
| Project Status |
Completed |
| Final Project Report Submitted |
Yes |
| Project Activities Description |
Other Heavy and Civil Engineering Construction |
| Quarterly Activities/Project Description |
Mobilization, cast-in-place concrete, demo and remove VBS/STS, demo pipe at fish ladder, demo pump house and equipment, demo railing and oriface at JBS, electrical demolition, electrical rough-in, JBS wall removal, miscellaneous steel, cast-in-place concrete at sluiceway, support basket removal, additional demolition and concret. |
| Jobs Created |
5.74 |
| Description of Jobs Created |
Carpentry - form, pour, finish concrete, Demolition - demolish concrete and metal structures |
Purchaser Information
(Contracts)
| Purchaser Information |
| Contracting Office ID |
W9127N |
| Contracting Office Name |
Not Available |
| Contracting Office Region |
Not Available |
| TAS Major Program |
96-3134 |
| Award Information |
| Award Date |
08/21/2009 |
| Award Number |
W9127N-09-C0033 |
| Order Number |
|
| Award Type |
Contracts |
| Funding Agency ID |
96 |
| Funding Agency Name |
Corps of Engineers |
| Funding Office Name |
Not Available |
| Awarding Agency ID |
96 |
| Awarding Agency Name |
Corps of Engineers |
| Amount of Award |
$2,168,970 |
| Funds Invoiced/Received |
$2,168,970 |
| Expenditure Amount |
$0 |
| Infrastructure Expenditure Amount |
$0 |
| Infrastructure Purpose and Rationale |
Not Reported |
| Infrastructure Point of Contact Name |
Not Reported |
| Infrastructure Point of Contact Email |
Not Reported |
| Infrastructure Point of Contact Phone |
Not Reported |
| Infrastructure Point of Contact Address |
Not Reported |
| Infrastructure Point of Contact City |
Not Reported |
| Infrastructure Point of Contact State |
Not Reported |
| Infrastructure Point of Contact Zip |
Not Reported |
Product or Service Information
(Contracts)
| Product or Service Information |
| Primary Activity Code |
237990 |
| Activity Description |
Other Heavy and Civil Engineering Construction |
| Sub-Awards Information |
| Sub-awards to Organizations |
4 |
| Sub-award Amounts to Organizations |
$858,328 |
| Sub-Awards to Individuals |
0 |
| Sub-Award Amounts to Individuals |
$0 |
| Number of Sub-awards less than $25,000/award |
0 |
| Amount of Sub-awards less than $25,000/award |
$0 |
| Number of payments to vendors greater than $25,000 |
0 |
| Total Amount of payments to vendors greater than $25,000/award |
$0 |
| Number of payments to vendors less than $25,000/award |
0 |
| Total Amount of payments to vendors less than $25,000/award |
$0 |
Sub-award 0910-02007 - Axis Crane LLC
| Sub-Award Amount |
$35,001 |
| Sub-Award Date |
08/19/2009 |
| Sub-Awards Disbursed |
$0.00 |
| Project Location - City |
Cascade Locks |
| Project Location - State |
OR |
| Project Location - Zip Code |
97014-0150 |
| Project Location - Congressional District |
02 |
| Sub-Recipient DUNS Number |
137568726
|
| Sub-Recipient Address |
4616 25th Ave Ne 340 |
| Sub-Recipient City |
Seattle |
| Sub-Recipient State |
Washington |
| Sub-Recipient Zip Code |
98105-4183 |
| Sub-Recipient Congressional District |
07 |
Required To Report Top 5 Highly Compensated Officials |
No |
Sub-award 0910-02005 - NUPRECON, L.P.
| Sub-Award Amount |
$703,760 |
| Sub-Award Date |
08/19/2009 |
| Sub-Awards Disbursed |
$0.00 |
| Project Location - City |
Cascade Locks |
| Project Location - State |
OR |
| Project Location - Zip Code |
97014-0150 |
| Project Location - Congressional District |
02 |
| Sub-Recipient DUNS Number |
173818519
|
| Sub-Recipient Address |
35131 SE CENTER ST |
| Sub-Recipient City |
SNOQUALMIE |
| Sub-Recipient State |
Washington |
| Sub-Recipient Zip Code |
98065-9231 |
| Sub-Recipient Congressional District |
08 |
Required To Report Top 5 Highly Compensated Officials |
No |
Sub-award 0910-16000 - PRAIRIE ELECTRIC, INC.
| Sub-Award Amount |
$91,547 |
| Sub-Award Date |
08/19/2009 |
| Sub-Awards Disbursed |
$0.00 |
| Project Location - City |
Cascade Locks |
| Project Location - State |
OR |
| Project Location - Zip Code |
97014-0150 |
| Project Location - Congressional District |
02 |
| Sub-Recipient DUNS Number |
112679147
|
| Sub-Recipient Address |
6000 NE 88TH ST |
| Sub-Recipient City |
VANCOUVER |
| Sub-Recipient State |
Washington |
| Sub-Recipient Zip Code |
98665-0958 |
| Sub-Recipient Congressional District |
03 |
Required To Report Top 5 Highly Compensated Officials |
No |
Sub-award 0910-03010 - Preferred Steel
| Sub-Award Amount |
$28,020 |
| Sub-Award Date |
08/19/2009 |
| Sub-Awards Disbursed |
$0.00 |
| Project Location - City |
Cascade Locks |
| Project Location - State |
OR |
| Project Location - Zip Code |
97014-0150 |
| Project Location - Congressional District |
02 |
| Sub-Recipient DUNS Number |
119980782
|
| Sub-Recipient Address |
3925 E 8th St |
| Sub-Recipient City |
Vancouver |
| Sub-Recipient State |
Washington |
| Sub-Recipient Zip Code |
98661-6012 |
| Sub-Recipient Congressional District |
03 |
Required To Report Top 5 Highly Compensated Officials |
No |
| Location Information |
| Latitude, Longitude |
45º 37' 31",
-121º 50' 22" |
| Congressional District |
02 |
| Address 1 |
|
| Address 2 |
|
| City |
Cascade Locks |
| County |
Hood River |
| State |
OR |
| Zip |
97014-0150 |
|
 |