MAPCO, INC.
Options for all areas: Paint over existing wallcovering. Patch areas as required. One coat of tinted primer and two finish coat to be applied. Walls will be painted down to the top of furniture that is left in place.Clean and reuse all lights in all areas. Replace approx 25 paroboloc lights ? total for project. Install new supply and return grilles in all areas. Install approx 25 power poles - total for project.
Phase 1 (center section):Demo large office, Replace ceiling tile and insulation, Change sprinkler heads to quick response heads, Paint all painted doors, Clear coat all wood doors, Paint all doors frames. Phase 2 (west center):Replace ceiling tile and insulation, Change sprinkler heads to quick response heads, Paint all painted doors, Clear coat all wood doors, Paint all doors frames Phase 3 (east center):Demo service counter window and install new metal roll-up window, Replace ceiling tile and insulation, Change sprinkler heads to quick response heads, Paint all painted doorsClear coat all wood doors, Paint all doors frames. Phase 4 east side break area, corridor, offices: Add two new lights in office # 604, Prime and multispec splatter paint block walls in hallway between office area and south warehouse, Replace ceiling tile and insulation, Change sprinkler heads to quick response heads, Paint all painted doors, Clear coat all wood doors, Paint all doors frames.