LJM ENGINEERING GROUP INC
Design construction documents and specifications for energy conservation measures to replace steam traps throughout buildings 64/65, 85, 86, 87, 88, and 89. Design to install insulation jackes on PRV stations throughout the campus. Design to replace incandescent light fixtures with compact fluorescent fixtures in Mechanical Equipment Rooms throughout the campus. Design to install electrical metering for various buildings and connect to central commuter system for monitoring located in the Engineering Office. Survey the existing Laundry Heat Recovery system that is not in use and report what is needed to activate the system and determine the estimated savings to the VA if system is in use.