As a part of the Multiple Award Task Order Contract (MATOC), construction on Building 718 Restoration, Ft. Shafter, Honolulu HI includes restoration of the interior of the building (4500 sf) to meet pertinent current code requirements, handicap ramp and parking stalls, shower and office installations, hazardous material mitigation, replace electrical and telecom systems, replace air-conditioning, ventilation and plumbing systems, replace fire protection systems, replace electrical system, and fire hydrant installation which includes 240 lf of waterline on Carter Drive.