EDCO CONTRACTORS, INC.
Provide labor and materials to help APG meet its mandatory energy consumption reduction requirement. 2207: disconnect and remove all existing exhaust fans and disconnects and replace in kind. Remove existing circuits back to the panel, and provide power to exhaust fans from the existing assigned breakers. 3660: Replace missing insulation and repair air leaks in HVAC Unit.