TERRAPIN UTILITY SERVICES INC
Removal and replacement of twelve fire hydrants, the installation of twelve 6? valves and the replacement of concrete pavement as required. Extend the proposed east Hydrants from 3-5 feet toward the East runway as determined in the field. Remove and replace the three hydrants at the West run way in its exact place and no extension required. Contractor to review the FAA letter of determination (Study Number 2009-AEA-3802-OE, 2009-AEA-3803-OE AND 2009-AEA-3804-OE) and adhere to all conditions.