CHIPPEWA CREE TRIBE, THE (INC)
Estimated project cost is $65,484. This multi-route Road/Bridge Repair and Restoration project includes route and bridge assessments on each BIA-owned route on the Chippewa Cree IRR system in order to identify those activities required to assure that an ?Acceptable Condition? is maintained on the LOS 1 & 2 routes and that public health and safety issues are addressed on LOS 4 & 5 routes and to determine that the regional goal of elevating 20% of the LOS 3 routes to an ?acceptable condition? has been met. This project also includes assessing and quantifying sign replacement needs on each route.