contract- RECIPIENT AWARD SUMMARY
| AWARD OVERVIEW |
|
Agency Name: Department of Defense--Military |
Project Location:
VAL VERDE |
|
Award Number: 0015 |
Project Location - State: TX |
|
Funding Amount:
$201,224 |
Project Location - Zip Code: 788435102 |
|
Ending Date:
2009-11-01 |
Congressional District: 23 |
RECIPIENT INFORMATION (AWARD)
| RECIPIENT INFORMATION (AWARD) |
|
Recipient Name:
|
JAMCO VENTURES LLC |
|
Recipient Address:
|
1907 N NEW BRAUNFELS AVE |
|
Recipient City:
|
SAN ANTONIO |
|
Recipient State:
|
TX |
|
Recipient Zip Code:
|
782081419 |
|
Congressional District:
|
TX-21 |
DESCRIPTION OF WORK/SERVICE PERFORMED
TAS::57 3404::TAS RECOVERY-- MXDP031027 - REMOVE/PREVENT CORROSION, WATER TOWERS--B280,282, LAUGHLIN AFB, TX. PROJECT IS TO REPAINT ELEVATED WATER TANKS TO PROVIDE CORROSION CONTROL MEASURES TO EXTEND USABLE LIFE.
ARRA::YES::ARRA
PURCHASER INFORMATION (AWARD)
| PURCHASER INFORMATION (AWARD) |
| Contracting Office ID: |
FA3099 |
| Contracting Office Name: |
FA3099 47 CONS-CC |
| Contracting Office Region: |
NO REGI |
| TAS Major Program: |
2192 |
CONTRACT INFORMATION (AWARD)
| CONTRACT INFORMATION (AWARD) |
| Date Signed: |
2009-04-29 |
| Effective Date: |
2009-04-29 |
| Current Completion Date: |
2009-11-01 |
| Ultimate Completion Date: |
2009-11-01 |
| Award Type: |
DELIVERY ORDER |
| Reason For Modification: |
|
| Type of Contract Pricing: |
FIXED PRICE |
| Last Date to Order: |
|
| Funding Agency ID: |
5700 |
| Funding Office ID: |
FA3099 |
| Funding Office Name: |
FA3099 47 CONS-CC |
| Number of Offers Received: |
1 |
PRODUCT OR SERVICE INFORMATION (AWARD)
| PRODUCT OR SERVICE INFORMATION (AWARD) |
|
Product Code:
|
Z299 |
|
Product Description:
|
MAINT, REP/ALTER/ALL OTHER |
|
NAICS Code:
|
236220 |
|
NAICS Description:
|
COMMERCIAL AND INSTITUTIONAL BUILDING CONSTRUCTION |
COMPETITION INFORMATION (AWARD)
| COMPETITION INFORMATION (AWARD) |
|
Extent Competed:
|
NOT AVAILABLE FOR COMPETITION |
|
Reason Not Competed:
|
AUTHORIZED BY STATUTE |
|
Solicitation Procedure:
|
ONLY ONE SOURCE |
|
Type of Set Aside:
|
8(A) SOLE SOURCE |
|
Statutory Exception to Fair Opportunity:
|
|
|
Type of Contract Pricing:
|
FIXED PRICE |
PREFERENCE PROGRAMS (AWARD)
Business Size Determination: SMALL BUSINESS
| Other Awards |
Amount:
$71,483
Award Description: TAS::57 3404::TAS RECOVERY-- MXDP101012 - REPAIR ROOF, AIR TRAFFIC CONTROL TOWER, B309, LAUGHLIN AFB, TX; PROJECT IS TO REPLACE EXISTING BUILT-UP ROOF SYSTEM
ARRA::YES::ARRA |
Amount:
$0
Award Description: TAS::57 3404::TAS RECOVERY--MXDP101012 - REPAIR ROOF, AIR TRAFFIC CONTROL TOWER, B309 AT LAUGHLIN AFB, TX; MODIFICATION TO INCORPORATE REVISED SCHEDULE OF MATERIAL SUBMITTALS ARRA::YES::ARRA |
Amount:
$64,901
Award Description: TAS::57 3404::TAS RECOVERY-- MXDP101011 - REPAIR MILITARY WORKING DOG KENNEL FLOOR, LAUGHLIN AFB, TX. PROJECT IS TO PROVIDE A SEALED SURFACE, IS WASHABLE TO ELIMINATE BACTERIA TRANSMISSION AND PROPERLY DRAINS. ARRA::YES::ARRA |
Amount:
$501,453
Award Description: TAS::57 3404::TAS RECOVERY-- MXDP961018A - SR-CONST COVER OVER PARKNG/UOQ - A, MXDP961018B - SR-CONST COVER OVER PARKNG/UOQ - B, LAUGHLIN AFB,TX. PROJECTS ARE TO INSTALL METAL PARKING COVER STRUCTURES TO COVER PARKING SPACES AT THE UNACCOMPANIED OFFICERS QUARTERS (UOQ).
ARRA::YES::ARRA |
Amount:
$0
Award Description: TAS::57 3404::TAS RECOVERY--MXDP031027 - REMOVE/PREVENT CORROSION, WATER TOWERS--B280,282, LAUGHLIN AFB, TX THIS NO-COST MODIFICATION IS TO REMOVE FAA WAIVER REQUIREMENT, CORRECT VERBIAGE IN STATEMENT OF OBJECTIVES, AND REPLACE SCHEDULE OF MATERIAL SUBMITTALS REGISTER. ARRA::YES::ARRA |
Amount:
$201,224
Award Description: TAS::57 3404::TAS RECOVERY-- MXDP031027 - REMOVE/PREVENT CORROSION, WATER TOWERS--B280,282, LAUGHLIN AFB, TX. PROJECT IS TO REPAINT ELEVATED WATER TANKS TO PROVIDE CORROSION CONTROL MEASURES TO EXTEND USABLE LIFE.
ARRA::YES::ARRA |
Amount:
$2,714,456
Award Description: TAS::21 2022::TAS
AIRFIELD REPAIR OF ROBERT GRAY ARMY AIRFIELD (RGAAF) LOCATED ON FT HOOD, TEXAS. REPAIR AND RESTRIPING OF PAVEMENT ON TAXIWAY ALPHA, RGAAF. CRACKS ARE TO BE CLEANED AND RESEALED AND A BITUMINOUS SEALER APPLIED TO THE ENTIRE TAXIWAY AREA, REPAIR AND RESTRIPING OF PAVEMENT ON TAXIWAY CHARLIE (WEST), RGAAF. CRACKS ARE TO BE CLEANED AND RESEALED AND A BITUMINOUS SEALER APPLIED TO THE ENTIRE TAXIWAY AREA, REPAIR AND RESTRIPING OF PAVEMENT ON TAXIWAY ECHO (WEST), RGAAF. CRACKS ARE TO BE CLEANED AND RESEALED AND A BITUMINOUS SEALER APPLIED TO THE ENTIRE TAXIWAY AREA, CONSTRUCT 25 FT. WIDE ASPHALTIC CONCRETE SHOULDERS THE LENGTH OF TAXIWAY ALPHA, RGAAF, CONSTRUCT 25 FT. WIDE ASPHALTIC CONCRETE SHOULDERS THE LENGTH OF TAXIWAY CHARLIE (WEST), RGAAF, CONSTRUCT 25 FT. WIDE ASPHALTIC CONCRETE SHOULDERS THE LENGTH OF TAXIWAY ECHO (WEST), RGAAF, STRIPING REMOVAL, REPAIR AND RESTRIPING OF THE SOUTH RAMP AND ADJACENT AREAS IAW UFC 3-260-05, REMOVE VEGETATION, DIRT AND DEBRIS FROM EXISTING CRACKS; CLEAN, APPLY HERBICIDE AND RESEAL CRACKS EQUIVALENT TO APPROXIMATELY 70,000 LINEAR FEET ON THE NORTHEAST RAMP OF RGAAF, AND TRIM AND REMOVE AREAS OF VEGETATION IN THE VICINITY OF THE AIRFIELD APPROACH LIGHTING AT RGAAF. THE AREA TO BE TRIMMED EXTENDS 200 FEET TO EACH SIDE OF THE EXTENDED CENTERLINE OF THE RUNWAY AND 200 FEET PAST THE FIRST ROW OF APPROACH LIGHTING. |
Amount:
$42,000
Award Description: ARRA REPLACE HVAC
MJ001 UCO HAZMAT SURVEY |
Amount:
$1,055,059
Award Description: RECOVERYPROJECT#:: 38959, 14794, 22353, 14793::RP# EXERCISE OPTIONS 1,2,3,4,5, AND 6. OPTION 1 ADD THE MONITORING AND CONTROLS FOR ALL THE AHU'S AND BUILDING MANAGER SCREENS IN ALL ELEVEN BUILDINGS. OPTION 2 ADD THE HISTORIAN SOFTWARE PACKAGE UPGRADE. OPTION 3 ADD THE ASSET CENTER SERVER PACKAGE UPGRADE. OPTION 4 ADD THE 5TH SERVER DEDICATED TO THE ELEVEN. OPTION 5 ADD THE TYING IN VARIOUS EXISTING BUILDINGS CONTROL SYSTEMS INTO THE NEW CONTROL CENTER. OPTION 6 ADD THE REPLACEMENT OF THE EXISTING SCREENS WITH NEW SCREENS AT THE CONTROL CENTER. |
Amount:
-$7,030
Award Description: ARRA REPLACE HVAC
MJ002 TOWER ANTENNA VS. ROOF MOUNTED ANTENNA |
Amount:
$2,535,117
Award Description: TAS::21 2022::TAS REPAIR WATER SYSTEMS CONTROLS, CONNECT BUILDING 1377 TO UTILITY MANAGEMENT CONTROL SYSTEMS (UMCS), REPAIR HEAT DISTRIBUTION LINES,BUILDING 2248, REPLACE HVAC CONTROLS; CONNECT BUILDING 4584 TO UTILITY MANANGEMENT CONTROL SYSTEM (UMCS), FORT SAM HOUSTON, TEXAS |
Amount:
$250,000
Award Description: ARRA REPLACE HVAC
MJ003 B. 2194 GENERATOR ADDITION |
Amount:
$0
Award Description: ARRA REPLACE HVAC, BLDG 2248
SCOPE OF WORK
MJ017 EXCHANGE OF SCOPE
PROVIDE CREDIT FOR COSTS ASSOCIATED WITH THE TYING-IN OF BUILDINGS 320, 914, 919, 922, 928, 1382, 2006, 4195, AND 4199 TO THE FRONT-END AS REQUIRED PER CLIN 0009 (OPTION 5). THESE BUILDINGS ARE EITHER UNDER CONSTRUCTION ON A SEPARATE CONTRACT OR HAVE NO MEANS TO CONNECT THE UMCS TO FRONT-END SERVERS.
CO2 ADDITION - ADD (2) TWO WALL MOUNTED CARBON DIOXIDE SENSORS IN OCCUPIED SPACE OF CHAPEL. THE SENSORS ARE TO BE LINKED TO CONTROLS FOR OUTSIDE AIR DAMPERS AT THE (2) TWO AHU'S.
ADD VOICE DIAL-UP OF RECORDED MESSAGE TO THE FIRE DEPARTMENT, TO EXISTING ALARM NOTIFICATION PROGRAM AT "FRONT END" WORKSTATION LOCATED IN BLDG 2194.
ADD ADDITIONAL CHLORINE INJECTION CAPACITY, PROVIDING CONFIGURATION FOR A THIRD CHLORINE INJECTION BOTTLE. THIS AUXILIARY BOTTLE WILL ONLY BECOME ACTIVATED IN THE EVENT OF TWO WATER PUMPS RUNNING SIMULTANEOUSLY.
PROVIDE PROGRAMMING AND COMMISSIONING FOR THE WORK MENTIONED ABOVE. |
Amount:
$12,371
Award Description: TAS::21 2022::TAS ARRA::YES::ARRA RECOVERY PROJECT#::29109::PR# 2009 AMERICAN RECOVERY AND REINVESTMENT ACT PROJECT, FY2009, 29109, DEPLOYMENT INFRASTRUCTURE-REPAIRS TO AIRFIELD TAXIWAYS AND RUNWAYS REFERENCE NO. R00002
SCOPE OF THIS MODIFICATION IS TO ADJUST BASE MOUNTED TAXIWAY EDGE LIGHTS. |
| Location Information |
| Latitude, Longitude |
0º 0' 0",
0º 0' 0" |
| Congressional District |
23 |
| City |
VAL VERDE |
| County |
VAL VERDE |
| State |
TX |
| Zip |
78843 |
|