contract- RECIPIENT AWARD SUMMARY

SUULUTAAQ, INC.

Clarification of Codes


AWARD OVERVIEW

AWARD OVERVIEW
Agency Name: US Army Corps of Engineers Project Location: NAPA
Award Number: W9123808C0022 Project Location - State: CA
Funding Amount: $53,373,325 Project Location - Zip Code: 945581327
Ending Date: 2011-12-24 Congressional District: 01

RECIPIENT INFORMATION (AWARD)

RECIPIENT INFORMATION (AWARD)
Recipient Name: SUULUTAAQ, INC.
Recipient Address: 4300 B ST STE 205
Recipient City: ANCHORAGE
Recipient State: AK
Recipient Zip Code: 995035946
Congressional District: AK-00

DESCRIPTION OF WORK/SERVICE PERFORMED

TAS::96 3134::TAS RECOVERYPROJECT#::12130::RP# NAPA RIVER, CA, NAPA VALLEY WINE TRAIN RELOCATION PROJECT FLOOD CONTROL IMPROVEMENTS ON THE NAPA RIVER TO INCLUDE CONSTRUCTING A NEW RAILROAD BRIDGE, DRY BYPASS BRIDGE AND STREET RAISES FOR 3RD STREET OR 3 FT AND 1ST STREET OF 5 FT.

PURCHASER INFORMATION (AWARD)

PURCHASER INFORMATION (AWARD)
Contracting Office ID: W91238
Contracting Office Name: W075 ENDIST SACRAMENTO
Contracting Office Region: NO REGI
TAS Major Program: 3675

CONTRACT INFORMATION (AWARD)

CONTRACT INFORMATION (AWARD)
Date Signed: 2009-05-28
Effective Date: 2009-05-28
Current Completion Date: 2011-12-24
Ultimate Completion Date: 2011-12-24
Award Type: DEFINITIVE CONTRACT
Reason For Modification: SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE
Type of Contract Pricing: FIRM FIXED PRICE
Last Date to Order:
Funding Agency ID: 96CE
Funding Office ID: W91238
Funding Office Name: Sacramento
Number of Offers Received: 1

PRODUCT OR SERVICE INFORMATION (AWARD)

PRODUCT OR SERVICE INFORMATION (AWARD)
Product Code: Y199
Product Description: CONSTRUCT/MISC BLDGS
NAICS Code: 237990
NAICS Description: OTHER HEAVY AND CIVIL ENGINEERING CONSTRUCTION

COMPETITION INFORMATION (AWARD)

COMPETITION INFORMATION (AWARD)
Extent Competed: NOT AVAILABLE FOR COMPETITION
Reason Not Competed: AUTHORIZED BY STATUTE
Solicitation Procedure: ONLY ONE SOURCE
Type of Set Aside: 8(A) SOLE SOURCE
Statutory Exception to Fair Opportunity:
Type of Contract Pricing: FIRM FIXED PRICE

PREFERENCE PROGRAMS (AWARD)

Business Size Determination: SMALL BUSINESS

TRANSACTIONS

TRANSACTIONS

Other Awards

Other Awards
Amount: -$27,520
Award Description: TAS::96 3134::TAS RECOVERYPROJECT#::12130::RP# NAPA RIVER, CA, NAPA VALLEY WINE TRAIN RELOCATION PROJECT FLOOD CONTROL. THIS IS IN SUPPORT OF DELETE CONFIRMATION SAMPLING OF CONTAMINATED AREA MATERIALS.
Amount: $2,925
Award Description: TAS::96 3134::TAS RECOVERYPROJECT#::12130::RP# NAPA RIVER, CA, NAPA VALLEY WINE TRAIN RELOCATION PROJECT FLOOD CONTROL. THIS IS IN SUPPORT OF PHASE I TO CUT ASBESTOS CONCRETE PIPE 10 FT TO THE WEST OF CLEANOUT SHOWN ON SHEET CD202, REMOVE AND DISPOSE OF PIPE PER LOCAL, STATE AND FEDERAL REGULATIONS AND SPECIFICATIONS.
Amount: $129,825
Award Description: TAS::96 3134::TAS RECOVERYPROJECT#::12130::RP# NAPA RIVER, CA, NAPA VALLEY WINE TRAIN RELOCATION PROJECT FLOOD CONTROL. THIS IS IN SUPPORT OF FLOODWALL REVISIONS (R00014) WHICH INCLUDE ADDITION OF OVERFLOW PUMP SYSTEM, RELOCATION OF COMMUNICATIONS CABLE, AND ADDITION OF SEWER BACKFLOW PREVENTOR.
Amount: $53,373,325
Award Description: TAS::96 3134::TAS RECOVERYPROJECT#::12130::RP# NAPA RIVER, CA, NAPA VALLEY WINE TRAIN RELOCATION PROJECT FLOOD CONTROL IMPROVEMENTS ON THE NAPA RIVER TO INCLUDE CONSTRUCTING A NEW RAILROAD BRIDGE, DRY BYPASS BRIDGE AND STREET RAISES FOR 3RD STREET OR 3 FT AND 1ST STREET OF 5 FT.
Amount: $10,600
Award Description: TAS::96 3134::TAS RECOVERYPROJECT#::12130::RP# CUT AND REMOVE SECTION OF 4" WATERLINE IN THE MIDDLE OF WATER STREET. REMOVE WATERLINE BACK TO THE NEAREST USABLE JOINT. CUT AND CAP ABANDONED WATERLINE.
Amount: $17,780
Award Description: TAS::96 3134::TAS RECOVERYPROJECT#::12130::RP# NAPA RIVER, CA, NAPA VALLEY WINE TRAIN RELOCATION PROJECT FLOOD CONTROL; SORT AND REMOVE TRASH UNCOVERED DURING EXCAVATION OF ABUTMENT NO. 4. TRASH TO BE TRANSORTED AND DISPOSED OF AT AN APPROVED LANDFILL. ARRA::YES::ARRA
Amount: $173,316
Award Description: TAS::96 3134::TAS RECOVERYPROJECT#::12130::RP# NAPA RIVER, CA, NAPA VALLEY WINE TRAIN RELOCATION PROJECT FLOOD CONTROL; OPEN EXCAVATION IN LIEU OF VACUUM EXCAVATION TO LOCATE AND IDENTIFY UTILITY CROSSINGS. EXCAVATE 101 POTHOLES ALONG FIRST STREET AND THIRD STREET. FURTHER, A UNIT PRICE OF $1,716.00 PER POTHOLE IS ESTABLISHED FOR ANY ADDITIONAL POTHOLING EFFORTS MAY BE REQUIRED. ARRA::YES::ARRA
Amount: $116,001
Award Description: TAS::96 3134::TAS ARRA::YES::ARRA RECOVERYPROJECT#::12130::RP# NAPA RIVER, CA, NAPA VALLEY WINE TRAIN RELOCATION PROJECT FLOOD CONTROL; PURCHASE AND INSTALL TRAFFIC CONTROL SIGNAL FOR THE CORNER OF SOSCAL AND EIGHTH STREET
Amount: $900
Award Description: TAS::96 3134::TAS RECOVERYPROJECT#::12130::RP# NAPA RIVER, CA, NAPA VALLEY WINE TRAIN RELOCATION PROJECT FLOOD CONTROL; REPLACE DAMAGED 6X6 POSTS AT THE STATION WITH PRESSURE TREATED POSTS. ARRA::YES::ARRA
Amount: $304,325
Award Description: TAS::96 3134::TAS RECOVERYPROJECT#::12130::RP# NAPA RIVER, CA, NAPA VALLEY WINE TRAIN RELOCATION PROJECT FLOOD CONTROL; CONTRACTOR SHALL SUSPEND PILE DRIVING OPERATIONS DURING THE EMBARKING AND DISEMBARKING OF RAILROAD PASSENGERS FROM THE TIME THE TRAIN ENTERS THE STATION UNTIL SUCH TIME AS THE TRAIN LEAVES THE STATION. ARRA::YES::ARRA
Amount: $195,000
Award Description: RECOVERYPROJECT#::12130::RP# NAPA RIVER, CA, NAPA VALLEY WINE TRAIN RELOCATION PROJECT FLOOD CONTROL; THIS MODIFICATION IS A UNILATERAL CHANGE ORDER TO DIRECT THE CONTRACTOR TO BEGIN DRIVING NEW PILES TO SUPPORT THE EXISTING RIVER BRIDGE IN ORDER TO REMOVE THE EXISTING STRUCTURE'S BATTER PILES THAT CONFLICT WITH THE COFFER DAM NEEDED TO BUILD THE PIER FOUNDATION FOR THE NEW RIVER BRIDGE.
Amount: $5,496
Award Description: TAS::96 3134::TAS RECOVERYPROJECT#::12130::RP# NAPA RIVER, CA, NAPA VALLEY WINE TRAIN RELOCATION PROJECT FLOOD CONTROL; RELOCATE ELECTRICAL LINE AT ABUTMENT 1 OF THE DRY BYPASS BRIDGE. ARRA::YES::ARRA
Amount: $151,250
Award Description: TAS::96 3134::TAS ARRA::YES::ARRA RECOVERYPROJECT#::12130::RP# NAPA RIVER, CA, NAPA VALLEY WINE TRAIN RELOCATION PROJECT FLOOD CONTROL; THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE CHANGES TO PILE DRIVING DUE TO DIFFERING SITE CONDITIONS RESULTING IN THE USE OF AN IMPACT HAMMER VERSUS VIBRATION.
Amount: $64,008
Award Description: TAS::96 3134::TAS RECOVERYPROJECT#::12130::RP# NAPA RIVER, CA, NAPA VALLEY WINE TRAIN RELOCATION PROJECT FLOOD CONTROL; INCREASED SUBGRADE TO 18" ALONG NAPA STREET. AFTER EXCAVATION THE BOTTOM SHALL HAVE A LAYER OF BIAXIAL GEOGRID FOLLOWED BY 18" OF 3/4" AGGREGATE BASE COURSE. THE FIRST 12" SHALL BE TRACKED IN AND THE FINAL 6" SHALL BE COMPACTED TO 90%. THE REMAINDER OF THE SECTION, THE ABC AND AC SHALL BE IN ACCORDANCE WITH THE CONTRACT. ARRA::YES::ARRA
Amount: $4,107
Award Description: TAS::96 3134::TAS RECOVERYPROJECT#::12130::RP# NAPA RIVER, CA, NAPA VALLEY WINE TRAIN RELOCATION PROJECT FLOOD CONTROL; FIRE SYSTEM DRAINS- EXTEND TWO EXISTING FIRE SPRINKLER SYSTEM DRAINS TO EXTERIOR OF FLOODWALL AT THE NVWT STATION. DRAINS SHALL BE TERMINATED WITH APPROPRIATE FITTINGS. ROOF DRAIN LEADERS- COLLECT AND EXTEND EXISTING ROOF DRAINS INTO A COMMON DRAIN. EXTEND DRAIN TO EXIT FLOODWALL ALONG THE EAST SIDE. ELEVATION TO MATCH FUTURE GRADES AT THE FLOODWALL. ARRA::YES::ARRA
Amount: $260,350
Award Description: TAS::96 3134::TAS RECOVERYPROJECT#::12130::RP# NAPA RIVER, CA, NAPA VALLERY WINE TRAIN RELOCATION PROJECT FLOOD CONTROL; DELAY CLOSURE OF 1ST AND 3RD STREET CROSSING.
Amount: $1,076
Award Description: TAS::96 3134::TAS RECOVERYPROJECT#::12130::RP# NAPA RIVER, CA, NAPA VALLEY WINE TRAIN RELOCATION PROJECT FLOOD CONTROL; REDUCE THE SIZE OF THE FLOODWALL FOOTING FROM 6.0' TO 4.5' PER DETAIL SHEET 4 SHEET A-500. RAISE FOOTING ELEVATION 0.5' REDUCING DIMENSION H 0.5' FROM 7.0' TO 6.5' FOR APPROX. 270' FROM NE CORNER TO SW CORNER. ARRA::YES::ARRA
Amount: $141,222
Award Description: TAS::96 3134::TAS ARRA::YES::ARRA RECOVERYPROJECT#::12130::RP# NAPA RIVER, CA, NAPA VALLEY WINE TRAIN RELOCATION PROJECT FLOOD CONTROL; PURCHASE AND INSTALL TRAFFIC CONTROL SIGNAL FOR THE CORNER OF SOSCAL AND EIGHTH STREET; THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE THE FOLLOWING CHANGES: RELOCATE NOT PREVIOUSLY IDENTIFIED WATERLINES AT FLOODWALLS; USE OF IMPACT HAMMER ON SHEETPILES AT RIVER; REMOVE CONTAMINATED MATERIAL AT DRY BRIDGE ABUTMENT #4; RE-ROUTE UTILITIES UNDER FIRST STREET DUE TO HORIZONTAL/VERTICAL CONFLICTS; MOVE ELECTRICAL JUNCTION BOX AT THE PARKING AREA OF THE TRAIN STATION.
Amount: $1,170,775
Award Description: TAS::96 3134::TAS RECOVERYPROJECT#::12130::RP# NAPA RIVER, CA, NAPA VALLEY WINE TRAIN RELOCATION PROJECT FLOOD CONTROL; TAS::96 3134::TAS RECOVERYPROJECT#::12130::RP# NAPA RIVER, CA, NAPA VALLEY WINE TRAIN RELOCATION PROJECT FLOOD CONTROL; CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIALS, AND EQUIPMENT TO LIMIT CLOSURES FOR FIRST STREET (5 MONTHS) AND THIRD STREET (4 MONTHS). THIS WILL INCLUDE A TEMPORARY RAISE OF EXISTING RAILROAD TRACKS FROM SOUTH OF FIRST STREET TO NORTH OF NORTH SOSCAL. ALSO INCLUDED ARE AN ELEVATED PASSENGER PLATFORM TO MEET THE NEW TRACK LEVEL AND ADA ACCESS FROM SOSCAL TO MCKINSTRY ALONG FIRST STREET FOR THE DURATION OF THE STREET CLOSURES. ARRA::YES::ARRA
Amount: $1,155
Award Description: TAS::96 3134::TAS RECOVERYPROJECT#::12130::RP# NAPA RIVER, CA, NAPA VALLEY WINE TRAIN RELOCATION PROJECT FLOOD CONTROL; REMOVE AND DISPOSE OF 6" ASBESTOS WATER PIPE DISCOVERED DURING EXCAVATION FOR ABUTMENT 4. ASBESTOS PIPE IS APPROXIMATELY 4 FEET IN LENGTH. REMOVAL AND DISPOSAL SHALL BE IN COMPLIANCE WITH ALL LAWS AND REGULATIONS FOR REMOVAL AND DISPOSAL OF ASBESTOS CONTAINING MATERIAL. ARRA::YES::ARRA
Amount: -$41,688
Award Description: TAS::96 3134::TAS RECOVERYPROJECT#::12130::RP# NAPA RIVER, CA, NAPA VALLEY WINE TRAIN RELOCATION PROJECT FLOOD CONTROL; DELETE REQUIREMENT TO PLACE PRIME COAT FOR ASPHALT PAVING. ARRA::YES::ARRA
Amount: $1,140
Award Description: TAS::96 3134::TAS RECOVERYPROJECT#::12130::RP# NAPA RIVER, CA, NAPA VALLEY WINE TRAIN RELOCATION PROJECT FLOOD CONTROL; ON WEST SIDE OF NVWT STATION: 1. POTHOLE AND EXPOSE 1" WATERLINE AT CURB TO DETERMINE IF ACTIVE OR ABANDONED. 2. EXTEND 4" SEWER CLEAN-OUT TO EXTERIOR OF FLOODWALL. ARRA::YES::ARRA
Amount: $0
Award Description: TAS::96 3134::TAS RECOVERYPROJECT#::12130::RP# NAPA RIVER, CA, NAPA VALLEY WINE TRAIN RELOCATION PROJECT FLOOD CONTROL; INCREASE IN QUANTITY OF ASPHALT CONCRETE AND DELETE REQUIREMENT FOR PRIME COAT ON ASPHALT PAVING RESULTING IN NO COST CHANGE. ARRA::YES::ARRA
Amount: $273,000
Award Description: TAS::96 3134::TAS ARRA::YES::ARRA RECOVERYPROJECT#::12130::RP# NAPA RIVER, CA, NAPA VALLEY WINE TRAIN RELOCATION PROJECT FLOOD CONTROL; THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE ELECTRICAL DESIGN CHANGES INCLUDING PANEL AND SERVICE LINE LOCATIONS.
Amount: $346,500
Award Description: TAS::96 3134::TAS RECOVERYPROJECT#::12130::RP# NAPA RIVER, CA, NAPA VALLEY WINE TRAIN RELOCATION PROJECT FLOOD CONTROL; VARIATION IN ESTIMATED QUANTITY FOR PILE DRIVING ON THE DRY BY-PASS BRIDGE DUE TO ADDITIONAL 4.5 FEET PER PILE. ARRA::YES::ARRA
Amount: $116,593
Award Description: TAS::96 3134::TAS RECOVERYPROJECT#::12130::RP# NAPA RIVER, CA, NAPA VALLEY WINE TRAIN RELOCATION PROJECT FLOOD CONTROL; CONTRACTOR SHALL PROVIDE FOUR (4) TRAFFIC LIGHT STANDARDS AND SIGNAL EQUIPMENT FOR THE INTERSECTION OF MCKINSTRY AND NORTH SOSCAL. ARRA::YES::ARRA
Amount: $569,224
Award Description: TAS::96 3134::TAS RECOVERYPROJECT#::12130::RP# NAPA RIVER, CA, NAPA VALLERY WINE TRAIN RELOCATION PROJECT FLOOD CONTROL; PARTIAL PAYMENT FOR ROAD SIMULTANEOUS CLOSURE. PAYMENT FOR LONG LEADTIME MATEREIALS RELATED TO THE INTERIM TRACK RAISE. ARRA::YES::ARRA
Amount: $111,887
Award Description: TAS::96 3134::TAS RECOVERYPROJECT#::12130::RP# NAPA RIVER, CA, NAPA VALLEY WINE TRAIN RELOCATION PROJECT FLOOD CONTROL; INSTALL A 7 FOOT HIGH SOLID WOOD FENCE BETWEEN THE BRIDGE CONSTRUCTION AND THE WINE TRAIN LOADING PLATFORM. ARRA::YES::ARRA
Amount: $1,284,223
Award Description: TAS::96 3134::TAS ARRA::YES::ARRA RECOVERYPROJECT#::12130::RP# NAPA RIVER, CA, NAPA VALLEY WINE TRAIN RELOCATION PROJECT FLOOD CONTROL; THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE QUANTITY OVERRUNS ON AGGREGATE BASE, AGGREGATE CONCRETE AND CONTAMINATED SOIL REMOVAL. ADDITIONALLY, DIFFERING SITE CONDITIONS ASSOCIATED WITH CONSTRUCTION OF THE NAPA RIVER BRIDGE THAT CAUSED HARD DRIVING OF SHEETPILES AND OBSTRUCTIONS IN THE COFFERDAMS. FINALLY, CHANGES ASSOCIATED WITH RETAINING WALL FOOTINGS AND OTHER MINOR DESIGN CHANGES ON FIRST AND THIRD STREETS.
Amount: $612,886
Award Description: TAS::96 3134::TAS ARRA::YES::ARRA RECOVERYPROJECT#::12130::RP# NAPA RIVER, CA, NAPA VALLEY WINE TRAIN RELOCATION PROJECT FLOOD CONTROL; THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE CHANGES TO PILE DRIVING FOR THE DRY BYPASS BRIDGE DUE TO DIFFERING SITE CONDITIONS RESULTING IN THE USE OF AN IMPACT HAMMER AND PREDRILLING. ADDITIONAL CHANGES INCLUDE THE EXTENSION OF TEMPORARY POWER AT THE PARKING AREA FOR THE TRAIN STATION AND HANDRAILS FOR SAFETY. THERE WERE ALSO IMPACTS DUE TO INEFFICIENCIES ASSOCIATED WITH THE CONSTRUCTION OF FLOODWALLS AT FIRST STREET DUE TO A COMPRESSED SCHEDULE FOR ROAD CLOSURE AS REQUESTED BY THE CITY OF NAPA. FINALLY, DUE TO A CHANGE IN THE CONSTRUCTION JOINT FOR THE DRY BYPASS BRIDGE, THE EXISTING PLATFORM NEEDED TO BE MODIFIED TO ENSURE PASSENGER SAFETY WHILE BOARDING.
Amount: $916,900
Award Description: TAS::96 3134::TAS ARRA::YES::ARRA RECOVERYPROJECT#::12130::RP# NAPA RIVER, CA, NAPA VALLEY WINE TRAIN RELOCATION PROJECT FLOOD CONTROL; THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE CHANGES RELATED TO DIFFERING SITE CONDITIONS IN THE RIVER RESULTING IN HARD EXCAVATION FOR THE NEW RIVER BRIDGE PIERS 2&3 WHICH REQUIRED ACCELERATION OF THE INWATER WORK DUE TO EXPIRING PERMIT WINDOWS, THE WORK HAD TO BE COMPLETED DURING THIS PERMIT WINDOW OTHERWISE THERE WOULD HAVE BEEN SUSPENDED UNTIL THE NEW PERMIT WINDOW STARTING JUNE 2011.
Amount: $164,600
Award Description: TAS::96 3134::TAS ARRA::YES::ARRA RECOVERYPROJECT#::12130::RP# NAPA RIVER, CA, NAPA VALLEY WINE TRAIN RELOCATION PROJECT FLOOD CONTROL; THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE AN EMERGENCY ACTION PLAN FOR THE IMMEDIATE REMOVAL OF SHEETPILES IN THE EVENT OF HIGH RIVER FLOWS.
Amount: $1,544,100
Award Description: TAS::96 3134::TAS ARRA::YES::ARRA RECOVERYPROJECT#::12130::RP# NAPA RIVER, CA, NAPA VALLEY WINE TRAIN RELOCATION PROJECT FLOOD CONTROL; THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE CHANGES RELATED TO DIFFERING SITE CONDITIONS AND UTILITY ISSUES ON FIRST AND THIRD STREETS, DESIGN ISSUES RELATED TO THE NAPA RIVER AND DRY BYPASS BRIDGES RELATED, ENVIRONMENTAL PERMIT CHANGES AND ISSUES RELATED TO THE ELECTRICAL DESIGN THAT REQUIRED A SIGNIFICANT REDESIGN OF THE LOADING PLATFORM LIGHTING PLAN.
Amount: $308,450
Award Description: TAS::96 3134::TAS ARRA::YES::ARRA RECOVERYPROJECT#::12130::RP# NAPA RIVER, CA, NAPA VALLEY WINE TRAIN RELOCATION PROJECT FLOOD CONTROL; THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE TEMPORARY SUPPORTS ON THE EXISTING NAPA RIVER BRIDGE DUE TO A CONFLICT WITH THE SHEETPILE COFFERDAM
Amount: -$299,875
Award Description: THIS MODIFICATION ADJUSTS THIS CONTRACT FOR FINAL QUANTITIES AS WELL AS RE-ALIGNING THE PRICING SCHEDULE TO PROPERLY REFLECT THE APPROPRIATION TYPES ON THIS CONTRACT.

Project Location Detail

Location Information
Latitude, Longitude 0º 0' 0", 0º 0' 0"
Congressional District 01
City NAPA
County NAPA
State CA
Zip 94558