| Other Awards |
Amount:
$8,000
Award Description: TAS::96 3134::TAS
THIS MODIFICATION TO TASK ORDER 0011 IS NEEDED TO PROVIDE A SR. CONSTRUCTION ENGINEER (BOB COUCH) ON THE CASTLE ROCK ARRA PROJECT. THE SR. CONSTRUCTION ENGINEER WILL PROVIDE CONTRACT ADMINISTRATION SUPPORT AND TECHNICAL ASSISTANCE FOR THE PROJECT. ARRA::YES::ARRA |
Amount:
$41,500
Award Description: TAS::96 3134::TAS
THIS MODIFICATION IS TO INCREASE QUALITY ASSURANCE SURVEILLANCE HOURS AND OTHER ASSOCIATED COSTS (TRAVEL, PER DIEM) TO MEET THE NEEDS OF THE REQUESTER FOR THE LOWELL COUNTY SHEEPY LAKE PROJECT. ARRA::YES::ARRA |
Amount:
$18,000
Award Description: TAS::96 3134::TAS
THIS MODIFICATION IS TO INCLUDE ADDITIONAL QUALITY ASSURANCE SERVICE HOURS TO THE EXISTING CONTRACT DUE TO UNEXPECTED ADDITIONAL QUALITY ASSURANCE SURVEILLANCE NEEDED.
ARRA::YES::ARRA |
Amount:
$10,000
Award Description: TAS::96 3135::TAS
THIS MODIFICATION IS FOR ADDITIONAL QUALITY ASSURANCE SERVICES FOR THE BONNEVILLE NORTH SHORE FISH VIEWING FACILITY FOR ANDY DEBRIAE. THE PROFESSIONAL SERVICE QUANTITIES ARE ESTIMATES, BUT TOTAL FUNDING SHOWN BELOW CANNOT BE EXCEEDED. ARRA::YES::ARRA |
Amount:
$303,000
Award Description: TAS::96 3135::TAS
SERVICES ARE FOR QUALITY ASSURANCE PERSONNEL FOR THE LOWER COLUMBIA RESIDENT OFFICE. SERVICES SHALL BE PREFORMED ALONG THE COOS BAY AREA. ARRA::YES::ARRA |
Amount:
-$90,000
Award Description: TAS::96 3135::TAS
THIS MODIFICATION IS FOR A DECREASE OF QUALITY ASSURANCE SERVICES FOR THE NORTH COAST HOPPER PROJECT LOCATED IN COOS BAY, OREGON. ARRA::YES::ARRA |
Amount:
$114,000
Award Description: TAS::96 3135::TAS
MODIFICATION TO INCREASE QA SERVICES ON THE LOWER COLUMBIA RESIDENT OFFICE DREDGING PROJECTS. ARRA::YES::ARRA |
Amount:
$64,000
Award Description: SENIOR QA INSPECTOR |
Amount:
$308,302
Award Description: CI SERVICES MT PFH 78(1)EAST FORK BITTEROOT ROAD |
Amount:
$153,885
Award Description: CONSTRUCTION INSPECTION SERVICES |
Amount:
$97,000
Award Description: TAS::96 3134::TAS RECOVERYPROJECT#::133730::RP# QA INSPECTOR CIVIL WORKS/FISH AT BONNEVILLE LOCK AND DAM, OREGON |
Amount:
$15,000
Award Description: TAS::96 3134::TAS RECOVERYPROJECT#132528::RP# INCREASE IN ARRA QUALITY ASSURANCE SERVICES FOR BONNEVILLE WATER PROJECT, BONNEVILLE DAM, OREGON. ARRA::YES::ARRA |
Amount:
$30,000
Award Description: RECOVERYPROJECT#::122939::RP#DV2020-CG-DIVERSION TUNNEL REPAIR-S&A. QUALITY ASSURANCE ELECTRICAL/MECHANICAL SERVICES (STRAIGHT TIME, OVERTIME, AND MISCELLANEOUS TRAVEL AND PER DIEM) FOR THE COUGAR FISH TRAP AND HAUL TUNNEL REPAIR PROJECT AT BLUE RIVER, OREGON 97413. |
Amount:
$79,850
Award Description: TAS::96 3134::TAS RECOVERPROJECT#::324667::RP# QUALITY ASSURANCE SERVICES FOR BONNEVILLE SPILLWAY GATE PIT REPAIR PROJECT, BONNEVILLE DAM, OREGON. ARRA::YES::ARRA |
Amount:
$19,800
Award Description: TAS::96 3134::TAS RECOVERYPROJECT#132528::RP# INCREASE IN ARRA QUALITY ASSURANCE SERVICES FOR BONNEVILLE WATER PROJECT, BONNEVILLE DAM, OREGON. ARRA::YES::ARRA |
Amount:
-$39,273
Award Description: TAS::96 3134::TAS ARRA::YES::ARRA RECOVERYPROJECT#::122939::RP#
PROJECT TITLE: DV2020 CG DIVERSION TUNNEL REPAIR S&A WILL AT BONNEVILLE DAM AND BIG CLIFF, OREGON.
DECREASE TRAVEL AND PER DIEM AND LABOR HOUR STRAIGHT TIME AND OVERTIME HOUR COSTS FOR QUALITY ASSURANCE INSPECTOR CIVIL WORKS/FISH FOR BONNEVILLE 1ST PH SLUICEWALL REMOVAL AND BIG CLIFF TAINTER GATE REPAIRS PROJECT. |
Amount:
-$30,203
Award Description: TAS::96 3134::TAS RECOVERYPROJECT#::149708, 150373::RP#
QUALITY ASSURANCE INSPECTOR SERVICES ARRA::YES::ARRA |
Amount:
$39,500
Award Description: TAS::96 3135::TAS ARRA::YES::ARRA RECOVERYPROJECT#::145341::RECOVERYPROJECT#::145332
RD# QA INSPECTOR SERVICES, INCREASE STRAIGHT TIME HOURS, OVERTIME HOURS, NIGHT DIFFERENTIAL, AND TRAVEL AND PER DIEM FOR SIUSLAW AND DEPOT SLOUGH DREDGING PROJECTS, SOUTH COAST, OREGON STATE. |
Amount:
$50,000
Award Description: TAS::96 3135::TAS RECOVERYPROJECT#::145300RP# THIS IS FOR SENIOR QA INSPECTOR SERVICE FOR THE NORTH COAST MECHANICAL PROJECT, OREGON. ARRA::YES::ARRA |
Amount:
-$29,970
Award Description: TAS::96 3135::TAS RECOVERYPROJECT#::145300:: RP# DECREASE IN ARRA MECHANIC LABOR FOR NORTH COAST ENGINEERING AID/INTERN, DREDGING PROJECT,CHANNELS & HARBOR PROJECT,STRAIGHT TIME AND OVERTIME, PACIFIC COUNTY.
TAS::96 3134::TAS RECOVERYPROJECT#::122353::RP# DECREASE IN ARRA QUALITY ASSURANCE SERVICES FOR THE DREDGING CHANNELS AND HARBOR PROJECT IN COWLITZ COUNTY. ARRA::YES::ARRA |
Amount:
-$63,603
Award Description: TAS::96 3135::TAS RECOVERYPROJECT#::145300::RP# DECREASE IN ARRA FUNDING FOR THE C&LW DREDGING PROJECT IN OREGON. ARRA::YES::ARRA |
Amount:
$20,000
Award Description: TAS::96 3135::TAS RECOVERYPROJECT#::122353::RP# ENGINEERING AID/INTERN TO PROVIDE QA SUPPORT FOR THE DREDGE OREGON FOR DREDGE WORK ON THE COWLITZ RIVER, WASHINGTON. ARRA::YES::ARRA |
Amount:
$16,456
Award Description: TAS::96 3135::TAS ARRA::YES::ARRA RECOVERYPROJECT#::322573::RP#
PROJECT TITLE: BLUE RIVER GATES RO CYLINDERS
BLUE LAKE, OREGON |
Amount:
-$105,585
Award Description: TAS::96 3135::TAS RECOVERYPROJECT#::145320,145300,145341::RP# THIS IS FOR QA INSPECTOR SERVIES FOR DREDGING AT SEVERAL LOCATION IN THE STATES OF OREGON AND WASHINGTON. ARRA::YES::ARRA |
Amount:
$27,300
Award Description: TAS::96 3135::TAS RECOVERYPROJECT#::150373::RP# QA INSPECTOR SERVICE SHEEPY LAKE, OR |
Amount:
-$2,533
Award Description: TAS::96 3135::TAS RECOVERYPROJECT#::150373::RP# QA INSPECTOR SERVICES, DECREASE STRAIGHT TIME HOURS FOR QA INSPECTOR AND SR. CONST. ENG., TRAVEL AND PER DIEM, AND MISCELLANEOUS EXPENSES;AND INCREASE OVERTIME HOURS FOR QA INSPECTOR AND STRAIGHT TIME HOURS FOR SR. CONSTR. ENG. FOR THE SHEEPY LAKE PROJECT, OREGON. |
Amount:
-$144
Award Description: ADMINISTRATIVE SUPPORT. |
Amount:
$0
Award Description: TAS::96 3124::TAS ARRA::YES::ARRA RECOVERYPROJECT#122744::PROJECT TITLE::JOHN DAY DAM AVIAN WIRE PROJECT QA INSPECTOR CIVIL WORKS/FISH FOR THE JOHN DAY DAM; THE BONNEVILLE GATE REPAIR; AND THE BONNEVILLE DOMESTIC WATER UPGRADE PROJECTS. |
Amount:
-$2,203
Award Description: QA INSPECTOR CIVIL WORKS/FISH |
Amount:
$13,600
Award Description: TAS::96 3134::TAS ARRA::YES::ARRA RECOVERYPROJECT#::122744::RP#:PROJECT TITLE: JOHN DAY DAM AVIAN WIRE PROJECT
QUALITY ASSURANCE SERVICES CIVIL WORKS/FISH ADD ADDITIONAL STRAIGHT TIME AND OVERTIME LABOR HOURS; AND ADDITIONAL TRAVEL AND PER DIEM COSTS.
INSPECTOR CIVIL WORKS/FISH |
Amount:
$8,228
Award Description: TAS::96 3135::TAS ARRA::YES::ARRA RECOVERYPROJECT#::132528::RP#
PROJECT TITLE: BONNEVILLE DOMESTIC WATER PROJECT
DEFINITIZE: QUALITY ASSURANCE INSPECTOR SERVICES FOR CIVIL WORKS/FISH AT BONNEVILLE DAM. |
Amount:
$100,000
Award Description: TAS::96 3135::TAS ARRA::YES::ARRA RECOVERYPROJECT#::323857::RP#
PROJECT TITLE: THE DALLES DAM/JOHN DAY DAM PROJECT |
Amount:
$15,000
Award Description: TAS::96 4045::TAS ARRA::YES::ARRA RECOVERYPROJECT#322629::PROJECT TITLE::COUGAR DAM CYLINDER REPLACEMENT, MCKENZIE BRIDGE, LANE COUNTY, OREGON |
Amount:
-$15,117
Award Description: QA SERVICES FOR DREDGING AND CONSTRUCTION PROJECTS, PORTLAND DISTRICT, EUGENE RESIDENT OFFICE, EUGENE, OREGON |