contract- RECIPIENT AWARD SUMMARY
C.J. MAHAN CONSTRUCTION COMPANY, LLC
| AWARD OVERVIEW |
|
Agency Name: US Army Corps of Engineers |
Project Location:
WESTMORELAND |
|
Award Number: W911WN09C0012 |
Project Location - State: PA |
|
Funding Amount:
$28,365,517 |
Project Location - Zip Code: 150620001 |
|
Ending Date:
2011-10-02 |
Congressional District: 12 |
RECIPIENT INFORMATION (AWARD)
| RECIPIENT INFORMATION (AWARD) |
|
Recipient Name:
|
C.J. MAHAN CONSTRUCTION COMPANY, LLC |
|
Recipient Address:
|
3400 SOUTHWEST BLVD |
|
Recipient City:
|
GROVE CITY |
|
Recipient State:
|
OH |
|
Recipient Zip Code:
|
431232242 |
|
Congressional District:
|
OH-15 |
DESCRIPTION OF WORK/SERVICE PERFORMED
TAS::96 3134::TAS RECOVERYPROJECT#::10286::RP# CHARLEROI GUARD WALLS
CONSTRUCTION OF THE UPPER AND LOWER GUARD WALLS AT CHARLEROI LOCKS AND DAM, MONONGAHELA RIVER, PA.
PURCHASER INFORMATION (AWARD)
| PURCHASER INFORMATION (AWARD) |
| Contracting Office ID: |
W911WN |
| Contracting Office Name: |
W072 ENDIST PITTSBURGH |
| Contracting Office Region: |
NO REGI |
| TAS Major Program: |
3675 |
CONTRACT INFORMATION (AWARD)
| CONTRACT INFORMATION (AWARD) |
| Date Signed: |
2009-08-30 |
| Effective Date: |
2009-08-29 |
| Current Completion Date: |
2011-10-02 |
| Ultimate Completion Date: |
2011-10-02 |
| Award Type: |
DEFINITIVE CONTRACT |
| Reason For Modification: |
|
| Type of Contract Pricing: |
FIRM FIXED PRICE |
| Last Date to Order: |
|
| Funding Agency ID: |
96CE |
| Funding Office ID: |
W911WN |
| Funding Office Name: |
Pittsburgh |
| Number of Offers Received: |
5 |
PRODUCT OR SERVICE INFORMATION (AWARD)
| PRODUCT OR SERVICE INFORMATION (AWARD) |
|
Product Code:
|
Y299 |
|
Product Description:
|
CONTRUCT/ALL OTHER NON-BLDG FACS |
|
NAICS Code:
|
237990 |
|
NAICS Description:
|
OTHER HEAVY AND CIVIL ENGINEERING CONSTRUCTION |
COMPETITION INFORMATION (AWARD)
| COMPETITION INFORMATION (AWARD) |
|
Extent Competed:
|
FULL AND OPEN COMPETITION |
|
Reason Not Competed:
|
Not Reported |
|
Solicitation Procedure:
|
SEALED BID |
|
Type of Set Aside:
|
NO SET ASIDE USED. |
|
Statutory Exception to Fair Opportunity:
|
|
|
Type of Contract Pricing:
|
FIRM FIXED PRICE |
PREFERENCE PROGRAMS (AWARD)
Business Size Determination: OTHER THAN SMALL BUSINESS
| Other Awards |
Amount:
$5,000,000
Award Description: TAS::96 3134::TAS, RECOVERY - COFFERDAM CONSTRUCTION CONTRACT FOR THE CHICKAMAUGA LOCK OF THE NASHVILLE DISTRICT USACE. MOD P00025 OBLIGATES $5M OF 96 3134 ARRA FUNDS. |
Amount:
$28,365,517
Award Description: TAS::96 3134::TAS RECOVERYPROJECT#::10286::RP# CHARLEROI GUARD WALLS
CONSTRUCTION OF THE UPPER AND LOWER GUARD WALLS AT CHARLEROI LOCKS AND DAM, MONONGAHELA RIVER, PA. |
Amount:
$187,818
Award Description: TAS::96 3134::TAS, RECOVERY - COFFERDAM CONSTRUCTION AT THE CHICKAMAUGA LOCK OF THE NASHVILLE DISTRICT USACE. MOD P00033 OBLIGATES $187,818.84 OF 96 3134 ARRA FUNDS. |
Amount:
$273,190
Award Description: TAS::96 3134::TAS ARRA :YES::ARRA RECOVERYPROJECT#::10286::RP# CONTRACT FOR UPPER&LOWER GUARD WALLS, CHARLEROI L/D, MONONGAHELA RIVER, PA AT CHARLEROI L/D, MONONGAHELA RIVER, PA. MODIFICATION FOR LOWER GUARD WALL TO ADD DRILLED SHAFT QUANTITIES. |
Amount:
$14,059,290
Award Description: TAS::96 3134::TAS ARRA::YES::ARRA RECOVERYPROJECT#::118339::RP#
PROJECT TITLE: 118339 CHICKAMAUGA LOCK & DAM, TN
FABRICATION AND DELIVERY OF LOCK APPROACH WALL PRE-CAST CONCRETE BEAMS AT CHICKAMAUGA LOCK, PROJECT OF THE NASHVILLE DISTRICT U.S. ARMY CORPS OF ENGINEERS. |
Amount:
$4,966,181
Award Description: TAS::96 3134::TAS RECOVERY - COFFERDAM CONSTRUCTION AT THE CHICKAMAUGA LOCK OF THE NASHVILLE DISTRICT USACE. MOD P00034 OBLIGATES $4,966,181.16 OF 96 3134 ARRA FUNDS. |
Amount:
$1,872,364
Award Description: TAS::96 3135::TAS ARRA::YES::ARRA
RECOVERYPROJECT#::11158::RP# PROJECT TITLE: 111258 CHICKAMAUGA LOCK, TN CONSTRUCTION OF COFFERDAM AT CHICKAMAUGA LOCK, CHATTANOOGA, TN OF THE NASHVILLE DISTRICT U.S. ARMY CORPS OF ENGINEERS. |
Amount:
$285,662
Award Description: TAS::96 3135::TAS
RECOVERY - CONSTRUCTION OF COFFERDAM AT CHICKAMAUGA LOCK OF THE NASHVILLE DISTRICT USACE. ARRA::YES::ARRA |
Amount:
$758,668
Award Description: TAS::96 3134::TAS ARRA::YES::ARRA RECOVERYPROJECT#::118339::RP# PROJECT TITLE: 118339 CHICKAMAUGA LOCK & DAM, TN. CONSTRUCTION OF COFFERDAM AT CHICKAMAUGA LOCK, CHATTANOOGA, TN, OF THE NASHVILLE DISTRICT U.S. ARMY CORPS OF ENGINEERS. |
Amount:
-$16,614
Award Description: TAS::96 3134::TAS ARRA::YES::ARRA RECOVERYPROJECT#::10286::RP# CONTRACT FOR UPPER&LOWER GUARD WALLS, CHARLEROI L/D, MONONGAHELA RIVER, PA AT CHARLEROI L/D, MONONGAHELA RIVER, PA. CONTRACT MODIFICATION TO PROVIDE FOR THE DISPOSAL OF IN-SITU MATERIAL GENERATED FROM PRE-EXCAVATION AND DRILLING ACTIVITIES ON THE PROJECT, AT A LICENSED LANDFILL THAT IS PERMITTED TO RECEIVE REGULATED FILL. THIS WAS NECESSITATED BY THE ABOVE MATERIAL HAVING CONCENTRATIONS OF CERTAIN CONSTITUENTS THAT EXCEEDED THE CLEAN FILL STANDARDS ESTABLISHED IN THE GOVERNMENT OWNED VICTORY HOLLOW DISPOSAL SITE PERMIT. DUE TO THE OFF-SITE DISPOSAL, APPLICABLE CREDITS WERE GIVEN FOR THE NON-PERFORMED ON-SITE DISPOSAL CONTRACT LINE ITEMS. |
Amount:
$15,940
Award Description: TAS::96 3134::TAS ARRA::YES::ARRA RECOVERYPROJECT#::10286::RP# CONTRACT FOR UPPER&LOWER GUARD WALLS, CHARLEROI L/D, MONONGAHELA RIVER, PA AT CHARLEROI L/D, MONONGAHELA RIVER, PA. CONTRACT MODIFICATION TO PROVIDE MAGNETIC PARTICLE AND ULTRASOUND INSPECTION OF EIGHT (8) FRACTURE CRITICAL CONNECTIONS IN THE LOWER GUARD WALL NOSE PIER FABRICATION. |
Amount:
$5,158
Award Description: TAS::96 3134::TAS ARRA::YES::ARRA RECOVERYPROJECT#::10286::RP# CONTRACT FOR UPPER&LOWER GUARD WALLS, CHARLEROI L/D, MONONGAHELA RIVER, PA AT CHARLEROI L/D, MONONGAHELA RIVER, PA. MODIFICATION FOR REPROGRAMMING CONCRETE DATA LOGGERS USED TO MONITOR STRENGTH FOR CAST-IN-PLACE CONCRETE FOR LONGER DATA LOGGING CAPABILITY. |
Amount:
$5,315
Award Description: TAS::96 3134::TAS ARRA::YES::ARRA RECOVERYPROJECT#::10286::RP# CONTRACT FOR UPPER&LOWER GUARD WALLS, CHARLEROI L/D, MONONGAHELA RIVER, PA AT CHARLEROI L/D, MONONGAHELA RIVER, PA. CONTRACT MODIFICATION TO PROVIDE ADDITIONAL BEARING PADS FOR THE UPPER GUARD WALL STORED PRECAST CONCRETE BOX BEAMS. |
Amount:
-$2,661
Award Description: TAS::96 3135::TAS
RECOVERY - CONSTRUCTION OF COFFERDAM AT CHICKAMAUGA LOCK OF THE NASHVILLE DISTRICT USACE. ARRA::YES::ARRA |
Amount:
$30,395
Award Description: TAS::96 3134::TAS ARRA::YES::ARRA RECOVERYPROJECT#::118339::RP# PROJECT TITLE: 118339 CHICKAMAUGA LOCK&DAM, TN
CONSTRUCTION OF COFFERDAM AT CHICKAMAUGA LOCK, CHATTANOOGA, TN, OF THE NASHVILLE DISTRICT U.S. ARMY CORPS OF ENGINEERS.
GLOBAL SETTLEMENT&FINAL QTY ADJUSTMENTS |
Amount:
$0
Award Description: TAS::96 3134::TAS ARRA ::YES::ARRA RECOVERYPROJECT#10286::RP# 10286 CONTRACT FOR UPPER&LOWER GUARD WALLS, CHARLEROI L/D, MONONGAHELA RIVER, PA AT CHARLEROI L/D, MONONGAHELA RIVER, PA. CONTRACT MODIFICATION FOR NO COST TIME EXTENSION OF TWENTY-ONE DAYS DUE TO ADVERSE WEATHER FOR 4TH QUARTER 2010. |
Amount:
$1,079,482
Award Description: TAS::96 3134::TAS ARRA ::YES::ARRA RECOVERYPROJECT#10286::RP# 10286 CONTRACT FOR UPPER&LOWER GUARD WALLS, CHARLEROI L/D, MONONGAHELA RIVER, PA AT CHARLEROI L/D, MONONGAHELA RIVER, PA. DUE TO THE DELAY IN COMPLETION OF THE UPPER&LOWER GUARD WALLS CONTRACT, IT IS FINANCIALLY ADVANTAGEOUS TO THE GOVERNMENT TO TRANSFER THE CONCRETE PRODUCTION AND MAINTENANCE RESPONSIBILITIES FOR THE GOVERNMENT'S CHARLEROI LEFT BANK CONCRETE BATCH PLANT TO THE UPPER&LOWER GUARD WALL CONTRACTOR FOR THE REMAINDER OF THE UPPER&LOWER GUARD WALL CONTRACT. THIS CONTRACT MODIFICATION PROVIDES THE MEANS FOR UPPER&LOWER GUARD WALL CONTRACTOR TO MAINTAIN AND OPERATE THE GOVERNMENT'S CHARLEROI LEFT BANK CONCRETE BATCH PLANT (BATCH PLANT) FOR THE PRODUCTION AND DELIVERY OF CONCRETE FOR THE UPPER&LOWER GUARD WALLS CONTRACT. IN ADDITION, THE MODIFICATION INCLUDES THE RESPONSIBILITY FOR PROVIDING QUALITY CONTROL, ENVIRONMENTAL CONTROL, AND CONVEYOR OPERATION AND MAINTENANCE ASSOCIATED WITH THE PRODUCTION OF CONCRETE AT THE BATCH PLANT. |
Amount:
$107,839
Award Description: TAS::96 3134::TAS ARRA ::YES::ARRA RECOVERYPROJECT#10286::RP# 10286 CONTRACT FOR UPPER&LOWER GUARD WALLS, CHARLEROI L/D, MONONGAHELA RIVER, PA AT CHARLEROI L/D, MONONGAHELA RIVER, PA. THE WORK TO BE PERFORMED UNDER THIS MODIFICATION IS TO CONSTRUCT SUITABLE STORAGE FACILITIES FOR THE VARIOUS UPPER GUARD WALL (UGW) AND LOWER GUARD WALL (LGW) STRUCTURAL COMPONENTS THAT WILL BE DELIVERED, BUT NOT INSTALLED AS PART OF THE ORIGINAL CONTRACT. THE ORIGINAL CONTRACT INCLUDES PROVISIONS FOR THE UGW AND LGW COMPONENTS TO BE STORED, BUT NOT CONSTRUCTING THE SPECIFIC STORAGE FOUNDATIONS FOR THE COMPONENTS. THIS MODIFICATION IS PART II OF A TWO-PART MODIFICATION, AND THE FINAL PART OF THE MODIFICATION THAT DEFINITIZES THE PRICE, QUANTITY, AND TIME. |
Amount:
$0
Award Description: TAS::96 3134::TAS ARRA::YES::ARRA RECOVERYPROJECT#::10286::RP# CONTRACT FOR UPPER&LOWER GUARD WALLS, CHARLEROI L/D, MONONGAHELA RIVER, PA AT CHARLEROI L/D, MONONGAHELA RIVER, PA. CONTRACT MODIFICATION FOR A NO COST TIME EXTENSION OF TWENTY-ONE (21) CALENDAR DAYS DUE TO ADVERSE WEATHER FOR THE 2ND QUARTER OF 2011. |
Amount:
$18,510
Award Description: TAS::96 3134::TAS ARRA ::YES::ARRA RECOVERYPROJECT#10286::RP# 10286 CONTRACT FOR UPPER&LOWER GUARD WALLS, CHARLEROI L/D, MONONGAHELA RIVER, PA AT CHARLEROI L/D, MONONGAHELA RIVER, PA. CONTACT MODIFICATION TO PREPARE AND PROVIDE A STEP-BY-STEP MANUAL FOR PLACING THE GOVERNMENT'S CONCRETE BATCH PLANT INTO A STATE OF EXTENDED SHUT DOWN THAT WILL PROTECT THE EQUIPMENT FROM DAMAGE DUE TO NON-USE, AND FOR STARTING THE BATCH PLANT UP AFTER AN EXTENDED PERIOD OF SHUT DOWN. |
Amount:
$143,404
Award Description: TAS::96 3134::TAS ARRA ::YES::ARRA RECOVERYPROJECT#10286::RP# 10286 CONTRACT FOR UPPER&LOWER GUARD WALLS, CHARLEROI L/D, MONONGAHELA RIVER, PA AT CHARLEROI L/D, MONONGAHELA RIVER, PA. CONTRACT MODIFICATION FOR COSTS ASSOCIATED WITH THE INSTALLATION OF POST-TENSIONING MONOSTRANDS TO ONE (1) LOWER GUARD WALL (LGW) TYPE 1 WALL PANEL&SEVEN (7) LGW TYPE 2 WALL PANELS TO ALLEVIATE WALL PANEL CRACKING ISSUES WHEN THE WALL PANELS ARE LIFTED AND ROTATED FROM THE HORIZONTAL FABRICATED POSITION TO THE FINAL ERECTED VERTICAL POSITION. |
Amount:
$58,627
Award Description: TAS::96 3134::TAS ARRA::YES::ARRA RECOVERYPROJECT#::10286::RP# 10286 CONTRACT FOR UPPER&LOWER GUARD WALLS, CHARLEROI L/D, MONONGAHELA RIVER, PA AT CHARLEROI L/D, MONONGAHELA RIVER, PA. THE WORK TO BE PERFORMED UNDER THIS MODIFICATION IS THE REPLACEMENT OF WATER VALVES AT THE GOVERNMENT'S CONCRETE BATCH PLANT. THE VALVES ARE PART OF THE BATCH PLANT COOLING SYSTEM AND ARE USED IN ADJUSTING THE TEMPERATURE OF THE COOLING WATER DURING CONCRETE PRODUCTION. THE EXISTING VALVES HAVE BECOME INOPERABLE AND ARE FROZE IN PLACE, DUE TO CORROSION AND EROSION OF THE INTERIOR OF THE VALVES. IN TOTAL SEVEN (7) EXISTING VALVES WILL NEED TO BE REMOVED AND REPLACED. THE MODIFICATION WILL ALSO INCLUDE THE NECESSARY GASKETS AND BOLTS NEEDED FOR THE WORK, AND A SPECIALIZED GREASE GUN NEEDED TO MAINTAIN THE REPLACEMENT VALVES. |
Amount:
$14,813
Award Description: TAS::96 3134::TAS ARRA ::YES::ARRA RECOVERYPROJECT#10286::RP# 10286 CONTRACT FOR UPPER&LOWER GUARD WALLS, CHARLEROI L/D, MONONGAHELA RIVER, PA AT CHARLEROI L/D, MONONGAHELA RIVER, PA. CONTRACT MODIFICATION TO RENDER THE VICTORY HOLLOW (VH) UPLAND PLACEMENT AREA AS SUITABLE PLACEMENT OF THE DREDGED MATERIAL STOCKPILED WITHIN THE VH DEWATERING AREA IN ACCORDANCE WITH LOCAL, STATE AND FEDERAL REQUIREMENTS. |
Amount:
$0
Award Description: TAS::96 3134::TAS ARRA ::YES::ARRA RECOVERYPROJECT#10286::RP# 10286 CONTRACT FOR UPPER&LOWER GUARD WALLS, CHARLEROI L/D, MONONGAHELA RIVER, PA AT CHARLEROI L/D, MONONGAHELA RIVER, PA. THIS CONTRACT MODIFICATION ENABLES THE CONTRACTOR TO DISASSEMBLE, TRANSPORT, SET-UP, AND REASSEMBLE THE GOVERNMENT-OWNED CONVEYOR FOR GUARD WALL CONCRETE PLACEMENTS IN EITHER POOL, AS NECESSITATED BY THE CONTRACTOR'S SCHEDULE. TOTAL CONTRACT PRICE AND COMPLETION DATE REMAIN UNCHANGED BY THIS MODIFICATION. |
Amount:
$0
Award Description: TAS::96 3134::TAS ARRA::YES::ARRA RECOVERYPROJECT#::10286::RP# CONTRACT FOR UPPER&LOWER GUARD WALLS, CHARLEROI L/D, MONONGAHELA RIVER, PA AT CHARLEROI L/D, MONONGAHELA RIVER, PA. CONTRACT MODIFICATION FOR A NO COST TIME EXTENSION OF THIRTY-SEVEN (37) CALENDAR DAYS DUE TO ADVERSE WEATHER FOR THE 1ST QUARTER OF 2011. |
Amount:
$18,480
Award Description: TAS::96 3134::TAS ARRA ::YES::ARRA RECOVERYPROJECT#10286::RP# 10286 CONTRACT FOR UPPER&LOWER GUARD WALLS, CHARLEROI L/D, MONONGAHELA RIVER, PA AT CHARLEROI L/D, MONONGAHELA RIVER, PA. THIS MODIFICATION ADDRESS THE ADDITIONAL MATERIAL AND LABOR COSTS ASSOCIATED WITH THE INSTALLATION OF ADDITIONAL #10 REBAR REINFORCEMENT IN THE SIX (6) UGW PIER CAPS. |
Amount:
$0
Award Description: TAS::96 3134::TAS ARRA ::YES::ARRA RECOVERYPROJECT#10286::RP# 10286 CONTRACT FOR UPPER&LOWER GUARD WALLS, CHARLEROI L/D, MONONGAHELA RIVER, PA AT CHARLEROI L/D, MONONGAHELA RIVER, PA. CONTRACT MODIFICATION FOR A NO COST TIME EXTENSION OF FORTY-ONE (41) CALENDAR DAYS DUE TO ADVERSE WEATHER FOR THE 4TH QUARTER OF 2011. |
Amount:
$272,000
Award Description: TAS::96 3134::TAS ARRA ::YES::ARRA RECOVERYPROJECT#10286::RP# 10286 CONTRACT FOR UPPER&LOWER GUARD WALLS, CHARLEROI L/D, MONONGAHELA RIVER, PA AT CHARLEROI L/D, MONONGAHELA RIVER, PA. DESIGN DETAILS FOR THE LOWER GUARD WALL (LGW) PRECAST CONCRETE WALL PANELS WERE BASED UPON THE CURRENT LOWER POOL ELEVATION AT CHARLEROI, NOT THE FUTURE LOWER POOL ELEVATION, WHICH IS APPROXIMATELY 3 FEET LOWER. AS A RESULT, THE BOTTOMS OF THE WALL PANELS ARE NOT DEEP ENOUGH IN THE WATER TO PROTECT AGAINST IMPACT. THE PRECAST WALL PANELS MUST BE INCREASED IN HEIGHT TO COMPENSATE FOR THE FUTURE POOL. THIS IS PART 1 OF A TWO-PART CONTRACT MODIFICATION FOR THE ABOVE REVISIONS TO THE LGW PRECAST CONCRETE WALL PANELS. PART 1 OF THE CONTRACT MODIFICATION WILL BE FOR A NOT TO EXCEED (NTE) AMOUNT OF $270,000.00 FOR THE COMMENCEMENT OF CASTING OF THE LGW PRECAST CONCRETE WALL PANELS IN ACCORDANCE WITH FAR 52.232-5 PAYMENTS UNDER FIXED-PRICE CONSTRUCTION. FINALIZATIONS OF THE PRICE, QUANTITY, AND TIME WILL BE MADE IN PART 2 OF THIS MODIFICATION. |
Amount:
$140,000
Award Description: TAS::96 3134::TAS ARRA ::YES::ARRA RECOVERYPROJECT#10286::RP# 10286 CONTRACT FOR UPPER&LOWER GUARD WALLS, CHARLEROI L/D, MONONGAHELA RIVER, PA AT CHARLEROI L/D, MONONGAHELA RIVER, PA. CONTACT MODIFICATION FOR A NEW SPECIFICATION SECTION WITH THE REQUIREMENTS NECESSARY FOR THE UPPER GUARD WALL SHAFT CASING TO PIER CAP ANNULUS GROUTING TO BE PLACED IN-THE-DRY. IN ADDITION, CONCEPTUAL ANNULUS SEAL DETAILS WILL BE PROVIDED AS PART OF THIS MODIFICATION. THIS IS PART 1 OF A TWO-PART MODIFICATION. FINALIZATION OF THE PRICE, QUANTITY, AND TIME WILL BE BASED UPON PENDING REVIEW, ANALYSIS, AND NEGOTIATIONS. THE FINAL ADJUSTMENT OF PRICE AND QUANTITY WILL BE MADE IN PART 2 OF THIS MODIFICATION. A NOT TO EXCEED (NTE) AMOUNT OF $140,000.00 FOR INSTALLATION OF THE UNDERWATER UGW PIER CAP ANNULUS GROUT FORMS AND ASSOCIATED DIVING REQUIRED FOR THE INSTALLATION, IS AVAILABLE FOR BILLING IN ACCORDANCE WITH FAR 52.232-5 PAYMENTS UNDER FIXED-PRICE CONSTRUCTION CONTRACT. |
Amount:
$0
Award Description: TAS::96 3134::TAS ARRA ::YES::ARRA RECOVERYPROJECT#10286::RP# 10286 CONTRACT FOR UPPER&LOWER GUARD WALLS, CHARLEROI L/D, MONONGAHELA RIVER, PA AT CHARLEROI L/D, MONONGAHELA RIVER, PA. CONTRACT MODIFICATION FOR A NO COST TIME EXTENSION OF FIVE (5) CALENDAR DAYS DUE TO ADVERSE WEATHER FOR THE 3RD QUARTER OF 2011. |
Amount:
$145,000
Award Description: TAS::96 3134::TAS ARRA::YES::ARRA RECOVERYPROJECT#::10286::RP# 10286 CONTRACT FOR UPPER&LOWER GUARD WALLS, CHARLEROI L/D, MONONGAHELA RIVER, PA AT CHARLEROI L/D, MONONGAHELA RIVER, PA. CONTRACT MODIFICATION TO ADDRESS THE UNFORESEEN ADDITIONAL NEEDED EQUIPMENT, SERVICING, AND MISCELLANEOUS NEEDED REPAIRS REQUIRED FOR STARTUP OF THE GOVERNMENT'S CONCRETE BATCH PLANT. COSTS ASSOCIATED WITH SERVICING INCLUDE SEASONAL REQUIRED SERVICING ON THE BATCH PLANT CONCRETE COOLING SYSTEM (BOTH WINTERIZING&DE-WINTERIZING) AND SERVICING ON THE BATCH PLANT HOT WATER SYSTEM. IN ADDITION, A CONTINGENCY COST HAS BEEN INCLUDED IN THE MODIFICATION FOR NECESSARY REPAIRS DUE TO UNFORESEEN BATCH PLANT PART/SYSTEM BREAKAGES. |
Amount:
$188,069
Award Description: TAS::96 3134::TAS ARRA::YES::ARRA RECOVERYPROJECT#::10286::RP# 10286 CONTRACT FOR UPPER&LOWER GUARD WALLS, CHARLEROI L/D, MONONGAHELA RIVER, PA AT CHARLEROI L/D, MONONGAHELA RIVER, PA. THIS MODIFICATION ADDRESSES THE ADDITIONAL RAW MATERIALS NEEDED FOR CONCRETE PRODUCTION AT THE GOVERNMENT'S BATCH PLANT. IN ADDITION, EXISTING CONTRACT LINE ITEMS ASSOCIATED WITH CONCRETE PRODUCTION WILL BE INCREASED. |
Amount:
$0
Award Description: TAS::96 3134::TAS ARRA ::YES::ARRA RECOVERYPROJECT#10286::RP# 10286 CONTRACT FOR UPPER&LOWER GUARD WALLS, CHARLEROI L/D, MONONGAHELA RIVER, PA AT CHARLEROI L/D, MONONGAHELA RIVER, PA. CONTRACT MODIFICATION FOR A NO COST TIME EXTENSION OF FIFTY-EIGHT (58) CALENDAR DAYS DUE TO ADVERSE WEATHER FOR THE 1ST QUARTER OF 2012. |
Amount:
$105,221
Award Description: TAS::96 3134::TAS ARRA ::YES::ARRA RECOVERYPROJECT#10286::RP# 10286 CONTRACT FOR UPPER&LOWER GUARD WALLS, CHARLEROI L/D, MONONGAHELA RIVER, PA AT CHARLEROI L/D, MONONGAHELA RIVER, PA. DESIGN DETAILS FOR THE LOWER GUARD WALL (LGW) PRECAST CONCRETE WALL PANELS WERE BASED UPON THE CURRENT LOWER POOL ELEVATION AT CHARLEROI, NOT THE FUTURE LOWER POOL ELEVATION, WHICH IS APPROXIMATELY 3 FEET LOWER. AS A RESULT, THE BOTTOMS OF THE WALL PANELS ARE NOT DEEP ENOUGH IN THE WATER TO PROTECT AGAINST IMPACT. THE PRECAST WALL PANELS MUST BE INCREASED IN HEIGHT TO COMPENSATE FOR THE FUTURE POOL. THIS IS PART II OF A TWO-PART CONTRACT MODIFICATION FOR THE ABOVE REVISIONS TO THE LGW PRECAST CONCRETE WALL PANELS. PART I OF THE CONTRACT MODIFICATION WAS FOR A NOT TO EXCEED (NTE) AMOUNT OF $270,000.00 FOR THE COMMENCEMENT OF CASTING OF THE LGW PRECAST CONCRETE WALL PANELS IN ACCORDANCE WITH FAR 52.232-5 PAYMENTS UNDER FIXED-PRICE CONSTRUCTION. THIS MODIFICATION FINALIZES THE CHANGE IN CONTRACT PRICE AS ACCOUNTED FOR IN THE FIRST PART OF THE MODIFICATION. IN ADDITION, THIS MODIFICATION EXTENDS THE CONTRACT COMPLETION DATE BY ONE HUNDRED AND SIXTY-THREE (163) CALENDAR DAYS. |
Amount:
$268,000
Award Description: TAS::96 3134::TAS ARRA ::YES::ARRA RECOVERYPROJECT#10286::RP# 10286 CONTRACT FOR UPPER&LOWER GUARD WALLS, CHARLEROI L/D, MONONGAHELA RIVER, PA AT CHARLEROI L/D, MONONGAHELA RIVER, PA. CONTRACT MODIFICATION FOR CONSTRUCTING A SUITABLE STORAGE FACILITY FOR THE VARIOUS UPPER GUARD WALL (UGW) AND LOWER GUARD WALL (LGW) PRECAST CONCRETE AND STRUCTURAL COMPONENTS THAT WILL BE DELIVERED BUT NOT INSTALLED AS PART OF THE ORIGINAL CONTRACT. THIS IS PART 1 OF A TWO-PART MODIFICATION. FINALIZATION OF THE PRICE, QUANTITY, AND TIME WILL BE BASED UPON PENDING REVIEW, ANALYSIS, AND NEGOTIATIONS. THE FINAL ADJUSTMENT OF PRICE AND QUANTITY WILL BE MADE IN PART 2 OF THIS MODIFICATION. A NOT TO EXCEED (NTE) AMOUNT OF $268,000.00 FOR WORK TO COMMENCE IS AVAILABLE FOR BILLING IN ACCORDANCE WITH FAR 52.232-5 PAYMENTS UNDER FIXED-PRICE CONSTRUCTION CONTRACT. |
Amount:
$10,471
Award Description: TAS::96 3134::TAS ARRA ::YES::ARRA RECOVERYPROJECT#10286::RP# 10286 CONTRACT FOR UPPER&LOWER GUARD WALLS, CHARLEROI L/D, MONONGAHELA RIVER, PA AT CHARLEROI L/D, MONONGAHELA RIVER, PA. THE WORK TO BE PERFORMED UNDER THIS MODIFICATION IS TO PROVIDE PLACEMENT PROCEDURES AND A FASTENING SYSTEM FOR THE HORIZONTAL BEARING PADS FOR THE UPPER GUARD WALL BOX BEAMS. |
Amount:
$95,661
Award Description: TAS::96 3134::TAS ARRA ::YES::ARRA RECOVERYPROJECT#10286::RP# 10286 CONTRACT FOR UPPER&LOWER GUARD WALLS, CHARLEROI L/D, MONONGAHELA RIVER, PA AT CHARLEROI L/D, MONONGAHELA RIVER, PA. CONTRACT MODIFICATION TO PERFORM SITE PREPARATION WORK FOR THE PLACEMENT OF EXCAVATED STREAMBED MATERIAL (APPROXIMATELY 3,000 CY) FROM THE CHARLEROI L/D UPPER AND LOWER GUARD WALL CONTRACT AT THE VICTORY HOLLOW DISPOSAL SITE - OFFLOADING AREA. |
Amount:
$141,007
Award Description: TAS::96 3134::TAS ARRA::YES::ARRA RECOVERYPROJECT#::118339::RP#PROJECT TITLE: 118339 CHICKAMAUGA LOCK&DAM, TN FABRICATION AND DELIVERY OF LOCK APPROACH WALL PRE-CAST CONCRETE BEAMS AT CHICKAMAUGA LOCK, PROJECT OF THE NASHVILLE DISTRICT U.S. ARMY CORPS OF ENGINEERS. |
Amount:
$1,496,568
Award Description: TAS::96 3134::TAS ARRA ::YES::ARRA RECOVERYPROJECT#10286::RP# 10286 CONTRACT FOR UPPER&LOWER GUARD WALLS, CHARLEROI L/D, MONONGAHELA RIVER, PA AT CHARLEROI L/D, MONONGAHELA RIVER, PA. THE WORK TO BE PERFORMED UNDER THIS MODIFICATION IS TO CHANGE THE ANNULUS GROUT PLACEMENT REQUIREMENTS OF THE GROUTED SHEAR KEY AT THE UPPER GUARD WALL SHAFT CASING TO PIER CAP CONNECTION. THE ORIGINAL DESIGN DOCUMENTS INDICATED THAT THE ANNULUS GROUT SHALL BE PLACED IN-THE-WET CONDITION. THE SHEAR KEY AT THIS LOCATION IS A HIGHLY CRITICAL CONNECTION FOR THE UPPER GUARD WALL STRUCTURAL SYSTEM. IT WAS DETERMINED THAT PLACING THE ANNULUS GROUT IN-THE DRY CONDITION WOULD PROVIDE A BETTER QUALITY PRODUCT AND ELIMINATE ISSUES INVOLVED WITH THE APPROVAL OF AN UNDERWATER GROUT. THIS MODIFICATION REPRESENTS PART II OF A 2-PART MODIFICATION, AND FINALIZES THE CHANGE IN CONTRACT PRICE AS ACCOUNTED FOR IN PART I OF THE MODIFICATION. |
Amount:
$0
Award Description: TAS::96 3134::TAS ARRA ::YES::ARRA RECOVERYPROJECT#10286::RP# 10286 CONTRACT FOR UPPER&LOWER GUARD WALLS, CHARLEROI L/D, MONONGAHELA RIVER, PA AT CHARLEROI L/D, MONONGAHELA RIVER, PA. CONTRACT MODIFICATION FOR A NO COST TIME EXTENSION OF TWO (2) CALENDAR DAYS DUE TO ADVERSE WEATHER FOR THE 3RD QUARTER OF 2012. |
Amount:
$7,249
Award Description: TAS::96 3134::TAS ARRA ::YES::ARRA RECOVERYPROJECT#10286::RP# 10286 CONTRACT FOR UPPER&LOWER GUARD WALLS, CHARLEROI L/D, MONONGAHELA RIVER, PA AT CHARLEROI L/D, MONONGAHELA RIVER, PA. THE WORK TO BE PERFORMED UNDER THIS MODIFICATION IS TO PROVIDE A TOOLED JOINT WITH SEALANT AROUND THE PERIMETER OF THE CAST-IN-PLACE CONCRETE INFILL OF THE LOWER GUARD WALL PRECAST CAP BEAMS. THIS WILL ENSURE THAT WATER INFILTRATION DOES NOT OCCUR INTO THIS VOID, WHICH WOULD CAUSE DAMAGE AND DETERIORATION TO THE CAP BEAMS. BASED ON THE GOVERNMENT'S EXPERIENCE WITH THE CONCRETE MIX THAT WAS USED FOR THE INFILL WORK, IT IS EXPECTED THAT THE CAST-IN-PLACE CONCRETE WILL SHRINK, OPENING A VOID BETWEEN ITSELF AND THE PRECAST CONCRETE. ADDITIONALLY, ONE CAP BEAM WAS FILLED WITH CAST-IN-PLACE CONCRETE PRIOR TO THE GOVERNMENT DIRECTING THE CONTRACTOR TO TOOL AND SEAL THE JOINT. THIS CAP BEAM REQUIRES SAW CUTTING THE JOINT AND FILLING THE CUT JOINT WITH SEALANT. |
Amount:
$6,140
Award Description: TAS::96 3134::TAS ARRA ::YES::ARRA RECOVERYPROJECT#10286::RP# 10286 CONTRACT FOR UPPER&LOWER GUARD WALLS, CHARLEROI L/D, MONONGAHELA RIVER, PA AT CHARLEROI L/D, MONONGAHELA RIVER, PA. THIS MODIFICATION ADDRESSES THE ADDITIONAL COSTS INCURRED BY THE CONTRACTOR REGARDING GROUTING UNDER THE LGW DRILLED SHAFT ENCLOSURE WALL PANEL SUPPORT BRACKETS AND INSTALLING ADDITIONAL METAL PLATES FOR THE PRECAST WALL PANEL CONNECTION AT THE LGW NOSE PIER. BOTH THE GROUTING AND ADDITIONAL METAL PLATES FOR THE PRECAST WALL PANELS WAS NOT FULLY DETAILED IN THE CONTRACT DOCUMENTS, AND WERE NOT IDENTIFIED UNTIL CONSTRUCTION IN THE FIELD WAS UNDER WAY. |
Amount:
$56,947
Award Description: TAS::96 3134::TAS ARRA ::YES::ARRA RECOVERYPROJECT#10286::RP# 10286 CONTRACT FOR UPPER&LOWER GUARD WALLS, CHARLEROI L/D, MONONGAHELA RIVER, PA AT CHARLEROI L/D, MONONGAHELA RIVER, PA. THIS MODIFICATION ADDRESSES THE REMOVAL AND DISPOSAL AT A LICENSED RESIDUAL WASTE FACILITY OF APPROXIMATELY 250 CUBIC YARDS OF STOCKPILED EXCAVATED MATERIAL FROM THE PRECAST STORAGE AREA LOCATED AT THE CHARLEROI LOCK AND DAM UPPER GUIDE WALL AREA, AND APPROXIMATELY 500 CUBIC YARDS OF EXCAVATED MATERIAL FROM THE PRECAST STORAGE AREA STOCKPILED AT THE VICTORY HOLLOW SITE (APPROXIMATE TOTAL OF 750 CUBIC YARDS). BASED ON DOCUMENTED SAMPLING TEST RESULTS PERFORMED ON THE STOCKPILED MATERIAL DURING THE PRECAST STORAGE AREA SITE WORK, THE MATERIAL STOCKPILED AT BOTH THE PRECAST STORAGE AREA AND VICTORY HOLLOW IS CLASSIFIED AS RESIDUAL WASTE DUE TO ELEVATED LEAD LEVELS, THUS NECESSITATING THE MATERIAL BE TAKEN TO A LICENSED RESIDUAL WASTE FACILITY. |
Amount:
$121,541
Award Description: TAS::96 3134::TAS ARRA ::YES::ARRA RECOVERYPROJECT#10286::RP# 10286 CONTRACT FOR UPPER&LOWER GUARD WALLS, CHARLEROI L/D, MONONGAHELA RIVER, PA AT CHARLEROI L/D, MONONGAHELA RIVER, PA. THIS MODIFICATION ADDRESSES MOVING 27,500 CUBIC YARDS OF STOCKPILED DREDGED MATERIAL AT THE VICTORY HOLLOW (VH) SEDIMENT DEWATERING AREA TO THE VH UPLAND FILL PLACEMENT AREA. MODIFICATION WILL ALSO INCLUDE: CLEARING OF THE VH UPLAND FILL PLACEMENT AREA, INSTALLATION OF EROSION AND SEDIMENT CONTROL MEASURES (INCLUDING USE OF SEDIMENT FILTER LOGS), TRAFFIC CONTROL FLAGGERS AT THE HAUL ROAD BRIDGE CROSSING, PRE AND POST TOPOGRAPHIC SURVEYS OF BOTH STOCKPILE AND FINAL PLACEMENT AREAS, AND FINAL SEEDING OF STOCKPILE AND FINAL PLACEMENT AREAS. |
Amount:
$27,205
Award Description: TAS::96 3134::TAS ARRA ::YES::ARRA RECOVERYPROJECT#10286::RP# 10286 CONTRACT FOR UPPER&LOWER GUARD WALLS, CHARLEROI L/D, MONONGAHELA RIVER, PA AT CHARLEROI L/D, MONONGAHELA RIVER, PA. THIS MODIFICATION ADDRESSES REVISIONS TO THE UPPER GUARD WALL (UGW) SKIRT PANEL BRACKET COVERS. THE CONTRACTOR HAS DISCOVERED UNFORESEEN INTERFERENCE ISSUES WITH MOUNTING THE UGW SKIRT PANEL COVERS TO THE UGW THRUST BLOCKS. THIS NECESSITATES THE CONTRACTOR TO REVISE THE BRACKET COVERS BY WELDING ADDITIONAL STEEL MATERIAL AND GALVANIZING PROTECTION. |
Amount:
$230,435
Award Description: TAS::96 3134::TAS ARRA::YES::ARRA RECOVERYPROJECT#::10286::RP# CONTRACT FOR UPPER&LOWER GUARD WALLS, CHARLEROI L/D, MONONGAHELA RIVER, PA AT CHARLEROI L/D, MONONGAHELA RIVER, PA. THIS MODIFICATION WILL ADDRESS THE WORK NECESSARY FOR THE LONG TERM SHUTDOWN OF THE GOVERNMENT'S CONCRETE BATCH PLANT. WORK WILL INCLUDE PREPARING THE CONCRETE PRODUCTION SYSTEM FOR SHUTDOWN, EMPTYING OF THE VARIOUS MATERIAL HOLDING BINS, AND PROVIDING AN OPERATIONS ADVISOR TO OVERSEE THE ENTIRE SHUTDOWN EFFORT. |
| Location Information |
| Latitude, Longitude |
0º 0' 0",
0º 0' 0" |
| Congressional District |
12 |
| City |
WESTMORELAND |
| County |
WESTMORELAND |
| State |
PA |
| Zip |
15062 |
|