Skip to content Skip to footer site map
Navigate Up

Recovery.gov - Track the Money

Recovery.gov is the U.S. government's official website that provides easy access to data
related to Recovery Act spending and allows for the reporting of potential fraud, waste, and abuse.

contract- RECIPIENT AWARD SUMMARY


AWARD OVERVIEW

AWARD OVERVIEW
Agency Name: Department of Agriculture Project Location: LANE
Award Number: AG0489C100033 Project Location - State: OR
Funding Amount: $392 Project Location - Zip Code: 974136900
Ending Date: 2010-08-21 Congressional District: 04

RECIPIENT INFORMATION (AWARD)

RECIPIENT INFORMATION (AWARD)
Recipient Name: LKE CORP.
Recipient Address: 1622 RYAN TAVELLI RD
Recipient City: WASHOUGAL
Recipient State: WA
Recipient Zip Code: 986717551
Congressional District: WA-03

DESCRIPTION OF WORK/SERVICE PERFORMED

TAS::12 1102::TAS RECOVERY BALLPARK ROAD REPAIR FOR THE PURPOSE OF EROSION CONTROL, REMOVAL OF DANGER TREES, ROAD RECONDITIONING AND INSTALLATION OF CULVERTS.

PURCHASER INFORMATION (AWARD)

PURCHASER INFORMATION (AWARD)
Contracting Office ID: 0489
Contracting Office Name: EROC NORTHWEST
Contracting Office Region: WO
TAS Major Program: 385

CONTRACT INFORMATION (AWARD)

CONTRACT INFORMATION (AWARD)
Date Signed: 2010-08-12
Effective Date: 2010-08-12
Current Completion Date: 2010-08-21
Ultimate Completion Date: 2010-08-21
Award Type: DEFINITIVE CONTRACT
Reason For Modification: CHANGE ORDER
Type of Contract Pricing: FIRM FIXED PRICE
Last Date to Order:
Funding Agency ID: 12C2
Funding Office ID: 0489
Funding Office Name: EROC NORTHWEST
Number of Offers Received: 1

PRODUCT OR SERVICE INFORMATION (AWARD)

PRODUCT OR SERVICE INFORMATION (AWARD)
Product Code: Y299
Product Description: CONTRUCT/ALL OTHER NON-BLDG FACS
NAICS Code: 237310
NAICS Description: HIGHWAY, STREET, AND BRIDGE CONSTRUCTION

COMPETITION INFORMATION (AWARD)

COMPETITION INFORMATION (AWARD)
Extent Competed: NOT COMPETED UNDER SAP
Reason Not Competed: AUTHORIZED BY STATUTE
Solicitation Procedure: SIMPLIFIED ACQUISITION
Type of Set Aside: 8(A) SOLE SOURCE
Statutory Exception to Fair Opportunity:
Type of Contract Pricing: FIRM FIXED PRICE

PREFERENCE PROGRAMS (AWARD)

Business Size Determination: SMALL BUSINESS

TRANSACTIONS

TRANSACTIONS

Other Awards

Other Awards
Amount: $265,200
Award Description: TAS::96 3134::TAS EXERCISE OPTIONAL LINE ITEM 7011 FOR OREMS1 TEMPORARY HAUL ROAD. ARRA::YES::ARRA
Amount: $0
Award Description: TAS::96 3134::TAS CONSTRUCTION OF TWO ROCK ISLANDS (ONE IN TULE LAKE NWR AND THE OTHER IN LOWER KLAMATH NWR) TO PROVIDE NESTING HABITAT FOR CASPAIN TERNS. ARRA::YES::ARRA
Amount: $1,276,700
Award Description: TAS::96 3134::TAS CONSTRUCTION OF TWO ROCK ISLANDS (ONE IN TULE LAKE NWR AND THE OTHER IN LOWER KLAMATH NWR) TO PROVIDE NESTING HABITAT FOR CASPIAN TERNS. ARRA::YES::ARRA
Amount: $392
Award Description: TAS::12 1102::TAS RECOVERY BALLPARK ROAD REPAIR FOR THE PURPOSE OF EROSION CONTROL, REMOVAL OF DANGER TREES, ROAD RECONDITIONING AND INSTALLATION OF CULVERTS.
Amount: $85,896
Award Description: TAS::12 1102::TAS BALLPARK ROAD REPAIR FOR THE PURPOSE OF EROSION CONTROL, REMOVAL OF DANGER TREES, ROAD RECONDITIONING AND INSTALLATION OF CULVERTS.
Amount: $86,168
Award Description: TAS::96 3134::TAS ARRA::YES::ARRA RECOVERYPROJECT#::122353::RP# MOUNT SAINT HELENS GRADE BUILDING STRUCTURES PILOT PROJECT THIS MODIFICATION PROVIDES FUNDING FOR AN ADDITIONAL 25 FEET OF CVS GEOTUBE ON THE LEFT FLANK; THE INSTALLATION OF CVS GEOTUBE ON THE RIGHT FLANK; THE CREATION OF A DIVERSION BERM UNDER THE SCOUR APRON OF THE GEOTUBE; AN EXTENSION OF THE IN-WATER WORK PERIOD TO 30 SEPTEMBER 2010; AND THE PLACEMENT OF RIPRAP ALONG THE DOWN STREAM SIDE OF THE CVS STRUCTURE.
Amount: $8,851
Award Description: TAS::96 3134::TAS ARRA::YES::ARRA RECOVERYPROJECT#::122353::RP# MOUNT SAINT HELEN'S GRADE BUILDING STRUCTURES PILOT PROJECT THIS MODIFICATION CHANGES THE CULVERT DEPTH FROM 24" RCP TO 30" DUCTILE IRON AND UPDATE THE CONTRACT DRAWING C-0003 TO REFLECT THIS CHANGE.
Amount: $3,499,999
Award Description: RECOVERYPROJECT#::122353::RP#MT.ST. HELENS GRADE BUILDING STRUCTURES PILOT PROJECT
Amount: $7,164
Award Description: TAS::96 3134::TAS ARRA::YES::ARRA RECOVERYPROJECT#::122353::RP# MOUNT SAINT HELENS GRADE BUILDING STRUCTURES PILOT PROJECT THIS MODIFICATION ADDS THE REQUIREMENT OF CHANGING THE ROUGH SAWN LUMBER ON THE RIGHT FLANK SIDE BETWEEN PILES M-Q AND THE LEFT FLANK SIDE BEETWEEN PILES O-Q; AND CHANGES DRAWINGS C-006 AND C-007 TO REFLECT THIS CHANGE.
Amount: $104,202
Award Description: TAS::96 3134::TAS ARRA::YES::ARRA RECOVERYPROJECT#::122353::RP# MOUNT SAINT HELENS GRADE BUILDING STRUCTURES PILOT PROJECT THIS MODIFICATION PROVIDES FOR PAYMENT FOR ADDITIONAL RACKING MOUNT SAINT HELENS GRADE BUILDING STRUCTURES PILOT PROJECT THIS MODIFICATION PROVIDES FOR PAYMENT FOR ADDITIONAL RACKING MATERIAL THAN WAS ORIGINALLY ANTICIPATED AND SETTLES ALL OTHER OUTSTANDING ISSUES.

Project Location Detail

Location Information
Latitude, Longitude 0º 0' 0", 0º 0' 0"
Congressional District 04
City LANE
County LANE
State OR
Zip 97413