| Other Awards |
Amount:
$2,786,464
Award Description: TAS::21 2022::TAS PROJECT NUMBER::32778::PN
UMCS INTEGRATED SYSTEM |
Amount:
$1,190,688
Award Description: TAS::57 3404::TAS
WIRELESS COMMUNICATIONS NETWORK |
Amount:
$935,896
Award Description: ARRA INTEGRATE DIRECT DIGTAL CONTROLS
TAS::97 0501::TAS RECOVERYPROJECT#::69770::RP# |
Amount:
$145,124
Award Description: ARRA: RETRO-COMMISSIONING |
Amount:
$350,676
Award Description: TAS::21 2022::TAS PROJECT#37143
ARRA - UPGRADE HVAC AND DDC CONTROLLERS AT FT. BRAGG MINI MALL |
Amount:
$445,739
Award Description: TAS::21 2022::TASRECOVERYPROJECT#::38128::RP# |
Amount:
$382,267
Award Description: TAS::21 2022::TAS RECOVERYPROJECT#::34280::RP#
CONTRACTOR SHALL DESIGN, FURNISH LABOR AND MATERIALS, AND PERFORM WORK FOR THE INSTALLATION OF LIGHTING OCCUPANCY SENSORS AND TIMERS FOR MULTIPLE BUILDINGS AT FORT BLISS, TEXAS. PROVIDE SURVEY AND ENGINEERING FOR PROPER PLACEMENT TO OPTIMIZE OPERATIONAL EFFICIENCIES. |
Amount:
$1,237,250
Award Description: TAS::21 2022::TAS RECOVERYPROJECT@::37131::RP#
THIS MODIFICATION TO TASK ORDER 0053 IS TO EXERCISE OPTIONS 7006 THRU 7012 IDENTIFIED IN THE ORIGINAL TASK ORDER. THE ORIGINAL TASK ORDER IS TO REPLACE FAILING CHILLER, OVERSIZED BOILERS, AND MODIFY ASSOCIATED PLANT PIPING TO MAXIMIZE PLANT OPERATIONS FOR CURRENT BUILDING LOAD. AS SOLDIER SUPPORT CENTER (SSC) CHANGED FROM HOSPITAL TO ADMINISTRATIVE USE, HEATING AND COOLING LOAD PROFILES CHANGED DRASTICALLY. THIS REQUIRES A DIFFERENT PLANT OPERATION AND ASSOCIATED HVAC REQUIREMENT. INTEGRATE ALL LNS BASED LONWORK DDC SYSTEM FOR HVAC CONTROL AND EQUIPMENT INTO FT BRAGG UTILITY MONITORING CONTROL SYSTEM (UMCS). ALL WORK SHALL BE IN COMPLIANCE WITH THE FT. BRAGG UMCS INTEGRATION STATEMENT OF WORK AND FT BRAGG SUPPLEMENT TO LONWORK DDC FOR HVAC AND OTHER LOCAL BUILDING SYSTEM. ARRA::YES::ARRA |
Amount:
$5,170,889
Award Description: TAS::21 2022::TAS PROJECT#32493 UMCS INTEGRATED SYSTEM |
Amount:
$315,361
Award Description: TAS::21 2022::TAS RECOVERYPROJECT#::37148::RP#
THIS MODIFICATION IS TO REPLACE ALL PNEUMATIC DEVICES WITH ELECTRICAL, INTEGRATION INTO THE BASE-WIDE UMCS SYSTEM, TRANSPORTATION WING CHILLED WATER PIPIING REPLACEMENT/UPSIZING AND REBALANCING IN THE TRANSPORTATION WING OF SOLDIER SUPPORT CENTER AT FT. BRAGG, NC. ARRA::YES::ARRA |
Amount:
$136,186
Award Description: TAS::21 2022::TAS RECOVERY PROJECT#::37148::RP#
THE ORIGINAL TASK ORDER IS TO SURVEY, ANALYZE FIELD DATA, PREPARE AN ENGINEERING DESIGN DRAWINGS AND SPECIFICATIONS, INSTALL EQUIPMENT OR COMPLETE REPAIRS PER THE APPROVED DESIGN. THE CONTRACTOR SHALL FURNISH THE MATERIALS AND LABOR REQUIRED FOR REPLACING PNEUMATIC CONTROLS TO DDC; RELOCATING OF THE MECHANICAL ROOM EXHAUST FAN; AND REMOVAL OF AUTOMATIC TUBE CLEANERS ON THE CHILLER IN BUILDING C-3531 AT FT. BRAGG, NC. ARRA::YES::ARRA |
Amount:
$800,000
Award Description: TAS::21 2022::TAS RECOVERYPROJECT#::37148::RP#
THIS TASK ORDER IS TO SURVEY, ANALYZE FIELD DATA, PREPARE ENGINEERING DESIGN DRAWINGS AND SPECIFICATIONS, INSTALL EQUIPMENT OR COMPLETE REPAIRS PER THE APPROVED DESIGN. THE CONTRACTOR SHALL FURNISH THE MATERIALS AND LABOR REQUIRED FOR INSPECTING AND UPGRADING HVAC EQUIPMENT AND DIRECT DIGITAL CONTROLS IN BUILDING H-3531 AT FT. BRAGG, NC. DIRECT DIGITAL CONTROLS SHALL BE INSPECTED AND UPGRADED ON HVAC SYSTEMS AS SPECIFIED IN ATTACHMENT 4 AND 5. THE CONTRACTOR SHALL REPAIR AND REPLACE CONTROLS AND INCIDENTAL ELECTRICAL AND STRUCTURAL ELEMENTS AS NEEDED FOR A COMPLETE AND USEABLE SYSTEM. THE CONTRACTOR SHALL SURVEY THE HARDWARE NECESSARY FOR THIS PROJECT AND VALIDATE THE OPERATIONAL EFFECTIVENESS OF ANY EQUIPMENT TO BE REUSED. ALL SURVEYS WILL BE COORDINATED WITH FT. BRAGG MAINTENANCE PERSONNEL. THE HVAC EQUIPMENT AND LONWORKS« SYSTEM SHALL BE FOR A COMPLETE OPERATIONAL SYSTEM AS DEFINED IN ATTACHMENT NO. 4 AND 5 AND PER THE SPECIFICATIONS LISTED IN ATTACHMENT NO. 1. IN ADDITION, THIS PROJECT INCLUDES DESIGN AND INSTALLATION OF ADDITION DIRECT DIGITAL CONTROL (DDC) SYSTEM EQUIPMENT IN ORDER TO REMOTELY CONTROL THIS EQUIPMENT FROM THE EXISTING FT. BRAGG LCS SERVER LOCATED IN 3-1634. |
Amount:
$139,769
Award Description: TAS::21 2022::TAS RECOVERYPROJECT#::37148::RP#
THIS MODIFICATION WILL CONSIST OF THE FOLLOWING: NEW PLANT MASTER CONTROLS WILL BE INSTALLED FOR THE SMOKE BOMB HILL CENTRAL PLANT, AND INTEGRATED INTO THE BASE-WIDE UMCS SYSTEM. ALL SENSORS WILL BE REPLACED AS NEEDED WITH NEW THAT MEET UFGS 23 09 23 SPECIFICATIONS. COOLING TOWERS WILL BE OPTIMIZED FOR SUMMER AND WINTER OPERATIONS. ALL VFD¿S WILL BE EVALUATED FOR PROPER OPERATION AND REPLACED AS NEEDED. A NEW HYDRAULIC ANALYSIS OF THE PLANT WILL BE CONDUCTED. ALL PNEUMATIC CONTROLS WILL BE REPLACED. ARRA::YES::ARRA |
Amount:
$914,406
Award Description: TAS::21 2022::TAS RECOVERYPROJECT#::30683::PR#
ARRA FT. BLISS EMERGENCY GENERATORS |
Amount:
$2,072,266
Award Description: TAS::21 2022::TAS RECOVERYPROJECT#38260::RP#
CONTRACTOR SHALL DESIGN, FURNISH LABOR AND MATERIALS, AND PERFORM WORK FOR THE INSTALLATION OF HYBRID AIR-CONDITIONING UNITS FOR BUILDING 1107/1108 AT FORT BLISS, TEXAS. THE HYBRID IS A COMBINATION OF EVAPORATIVE COOLING AND DIRECT EXCHANGE COOLING. PROVIDE ENGINEERING FOR PROPER SIZING WITH RESPECT TO HEAT LOAD AND TO OPTIMIZE OPERATIONAL EFFICIENCIES. ADDITIONALLY THIS PROJECT WILL PROVIDE FOR NATURAL DAYLIGHTING THROUGH UTILIZATION OF HIGH WINDOWS AND REFLECTIVE MATERIAL. |
Amount:
$763,304
Award Description: TAS::21 2022::TAS RECOVERYPROJECT#::38267::RP#
CONTRACTOR SHALL DESIGN, FURNISH LABOR AND MATERIALS, AND PERFORM WORK FOR THE INSTALLATION OF HYBRID AIR-CONDITIONING UNITS FOR 2 BUILDINGS AT FORT BLISS, TEXAS. THE HYBRID IS A COMBINATION OF EVAPORATIVE COOLING AND DIRECT EXCHANGE COOLING. PROVIDE ENGINEERING FOR PROPER SIZING WITH RESPECT TO HEAT LOAD AND TO OPTIMIZE OPERATIONAL EFFICIENCIES. |
Amount:
$850,662
Award Description: TAS::21 2022::TAS RECOVERYPROJECT#::35711::RP#
THE CONTRACTOR SHALL PROVIDE NEW HIGH EFFICIENCY BOILERS AND ASSOCIATED DIRECT DIGITAL CONTROLS AT FORT CARSON, COLORADO. THE CONTRACTOR SHALL UTILIZE THE GOVERNMENT SUPPLIED EXISTING BUILDING AND BOILER EQUIPMENT LISTS AND PROVIDE A TECHNICAL PROPOSAL TO REPLACE BOILERS WITH NEW EQUIPMENT THAT WILL MEET THE HEATING REQUIREMENTS IN MULTIPLE FACILITIES AT FORT CARSON AND OPTIMIZE COST EFFECTIVENESS AND ENERGY EFFICIENCY. THE CONTRACTOR SHALL EVALUATE EXISTING CONDITIONS, ESTIMATE HEATING LOADS, COORDINATE WITH DPW TO DETERMINE ENERGY EFFICIENT SOLUTIONS, SUBMIT A TECHNICAL DATA PACKAGE, AND EXECUTE THE GOVERNMENT APPROVED SOLUTION. |
Amount:
$76,897
Award Description: TAS::21 2022::TAS RECOVERY PROJECT#::35789::RP#
TO EXERCISE THE ENGINEERING CHANGE PROPOSAL AS LISTED BELOW:
ENGINEERING CHANGE PROPOSAL FOR ENERGY SAVING LIGHTING REPLACEMENT IN THE AMOUNT OF $76,897.00.
THE ORIGINAL TASK ORDER IS TO SURVEY, ANALYZE FIELD DATA, PREPARE AN ENGINEERING DESIGN DRAWINGS AND SPECIFICATIONS, INSTALL EQUIPMENT OR COMPLETE REPAIRS PER THE APPROVED DESIGN. THE CONTRACTOR SHALL FURNISH THE MATERIALS AND LABOR REQUIRED FOR INSPECTING AND UPGRADING HVAC EQUIPMENT AND DIRECT DIGITAL CONTROLS IN BUILDING H-5454 AT FT. BRAGG, NC. DIRECT DIGITAL CONTROLS SHALL BE INSPECTED AND UPGRADED ON HVAC SYSTEMS AS SPECIFIED IN ATTACHMENT 4. THE CONTRACTOR SHALL REPAIR AND REPLACE HVAC EQUIPMENT, CONTROLS AND INCIDENTAL ELECTRICAL AND STRUCTURAL ELEMENTS AS NEEDED FOR A COMPLETE AND USEABLE SYSTEM. THE CONTRACTOR SHALL SURVEY THE HARDWARE NECESSARY FOR THIS PROJECT AND VALIDATE THE OPERATIONAL EFFECTIVENESS OF ANY EQUIPMENT TO BE REUSED. ALL SURVEYS WILL BE COORDINATED WITH FT. BRAGG MAINTENANCE PERSONNEL. THE HVAC EQUIPMENT AND LONWORKS® SYSTEM SHALL BE FOR A COMPLETE OPERATIONAL SYSTEM AS DEFINED IN ATTACHMENT NO. 4 AND PER THE SPECIFICATIONS LISTED IN ATTACHMENT NO. 1. THIS PROJECT INCLUDES DESIGN AND INSTALLATION OF LONWORKS DIRECT DIGITAL CONTROL (DDC) EQUIPMENT FOR REMOTE MONITORING AND CONTROL FROM THE EXISTING FT. BRAGG LCS SERVER LOCATED IN 3-1634.
ARRA::YES::ARRA |
Amount:
$45,547
Award Description: TAS::21 2022::TAS RECOVERY PROJECT#::35789::RP#
ENGINEERING CHANGE PROPOSAL FOR FIRE CODE UPGRADE TO UFC 3-600-1 IN THE AMOUNT OF $45,547.00
THE ORIGINAL TASK ORDER IS TO SURVEY, ANALYZE FIELD DATA, PREPARE AN ENGINEERING DESIGN DRAWINGS AND SPECIFICATIONS, INSTALL EQUIPMENT OR COMPLETE REPAIRS PER THE APPROVED DESIGN. THE CONTRACTOR SHALL FURNISH THE MATERIALS AND LABOR REQUIRED FOR INSPECTING AND UPGRADING HVAC EQUIPMENT AND DIRECT DIGITAL CONTROLS IN BUILDING H-5454 AT FT. BRAGG, NC. DIRECT DIGITAL CONTROLS SHALL BE INSPECTED AND UPGRADED ON HVAC SYSTEMS AS SPECIFIED IN ATTACHMENT 4. THE CONTRACTOR SHALL REPAIR AND REPLACE HVAC EQUIPMENT, CONTROLS AND INCIDENTAL ELECTRICAL AND STRUCTURAL ELEMENTS AS NEEDED FOR A COMPLETE AND USEABLE SYSTEM. THE CONTRACTOR SHALL SURVEY THE HARDWARE NECESSARY FOR THIS PROJECT AND VALIDATE THE OPERATIONAL EFFECTIVENESS OF ANY EQUIPMENT TO BE REUSED. ALL SURVEYS WILL BE COORDINATED WITH FT. BRAGG MAINTENANCE PERSONNEL. THE HVAC EQUIPMENT AND LONWORKS« SYSTEM SHALL BE FOR A COMPLETE OPERATIONAL SYSTEM AS DEFINED IN ATTACHMENT NO. 4 AND PER THE SPECIFICATIONS LISTED IN ATTACHMENT NO. 1. THIS PROJECT INCLUDES DESIGN AND INSTALLATION OF LONWORKS DIRECT DIGITAL CONTROL (DDC) EQUIPMENT FOR REMOTE MONITORING AND CONTROL FROM THE EXISTING FT. BRAGG LCS SERVER LOCATED IN 3-1634.
|
Amount:
$48,776
Award Description: TAS::21 2022::TAS RECOVERYPROJECT#::35789::RP#
TO EXERCISE THE ENGINEERING CHANGE PROPOSAL AS LISTED BELOW:
ENGINEERING CHANGE PROPOSAL FOR UNDERGROUND 6¿ WATER PIPING IN THE AMOUNT OF $48,776.00
THE ORIGINAL TASK ORDER IS TO SURVEY, ANALYZE FIELD DATA, PREPARE AN ENGINEERING DESIGN DRAWINGS AND SPECIFICATIONS, INSTALL EQUIPMENT OR COMPLETE REPAIRS PER THE APPROVED DESIGN. THE CONTRACTOR SHALL FURNISH THE MATERIALS AND LABOR REQUIRED FOR INSPECTING AND UPGRADING HVAC EQUIPMENT AND DIRECT DIGITAL CONTROLS IN BUILDING H-5454 AT FT. BRAGG, NC. DIRECT DIGITAL CONTROLS SHALL BE INSPECTED AND UPGRADED ON HVAC SYSTEMS AS SPECIFIED IN ATTACHMENT 4. THE CONTRACTOR SHALL REPAIR AND REPLACE HVAC EQUIPMENT, CONTROLS AND INCIDENTAL ELECTRICAL AND STRUCTURAL ELEMENTS AS NEEDED FOR A COMPLETE AND USEABLE SYSTEM. THE CONTRACTOR SHALL SURVEY THE HARDWARE NECESSARY FOR THIS PROJECT AND VALIDATE THE OPERATIONAL EFFECTIVENESS OF ANY EQUIPMENT TO BE REUSED. ALL SURVEYS WILL BE COORDINATED WITH FT. BRAGG MAINTENANCE PERSONNEL. THE HVAC EQUIPMENT AND LONWORKS® SYSTEM SHALL BE FOR A COMPLETE OPERATIONAL SYSTEM AS DEFINED IN ATTACHMENT NO. 4 AND PER THE SPECIFICATIONS LISTED IN ATTACHMENT NO. 1. THIS PROJECT INCLUDES DESIGN AND INSTALLATION OF LONWORKS DIRECT DIGITAL CONTROL (DDC) EQUIPMENT FOR REMOTE MONITORING AND CONTROL FROM THE EXISTING FT. BRAGG LCS SERVER LOCATED IN 3-1634.
ARRA::YES::ARRA |
Amount:
$577,342
Award Description: TAS::97 0501::TAS RECOVERYPROJECT#::64880
DDC UPGRADES AT VARIOUS BLDGS. |
Amount:
$225,890
Award Description: TAS::97 0501::TAS ARRA::YES::ARRA REOVERYPROJECT#::69770::RP# ARRA UMCS FT. BRAGG
HE CONTRACTOR SHALL PROVIDE THE MATERIALS AND LABOR REQUIRED TO INTEGRATE DIRECT DIGITAL CONTROL (DDC) SYSTEMS IN BUILDINGS C-3022, D-3206, H-2908, H-2834, & B-5102 AT FORT BRAGG.
|
Amount:
$730,036
Award Description: TAS::97 0501::TAS RECOVERYPROJECT#::323647::PR#
ARRA FORT HOOD |
Amount:
$25,106
Award Description: TAS::21 2022::TAS ARRA::YES::ARRA RECOVERYPROJECT#::326248::RP#
PROJECT TITLE: 326248 FLAME DETECTOR FOR GENERATOR AT FT. BLISS, TX. |
Amount:
$15,519
Award Description: TAS::21 2022::TAS ARRA::YES::ARRA RECOVERYPROJECT#::326248::RP#
PROJECT TITLE: 326248 INSTALL PRE COOLING MODULE AND UPGRADE CONTROLS FOR GENERATOR AT FT. BLISS, TX. |
Amount:
$0
Award Description: ARRA - BOILER REPLACEMENT FT. CARSON |
Amount:
$0
Award Description: TAS::21 2022::TAS RECOVERYPROJECT#38260::RP#
CONTRACTOR SHALL DESIGN, FURNISH LABOR AND MATERIALS, AND PERFORM WORK FOR THE INSTALLATION OF HYBRID AIR-CONDITIONING UNITS FOR BUILDING 1107/1108 AT FORT BLISS, TEXAS. THE HYBRID IS A COMBINATION OF EVAPORATIVE COOLING AND DIRECT EXCHANGE COOLING. PROVIDE ENGINEERING FOR PROPER SIZING WITH RESPECT TO HEAT LOAD AND TO OPTIMIZE OPERATIONAL EFFICIENCIES. ADDITIONALLY THIS PROJECT WILL PROVIDE FOR NATURAL DAYLIGHTING THROUGH UTILIZATION OF HIGH WINDOWS AND REFLECTIVE MATERIAL. |
Amount:
$0
Award Description: POP EXTENSION TO 30 APRIL 2012 |
Amount:
$0
Award Description: TASK ORDER MODIFICATION TO EXTEND THE PERIOD OF PERFORMANCE ENDING DATE FROM 30 OCTOBER 2012 TO 15 APRIL 2013. |