| Other Awards |
Amount:
$0
Award Description: THIS IS A BI-LATERAL MODIFICATION TO SPECIFY 1) A GMP FOR 88,870,872.83; 2) TO INCORPORATE OPTIONS A, B, AND C INTO THE CONTRACT; 3) TO INCOPORATE FAR CLAUSES 52.217-5, 52.232-18 AND GSAM CLUASE 536.270 |
Amount:
$75,000
Award Description: TAS::47 4543::TAS
THIS MODIFICATION IS BEING ISSUED AS A "TASK ORDER" MODIFICATION FOR THE NOT-TO-EXCEED AMOUNT OF $75,000.00 FOR THE RENOVATION OF THE FEDERAL BUILDING LOCATED AT 50 UNP IN SAN FRANCISCO, CALIFORNIA. |
Amount:
$28,978
Award Description: DEMOLITION OF THE FIRE SPRINKLER'S MAIN AND BRANCH LINES AS REQUIRED ON THE 3RD AND 5TH FLOORS PER HKS BULLETIN #5.1 REVISED, DATED APRIL 7, 2010 |
Amount:
$1,330
Award Description: DEMOLITION OF NON ORIGINAL WALLS AND DOORS |
Amount:
$92,600,650
Award Description: RECOVERY ACT - THIS MODIFICATION EXERCISES THE OPTION FOR CONSTRUCTION PHASE SERVICES IN THE AMOUNT OF $88,870,872.83. IN ADDITION THIS MODIFICATION EXERCISES GROUP A OPTIONS AS DESCRIBED IN PS04 IN THE AMOUNT OF $3,372,778.00 FOR A TOTAL GMP OF $92,600,650.00. |
Amount:
$22,576
Award Description: AMEND PC01 AND PC02 STOP WORK NOTICE TO RESUME DEMOLITION AND ABATEMENT PER THE REVISED SCOPE OF WORK |
Amount:
$31,734
Award Description: HISTORIC LIGHTING FIXTURES |
Amount:
$3,372,661
Award Description: TAS::47 4543::TAS *RECOVERY* DESIGN PHASE SERVICES, PRELIMINARY DEMOLITION/HAZARDOUS MATERIALS ABATEMENT WORK, & ALLOWANCES - 50 UNITED NATIONS PLAZA, SAN FRANCISCO, CA |
Amount:
$2,448
Award Description: ASBESTORS CONTAINING MATERIAL CEILINGS (1ST AND 2ND FLOORS) |
Amount:
$12,064
Award Description: ASBESTOS CONTAINING MATERIALS CEILINGS AND WALLS |
Amount:
$19,311
Award Description: RECOVERY ACT - ADDITIONAL ACM CEILING IN BOILER ROOM B047 |
Amount:
$24,035
Award Description: THIS MODIFICATION IS BEING ISSUED TO DISPOSE OF HOLLOW CLAY TILE AND PLASTER WASTE AT WALLS AS RCRA HAZARDOUS WASTER PER WASTE SAMPLING TEST RESULLTS AT THE 50 UNP BUILDING IN SAN FRANCISCO, CA. |
Amount:
$20,058
Award Description: THIS MODIFICATION IS BEING ISSED TO DEFINITZE PC06 IN THE TOTAL AMOUNT OF $42,634.00 AS A RESULT OF THE STOP WORK NOTICE FOR THE DEMOLITION AND ABATEMENT OF ROOM B047, PER HDCC PCO # 10330 FOR THE RENOVATION OF THE FEDERAL BUILDING AT 50 UNP IN SAN FRANCISCO, CA |
Amount:
-$3,518
Award Description: THIS MODIFICATION IS BEING ISSUED TO DEFINITIZE PC11 IN THE TOTAL AMOUNT OF $25,460.00 FOR THE WORK ASSOCIATED WITH THE FIRE SPRINKLER LINES ON THE 3RD AND 5TH FLOORS OF THE FEDERAL BUILDING LOCATED AT 50 UNITED NATIONS PLAZA IN SAN FRANCISCO, CA. |
Amount:
$31,000
Award Description: THIS MODIFICATION IS BEING ISSUED FOR MEP AND LANDSCAPING FIELD INCESTIGATIONS PER HKS BULLETIN #9 AT 50UNP IN SF, CA |
Amount:
$225,000
Award Description: PROVIDE EVALUATION OF BOTH OPTIONS A AND B AND CONCEPTUAL DESIGN DEVELOPMENT LEVLE COST ESTIMATES WHICH CAN BE COMPLARED WITH THE GMP. |
Amount:
$37,046
Award Description: THIS MODIFICATOIN IS BEING ISSUED TO TRANSPORT AND DISPOSE OF PLASTER WASTER AS NON-RCRA, HAZARDOUS WASTE AS DETERMINED BY LAB SAMPLING FOR 50UNP |
Amount:
$38,555
Award Description: THIS MODIFICATION IS BEING ISSUED TO DEFINITIZE PC09 AND PC10 IN THE TOTAL COMBINED AMOUNT OF $53,067.13 FOR THE DEMOLITION AND HAZMAT ABATEMENT OF THE PLASTER CEILING ON THE 1ST, 2ND, AND 3RD FLOORS FOR 50UNP IN SAN FRANCISCO, CA |
Amount:
-$3,876
Award Description: THIS MODIFICATION IS BEING ISSUED TO DEFINITIZE PC12 IN THE TOTAL AMOUNT OF $15,435.00 FOR THE DEMOLITION AND ABATEMENT OF THE SECOND PLASTER CEILING IDENTIFIED IN BOILER ROOM B047 FOR RENOVATION OF THE FEDERAL BUILDING LOCATED AT 50 UNITED NATIONS PLAZA IN SAN FRANCISCO, CA |
Amount:
$84,803
Award Description: PROVIDE FIELD INVESTIGATION FOR TESTING FOR REMOVAL OF CONCEALED THERMAL SYSTEM INSULATION PIPE MATERIALS CONTAINING ASBESTOS IN THE BASEMENT TO 6TH FLOORS FOR 50UNP |
Amount:
$17,929
Award Description: THIS MODIFICATION IS BEING ISSUED TO DEFINITIZE PC08 IN THE TOTAL AMOUNT OF $49,663.00 FOR THE DOCUMENTATION AND SALVAGE OF THE REMOVAL OF THE HISTORIC LIGHTING FIXTURES AT 50 UNP IN SAN FRANCISCO, CA |
Amount:
$26,000
Award Description: COST TO COMPLETE BACKFILL PROCESS PER THE STOP WORK ORDER PC13 |
Amount:
$15,021
Award Description: CLARIFICATION FOR MATERIALS TESTING SCHEDULE FOR 50 UNP IN SF, CA |
Amount:
$63,202
Award Description: TO CONDUCT A STRUCTURAL FIELD TEST AT 50 UNITED NATIONS PLAZA IN SAN FRANCISCO, CALIFORNIA |
Amount:
$7,032,000
Award Description: TO INCREASE THE GMP TO INCLUDE THE FOLLOWING WORK; 1) INCREASE TI, 2) CORRIDOR NODES, 3) CLOUD CEILING, 4) ADD COOLING AT TELE/DATA AND ELECTRICAL ROOMS, 5)INCREASED SITE ALLOWNACE, 6) ADD LIGHTS UNDER SOFFIT, 7) GREEN ROOF - OPTION 2 |
Amount:
$158,205
Award Description: REVIEW AND COST ESTIMATING SERVICES FOR SCHEDULING, MEP COORDINATION & CONSTRUCTABILITY REVIEW FOR 100% DD DOCUMENTS (CORE AND SHELL 6/11/2010 & TI DATED 8/9/10) |
Amount:
$5,598,561
Award Description: TO INCORPORATE CHANGES IN GROUP B AND GROUP C INTO THE GMP |
Amount:
$39,490
Award Description: TO PROVIDE FEES FOR GENERATING HAZARDOUS MATERIALS DURING PHASE 1 OF CONSTRUCTION FOR THE RENOVATION OF THE FEDERAL BUILDING LOCATED AT 50 UNP IN SAN FRANCISCO, CA |
Amount:
$37,408
Award Description: THIS MODIFICATION IS BEING ISSUED FOR THE INSTALLATION OF TEH CONCRETE FOUNDATIONS TO BE PERFORMED UNDER THE HDCCO CONTRACT TO SUPPORT THE ARTIST COURTYARD BENCHES AND FOUNDATIONS FOR 50UNP |
Amount:
$0
Award Description: THIS MODIFICATION IS BEING ISSUED TO INCREASE THE NOT-TO-EXCEED MOD AMOUNT OF PC27 |
Amount:
-$61,372
Award Description: DEDUCTIVE MODIFICATION TO COVER THE HDCCO REQUESTED ADDEDUM #2 DOCUMENTS WHICH SHALL BE PROVIDED BY LEAD DESIGN TEAM. |
Amount:
$4,232,000
Award Description: DEFINTIZE CHANGE ORDER PC27 IN THE TOTAL AMOUNT OF $7,032,000.00 |
Amount:
-$14,102
Award Description: MODIFICATION IS BEING ISSUED AS A DEDUCTIVE MOD TO PAY FOR ADDITIONAL HKS CONSULTANTS TO PRODUCE ADDENDUM #2 AT HDCCO'S REQUEST |
Amount:
-$4,232,000
Award Description: ADMIN MODIFICATION TO CANCEL PC44 AND DEOBLIGATE UNCOMMITTED BALANCE OF PC27 |
Amount:
$374,519
Award Description: THIS MODIFICATION IS BEING ISSUED TO INCLUDE EXTERIOR GRANITE ANCHORAGE WORK PER ASI 48.1, STEEL ARCHITRAVE SUPPORTS PER ASI 48.2, PARAPET BRACING PER ASI 48.3, AND OTHER ASSOCIATED WORK PER ASI 48 REQUIRED TO MEET SEISMIC CODE AND HISTORIC PRESERVATION GOALS FOR THE RENOVATION OF THE FEDERAL BUILDING LOCATED AT 50 UNITED NATIONS PLAZA IN SAN FRANCISCO, CALIFORNIA. |
Amount:
$48,927
Award Description: THIS MODIFICATION IS BEING ISSUED FOR THE HANDLING, HOISTING, AND SETTING OF THE ARTIST PROVIDED CONCRETE BENCHES AND GRANITE FOUNTAIN IN THE COURTYARD OF THE FEDERAL BUILDING LOCATED AT 50 UNITED NATIONS PLAZA IN SAN FRANCISCO, CALIFORNIA. |
Amount:
$453,466
Award Description: THIS MODIFICATION IS BEING ISSUED FOR THE HANDLING, HOISTING, AND SETTING OF THE ARTIST PROVIDED CONCRETE BENCHES AND GRANITE FOUNTAIN IN THE COURTYARD OF THE FEDERAL BUILDING LOCATED AT 50 UNITED NATIONS PLAZA IN SAN FRANCISCO, CALIFORNIA. |
Amount:
$105,822
Award Description: THIS MODIFICATION IS BEING ISSUED TO RELOCATE AND STRENGTHEN STEAM AND MEP PIPING TO MEET ENGINEERING DESIGN CRITERIA AND HISTORIC PRESERVATION GOALS PER COR #S 6108, 6179, 6181, 6182, 6257, 6283, 6309, 6327, AND 6355 FOR THE RENOVATION OF THE FEDERAL BUILDING LOCATED AT 50 UNITED NATIONS PLAZA IN SAN FRANCISCO, CALIFORNIA. |