| Other Awards |
Amount:
$95,586
Award Description: RECOVERY - TAS::14 1041:: TAS REHABILITATE QUARRY VISITOR CENTER AND REPLACE CONDEMNED PORTIONS COMMISSIONING SERVICES FOR CONSTRUCTION DOCUMENTS THROUGH POST-CONSTRUCTION, INCLUDING LEED AND FEDERAL SUSTAINABILITY REQUIREMENTS - (AMERICAN RECOVERY AND REINVESTMENT ACTION) (ARRA) INDEFINITE QUANTITY CONTRACT 1443C2000080300, TASK ORDER T2011090444, DINO-021511, UINTAH COUNTY, UTAH |
Amount:
$382,647
Award Description: TAS::14 1041::TAS RECOVERY AE CONSTRUCTION DOCUMENT SERVICES FOR WATER TANKS AND PIPING AT SEQOIA AND KING CANYON NATIONAL PARK. |
Amount:
$2,750
Award Description: TAS::47 4543::TAS
MODIFICATION TO ADD STUDY OF FIRST FLOOR EXERIOR WALL DAMAGE AT THE PIERRE FEDERAL BUILDING AND INCLUDE IN THE SCOPE FOR DESIGN-BUILD CONSTRUCTION PROJECT. |
Amount:
$47,553
Award Description: TAS::47 4543::TAS
DEVELOP THE STATEMENTS OF WORK FOR THE REPAIR AND ALTERATION OF THE PIERRE FEDERAL OFFICE BUILDING IN PIERRE, SD, TO REPLACE THE EXISTING CURTAIN WALL SYSTEM AND REPAIR BASEMENT WATER INFILTRATION ISSUES |
Amount:
$114,126
Award Description: ARRA FUNDED - RECOVERY RECOMMISSIONING PROJECT
TAS::47 4543::TAS ARRA::YES::ARRA |
Amount:
-$1,936
Award Description: ARRA - TAS: :47 4543: :TAS
MOD TO CREDIT MANDATORY MEETING REQUIREMENT THAT WAS DELETED FROM SOW. |
Amount:
$28,789
Award Description: RECOVERY DINO PMIS #021511 'REPLACE CONDEMNED PORTIONS OF QUARRY VISITOR CENTER' PROJECT AT DINOSAUR NATIONAL MONUMENT, UINTAH COUNTY, UTAH/COLORADO, MODIFICATION IS FOR ENHANCED COMMISSIONING SERVICES FOR THIS PROJECT |
Amount:
$105,067
Award Description: RECOVERY CAVE #116245 CONSTRUCTION A&E SERVICES DURING CONSTRUCTION AT CARLSBAD CAVERNS, EDDY COUNTY, NEW MEXICO |
Amount:
$0
Award Description: TAS::14 1041::TAS RECOVERY AE CONSTRUCTION DOCUMENT SERVICES FOR WATER TANKS AND PIPING AT SEQOIA AND KING CANYON NATIONAL PARK.
MOD1: EXTEND PERIOD OF PERFORMANCE |
Amount:
$106,803
Award Description: TAS::14 1041::TAS RECOVERY SEKI PMIS#059925 - AE TITLE III SERVICES FOR POTABLE WATER TANK REPLACEMENT AT SEQUOIA NATIONAL PARK. |
Amount:
$221,133
Award Description: TAS::14 1041::TAS RECOVERY CAVE 116245
THIS WORK OF THIS TASK ORDER CONSIST OF THE PREPARATION OF DESIGN DEVELOPMENT AND CONSTRUCTION DOCUMENTS FOR THE PROJECT 'STRUCTURAL REPAIR AND LEAD BASED POINT ABATEMENT' AT CARLSBAD CAVERNS NATIONAL PARK, NEW MEXICO. THIS PROJECT WILL ABATE DANGEROUS WORKING CONDITIONS, RESTORE LOST STRUCTURAL INTEGRITY AND EXTEND THE SERVICE LIFE OF THIS CRITICAL 53-YEAR OLD PASSENGER ELEVATOR SYSTEM. |
Amount:
$40,967
Award Description: RECOVERY DINO 021511 AE SERVICES DURING EXHIBIT FABRICATION AND INSTALLATION, SHOP DRAWING AND SUBMITTAL REVIEW, FABRICATION INSPECTION AND SITE INSTALLATION VISITS FOR THE EXHIBIT FABRICATION AND INSTALLATION PROJECT AT DINOSAUR NATIONAL MONUMENT, UINTAH COUNTY, UTAH |
Amount:
$249,050
Award Description: TAS::14 1041::TAS RECOVERY DINO PMIS #021511, ARCHITECTURAL/ENGINEERING CONSTRUCTION SERVICES, SUBMITTAL REVIEW, COORDINATION OF SUSTAINABILITY REQUIREMENTS, OFFICE SERVICES, AND SITE VISITS, DINOSAUR NATIONAL MONUMENT, UINTAH COUNTY, UTAH |
Amount:
$0
Award Description: CAVE #116245 INDUSTRIAL HYGIENE MONITORING FOR CARLSBAD CAVERNS CONSTRUCTION PROJECT "STRUCTURAL STEEL REPAIR AND LEAD BASED PAINT ABATEMENT IN PRIMARY ELEVATOR SHAFT" MODIFICATION TO CHANGE FEE AND PAYMENT SECTION OF SCOPE OF SERVICES. |
Amount:
$193,817
Award Description: RECOVERY CAVE #116245 A&E SERVICES FOR INDUSTRIAL HYGIENE MONITORING DURING CONSTRUCTION PROJECT AT CARLSBAD CAVERNS NATIONAL PARK. |
Amount:
$9,433
Award Description: RECOVERY CAVE 116245 THE WORK OF THIS TASK IS ATTENDANCE AT PRE-PROPOSAL MEETING, CARLSBAD CAVERNS NATIONAL PARK, EDDY COUNTY, NEW MEXICO, STRUCTURAL REPAIR AND LEAD BASED PAINT ABATEMENT IN PRIMARY ELEVATOR SHAFT |
Amount:
$268,963
Award Description: COMMISSIONING,LEED CONSULTATION, MEASUREMENT/INSPECTION/VERIFICATION SERVICES, O&M TRAINING: IN SUPPORT OF THE INSTALLATION OF ENERGY CONSERVATION MEASURES AT THE DAVID SKAGGS RESEARCH CENTER, BOULDER, COLORADO. |
Amount:
$165,573
Award Description: TAS::47 4543::TAS
ARCHITECT/ENGINEERING DESIGN ENERGY CONSERVATION MEASURES FOR THE DAVID SKAGGS RESEARCH CENTER, BOULDER, COLORADO |
Amount:
$7,431
Award Description: TAS::47 4543::TAS
MODIFICATION TO ADD ENERGY LOSS SURVEY INFRARED SCAN OF DAVID SKAGGS RESEARCH CENTER, BOULDER, COLORADO |
Amount:
$87,639
Award Description: TAS::47 4543::TAS
THIS MODIFICATION ADDS COMMISSIONING SERVICES AND TEST AND BALANCE SERVICES TO THE ENERGY CONSERVATION MEASURES DESIGN CONTRACT AT THE DAVID SKAGGS RESEARCH CENTER. |
Amount:
$100,267
Award Description: TAS::47 4543::TAS
DATA CENTER RECOMMISSIONING AT THE DAVID SKAGGS RESEARCH CENTER, BOULDER, CO. |
Amount:
-$1,586
Award Description: MODIFICATION DEOBLIGATES THE UNUSED NOT TO EXCEED AMOUNTS ON THE TASK ORDER FOR CLOSEOUT. |
Amount:
$6,160
Award Description: ARRA CONTRACT MODIFICATION FOR LABOR ASSOCIATED WITH APPLICATION FOR XCEL ENERGY REBATE - DAVID SKAGGS RECOMMISSIONING |
Amount:
$3,931
Award Description: MODIFICATION TO STUDY WORK TO ADD STUDY OF WATER INFILTRATION ISSUES FOR EVALUATION DURING EXCAVATION OF FOUNDATION FOR ANOTHER PROJECT. |
Amount:
$0
Award Description: RECOVERY CAVE 116245 CONSTRUCTION A&E OVERSIGHT ON CARLSBAD CAVERNS ELEVATOR PROJECT. MODIFICATION TO EXTEND THE PERFORMANCE PERIOD. |
Amount:
$10,000
Award Description: RECOVERY CAVE 116245 A&E CONSTRUCTION SERVICES FOR CARLSBAD CAVERNS NATIONAL PARK, STRUCTURAL REPAIR AND LEAD BASED PAINT ABATEMENT IN ELEVATOR SHAFT. MODIFICATION TO ADD ADDITIONAL FUNDING FOR OFFICE SERVICES DUE TO CHANGE IN METHOD FOR THE CONSTRUCTION CONTRACT. |
Amount:
$3,360
Award Description: RECOVERY DINO PMIS #021511 ADD ADDITIONAL ELEMENTS OF WORK RELATED TO 'COORDINATION OF SUSTAINABILITY REQUIREMENTS (LEED)', FOR THE 'REPLACE CONDEMNED PORTIONS OF QUARRY VISITOR CENTER' CONSTRUCTION PROJECT AT DINOSAUR NATIONAL MONUMENT IN UINTAH COUNTY, UTAH. |
Amount:
$0
Award Description: RECOVERY CAVE 116245 A&E SERVICES FOR CONSTRUCTION AT CARLSBAD CAVERNS NATIONAL MONUMENT, EDDY COUNTY, CARLSBAD, NEW MEXICO. MODIFICATION TO EXTEND PERFORMANCE PERIOD. |
Amount:
$101,384
Award Description: RECOVERY CAVE 116245 INDUSTRIAL HYGIENE MONITORING FOR CARLSBAD CAVERNS, CAVE ELEVATOR PROJECT. MODIFICATION FOR ADDITIONAL EFFORT AND FUNDING DUE TO CONSTRUCTION CONTRACTOR WORKING DOUBLE SHIFTS, AND DUE TO EXTENDING THE COMPLETION DATE OF THE CONSTRUCTION CONTRACT. |
Amount:
$40,000
Award Description: RECOVERY CAVE 116245 INDUSTRIAL HYGIENE MONITORING FOR CARLSBAD CAVERNS, CAVE ELEVATOR PROJECT. MODIFICATION FOR ADDITIONAL FUNDING DUE TO INCREASED WORK SCHEDULE FROM FIVE SHIFTS PER WEEK TO 14. |
Amount:
$0
Award Description: RECOVERY DINO 021511 DINOSAUR NATIONAL MONUMENT, UINTAH COUNTY, UTAH, AE SERVICES DURING EXHIBIT FABRICATION&INSTALLATION, TASK ORDER TIME EXTENSION. |
Amount:
$6,145
Award Description: RECOVERY DINO 021511 EXHIBIT GRAPHIC REVISIONS FROM EXPOSED WOOD EXHIBIT PANELS TO EMBEDDED HPL (HIGH PRESSURE LAMINATE), AE SERVICES DURING EXHIBIT FABRICATION&INSTALLATION, DINOSAUR NATIONAL MONUMENT, UINTAH COUNTY, UTAH |
Amount:
$11,822
Award Description: RECOVERY DINO 021511 GRAPHICS CHANGES TO THE DINOSAUR EXHIBITS GRAPHIC PACKAGE, AE SERVICES DURING EXHIBIT FABRICATION&INSTALLATION, DINOSAUR NATIONAL MONUMENT, UINTAH COUNTY, UTAH |
Amount:
$0
Award Description: RECOVERY DINO PMIS #021511, EXTENSION OF PERIOD OF PERFORMANCE NO-COST MODIFICATION FOR COMMISSIONING SERVICES FOR THE 'REPLACE QUARRY VISITOR CENTER' PROJECT AT DINOSAUR NATIONAL MONUMENT, UINTAH COUNTY, UTAH |
Amount:
$0
Award Description: THE PURPOSE OF THIS MODIFICATION IS TO MAKE ADMINISTRATIVE CHANGES TO THE CONTRACT WITHIN THE CONTRACT LINE ITEM (CLIN) STRUCTURE IN ORDER TO FACILITATE THE GOVERNMENT'S CONVERSION TO UPDATED SOFTWARE (FBMS). THIS MODIFICATION MADE CHANGES TO DELIVERY, START, AND/OR END DATES, CHANGING EACH CLIN TO BE CONSISTENT WITH THE CURRENT CONTRACT DATES. THIS MODIFICATION DOES NOT CHANGE ANY REQUIREMENTS, FUNDING, DELIVERY, OR PERFORMANCE DATES OF THE CONTRACT. ALL TERMS AND CONDITIONS REMAIN UNCHANGED. |
Amount:
$44,294
Award Description: ADD FUNDS FOR A/E CONSTRUCTION SERVICES DURING CONSTRUCTION OF MANY GLACIER HOTEL |
Amount:
$0
Award Description: RECOVERY DINO PMIS #021511 EXTENSION OF THE PERIOD OF PERFORMANCE FOR 'SUBMITTAL REVIEW, COORDINATION OF SUSTAINABILITY REQUIREMENTS, OFFICE SERVICES AND SITE VISITS' FOR THE THE 'REPLACE CONDEMNED PORTIONS OF QUARRY VISITOR CENTER', CONSTRUCTION PROJECT AT DINOSAUR NATIONAL MONUMENT, UINTAH COUNTY, UTAH |
Amount:
$0
Award Description: RECOVERY DINO 021511 DINOSAUR NATIONAL MONUMENT, UINTAH COUNTY, UTAH, AE SERVICES DURING EXHIBIT FABRICATION&INSTALLATION, TASK ORDER TIME EXTENSION |
Amount:
$0
Award Description: RECOVERY DINO PMIS #021511, EXTEND PERIOD OF PERFORMANCE, FOR THE ARCHITECTURAL ENGINEERING (A/E) CONSTRUCTION SERVICES ASSOCIATED WITH THE 'REPLACE CONDEMNED PORTIONS OF THE QUARRY VISITOR CENTER' CONSTRUCTION PROJECT AT DINOSAUR NATIONAL MONUMENT, UINTAH COUNTY, UTAH |
Amount:
$0
Award Description: TIME EXTENSION FOR AE CONSTRUCTION SERVICES FOR THE 'REPLACE CONDEMNED PORTIONS OF QUARRY VISITOR CENTER' CONSTRUCTION PROJECT AT DINOSAUR NATIONAL MONUMENT, UINTAH COUNTY, UTAH/COLORADO, DINO 021511 |
Amount:
$20,000
Award Description: CAVE 116245 A&E SERVICES FOR INDUSTRIAL HYGIENIST TO MONITOR CONTRACTOR'S PAINTING OPERATIONS, AT CARLSBAD CAVERNS NATIONAL PARK, EDDY COUNTY, CARLSBAD, NEW MEXICO. MOD TO ADD IN SCOPE WORK. |
Amount:
$0
Award Description: INDUSTRIAL HYGIENE SERVICES FOR CARLSBAD CAVERNS NATIONAL PARK, EDDY COUNTY, NEW MEXICO |
Amount:
$5,000
Award Description: INDUSTRIAL HYGIENE SERVICES FOR CARLSBAD CAVERNS NTL. PARK, ELEVATOR PROJECT, EDDY COUNTY, CARLSBAD, NEW MEXICO |
Amount:
$13,784
Award Description: ARCHITECTURAL ENGINEERING SERVICES FOR INDUSTRIAL HYGIENE INSPECTINS FOR CAVE ELEVATOR PROJECT AT CARLSBAD CAVERNS NATIONAL PARK, EDDY COUNTY, CARLSBAD, NEW MEXICO. MODIFICATION FOR ADDITIONAL IN SCOPE WORK. |
Amount:
$0
Award Description: THIS MODIFICATION EXTENDS THE CONTRACT DELIVERY DATE TO MARCH 30, 2012 TO ALLOW A/E CONTRACTOR TO COORDINATE TIMING OF INSPECTION, COMMISSIONING, AND REVIEW OF FINAL CONSTRUCITON DOCUMENTATION WITH COMPLETION OF DSRC ECM CONSTRUCTION PROJECT, EXPIRING 3/30/2012. |
Amount:
$0
Award Description: THIS MODIFICATION EXTENDS THE CONTRACT DELIVERY DATE TO JUNE 15, 2012 TO ALLOW A/E CONTRACTOR OT COORDINATE TIMING OF INSPECTION, COMMISSIONING, AND REVIEW OF FINAL CONSTRUCTION DOCUMENTATION WITH COMPLETION OF DSRC ECM CONSTRUCTION PROJECT. |
Amount:
$0
Award Description: THE SCOPE OF WORK FOR THIS CONTRACT INCLUDES A 12 MONTH PERIOD OF MEASUREMENT AND VERIFICATION (M&V) ANALYSIS OF UTILITY USAGE RELATING TO ENERGY CONSERVATION MEASURES IMPLEMENTED IN CONSTRUCTION CONTRACT GS-P-08-10-JB-5024. DELAYS IN THE CONSTRUCTION PROJECT HAVE REQUIRED THE M&V WORK TO BE SCHEDULED OUT FOR THE TIMEFRAME OF APRIL 2012 THROUGH MARCH 2013. THIS MODIFICATION EXTENDS THE CONTRACT DELIVERY DATE TO MARCH 30, 2013. |