| Other Awards |
Amount:
$585,067
Award Description: TAS::21 2066::TAS RECOVERYPROJECT#::325699::RP#
UMCS INTEGRATED SYSTEM |
Amount:
$298,876
Award Description: RECOVERY - TAS::47 4543::TAS
RETRO-COMMISSIONS AND ENERGY MANAGEMENT CONTROL SYSTEM SERVICES WITH ADVANCED METERING FOR THE DOLE COURTHOUSE, 8930 FEDERAL BUILDING, AND WICHITA U.S. COURTHOUSE |
Amount:
$0
Award Description: RECOVERY - TAS::47 4543::TAS
RETRO-COMMISSIONING AND ENERGY MANAGEMENT CONTROL SYSTEM SERVICES WITH ADVANCED METERING FOR THE DOLE COURTHOUSE, 8930 FEDERAL BUILDING, AND WICHITA U.S. COURTHOUSE |
Amount:
$4,320
Award Description: RECOVERY - TAS::47 4543::TAS
ADD TESTING AND BALANCING OF THE VAV BOXES AT THE ROBERT A. YOUNG FEDERAL BUILDING |
Amount:
$324,025
Award Description: RECOVERY - TAS::47 4543::TAS
RETRO-COMMISSIONING AND ENERGY MANAGEMENT CONTROL SYSTEM SERVICES WITH ADVANCED METERING FOR THE ROBERT A. YOUNG FEDERAL BUILDING, NEAL SMITH FEDERAL BUILDING AND SIOUX CITY U.S. COURTHOUSE AND FEDERAL BUILDING |
Amount:
$255,983
Award Description: RECOVERY - TAS::47 4543::TAS
RETRO-COMMISSIONING SERVICES AND ENERGY MANAGEMENT CONTROL SYSTEM SERVICES WITH ADVANCED METERING FOR THE IOWA CITY FEDERAL BUILDING, GRAND ISLAND FEDERAL BUILDING, AND RETRO-COMMISSIONING SERVICES ONLY FOR THE FRANK CARLSON U.S. COURTHOUSE AND FEDERAL BUILDING |
Amount:
$3,203,337
Award Description: TAS::47 4543::TAS RECOVERY - DESIGN SERVICES FOR ALTERATIONS AND BUILDING UPGRADE OF THE M.C. SMITH FEDERAL BUILDING IN BANGOR, ME. |
Amount:
$83,668
Award Description: TAS::47 4543::TAS FOR RETRO-COMMISSIONING, RE-COMMISSIONING AND CONSTRUCTION DESIGN SERVICES FOR THE FINDLEY FEDERAL BUILDING IN SPRINGFIELD, ILLINOIS. |
Amount:
$317,471
Award Description: TAS::47 4543::TAS EXERCISE OPTION 2 - CONSTRUCTION DOCUMENT PHASE SERVICES FOR THE FIRE/LIFE SAFETY AND HVAC UPGRADES PROJECT AT THE MINTON CAPEHART FEDERAL BUILDING IN INDIANAPOLIS, INDIANA. ARRA::YES::ARRA |
Amount:
$57,043
Award Description: TAS::47 4543::TAS
THIS MODIFICATION IS ISSUED FOR AN ARRA FEASBILITY STUDY TO ADDRESS POTENTIAL SCOPE ITEMS THAT MAY BE FURTHER DESIGNED AS PART OF THE ARRA PROJECT AT THE MINTON CAPEHART FEDERAL BUILDING IN INDIANAPOLIS, INDIANA. |
Amount:
$3,590,700
Award Description: TAS::47 4543::TAS RECOVERY - THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE STUDY AND DESIGN SERVICES FOR ENERGY RELATED SCOPE ITEMS AS WELL AS CONSTRUCTION ADMINISTRATION FOR THE FIRE/LIFE SAFETY & HVAC MODERNIZATION PROJECT AT THE MINTON CAPEHART FEDERAL BUILDING IN INDIANAPOLIS, IN. ARRA::YES::ARRA |
Amount:
$20,787
Award Description: TAS::21 2066::TAS ARRA::YES::ARRA RECOVERYPROJECT#::325699::RP# ARRA UMCS COLORADO ARMY NATIONAL RESERVES
PROCUREMENT AND INSTALLATION OF METERS FOR GOLDEN, BLDG. 122 ARMY RESERVE SITE IN COLORADO. |
Amount:
$872,099
Award Description: TAS::21 2066::TAS RECOVERYPROJECT#::080212::PR#
ARRA CONG ENERGY CONSERVATION |
Amount:
$12,507
Award Description: TAS::36 0158::TAS GEOTHERMAL FEASIBILITY STUDY
TAS::36 0158::TAS |
Amount:
$14,873
Award Description: TAS::36 0158::TAS GEOTHERMAL FEASIBILITY STUDY
TAS::36 0158::TAS |
Amount:
$49,707
Award Description: TAS::36 0158::TAS GEOTHERMAL FEASIBILITY STUDY
TAS::36 0158::TAS |
Amount:
$135,981
Award Description: RECOVERY: ADDITIONAL A/E SERVICES FOR MURAL AND LIGHTING RESTORATION |
Amount:
$0
Award Description: MODIFICATION PA02:
THE 100% ARRA LONG-LEAD EQUIPMENT AND SPECIFICATIONS SUBMITTAL DATE IS HEREBY REVISED FROM APRIL 2, 2010 TO APRIL 9, 2010. |
Amount:
$19,737
Award Description: RECOVERY:
WORK ORDER 1, MODIFICATION PS03
THIS MODIFICATION PS03 IS FOR INTERIOR PLUMBING INVESTIGATION SERVICES FOR THE FOLLOWING PROJECT:
SEWER REPLACEMENT (ARRA) IMO00096
4300 GOODFELLOW BLVD
ST. LOUIS, MO
|
Amount:
$66,989
Award Description: RECOVERY. TAS::47 4543::TAS.
THE WORK TO BE DELIVERED UNDER THIS TASK ORDER INCLUDES, BUT IS NOT LIMITE TO: DESIGN ERVICES AT THE FEDERAL CENTER, 4300 GOODFELLOW, ST. LOUIS MO. THE DESIGN SERVICES ARE FOR THE SEWER REPLACEMENT. |
Amount:
$3,909
Award Description: RECOVERY WORK ORDER 1, MODIFICATION PS04
THIS MODIFICATION IS FOR SITE SURVEY SERVICES TO BE DELIVERED TO GSA FROM TENG & ASSOCIATES FOR THE GOODFELLOW SITE AT:
4300 GOODFELLOW
ST. LOUIS, MO
THESE DESIGN SERVICES ARE FOR THE FOLLOWING PROJECT:
SEWER REPLACEMENT (IMO00096) |
Amount:
$870,978
Award Description: WO #1, MODIFICATION PS02 (ARRA)
DESIGN PHASE SERVICES FOR:
GOODFELLOW SEWER (ARRA)
4300 GOODFELLOW BLVD
ST. LOUIS, MO
PROJECT #IMO00096
DESIGN SERVICES INCLUDE BUT ARE NOT LIMITED TOO:
- DEVELOP BASE SHEETS, SCHEMATIC AND DESIGN DEVELOPMENT DRAWINGS.
- COORDINATE DESIGN WITH EXISTING/NEW PROJECTS BEING COMPLETED ONTHE SITE.
- INCORPORATION OF SUSTAINABLE DESIGN INTO DESIGN.
- PROVIDE COST ESTIMATE OF CONSTRUCTION AT EACH SUBMITTAL.
- ATTEND GOVERNMENT MEETINGS.
|
Amount:
$34,638
Award Description: TAS::47 4543::TAS RECOVERY - DESIGN SERVICES FOR ALTERATIONS AND BUILDING UPGRADE OF THE M.C. SMITH FEDERAL BUILDING IN BANGOR, ME. |
Amount:
$62,227
Award Description: REDESIGN OF ENTRY PAVILION AND ADDITIONAL DESIGN FEE FOR USMS SPACE FOR THE MC SMITH FEDERAL BUILDING LOCATED IN BANGOR, MAINE. |
Amount:
$333,188
Award Description: BAS UPGRADES/ DAMPER PROJECT |
Amount:
$0
Award Description: BAS UPGRADES |
Amount:
$25,437
Award Description: RECOVERY-MODIFICATION TO INCORPORATE FEASIBILITY STUDY FOR THE DOLE COURTHOUSE AND WICHITA COURTHOUSE |
Amount:
$80,543
Award Description: ARRA - ENGINEERING SERVICES
LOS ANGELES USCH, LOS ANGELES, CA
MEASURE AND VERIFICATION FOR THE ARRA HVAC AND CONTROLS PROJECTS.
THIS ORDER IS ARRA FUNDED. THE ARRA CLAUSES ARE APPLICABLE TO THIS ORDER, I.E FEDERAL REPORTING, AND OTHER RELATED ITEMS. PLEASE SEE ATTACHMENT. |
Amount:
$1,490,282
Award Description: RECOVERY - POST CONTRACT CONSTRUCTION SERVICES; LEED ADMINISTRATION SERVICES; VALUE ENGINEERING SERVICES; HAZARDOUS MATERIAL TESTING SERVICES. |
Amount:
$1,239,162
Award Description: RECOVERY - MANAGEMENT AND INSPECTION SERVICES AND BUILDING AUTOMATION NETWORK SERVICES FOR THE MODERNIZATION OF THE MC SMITH FB IN BANGOR, ME. |
Amount:
$16,827
Award Description: PROJECT: ARRA ENGINEERING SERVICES
EDWARD ROYBAL FEDERAL BUILDING AND USCH
LOS ANGELES, CA
THE PURPOSE OF THIS MODIFICATION IS TO ADD THE MEASURE AND VERIFICATION FOR THE ARRA HVAC AND CONTROLS PROJECT TO THE EXIST ORDER, IN AN AMOUNT OF $16,827.00.
THIS CHANGE WILL INCREASE THE CONTRAT TOTAL AMOUNT FROM $56,997.75 TO $73,824.75.
|
Amount:
$56,997
Award Description: TAS::47 4543::TAS ARRA- ENGINEERING ASSESSMENT AND SPECIFICATIONS FOR DESIGN-BUILD HVAC/BAS
EDWARD ROYBAL FEDERAL BUILDING&USCH
LOS ANGELES, CA
CONTRACTOR IS TO PROVIDE BRIDGING DOCUMENTS AND DESIGN-BUILD SCOPE PREPARATION BASED ON EXISTING ENERGY STUDY. |
Amount:
$4,242
Award Description: TENG&ASSOCIATES, INC.
WORK ORDER #1, MODIFICATION PS01.
ATTENDANCE AT EPM TRAINING HELD IN KANSAS CITY. |
Amount:
$13,958
Award Description: WORK ORDER 1, MODIFICATION PS07
CONSTRUCTION: ARRA SEWER REPLACEMENT (IMO00096)
4300 GOODFELLOW
ST. LOUIS, MO
THIS MODIFICATION IS HEREBY ISSUED FOR ADDITIONAL SITE SURVEYING OF THE BUILDINGS ON SITE. |
Amount:
$55,652
Award Description: RECOVERY.
GOODFELLOW FEDERAL CENTER
4300 GOODFELLOW BLVD
ST. LOUIS, MO 63120
WORK TO BE COMPLETED UNDER THIS MODIFICATION INCLUDES BUT IS NOT LIMITED TO: PROVIDE FIELD INVESTIGATION SURVEYING SERVICES OF THE ELEVATIONS OF EXISTING PLUMBING LATERALS. THIS WORK WAS PROVIDED FOR IN A PREVIOUS MODIFICATION BUT WAS LIMITED IN LOCATION. THIS MODIFICATION COVERS THE REMAINING AREAS OF THE SEWER. |
Amount:
$248,314
Award Description: RECOVERY.
GOODFELLOW FEDERAL CENTER
4300 GOODFELLOW BLVD
ST. LOUIS, MO 63120
MODIFICATION INCLUDES DESIGN SERVICES FOR THE CONSTRUCTION PHASES AT THE GOODFELLOW COMPLEX. THIS INCLUDES BUT IS NOT LIMITED TO: DESIN FOR DETENTION BASIN, LANDSCAPING AND PAVEMENT PARKING LOT LIGHTING. ALSO, DESIGN WILL BE FOR SEWER SEPARATION AND RECONSTRUCTION OF BUILDING CONNECTORS. |
Amount:
-$69,785
Award Description: ADMINISTRATIVE MODIFICATION FOR ARRA REPORTING ERRORS |
Amount:
$71,457
Award Description: TAS::21 2066::TAS RECOVERYPROJECT#::080212::PR#
ARRA CONG ENERGY CONSERVATION |
Amount:
$36,944
Award Description: TENG&ASSOCIATES, INC.
WORK ORDER 9, MODIFICATION PS01:
THIS MODIFICATION IS FOR ADDITIONAL DESIGN SERVICES REQUIRED TO OPTIMIZE NEW LIGHTING FIXTURE PLACEMENT.
PCN: NMO00384 |
Amount:
$0
Award Description: WORK ORDER 1 - MODIFICATION PS10
ARRA SEWER REPLACEMENT (IMO00096)
4300 GOODFELLOW
ST. LOUIS, MO
THIS MODIFICATION PS10 IS FOR THE FOLLOWING:
-PHASE 3 DESIGN FOR BLDNG 107 AND GUARD SHACK
-PHASE 2B LOT G NEXT TO BLDNG 107
-ADDITIONAL DESIGN FOR PHASE 2
-PHASE 3 DESIGN THAT NEEDS TO REMAIN IN THE CONTRACT
-REMOVE DESIGN FROM PHASE 3
BECAUSE OF THE ADDITIONS MINUS THE REMOVAL OF DESIGN FROM PHASE 3, THIS MODIFICATION PS10 IS A $0 DOLLAR MODIFICATION TO WORK ORDER 1. THE OVERALL CONTRACT AMOUNT WILL NOT BE INCREASED NOR DECREASED. |
Amount:
$24,398
Award Description: WORK ORDER 1, MODIFICATION PS08
ARRA SEWER REPLACEMENT (IMO00096)
4300 GOODFELLOW
ST. LOUIS, MO
THIS MODIFICATION PS08 IS HEREBY ISSUED TO INCLUDE THE FOLLOWING ADDITIONAL DESIGN SERVICES:
1. REVIEW ALTERNATE DESIGN FOR LIGHT POLE BASES AND PROVIDE DETAILED DRAWING OF SUCH. COORDINATE WITH OTHER DISCIPLINES REGARDING DEPTH REQUIRED TO UNDERGROUND DETENTION. COORDINATE WITH UNDERGROUND DETENTION MANUFACTURER.
2. PROVIDE DESIGN SERVICES TO DO ADDITIONAL FIELD WORK RELATED TO INCOMPLETE BIM MODEL AND SURVEY PROVIDED TO TENG. INCORPORAT THE CHANGES FROM FIELD WORK AND ADDITIONAL SURVEY INTO THE DOCUMENTS.
3. PROVIDE ADDITIONAL COST BREAKDOWN FOR PRIORITIES AREAS OF PHASE 3. PROVIDE ADDITIONAL COST ESTIMATE FOR ALTERNATE OF LEAVING BUILDING CONNECTORS IN PLACE. |
Amount:
$88,574
Award Description: WORK ORDER 13
TENG&ASSOCIATES, INC.
RAY ARRA MECHANICAL (IMO00090-MECHANICAL)
ROBERT A. YOUNG FEDERAL BUILDING
1222 SPRUCE
ST. LOUIS, MO
CXA COMMISSIONING AND CONSULTING SERVICES TO AID IN THE IMPLEMENTATION OF DESIGN INTENT FOR THE CONSTRUCTION OF THE RAY ARRA MECHANICAL PROJECT. |
Amount:
$30,388
Award Description: PROJECT: ARRA ENGINEERING SERVICES
ROYBAL FEDERAL BUILDING, LOS ANGELES, CA
LOS ANGELES USCH, LOS ANGELES, CA
THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE THE TECHNICAL SUPPORT TO THE CONSTRUCTION OF ARRA PROJECT AT THE FOLLOWING SITES, IN AN AMOUNT OF $30,388.
1. ROYBAL FEDERAL BUILDING, 255 E TEMPLE STREET, LOS ANGELES, CA - $7,708
2. LOS ANGELES USCH, LOS ANGELES, CA - $22,680
THIS CHANGE WILL INCREASE THE TOTAL CONTRACT AMOUNT AS FOLLOWS:
ARRA FUNDED - FROM $73,824.75 TO $104,212.75
NON_ARRA FUNDED - NO CHANGE, $17,675
ALL TERMS AND CONDITIONS REMAIN UNCHANGED. |
Amount:
$16,394
Award Description: RECOVERY - EQUITABLE ADJUSTMENT DUE THE CONTRACTOR FOR A/E SERVICES TO COLLECT AND ANALYZE SUBSTRATE SAMPLES FROM THE SLATE ASSOCIATED WITH THE WINDOW SYSTEM FOR PCBS. |
Amount:
$373,421
Award Description: REDESIGN OF THE EMERGENCY GENERATOR; MANAGEMENT&INSPECTION SERVICES DURING PCB REMEDIATION; ADDITIONAL ACM SAMPLINGS, MONITORING AND CLEARANCES; EXTENSION OF M&I, PCCS AND M&I FOR GEOTHERMAL WELL DRILLING. |
Amount:
$46,455
Award Description: RECOVERY - ADDITIONAL ENTRY PAVILION DESIGN CONCEPTS AND RENDERING; PCB REMEDIATION WORK PLAN |
Amount:
$30,729
Award Description: SEOBLIGATES $26,595.00 FROM THIS LINE FOR CREDIT DUE THE GSA FOR A/E - DESIGN SERVICES FOR THE ORIGINAL 350KW PHOTOVOLTAIC CANOPY MOUNTED SOLAR POWER SYSTEM, DESIGN SERVICES OF A SMALLER 100KW PHOTOVOLTAIC ROOF-MOUNTED ARRAY THAT REPLACES THE ORIGINAL PROPOSED 350KW ARRAY, DESIGN A CHILLED WATER RECLAMATION SYSTEM TO REDUCE BUILDING WATER USAGE BY RECLAIMING OUTSIDE AIR HANDLING UNIT CONDENSATE, DESIGN SERVICES OF A SOLAR/WIND PARKING DECK LIGHTING SYSTEM, TO DESIGN A "DASHBOARD" SOFTWARE AND HARDWARE SYSTEM TO ANALYZE THE RAW DATA FOR BUILDING MANAGEMENT TO MONITOR ENERGY CONSUMPTION AND FORMAT THE INFORMATION FOR PUBLIC EDUCATION ON GREEN BUILDING DESIGN OF MC SMITH, TO PERFORM ADVANCED ENERGY MODELING TO MODEL THE ADVANCED BUILDING HVAC AND ENERGY SYSTEMS FOR REQUIRED BACK-UP FOR LEED. |
Amount:
$207,459
Award Description: RECOVERY - EXTENSION OF MANAGEMENT AND INSPECTION SERVICES FOR GEOTHERMAL WELL DRILLING; ANALYSIS OF DUST SAMPLES; REDESIGN OF AREAS ON 2ND AND 3RD FLOOR. |
Amount:
$11,530
Award Description: PROJECT: ARRA ENGINEERING SERVICES FOR M&V
LOS ANGELES USCH,312 NSS, LOS ANGELES, CA
THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE THE FOLLOWING TO THE CONTRACT:
1. TO CORRECT AND CLARIFY AN ADMINSTRATIVE ITEM, THAT THE INITIAL ORDER WAS NOT INTENDED TO BE UNDER THE FAS SCHEDULE, AND IT SHOULD BE TREATED AS A STANDALONE PURCHASE ORDER.
2. TO EXTEND THE CONTRACT DELIVERY TO DECEMBER 31, 2011.
3. TO INCLUDE ADDITIONAL INSTRUMENTATION COMPONENTS AND INSTALLATION LABOR TO THE ORDER, IN AN AMOUNT OF $11,530.00.
THIS CHANGE WILL INCREASE THE CONTRACT TOTAL AMOUNT FROM $80,543.00 TO $92,073.00
ARRA FUNDED: $92,073.00
ALL OTHER TERMS AND CONDITIONS REMAIN UNCHANGED. |
Amount:
$0
Award Description: TAS::47 4543::TAS RECOVERY + THIS MODIFICATION ACCEPTS THE FOLLOWING (1) ARRA CONSTRUCTION PHASE SERVICES (2) VETERAN AFFAIR REGIONAL OFFICE REMODELING/3RD FLOOR PROJECT CONSTRUCTION PHASE SERVICES (3) ADDITIONAL ON-SITE CONSTRUCTION PHASE SERVICES |
Amount:
$0
Award Description: TAS::47 4543::TAS RECOVERY + THIS MODIFICATION ACCEPTS THE FOLLOWING (1) SPRINKLER AND FIRE ALARM SYSTEM MODIFICATIONS (2) RESTROOM RENOVATIONS AT BASEMENT AND MEZZANINE (3) FIRST FLOOR TENANT AREA MECHANICAL DISTRIBUTION AND CONTROLS SYSTEM REPLACEMENT&(4) RESTROOM RENOVATION |
Amount:
$0
Award Description: TAS::47 4543::TAS RECOVERY + THIS MODIFICATION ACCEPTS THE FOLLOWING (1) THIRD FLOOR PERIMETER VETERANS ADMINISTRATION TENANT SPACE MODIFICATIONS (2) LOBBY RENOVATION + DESIGN&CONSTRUCTION PHASE (3) LIGHTING DIMMING AT THE FIRST FLOOR LOBBY (4) TENANT LIGHTING DIMMING AT FIRST FLOOR CHILDCARE CENTER (5) CAFETERIA AND CHILDCARE CENTER KITCHEN EXHAUST REPLACEMENT |
Amount:
$0
Award Description: TAS::47 4543::TAS RECOVERY - TO ACCEPT THE FOLLOWING CHANGES: (1) ADDITIONAL ARRA LIGHTING FEASIBILITY STUDY (2) DESIGN OF METERING CONNECTIONS BETWEEN ADVANCED METERS AT ELECTRIC, STEAM,&WATER UTILITY SERVICE MAINS TO BUILDING AUTOMATION SYSTEM (3) LOBBY RENOVATION - CONCEPT PHASE (4) FLOOR PLAN CHANGES AT 4TH AND 5TH FLOOR INTERNAL REVENUE SERVICE AND 2ND FLOOR OFFICE OF SURFACE AND MINING FOR LIGHTING LAYOUT DESIGN&(5) BUILDING AUTOMATION SYSTEM NETWORK CHANGES |
Amount:
$0
Award Description: TAS::47 4543::TAS RECOVERY - THIS MODIFICATION ACCEPTS THE FOLLOWING (1) ELECTRICAL UPGRADES: ENERGY SAVINGS MEASURES AND GROUNDING (2) ELECTRICAL UPGRADES: MAIN SERVICE SWITCHBOARDS REPLACEMENT (3) MOTOR CONTROL CENTERS AND ELEVATOR MACHINE ROOM SWITCHBOARD REPLACEMENT&(4) CHILLER SYSTEM REPLACEMENT |
Amount:
$0
Award Description: TAS::47 4543::TAS RECOVERY - THIS MODIFICATION ACCEPTS THE FOLLOWING CHANGES: (1) ASBESTOS CONTAINING MATERIAL (ACM) ABATEMENT TECHNICAL SPECIFICATION (2) ACM SAMPLING, TESTING, AND WRITTEN REPORT OF ACM ABATEMENT (3) THIRD FLOOR VETERAN AFFAIRS JOINT COMPOUND ACM TESTING (4) TENANT PUBLIC RELATIONS ASSISTANCE REGARDING ACM INFORMATION&(5) GOVERNMENT ENVIRONMENTAL CONSULTANT FOR SAMPLING, REMOVAL OBSERVATION, TESTING, AND REPORTING SERVICES |
Amount:
$0
Award Description: TAS::47 4543::TAS RECOVERY + THIS MODIFICATION ACCEPTS THE FOLLOWING (1) MISCELLANEOUS ADDITIONAL ARRA INTERIOR LIGHTING REPLACEMENT (2) LOBBY SECURITY ADDITIONAL SERVICES (3) SUPPLY VENTILATION AT FIRST FLOOR RESTROOMS (4) BASEMENT STORAGE AREA MODIFICATIONS (5) PUBLIC CORRIDOR RENOVATION ON THE SECOND THROUGH SIXTH FLOOR (6) HEALTH CENTER EXAM PROCEDURE LIGHT |
Amount:
$0
Award Description: TAS::47 4543::TAS RECOVERY + THIS MODIFICATION ACCEPTS THE FOLLOWING (1) BUILDING INFORMATION MODELING (BIM) (2) DEMOLITION AND RENOVATION OF VACATED FEDERAL BUREAU OF INVESTIGATIONS AND UNITED STATES SECRET SERVICE TENANT SPACE AT SECOND, FOURTH AND SIXTH FLOORS INTO CORE/SHELL SPACE (3) DEDICATED CAFETERIA KITCHEN EXHAUST REPLACEMENT&(4) COOLING TOWER MODIFICATIONS |
Amount:
$0
Award Description: THIS MODIFICATION IS BEING ISSUED FOR DESIGN AND CONSTRUCTION ADMINISTRATION SERVICES FOR THE TOILET EXHAUST FAN REPLACEMENT AND THE FITNESS ROOM AND ASSOCIATED RESTROOM RENOVATION. |
Amount:
$0
Award Description: TAS::47 4543::TAS RECOVERY + THIS MODIFICATION ACCEPTS THE FOLLOWING (1) GLASER MURAL LIGHTING IMPROVEMENT + CONSTRUCTION PHASE (2) GLASER MURAL PAINTING RESTORATION + CONSTRUCTION PHASE |
Amount:
$0
Award Description: PROJECT: ARRA ENGINEERING SERVICES FOR M&V
LOS ANGELES USCH,312 NSS, LOS ANGELES, CA
THE PURPOSE OF THIS MODIFICATION IS TO ADMINISTRATIVELY EXTEND THE CONTRACT DELIVERY DATE TO JULY 31, 2012. THIS IS A NO COST CHANGE. ALL OTHER TERMS AND CONDITIONS REMAIN UNCHANGED. |
Amount:
$45,823
Award Description: ARRA SEWER REPLACEMENT (IMO00096)
GOODFELLOW FEDERAL COMPLEX
4300 GOODFELLOW
ST. LOUIS, MO 63102-1125
TENG&ASSOCIATES, INC.
WORK ORDER 1, MODIFICATION PS12
MODIFICATION PS11 IS FOR ADDITIONAL CA SERVICES AND RECORD DRAWINGS.
PDN: PJ0F00267 IMO00096 VMO00096 WI 033
UPON SIGNATURE OF THE CONTRACTING OFFICER, WORK ORDER 1, MODIFICATION PS12 IS HEREBY ISSUED TO PROVIDE THE NECESSARY PROFESSIONAL AE SERVICES IN ACCORDANCE WITH THE ATTACHED STATEMENT OF WORK / FEE PROPOSAL DATED MAY 30, 2012.
PERIOD OF PERFORMANCE: 42 CD'S (6 WEEKS) |
Amount:
$0
Award Description: ADMIN MOD TO EXTEND CONTRACT EXPIRATION DATE IN COMPRIZON. |
Amount:
$72,719
Award Description: ROBERT A YOUNG FEDERAL BUILDING
ST LOUIS, MO 63132-1547
TENG WO#13 PS02 (DESIGN FOR IMO00090 - RAY MECH)
THIS WORK ORDER 13, MODIFICATION PS02 IS HEREBY EXECUTED TO PROVIDE BUILDING COMMISSIONING SERVICES IN ACCORDANE WITH THE ATTACHED STATEMENT OF WORK AND FEE PROPOSAL WITH REVISED DATE OF JUNE 13, 2012. |
Amount:
$158,257
Award Description: IGF::OT::IGF
PREVEDEL PHASING STUDY
PREVEDEL FB, OVERLAND, MO
TENG&ASSOC, WORK ORDER 35
GS-06P-10-GZD-0002
PREVEDEL FEDERAL BUILDING
OVERLAND, MO 63132-1547
THIS WORK ORDER 35 IS HEREBY EXECUTED FOR DESIGN CHARETTE.
AE PERIOD OF PERFORMANCE THRU 04/01/2013.
UPON SIGNATURE OF THE CONTRACTING OFFICER, WORK ORDER 35 IS HEREBY ISSUED TO PROVIDE NECESSARY PROFESSIONAL DESIGN SERVICES IN ACCORDANCE WITH THE ATTACHED STATEMENT OF WORK AND FEE PROPOSAL DATED 05/18/2012. |
Amount:
$0
Award Description: PROJECT: ARRA ENGINEERING SERVICES
ROYBAL FEDERAL BUILDING, LOS ANGELES, CA
LOS ANGELES USCH, LOS ANGELES, CA
THIS IS A UNILATERAL MODIFICATION TO EXTEND THE TERM OF THE CONTRACT TO 06/30/2012 SOLELY FOR GSA INTERNAL ACCOUNTING PURPOSES. THIS MODIFICATION IN NO WAY CHANGES PRICE, TERMS OR CONDITIONS TO INCLUDE EXISTING REQUIRED COMPLETION DATES.
ARRA FUNDED: $104,212.75 |
Amount:
$0
Award Description: PROJECT: ARRA ENGINEERING SERVICES
ROYBAL FEDERAL BUILDING, LOS ANGELES, CA
LOS ANGELES USCH, LOS ANGELES, CA
THIS IS A UNILATERAL MODIFICATION TO EXTEND THE TERM OF THE CONTRACT TO 4/30/2012 SOLELY FOR GSA INTERNAL ACCOUNTING PURPOSES. THIS MODIFICATION IN NO WAY CHANGES PRICE, TERMS OR CONDITIONS TO INCLUDE EXISTING REQUIRED COMPLETION DATES. |
Amount:
-$32,106
Award Description: MODIFICATION TO DE-OBLIGATE FUNDING FOR FEBRUARY 2014 M&I SERVICES WHICH ARE NOT ANTICIPATED TO BE NEEDED BECAUSE THE PROJECT CONSTRUCTION (MODERNIZATION OF THE MC SMITH FB IN BANGOR, ME) IS TRACKING AHEAD OF SCHEDULE. |
Amount:
$0
Award Description: DEFINITIZATION OF NOT TO EXCEED PRICING ON PREVIOUS MODIFICATION. |
Amount:
$0
Award Description: THIS MODIFICATION IS BEING ISSUED FOR ADDITIONAL BUILDING INFORMATION MODELING (BIM) AND CONSTRUCTION OPERATIONS BUILDING INFORMATION EXCHANGE AND UPDATE THE ORIGINAL BUILDING DESIGN STANDARDS MANUAL. |
Amount:
$0
Award Description: THIS ADMINISTRATIVE MODIFICATION PA03 IS HEREBY EXECUTED FOR THE FOLLOWING:
UPDATE THE EXPIRATION DATE IN COMPRIZON TO MATCH THE ULTIMATE EXPIRATION DATE PER CENTRAL OFFICE. |
Amount:
-$10,870
Award Description: AMERICAN RECOVERY AND REINVESTMENT ACT - OTHER FUNCTION
DE-OBLIGATION OF FUNDS NO LONGER NEEDED SINCE WORK HAS STOPPED FOR THE BANNISTER FEDERAL COMPLEX
1500 E. BANNISTER ROAD
KANSAS CITY, MO 64131 |
Amount:
-$7,311
Award Description: OTHER FUNCTION:
ARRA
MODIFICATION IS TO DE-OBLIGATE FUNDS OF $7,311.02 FROM CLIN 002 AND 004, AT NEAL SMITH FEDERAL BUILDING, DES MOINES, IA 50309-2103 |
Amount:
-$8,961
Award Description: OTHER FUNCTION:
METERING FOR GRAND ISLAND, NE, IOWA CITY, IA FEDERAL BUILDING, AND CARLSON U.S. COURTHOUSE, TOPEKA, KS
MODIFICATION TO DE-OBLIGATE THE AMOUNT OF $8,961.02 |