| Other Awards |
Amount:
$12,391
Award Description: RECOVERY STLI 106096 "INSTALL POWER AND COMMUNICATION LINES," STATUE OF LIBERTY NATIONAL MONUMENT, MODIFICATION NO. 0003. MODIFICATION NO. 0003 PROVIDES FOR THE INSTALLATION OF UPSIZED CONDUIT AS OUTLINED ON SKRFI-029A DUE TO REROUTING OF LINES ON LIBERTY ISLAND. THE REROUTING IS NECESSARY IN ORDER TO AVOID PENETRATION OF THE HISTORIC FT. WOOD WALL. |
Amount:
$1,362,300
Award Description: RECOVERY STLI 106096 "INSTALL POWER AND COMMUNICATION LINES" THE SELECTED FIRM WILL PROVIDE POWER AND COMMUNICATIONS INFRASTRUCTURE IMPROVEMENTS ON LIBERTY AND ELLIS ISLANDS. THE PROJECT WILL CONSIST OF INSTALLATION OF ELECTRICAL AND COMMUNICATION CONDUITS, WIRE AND FIBER OPTICS AROUND BOTH ISLANDS AS WELL AS PROVIDE A BACK-UP POWER SUPPLY (UPS) IN THE ELECTRICAL DISTRIBUTION SYSTEM TO ALLOW THE SYSTEM TO REMAIN OPERATIONAL DURING POWER OUTAGES AND FLUCTUATIONS. THESE LINES WILL BE INSTALLED IN AND AROUND HISTORIC AND CULTURALLY SENSITIVE STRUCTURES AS WELL AS IN HIGHLY VISIBLE AND PUBLIC USE AREAS. THIS PROJECT IS TO BE DONE IN PHASES SO AS TO MINIMIZE INTERFERENCE WITH THE VISITOR'S EXPERIENCE, AND REQUIRES COORDINATION WITH THE PARK PERSONNEL AS WELL AS OTHER CONTRACTORS AND PROJECTS WHICH WILL BE UNDERWAY AT THE SAME TIME. |
Amount:
$7,859
Award Description: RECOVERY STLI 106096 "INSTALL POWER AND COMMUNICATION LINES" STATUE OF LIBERTY NATIONAL MONUMENT, MODIFICATION NO. 0002. THE PURPOSE OF MODIFICATION NO. 0002 IS TO SETTLE CONTRACTING OFFICER'S DIRECTIVE NO. 2. |
Amount:
$8,430
Award Description: RECOVERY STLI 106096 "INSTALL POWER AND COMMUNICATION LINES" STATUE OF LIBERTY NATIONAL MONUMENT, MODIFICATION NO. 0001. THE PURPOSE OF MODIFICATION NO. 0001 IS TO INCORPORATE THE FOLLOWING ITEMS INTO THE CONTRACT: MODIFY THE ARRA SIGN TO MATCH OTHER ARRA PARK SIGNS, PROVIDE A CONSTRUCTION FIELD OFFICE (INCLUDING TEMPORARY POWER), AND PROVIDE PORTABLE RESTROOM FACILITIES. |
Amount:
$705,236
Award Description: RECOVERY -VAFO-152410C REHABILITATE VEGETATED BASINS |
Amount:
$40,794
Award Description: VAFO 152410C REHABILITATE VEGETATED BASINS AND OTHER DRAINAGE ISSUES. INCREASE DESIGN EFFORT REQUIRED FOR REPAIR OPTION #5. |
Amount:
$807,500
Award Description: TAS::21 2022::TAS PROJECTNUMBER#325240 MDIFICATION TO SPILLWAY, LAKE FREDERICK DAM, WEST POINT, NEW YORK. |
Amount:
$775,000
Award Description: TAS::21 2022:: ARRA::YES::ARRA
RECOVERY PROJECT#35347::RP# CLIN 7003 EXERCISE OPTION, REPAIR TO PICATINNY LAKE DAM, AT PICATINNY ARSENAL, NEW JESEY |
Amount:
$1,723,000
Award Description: TAS::21 2022::TAS ARRA::YES::ARRA
RECOVERY PROJECT#325269 UPGRADE AND REPAIR TO PICATINNY LAKE DAM AND DEMARK LAKE DAM AT PICATINNY ARSENAL, NEW JERSEY. |
Amount:
$5,613
Award Description: EMERGENT REPAIRS, LPOE, MONTICELLO, ME, GROUP 4 |
Amount:
$45,099
Award Description: TAS::70 0535::TAS
REIMBURSABLE RECOVERY ACT
EMERGENT REPAIRS, LAND PORT OF ENTRY, MONTICELLO, ME. THIS REQUIREMENT IS FUNDED BY THE AMERICAN RECOVERY AND READJUSTMENT ACT OF 2009. |
Amount:
$6,050
Award Description: EMERGENT REPAIRS, LAND PORT OF ENTRY, MONTICELLO, ME |
Amount:
$1,982
Award Description: EMERGENT REPAIRS, LAND PORT OF ENTRY, MONTICELLO, ME |
Amount:
$373,528
Award Description: REIMBURSABLE RECOVERY ACT - CONSTRUCTION MANAGEMENT SERVICES FOR CBP LAND PORT OF ENTRY (LOPE) CONSTRUCTION PROJECT NEAR CHURUBUSCO, NEW YORK NORTHERN BORDER. |
Amount:
$83,391
Award Description: ARRA - CONSTRUCTION MANAGEMENT SERVICES FOR CBP LAND PORT OF ENTRY (LOPE) CONSTRUCTION PROJECT NEAR CHURUBUSCO, NEW YORK NORTHERN BORDER. |
Amount:
$39,037
Award Description: RECOVERY STLI PMIS# 106096 "INSTALL POWER AND COMMUNICATION LINES" STATUE OF LIBERTY NATIONAL MONUMENT,MODIFICATION NO. 0004 IS BEING ISSUED TO INCORPORATE THE FOLLOWING ITEMS THAT ARE WITHIN THE SCOPE OF THE CURRENT CONTRACT:
ITEM 1 DESCRIPTION: RELOCATE PULL BOX 3 AND ASSOCIATED POWER LINE A MINIMUM OF EIGHTEEN FEET FROM EXISTING LOCATION, AS PER ATTACHED SKETCH CR-1 (8/31/10).
ITEM 2 DESCRIPTION: PROVIDE ATTIC STOCK AS OUTLINED IN ATTACHED SKETCHES: STLIE2-02 ATTIC STOCK, STLIE2-05 ATTIC STOCK, STLIE2-07 ATTIC STOCK, STLIE2-09 ATTIC STOCK, STLIE2-10 ATTIC STOCK, STLIE2-11 ATTIC STOCK, STLIE2-12 ATTIC STOCK.
ITEM 3 DESCRIPTION: PROVIDE NEW UPS IN LIBERTY ADMIN BLDG- APS SYMMETRA TOWER.
|
Amount:
-$68
Award Description: VAFO-152410 REHABILITATE VEGETATED BASINS AT VALLEY FORGE NATIONAL HISTORICAL PARK, MONTGOMERY COUNTY, PENNSYLVANIA, CREDIT TAKEN FOR PLANT SUBSTITUTIONS AND COSTS ASSOCIATED WITH UNFORSEEN SITE CONDITIONS - TOTAL OVERALL DEDUCTION TO CONTRACT AMOUNT. |
Amount:
$82,133
Award Description: VAFO 152410 - REHABILITATE VEGETATED BASINS AND OTHER DRAINAGE ISSUES - INCREASE CONSTRUCTION EFFORT REQUIRED FOR REPAIR OPTION #5 |
Amount:
$0
Award Description: VAFO 152410 - REHABILITATE VEGETATED BASINS AND OTHER DRAINAGE ISSUES - ADD FIIPS CLAUSE |
Amount:
$0
Award Description: CONSTRUCTION MANAGMENT SERVICES FOR THE CHURUBUSCO, NEW YORK LAND PORT OF ENTRY (LPOE) |
Amount:
$25,819
Award Description: "CLOSELY ASSOCIATED" - CONSTRUCTION MANAGEMENT SERVICES FOR THE CHURUBUSCO LAND PORT OF ENTRY CONSTRUCTION PROJECT. |
Amount:
$0
Award Description: "CLOSELY ASSOCIATED" CHANGE TAS NUMBER |
Amount:
$0
Award Description: "CLOSELY ASSOCIATED" CHANGE TAS NUMBER. |
Amount:
-$176
Award Description: "CLOSELY ASSOCIATED" CLOSE OUT |
Amount:
$0
Award Description: "CLOSELY ASSOCIATED" TAS CHANGE |
Amount:
$0
Award Description: "CLOSELY ASSOCIATED" CHANGE COMPRIZON SCREEN TO MATCH TAS NG |