contract- RECIPIENT AWARD SUMMARY
WHITING-TURNER CONTRACTING COMPANY, THE
| AWARD OVERVIEW |
|
Agency Name: Department of Health and Human Services |
Project Location:
|
|
Award Number: HHSN292201000024C |
Project Location - State: |
|
Funding Amount:
$699,815 |
Project Location - Zip Code: |
|
Ending Date:
|
Congressional District: |
RECIPIENT INFORMATION (AWARD)
| RECIPIENT INFORMATION (AWARD) |
|
Recipient Name:
|
WHITING-TURNER CONTRACTING COMPANY, THE |
|
Recipient Address:
|
300 E JOPPA RD |
|
Recipient City:
|
BALTIMORE |
|
Recipient State:
|
MD |
|
Recipient Zip Code:
|
212863020 |
|
Congressional District:
|
MD-02 |
DESCRIPTION OF WORK/SERVICE PERFORMED
ARRA::YES::ARRA TAS::75 0839::TAS -- RECOVERY -- ARRA - HQC90344 - CONSTRUCTION MANAGER AS CONSTRUCTOR - BLDG 13 - REPLACE REQ# 1153430 - VENDOR - TBD - JACOB HOOTS (PART3).CAN 8385800TAS::75 0839::TAS 08013820092DBO.BASIC SERVICES - INSTALL EQUIPMENT RELATED TO GEOTHERMAL EFFORT:THE CONTRACTOR SHALL PROVIDE ALL THE NECESSARY SERVICES INCLUDING EQUIPMENT, MATERIALS, LABOR AND SUPERVISION REQUIRED TO PROVIDE SERVICES TO PERFORM MISCELLANEOUS CONSTRUCTION ACTIVITIES AT THE BUILDING KNOWN AS PRCII - BUILDING 35. WORK TO BE DONE IN ACCORDANCE WITH DOCUMENTS PROVIDED BY THE PERKINS + WILL AND AS STATED: THE WORK SHALL INCLUDE BUT NOT BE LIMITED TO THE FOLLOWING: THE CMC IS TO PROVIDE EQUIPMENT, MATERIALS, LABOR AND SUPERVISION REQUIRED FURNISHING THE DRILLING OF THE WELLS AND THE MECHANICAL SYSTEMS REQUIRED TO CONNECT THE GEOTHERMAL SYSTEM TO THE PNRC II CHILLED BEAM COOLING SYSTEM IN ACCORDANCE WITH THE DESIGN OF THE A/E&BOWMAN GEOTHEMAL COMPANY (GEOTHERMAL ENGINEERING FIRM). THE CMC IS TO INCLUDE THIS SCOPE AND THE COST OF THIS WORK IN THEIR GMP.THIS WAS REQUESTED AS AN OWNER REQUEST WHICH IS A VALID REQUEST FOR ADDITIONAL COMPENSATION TO THE CMC TEAM.ALL WORK SHALL ALSO BE PERFORMED IN ACCORDANCE WITH APPLICABLE PROVISIONS OF THE NIH DESIGN POLICY AND GUIDELINES (LATEST VERSION). THE FINAL WORK SHALL ALSO MEET ALL FEDERAL, STATE, AND LOCAL CODES AND REGULATORY REQUIREMENTS, INCLUDING NFPA, BOCO, UBC, ADA, AND ANSI BUILDING CODE REQUIREMENTS. THE WORK IS DEFINED IN NIH/ORF'S REQUEST FOR PROPOSAL OF 9/14/2010 AND THE CONTRACTOR'S PROPOSAL OF 9/20/2010.THE CONTRACTOR (CMC) SHALL FURNISH MATERIALS WITHIN 2 WEEKS FROM NOTICE TO PROCEED AND BE COMPLETED WITH ALL THE WORK WITHIN A TIME CONSIDERED REASONABLE DAYS AFTER RECEIPT OF THE NOTICE OF AWARD.
PURCHASER INFORMATION (AWARD)
| PURCHASER INFORMATION (AWARD) |
| Contracting Office ID: |
00292 |
| Contracting Office Name: |
OD OM ORFDO OA OFC ACQUISITIONS |
| Contracting Office Region: |
NO REGI |
| TAS Major Program: |
2959 |
CONTRACT INFORMATION (AWARD)
| CONTRACT INFORMATION (AWARD) |
| Date Signed: |
2010-09-24 |
| Effective Date: |
2010-09-24 |
| Current Completion Date: |
|
| Ultimate Completion Date: |
|
| Award Type: |
IDC |
| Reason For Modification: |
OTHER ADMINISTRATIVE ACTION |
| Type of Contract Pricing: |
FIRM FIXED PRICE |
| Last Date to Order: |
2013-04-03 |
| Funding Agency ID: |
|
| Funding Office ID: |
|
| Funding Office Name: |
|
| Number of Offers Received: |
7 |
PRODUCT OR SERVICE INFORMATION (AWARD)
| PRODUCT OR SERVICE INFORMATION (AWARD) |
|
Product Code:
|
Y111 |
|
Product Description:
|
CONSTRUCTION OF OFFICE BUILDINGS |
|
NAICS Code:
|
236220 |
|
NAICS Description:
|
COMMERCIAL AND INSTITUTIONAL BUILDING CONSTRUCTION |
COMPETITION INFORMATION (AWARD)
| COMPETITION INFORMATION (AWARD) |
|
Extent Competed:
|
FULL AND OPEN COMPETITION |
|
Reason Not Competed:
|
Not Reported |
|
Solicitation Procedure:
|
NEGOTIATED PROPOSAL/QUOTE |
|
Type of Set Aside:
|
NO SET ASIDE USED. |
|
Statutory Exception to Fair Opportunity:
|
|
|
Type of Contract Pricing:
|
FIRM FIXED PRICE |
PREFERENCE PROGRAMS (AWARD)
Business Size Determination: OTHER THAN SMALL BUSINESS
| Other Awards |
Amount:
$12,400,000
Award Description: TAS::12 1402::TAS RECOVERY - BUILDING 306 RENOVATIONS AT THE BELTSVILLE AGRICULTURAL RESEACH CENTER, BELTSVILLE, MD. |
Amount:
$64,971,000
Award Description: ARRA FUNDED BUILDING 1 EXTENSION INTERIORS PROJECT |
Amount:
$8,599,056
Award Description: MODIFICATION 3, ADDITIONAL WORK FOR SB1341-10-CN-0024. SOW TO INCLUDE INSTALLATION OF EQUIPMENT, SITE ISSUES, BIKE LOCKERS, SERVICE CARRIERS, CHILLER, AND ETCHERS. |
Amount:
$329,712
Award Description: MODIFICATION 4, SERVICE CARRIERS AND VACUUM SYSTEMS |
Amount:
$8,935,298
Award Description: MODIFICATION 2, ADDITIONAL WORK FOR SB1341-10-CN-0024. SOW TO INCLUDE FIT-UP, LAB & CLEAN ROOM EQUIPMENT, & CONNECTOR. |
Amount:
$10,974,264
Award Description: RECOVERY--LOWER COLORADO RIVER OPERATIONS PROGRAM, DESIGN/BUILD A NEW GREEN BUILDING FOR THE BOULDER CANYON OPERATIONS OFFICE, CONSTRUCTION OF NEW FACILITY - PROJECT NO. 26.000 - TAS::14 0681::TAS |
Amount:
$0
Award Description: RECOVERY--LOWER COLORADO RIVER OPERATIONS PROGRAM, DESIGN/BUILD A NEW GREEN BUILDING FOR THE BOULDER CANYON OPERATIONS OFFICE, CONSTRUCTION OF NEW FACILITY - PROJECT NO. 26.000 - TAS::14 0681::TAS MODIFICATION TO CORRECT TYPOGRAPHICAL ERROR IN CONTRACT LINE ITEM. |
Amount:
$3,800,000
Award Description: RECOVERY--LOWER COLORADO RIVER OPERATIONS PROGRAM, DESIGN/BUILD A NEW GREEN BUILDING FOR THE BOULDER CANYON OPERATIONS OFFICE, CONSTRUCTION OF NEW FACILITY - PROJECT NO. 26.000 - TAS::14 0681::TAS
MODIFICATION TO ISSUE UNDEFINITIZED CHANGE ORDER. |
Amount:
$0
Award Description: RECOVERY--LOWER COLORADO RIVER OPERATIONS PROGRAM, DESIGN/BUILD A NEW GREEN BUILDING FOR THE BOULDER CANYON OPERATIONS OFFICE, CONSTRUCTION OF A NEW FACILITY - PROJECT NO. 26.000 - TAS::14 0681::TAS MODIFICATION TO CHANGE THE TITLE OF THE CONTRACT TO LOWER COLORADO REGIONAL OFFICE GREEN BUILDING. |
Amount:
$15,282,432
Award Description: TAS::36 0158:: TAS CONSTRUCT COGEN SYSTEM AT VAMC CANANDAIGUA, NY. |
Amount:
$0
Award Description: TAS::47 4543::TAS. RECOVERY LOBBY EXPANSION AND LIGHTING UPGRADE, J. CALEB BOGGS COURTHOUSE AND FEDERAL BUILDING, 844 N. KING STREET, WILMINGTON, DE 19801. THIS MODIFICATION INCORPORATES GSAR 552.243-71(JAN 09). |
Amount:
$0
Award Description: TAS::47 4543::TAS. RECOVERY LOBBY EXPANSION & LIGHTING UPGRADE, CONSTRUCTION SERVICES, J. CALEB BOGGS COURTHOUSE AND FEDERAL BUILDING, WILMINGTON, DE 19801. THIS MODIFICATION INCORPORATES THE NOTICE TO PROCEED WITH PERFORMANCE UNDER THE TERMS AND CONDITIONS OF THIS CONTRACT. |
Amount:
$2,282
Award Description: TAS:: 47 4543::TAS. RECOVERY LOBBY EXPANSION AND LIGHTING UPGRADE, J. CALEB BOGGS COURTHOUSE AND FEDERAL BUILDING, 844 KING STREET, WILMINGTON, DE 19801. THIS MODIFICATION INCORPORATES THE CONTRACTOR'S PROPOSALS IN RESPONSE TO RFP #002, RFP #003, RFP #004, AND RFP #007. |
Amount:
$0
Award Description: TAS::47 4543::TAS. RECOVERY LOBBY EXPANSION AND LIGHTING UPGRADE, J. CALEB BOGGS FEDERAL BUILDING, 844 NORTH KING STREET, WILMINGTON, DE 19801. THIS IS AN ADMINISTRATIVE MODIFICATION TO REVISE THE ENERGY FUNCTION CODES. |
Amount:
$0
Award Description: TAS::47 4543::TAS. RECOVERY LOBBY EXPANSION AND LIGHTING UPGRADE, J. CALEB BOGGS COURTHOUSE AND FEDERAL BUILDING, WILMINGTON, DE 19801. THIS IS AN ADMINISTRATIVE MODIFICATION TO REPLACE THE CONTRACTOR'S PROJECT FOREMAN. |
Amount:
$1,644,400
Award Description: TAS::47 4543::TAS. CONSTRUCTION SERVICES FOR THE RECOVERY LOBBY EXPANSION AND LIGHTING UPGRADE AT THE J. CALEB BOGGS COURTHOUSE AND FEDERAL BUILDING, WILMINGTON, DE 19801-3519. |
Amount:
$145,068
Award Description: RECOVERY CMS ENERGY PACKAGE PROJECT (CHILLERS, LIGHTS AND BOILERS): MODIFICATION PS05 INCORPORATES A CREDIT FOR RETROFIT LIGHTING (IN LIEU OF NEW LIGHT FIXTURES), STAINLESS STEEL COOLING TOWER COMPONENTS IN LIEU OF POLYMER COATED AND ENERGY EFFICIENT WAREHOUSE LIGHTING. |
Amount:
$6,915,000
Award Description: APPLICABLE FUNDING AGENCY: TAS::47 4543::TAS
RECOVERY: CENTERS FOR MEDICARE AND MEDICAID (CMS)ENERGY PACKAGE (HVAC AND LIGHTING)- WOODLAWN, MARYLAND |
Amount:
$0
Award Description: APPLICABLE FUNDING AGENCY: TAS::47 4543::TAS
RECOVERY: CENTERS FOR MEDICARE AND MEDICAID (CMS)ENERGY PACKAGE (HVAC AND LIGHTING)- WOODLAWN, MARYLAND |
Amount:
$0
Award Description: CENTERS FOR MEDICARE AND MEDICAID SERVICES ENERGY PACKAGE (HVAC AND LIGHTING) |
Amount:
$80,966
Award Description: CENTERS FOR MEDICARE AND MEDICAID SERVIECS (CMS) ENERGY PACKAGE (HVAC AND LIGHTS) |
Amount:
$0
Award Description: CMS ENERGY PACKAGE (HVAC AND LIGHTING) - ACCOUNTING ERROR |
Amount:
$31,469
Award Description: CMS ENERGY PACKAGE (HVAC AND LIGHTING) - RFP 003 |
Amount:
$3,861
Award Description: TAS::47 4543::TAS. RECOVERY LOBBY EXPANSION AND LIGHTING UPGRADE, J. CALEB BOGGS COURTHOUSE AND FEDERAL BUILDING, 844 KING STREET, WILMINGTON, DE 19801. THIS MODIFICATION IS A SUPPLEMENTAL AGREEMENT FOR RFP #009 AND RFP #011. |
Amount:
$12,639
Award Description: TAS::47 4543::TAS. RECOVERY LOBBY EXPANSION AND LIGHTING UPGRADE, J. CALEB BOGGS COURTHOUSE AND FEDERAL BUILDING, WILMINGTON, DE, 19801. THIS MODIFICATION IS FOR INCORPORATION OF RFP'S 005, 008, AND 013. |
Amount:
$0
Award Description: TAS::47 4543::TAS. RECOVERY LOBBY EXPANSION AND LIGHTING UPGRADE, J. CALEB BOGGS COURTHOUSE AND FEDERAL BUILDING, 844 KING STREET, WILMINGTON, DE 19801. THIS MODIFICATION IS FOR THE REPLACEMENT OF THE WHITING-TURNER PROJECT MANAGER. |
Amount:
$22,421
Award Description: TAS::47 4543::TAS. RECOVERY LOBBY EXPANSION AND LIGHTING UPGRADE, J. CALEB BOGGS COURTHOUSE AND FEDERAL BUILDING, 400 KING STREET, WILMINGTON, DE 19108. THIS MODIFICATION IS A SUPPLEMENTAL AGREEMENT FOR RFP #012, RFP #018, AND WHITING-TURNER CHANGE ORDER REQUEST #015. |
Amount:
$9,996
Award Description: TAS::47 4543::TAS. RECOVERY LOBBY EXPANSION AND LIGHTING UPGRADE, J. CALEB BOGGS COURTHOUSE AND FEDERAL BUILDING, 844 KING STREET, WILMINGTON, DE 19801. THIS MODIFICATION INCORPORATES ACCEPTANCE OF THE CONTRACTOR'S PROPOSALS IN RESPONSE TO RFP #001 AND RFP #014. |
Amount:
$12,223
Award Description: TAS::47 4543::TAS. RECOVERY LOBBY EXPANSION AND LIGHTING UPGRADE, J. CALEB BOGGS COURTHOUSE AND FEDERAL BUILDING, 844 KING STREET, WILMINGTON, DE 19801. THIS MODIFICATION IS A SUPPLEMENTAL AGREEMENT FOR RFP #016, RFP #020, AND WHITING-TURNER CHANGE ORDER REQUEST #20. |
Amount:
$2,238
Award Description: TAS::47 4543::TAS. RECOVERY LOBBY EXPANSION & LIGHTING UPGRADE, J. CALEB BOGGS COURTHOUSE AND FEDERAL BUILDING, 844 KING STREET, WILMINGTON, DE 19801. THIS MODIFICATION IS A SUPPLEMENTAL AGREEMENT FOR RFP #021, RFP #022, AND RFP #028. |
Amount:
$13,029
Award Description: TAS::47 4543::TAS. RECOVERY LOBBY EXPANSION AND LIGHTING UPGRADE, J CALEB BOGGS COURTHOUSE AND FEDERAL BUILDING, 844 KING STREET, WILMINGTON, DE 19801. THIS MODIFICATION INCORPORATES WORK REQUIRED BY RFP #015. |
Amount:
$8,904
Award Description: TAS::47 4543::TAS. RECOVERY LOBBY EXPANSION AND LIGHTING UPGRADE, J. CALEB BOGGS COURTHOUSE AND FEDERAL BUILDING, 844 KING STREET, WILMINGTON, DE 19801. THIS MODIFICATION IS A SUPPLEMENTAL AGREEMENT FOR RFP #010, POWER FOR SECURITY CAMERAS. |
Amount:
$699,815
Award Description: ARRA::YES::ARRA TAS::75 0839::TAS -- RECOVERY -- ARRA - HQC90344 - CONSTRUCTION MANAGER AS CONSTRUCTOR - BLDG 13 - REPLACE REQ# 1153430 - VENDOR - TBD - JACOB HOOTS (PART3).CAN 8385800TAS::75 0839::TAS 08013820092DBO.BASIC SERVICES - INSTALL EQUIPMENT RELATED TO GEOTHERMAL EFFORT:THE CONTRACTOR SHALL PROVIDE ALL THE NECESSARY SERVICES INCLUDING EQUIPMENT, MATERIALS, LABOR AND SUPERVISION REQUIRED TO PROVIDE SERVICES TO PERFORM MISCELLANEOUS CONSTRUCTION ACTIVITIES AT THE BUILDING KNOWN AS PRCII - BUILDING 35. WORK TO BE DONE IN ACCORDANCE WITH DOCUMENTS PROVIDED BY THE PERKINS + WILL AND AS STATED: THE WORK SHALL INCLUDE BUT NOT BE LIMITED TO THE FOLLOWING: THE CMC IS TO PROVIDE EQUIPMENT, MATERIALS, LABOR AND SUPERVISION REQUIRED FURNISHING THE DRILLING OF THE WELLS AND THE MECHANICAL SYSTEMS REQUIRED TO CONNECT THE GEOTHERMAL SYSTEM TO THE PNRC II CHILLED BEAM COOLING SYSTEM IN ACCORDANCE WITH THE DESIGN OF THE A/E&BOWMAN GEOTHEMAL COMPANY (GEOTHERMAL ENGINEERING FIRM). THE CMC IS TO INCLUDE THIS SCOPE AND THE COST OF THIS WORK IN THEIR GMP.THIS WAS REQUESTED AS AN OWNER REQUEST WHICH IS A VALID REQUEST FOR ADDITIONAL COMPENSATION TO THE CMC TEAM.ALL WORK SHALL ALSO BE PERFORMED IN ACCORDANCE WITH APPLICABLE PROVISIONS OF THE NIH DESIGN POLICY AND GUIDELINES (LATEST VERSION). THE FINAL WORK SHALL ALSO MEET ALL FEDERAL, STATE, AND LOCAL CODES AND REGULATORY REQUIREMENTS, INCLUDING NFPA, BOCO, UBC, ADA, AND ANSI BUILDING CODE REQUIREMENTS. THE WORK IS DEFINED IN NIH/ORF'S REQUEST FOR PROPOSAL OF 9/14/2010 AND THE CONTRACTOR'S PROPOSAL OF 9/20/2010.THE CONTRACTOR (CMC) SHALL FURNISH MATERIALS WITHIN 2 WEEKS FROM NOTICE TO PROCEED AND BE COMPLETED WITH ALL THE WORK WITHIN A TIME CONSIDERED REASONABLE DAYS AFTER RECEIPT OF THE NOTICE OF AWARD. |
Amount:
$26,598
Award Description: RECOVERY: MAJOR RENOVATIONS TO BARC BLDG. 306 |
Amount:
$105,387
Award Description: RECOVERY::BARC BLDG. 306 MAJOR RENOVATIONS |
Amount:
$52,120
Award Description: RECOVERY: BARC, BLDG. 306 MAJOR RENOVATIONS |
Amount:
$13,928
Award Description: RECOVERY::BARC BLD.G 306 MAJOR RENOVATIONS |
Amount:
$38,404
Award Description: RECOVERY:BARC BLDG. 306 MAJOR RECOVERY |
Amount:
$39,312
Award Description: RENOVATION OF BUILDING 306, BELTSVILLE, MARYLAND |
Amount:
$0
Award Description: ADMINISTRATIVE MODIFICATION TO CHANGE THE CONTRACTING OFFICER. |
Amount:
$0
Award Description: RECOVERY: BLDG. 306 SELECTIVE RENOVATIONS AT BARC |
Amount:
$35,181
Award Description: RECOVERY:: MAJOR RENOVATIONS TO BARC BLDG. 306 |
Amount:
$142,421
Award Description: RENOVATION OF BUILDING 306, BELTSVILLE, MARYLAND |
Amount:
$63,063
Award Description: RECOVERY: ERRC MAJOR RENOVATIONS |
Amount:
$756,042
Award Description: RECOVERY-- LOWER COLORADO RIVER OPERATION PROGRAM, DESIGN/BUILD A NEW GREEN BUILDING FOR THE BOULDER CANYON OPERATIONS OFFICE, CONSTRUCTION OF A NEW FACILITY, NO. 26.000, TAS::14 0681::TAS
THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE A FULL AND COMPLETE EQUITABLE ADJUSTMENT FOR ALL COSTS ASSOCIATED WITH THE ADDITIONAL WORK TO DESIGN AND CONSTRUCT A DEEP FOUNDATION SYSTEM DUE TO THE ENCOUNTER OF A DIFFERING SITE CONDITION. |
Amount:
$49,143
Award Description: ARRA CHILLERS, LIGHTS, AND BOILERS |
Amount:
$332,560
Award Description: CENTERS FOR MEDICARE AND MEDICAID SERVICES - CHILLERS LIGHTS AND BOILERS |
Amount:
$0
Award Description: ARRA - CHILLERS, LIGHTS AND BOILERS AT THE CENTERS FOR MEDICARE AND MEDICAID SERVICES |
Amount:
$33,624
Award Description: MODIFICATION TO INCORPORATE RFP'S 025A, 026 PARTIAL, 029, 031, AND 032 PARTIAL. |
Amount:
$134,438
Award Description: ARRA CHILLERS, LIGHTS, AND BOILERS
ROTATION OF FIXTURES, UH/HW LINES AND CONDUIT, COOLING TOWER WALKWAYS, HEAT TRACE AND INSULATION, STAIRWELL LIGHTING, AND RE-WIRING FIXTURES. |
Amount:
$249,339
Award Description: CMS CHILLERS LIGHTS AND BOILERS |
Amount:
$56,083
Award Description: MODIFICATION TO INCOPORATE RFP'S 007,009,010,011,AND 012 |
Amount:
$0
Award Description: RECOVERY: CENTERS FOR MEDICARE AND MEDICAID CENTERS ENERGY PACKAGE |
Amount:
$0
Award Description: ARRA CHILLERS, LIGHTS, AND BOILERS AT CENTERS FOR MEDICARE AND MEDICAID SERVICES |
Amount:
$0
Award Description: RECOVERY CHILLER LIGHTS AND BOILERS - WOODLAWN MD |
Amount:
$34,866
Award Description: TAS::47 4543::TAS. RECOVERY LOBBY EXPANSION AND LIGHTING UPGRADE, J. CALEB BOGGS COURTHOUSE AND FEDERAL BUILDING, 844 KING STREET, WILMINGTON, DE 19801. THIS MODIFICATION IS A SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE. |
Amount:
$28,169
Award Description: TAS::47 4543::TAS. RECOVERY LOBBY EXPANSION AND LIGHTING UPGRADE, J. CALEB BOGGS COURTHOUSE AND FEDERAL BUILDING, 844 KING STREET, WILMINGTON, DE 19801. THIS MODIFICATION IS A SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE. |
Amount:
$23,733
Award Description: TAS::47 4543::TAS. RECOVERY LOBBY EXPANSION AND LIGHTING UPGRADE, J. CALEB BOGGS COURTHOUSE AND FEDERAL BUILDING, 844 KING STREET, WILMINGTON, DE 19801. |
Amount:
$79,559
Award Description: TAS::47 4543::TAS. RECOVERY LOBBY EXPANSION AND LIGHTING UPGRADE PROJECT, J. CALEB BOGGS COURTHOUSE AND FEDERAL BUILDING, 844 KING STREET, WILMINGTON, DE 19801. THIS MODIFICATIONS IS A SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE. |
Amount:
$0
Award Description: TAS::47 4543::TAS. RECOVERY LOBBY EXPANSION AND LIGHTING UPGRADES, J. CALEB BOGGS COURTHOUSE AND FEDERAL BUILDING, 844 KING STREET, WILMINGTON, DE 19801. THIS IS A MODIFICATION FOR WORK WITHIN SCOPE. |
Amount:
$9,416
Award Description: TAS::47 4543::TAS. RECOVERY LOBBY EXPANSION&LIGHTING UPGRADE PROJECT, J. CALEB BOGGS COURTHOUSE AND FEDERAL BUILDING, 844 KING STREET, WILMINGTON, DE 19801. THIS MODIFICATION IS FOR A SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE. |
Amount:
$55,849
Award Description: TAS::47 4543::TAS. RECOVERY LOBBY EXPANSION AND LIGHTING UPGRADE, J. CALEB BOGGS COURTHOUSE AND FEDERAL BUILDING, 844 KING STREET, WILMINGTON, DE 19801. THIS MODIFICATION IS A SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE. |
Amount:
$20,472
Award Description: TAS:47 4543::TAS. RECOVERY LOBBY EXPANSION AND LIGHTING UPGRADE, J. CALEB BOGGS COURTHOUSE AND FEDERAL BUILDING, 844 KING STREET, WILMINGTON, DE 19801. THIS MODIFICATION IS A SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE. |
Amount:
$8,748
Award Description: TAS::47 4543::TAS. RECOVERY ENVELOPE RENOVATION PROJECT, U.S. CUSTOM HOUSE, 200 CHESTNUT STREET, PHILADELPHIA, PA 19106. THIS MODIFICATION IS A SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE. |
Amount:
$16,220
Award Description: TAS::47 4543::TAS. RECOVERY LOBBY EXPANSION AND LIGHTING UPGRADE, J. CALEB BOGGS COURTHOUSE AND FEDERAL BUILDING, 844 KING STREET, WILMINGTON, DE 19801. THIS IS A SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE. |
Amount:
$3,705
Award Description: TAS::47 4543::TAS. RECOVERY LOBBY EXPANSION AND LIGHTING UPGRADE, J. CALEB BOGGS COURTHOUSE AND FEDERAL BUILDING, WILMINGTON, DE 19801. THIS MODIFICATION IS FOR A SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE. |
Amount:
$66,475
Award Description: RECOVERY: MAJOR RENOVATIONS TO BLDG. 306 |
Amount:
$1,882,332
Award Description: RECOVERY: LOWER COLORADO REGIONAL OFFICE GREEN BLDG, CONSTRUCTION OF A NEW FACILITY, NO. 26.000 TAS::14 0681::TAS |
Amount:
$398,406
Award Description: RECOVERY: LOWER COLORADO REGIONAL OFFICE GREEN BLDG, CONSTRUCTION OF A NEW FACILITY, NO. 26.000 TAS::14 0681::TAS |
Amount:
$0
Award Description: RECOVERY - CHILLERS LIGHTS AND BOILERS AT THE CENTERS FOR MEDICARE AND MEDICAID SERVICES - BACNET |
Amount:
$0
Award Description: ARRA - CHILLERS LIGHTS AND BOILERS - CENTERS FOR MEDICARE AND MEDICAID SERVICES |
Amount:
-$16,472
Award Description: RECOVERY - CHILLERS, LIGHTS AND BOILERS - DEOBLIGATION OF OCCUPANCY SENSORS |
Amount:
$0
Award Description: RECOVERY - CHILLER LIGHTS AND BOILERS AT THE CENTERS FOR MEDICARE AND MEDICAID SERVICES - CLOSE OUT MODIFICATION |
| Location Information |
| Latitude, Longitude |
0º 0' 0",
0º 0' 0" |
| Congressional District |
|
| City |
|
| County |
|
| State |
|
| Zip |
|
|