contract- RECIPIENT AWARD SUMMARY
| AWARD OVERVIEW |
|
Agency Name: National Aeronautics and Space Administration |
Project Location:
KERN |
|
Award Number: NND09AB82T |
Project Location - State: CA |
|
Funding Amount:
$15,866 |
Project Location - Zip Code: 935230273 |
|
Ending Date:
2013-08-01 |
Congressional District: 22 |
RECIPIENT INFORMATION (AWARD)
| RECIPIENT INFORMATION (AWARD) |
|
Recipient Name:
|
C J W CONSTRUCTION, INC. |
|
Recipient Address:
|
841 E WASHINGTON AVE STE B |
|
Recipient City:
|
SANTA ANA |
|
Recipient State:
|
CA |
|
Recipient Zip Code:
|
927013878 |
|
Congressional District:
|
CA-47 |
DESCRIPTION OF WORK/SERVICE PERFORMED
TAS::80 0119::TAS "RECOVERY"
LIFE SUPPORT AND EGRESS
PROVIDE ALL MATERIALS, EQUIPMENT AND LABOR TO REMODEL "LIFE SUPPORT&EGRESS" AREA AT THE DRYDEN AIRCRAFT OPERATIONS FACILITY (DAOF), BUILDING 703, PALMDALE, CA 93550 IN ACCORDANCE WITH THE PERFORMANCE WORK STATEMENT(PWS) AND APPROVED DRAWINGS.
PURCHASER INFORMATION (AWARD)
| PURCHASER INFORMATION (AWARD) |
| Contracting Office ID: |
DFRC0 |
| Contracting Office Name: |
DRYDEN FLIGHT RESEARCH CENTER |
| Contracting Office Region: |
NO REGI |
| TAS Major Program: |
3144 |
CONTRACT INFORMATION (AWARD)
| CONTRACT INFORMATION (AWARD) |
| Date Signed: |
2010-02-03 |
| Effective Date: |
2010-02-03 |
| Current Completion Date: |
2013-08-01 |
| Ultimate Completion Date: |
2013-08-01 |
| Award Type: |
DELIVERY ORDER |
| Reason For Modification: |
DEFINITIZE CHANGE ORDER |
| Type of Contract Pricing: |
FIRM FIXED PRICE |
| Last Date to Order: |
|
| Funding Agency ID: |
8000 |
| Funding Office ID: |
DFRC0 |
| Funding Office Name: |
DRYDEN FLIGHT RESEARCH CENTER |
| Number of Offers Received: |
1 |
PRODUCT OR SERVICE INFORMATION (AWARD)
| PRODUCT OR SERVICE INFORMATION (AWARD) |
|
Product Code:
|
Z119 |
|
Product Description:
|
MAINT-REP-ALT/OTHER ADMIN BLDGS |
|
NAICS Code:
|
236220 |
|
NAICS Description:
|
COMMERCIAL AND INSTITUTIONAL BUILDING CONSTRUCTION |
COMPETITION INFORMATION (AWARD)
| COMPETITION INFORMATION (AWARD) |
|
Extent Competed:
|
NOT AVAILABLE FOR COMPETITION |
|
Reason Not Competed:
|
AUTHORIZED BY STATUTE |
|
Solicitation Procedure:
|
NEGOTIATED PROPOSAL/QUOTE |
|
Type of Set Aside:
|
8(A) SOLE SOURCE |
|
Statutory Exception to Fair Opportunity:
|
|
|
Type of Contract Pricing:
|
FIRM FIXED PRICE |
PREFERENCE PROGRAMS (AWARD)
Business Size Determination: SMALL BUSINESS
| Other Awards |
Amount:
$401,401
Award Description: TAS::80 0119::TAS "RECOVERY FUNDS". PROVIDE LABOR, EQUIPMENT AND MATERIALS FOR THE CONSTRUCTION OF A +LIFE SUPPORT AND EGRESS+ FACILITY BUILD-OUT OF AN INTERIOR SPACE AT AN EXISTING AIRCRAFT HANGAR AND INCIDENTAL RELATED WORK AT THE DRYDEN AIRCRAFT OPERATIONS FACILITY (DAOF) IN PALMDALE, CA 93550. THE WORK CONSISTS OF, BUT IS NOT LIMITED, TO THE FOLLOWING: DEMOLITION, MISCELLANEOUS CAST-IN-PLACE CONCRETE, FLASHING AND SHEET METAL, FIRE STOPPING, JOINT SEALANTS, STEEL AND DOOR FRAMES, BLAST RESISTANT WINDOWS, DOOR HARDWARE, METAL SUPPORT ASSEMBLIES, GYPSUM BOARD, ACOUSTIC CEILINGS, RESILIENT FLOORING, PAINTS AND COATING, WET PIPE FIRE SUPPRESSION AND SPRINKLERS, PLUMBING GENERAL PURPOSE, EXTERIOR PIPING INSTALLATION, PLUMBING PIPING INSTALLATION, HVAC AIR-SOURCE UNITARY HEAT PUMPS, BASIC ELECTRICAL MATERIAL AND METHODS, INTERIOR DISTRIBUTION SYSTEM, WIRING DEVICES AND INTERIOR LIGHTING. |
Amount:
$11,813,000
Award Description: RECOVERY IMPERIAL DAM AND LAGUNA SETTLING BASIN DREDGING
PROJECT NO. 12.000, TAS::14 0681::TAS
|
Amount:
$11,410
Award Description: "RECOVERY" TAS::80 0119::TAS LIFE SUPPORT AND EGRESS. DIFFERING SITE CONDITIONS ENCOUNTERED; EXISITNG SUBSURFACE PIPING DOES NOT MEET CODE REQUIREMENTS. |
Amount:
$15,866
Award Description: TAS::80 0119::TAS "RECOVERY"
LIFE SUPPORT AND EGRESS
PROVIDE ALL MATERIALS, EQUIPMENT AND LABOR TO REMODEL "LIFE SUPPORT&EGRESS" AREA AT THE DRYDEN AIRCRAFT OPERATIONS FACILITY (DAOF), BUILDING 703, PALMDALE, CA 93550 IN ACCORDANCE WITH THE PERFORMANCE WORK STATEMENT(PWS) AND APPROVED DRAWINGS. |
Amount:
$1,425,140
Award Description: RECOVERYPROJECT#::013776::RP#
CONSTRUCTION SERVICES FOR HARBOR SOUTH BAY RECYCLE WATER SYSTEM EXPANSION PROJECT, CARSON MALL LATERAL, LOS ANGELES COUNTY, CA |
Amount:
$920,194
Award Description: TAS::96 3134::TAS ARRA::YES::ARRA RECOVERYPROJECT#::013776::RP#
CONSTRUCTION OF DOMINGUEZ BOOSTER PUMP STATION, CITY OF CARSON, HARBOR SOUTH BAY RECYCLING WATER STUDY, LOS ANGELES COUNTY, CALIFORNIA. |
Amount:
$1,599,000
Award Description: TAS::96 3135::TAR ARRA::YES::ARRA RECOVERYPROJECT#::009190::RP#
SAN GABRIEL RIVER DROP STRUCTURES #3, #4, #5 AND #8, LACDA, LOS ANGELES COUNTY, CA. DEMOLISH AND DISPOSE EXISTING CONCRETE, CONSTRUCT THE REINFORCED CONCRETE REAPRIS, ACCESS ROUTE PLAN, ACCESS RAMPS. |
Amount:
$60,000
Award Description: RECOVERY, TAS::14 0681::TAS, PROJECT NUMBER 12.000 PROVIDES DIRECTION TO EXTEND THE DISCHARGE LINE. |
Amount:
$0
Award Description: TAS::96 3134::TAS ARRA::YES::ARRA RECOVERYPROJECT#::013776::RP#
PUMP STATION AT CARSON, CA. THE PORTION OF WORK STATED IN THIS MOD REFERENCE NO. R00101 WAS FUNDED WITH NON-FED FUNDS (NON-ARRA. |
Amount:
$0
Award Description: TAS::96 3134::TAS ARRA::YES::ARRA RECOVERYPROJECT#::013776::RP#
CONSTRUCTION OF DOMINGUEZ BOOSTER PUMP STATION, CITY OF CARSON, HARBOR SOUTH BAY RECYCLING WATER STUDY, LOS ANGELES COUNTY, CALIFORNIA. WORK DESCRIBED IN MOD REFERENCE NO. R00102 - NE002 EPOXY COATING WAS FUNDED WITH FED FUNDS (NON-ARRA). |
Amount:
-$125,579
Award Description: TAS::14 0681::TAS RECOVERY - IMPERIAL DAM AND LAGUNA SETTLING BSIN DREDGING. DEFINITIZE CHANGE ORDER MODIFICATION NO. 0001, RECONCILE ESTIMATED QUANTITIES. |
Amount:
$0
Award Description: TAS::96 3134::ARRA TAS::YES::ARRA RECOVERYPROJECT#::013776::RP# CARSON MALL LATERAL, HARBOR/SOUTH BAY RECYCLING PROJECT, LOS ANGELES COUNTY, CALIFORNIA, AS PER ATTACHED PRICING SCHEDULE. THIS MOD EXTENDS THE PERIOD OF PERFORMANCE. |
Amount:
$0
Award Description: TAS::96 3134::TAS ARRA::YES::ARRA RECOVERYPROJECT#::013776::RP#
CONTRACT FOR ARRA DOMINQUEZ PUMP STATION AT CARSON, CA. REFERENCE NO. R00105, INCREASE $3,785.00, NE005 ADDITIONAL FEEDER WIRE. THE CONTRACT COMPLETION DATE SHALL REMAIN UNCHANGED BY THIS MODIFICATION. THIS IS AN ARRA CONTRACT BUT THIS MOD IS NOT ARRA FUNDED |
Amount:
$0
Award Description: TAS::96 3134:: TAS ARRA::YES:: RECOVERYPROJECT#::013776::
CONTRACT FOR ARRA DOMINGUEZ PUMP STATION AT CARSON, CA. REFERENCE NO. R00104 INCREASE OF $2,995.56, NE004 ATSI CONDUIT AND LIGHTNING ARRESTOR. THE CONTRACT COMPLETION DATE SHALL REMAIN UNCHANGED THIS MODIFICATION. |
Amount:
$0
Award Description: TAS::96 3134::TAS ARRA::YES::ARRA RECOVERYPROJECT#::013776::RP#
DOMINGUEZ BOOSTER PUMP STATION, CITY OF CARSON, HARBOR SOUTH BAY RECYCLING WATER STUDY, LOS ANGELES COUNTY, CALIFORNIA. MOD TO EXTEND POP. |
Amount:
$0
Award Description: TAS::31 3134::TAS ARRA::YES::ARRA RECOVERYPROJECT#::013776::RP#
CONTRACT FOR ARRA DOMINGUEZ PUMP STATION AT CARSON, CA. WORK DESCRIBED IN MOD#03, REFERENCE NO. R00103, NE003 STUCCO AND LIGHTING WAS NOT ARRA FUNDED. THE INCREASE OF $44,498.11 IS NON-FED FUNDS. THE CONTRACT COMPLETION DATE SHALL BE EXTENDED BY 30 CALENDAR DAYS BY REASON OF THIS MODIFICATION. |
| Location Information |
| Latitude, Longitude |
0º 0' 0",
0º 0' 0" |
| Congressional District |
22 |
| City |
KERN |
| County |
KERN |
| State |
CA |
| Zip |
93523 |
|