Skip to content Skip to footer site map
Navigate Up

Recovery.gov - Track the Money

Recovery.gov is the U.S. government's official website that provides easy access to data
related to Recovery Act spending and allows for the reporting of potential fraud, waste, and abuse.

contract- RECIPIENT AWARD SUMMARY

CORMAN CONSTRUCTION, INC.

Clarification of Codes


AWARD OVERVIEW

AWARD OVERVIEW
Agency Name: Department of the Interior Project Location: DISTRICT OF COLUMBIA
Award Number: INP10PC76074 Project Location - State: DC
Funding Amount: $13,838 Project Location - Zip Code: 200242000
Ending Date: 2012-04-12 Congressional District: 00

RECIPIENT INFORMATION (AWARD)

RECIPIENT INFORMATION (AWARD)
Recipient Name: CORMAN CONSTRUCTION, INC.
Recipient Address: 12001 GUILFORD RD
Recipient City: ANNAPOLIS JUNCTION
Recipient State: MD
Recipient Zip Code: 207011201
Congressional District: MD-03

DESCRIPTION OF WORK/SERVICE PERFORMED

TAS::14 1041::RAS RECOVERY NAMA 150274 REHABILITATE LINCOLN MEMORIAL REFLECTING POOL AND SURROUNDING GROUNDS. MODIFICATION 0001 ADDS FOR THE RELOCATION OF TWO ADDITIONAL ELM TREES AND ADDITIONAL COSTS OF PERMITS DUE TO FARE STRUCTURE INCREASE BY DDE FOR EROSION AND SEDIMENTATION PLAN.

PURCHASER INFORMATION (AWARD)

PURCHASER INFORMATION (AWARD)
Contracting Office ID: 20000
Contracting Office Name: DSC CONTRACTING SERVICES DIVISION
Contracting Office Region: NO REGI
TAS Major Program: 886

CONTRACT INFORMATION (AWARD)

CONTRACT INFORMATION (AWARD)
Date Signed: 2010-12-30
Effective Date: 2010-12-30
Current Completion Date: 2012-04-12
Ultimate Completion Date: 2012-04-12
Award Type: DEFINITIVE CONTRACT
Reason For Modification: SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE
Type of Contract Pricing: FIRM FIXED PRICE
Last Date to Order:
Funding Agency ID: 1443
Funding Office ID: 20000
Funding Office Name: DSC CONTRACTING SERVICES DIVISION
Number of Offers Received: 10

PRODUCT OR SERVICE INFORMATION (AWARD)

PRODUCT OR SERVICE INFORMATION (AWARD)
Product Code: Z249
Product Description: MAINT-REP-ALT/OTHER UTILITIES
NAICS Code: 237990
NAICS Description: OTHER HEAVY AND CIVIL ENGINEERING CONSTRUCTION

COMPETITION INFORMATION (AWARD)

COMPETITION INFORMATION (AWARD)
Extent Competed: FULL AND OPEN COMPETITION
Reason Not Competed: Not Reported
Solicitation Procedure: NEGOTIATED PROPOSAL/QUOTE
Type of Set Aside: NO SET ASIDE USED.
Statutory Exception to Fair Opportunity:
Type of Contract Pricing: FIRM FIXED PRICE

PREFERENCE PROGRAMS (AWARD)

Business Size Determination: OTHER THAN SMALL BUSINESS

TRANSACTIONS

TRANSACTIONS

Other Awards

Other Awards
Amount: $3,629,970
Award Description: TAS::14 1041::TAS RECOVERY CHOH PMIS#125585 CATOCTIN AQUEDUCT REHABILITATION, CHESAPEAKE AND OHIO CANAL NATIONAL HISTORIC PARK. THE AQUEDUCT REHABILITATION AND WILL INCLUDE CONSTRUCTION OF NEW CAST-IN-PLACE CONCRETE PIER, STRENGTHENING OF AN EXISTING STONE PIER USING GROUT INJECTION TECHNIQUES, SCOUR REPAIR OF EXISTING PIER FOOTINGS, CONSTRUCTION OF STRUCTURAL CAST-IN-PLACE REINFORCED CONCRETE ARCHES, AND RE-SETTING OF HISTORIC AND NEWLY CUT STONE. MUCH OF THE STONE LOST IN THE COLLAPSE HAS BEEN RECOVERED. THIS INCLUDES RING AND WALL STONE. THE STONE IS DRESSED AND FACED CUT STONE. STONE NOT RECOVERED HAS BEEN MAPPED AND DETAILED AND WILL NEED TO BE PURCHASED BY THE CONTRACTOR AND CUT TO SPECIFIC DIMENSIONS PROVIDED IN THE CONTRACT DOCUMENTS. ONCE ARCHES AND WALLS HAVE BEEN RE-BUILT, CONCRETE FILL WILL BE PLACED WITHIN THE PRISM UP TO THE WALKING SURFACE. NEW STEEL RAILING WILL BE INSTALLED AND A CAST-IN-PLACE CANTILEVER RETAINING WALL WILL BE CONSTRUCTED IN THE STREAM BED. FINALLY, UPON COMPLETION, THE CONTRACTOR WILL REMOVE THE TEMPORARY STEEL BRIDGE. ALL WORK WILL BE PERFORMED UNDER A SINGLE CONTRACT.
Amount: $30,747,421
Award Description: TAS::14 1041::TAS RECOVERY NAMA 150274 REHABILITATE LINCOLN REFLECTING POOL AND SURROUNDING GROUNDS
Amount: $237,351
Award Description: RECOVERY CHOH PMIS #125585 CATOCTIN AQUEDUCT REHABILITATION, CHESAPEAKE AND OHIO CANAL NATIONAL HISTORIC PARK, MODIFICATION NO. 0003. AS A RESULT OF DIFFERING SITE CONDITIONS, THE FOLLOWING ITEMS ARE BEING INCORPORATED INTO THE CONTRACT: BID ITEM NO. 1 + SCAFFOLDING, TEMPORARY CONTROLS, DEBRIS REMOVAL FROM RIVER (TIME) A. IMPLEMENTATION OF THIS MODIFICATION RESULTS IN 64 DAYS OF COMPENSABLE TIME AND 27 DAYS OF NON-COMPENSABLE TIME FOR A TOTAL OF 91 CALENDAR DAYS. THE 64 DAYS OF COMPENSABLE TIME WILL BE ADDED TO LINE ITEM 1. THE AGREED UPON DAILY RATE FOR TIME IS $912.18 PER DAY. **TWENTY-EIGHT (28) OF THE NINETY-ONE (91) CALENDAR DAYS WERE PREVIOUSLY AWARDED UNDER MODIFICATION NO. 0001, DATED 11/18/2010; THEREFORE, THE NEW CONTRACT COMPLETION DATE SHALL BE AUGUST 16, 2011. ADD $58,380.00 BID ITEM NO. 2 + SITE WORK (RPP 5) A. MODIFY THE WORK OF THIS LINE ITEM TO REPLACE INSTEAD OF REPAIR THE TWO EXISTING DRAINAGE PIPES. THE EXISTING PIPES WERE TO BE CLEANED BUT WERE FOUND TO BE RUSTED TOTALLY THROUGH, THUS REQUIRING REPLACEMENT. ADD $20,441.00 BID ITEM NO. 4 + REINFORCED CONCRETE ARCHES (RPP 8) A. MODIFY THE WORK OF THIS LINE ITEM IN ACCORDANCE WITH RPP 8: +MODIFY THE CONSTRUCTION BETWEEN THE CONCRETE ARCHES AND THE EXISTING STRUCTURE DUE TO THE CHANGE FROM WHAT IS SHOWN ON THE CONTRACT DOCUMENTS (SHEET S-5) AND THE ACTUAL CONDITIONS ON SITE. ADDITIONAL STONE REMOVAL DOWELS AND CONCRETE WILL BE REQUIRED (REFERENCE RFI #21 INCLUDED WITH THIS RPP).+ THIS WORK INCLUDES REMOVING EXISTING RUBBLE AND DAMAGED STONE AT THE WEST ABUTMENT AND WEST SIDE OF THE EAST PIER AND MODIFICATION OF STEEL REINFORCING DOWELS WHERE THE NEW CENTER ARCH AND EAST PIER MEET THE EXISTING EAST ARCH. ADD $25,665.00 BID ITEM NO. 13 + REPAIR OF EAST PIER FOUNDATION (RPP 7) A. MODIFY THE WORK OF THIS LINE ITEM TO ADD REPAIR OF A MISSING SECTION OF THE EAST PIER FOUNDATION. THE MISSING SECTION IS TO BE REPLACED WITH REINFORCED CONCRETE. ADD $30,359.00 BID ITEM NO. 22 + STONE PINNING, EPOXY CRACK INJECTION AND MISCELLANEOUS ITEMS (RPP 6) A. MODIFY THE WORK OF THIS LINE ITEM TO DELETE 4 OF 5 STONE PINS SHOWN ON SHEET S7 OF THE CONTRACT DRAWINGS. DELETION OF THIS WORK RESULTS IN A CREDIT OF $1,805.00 DEDUCT ($1,805.00) NEW BID ITEM NO. 24 + EAST PIER GABION REMOVAL (RPP 4) A. PROVIDE A NEW LINE ITEM TO PROVIDE FOR REMOVAL OF GABION BASKETS AND GABION STONE AROUND THE EAST PIER. ADD $92,654.00 NEW BID ITEM NO. 25 + RESETTING DISPLACED EAST ABUTMENT STONE (RPP 6) A. PROVIDE A NEW LINE ITEM TO PROVIDE FOR RESETTING DISPLACED STONE ON THE EAST ABUTMENT. ADD $11,657.00 TOTAL (ALL MODIFICATION BID ITEMS-1,2,4,13,22,24,25): $237,351.00
Amount: $106,611
Award Description: RECOVERY CHOH PMIS # 125585 CATOCTIN AQUEDUCT REHABILITATION, CHESAPEAKE AND OHIO CANAL NATIONAL HISTORIC PARK, MODIFICATION NO. 0001. AS A RESULT OF DIFFERING SITE CONDITIONS, THE FOLLOWING ITEMS ARE BEING MODIFIED: BID ITEM NO. 3-FOUNDATION VOID REPAIR ($15,120.00) BID ITEM NO. 12-GROUT FOR FOUNDATION VOID REPAIR AND FOR GROUTING BARS IN EAST AND WEST PIER ($82,000.00) BID ITEM NO. 20-CONCRETE RETAINING WALL $37,334.00 NEW BID ITEM NO. 23-FOUNDATION VOID REPAIR LUMP SUM $166,397.00 TOTAL FOR MODIFICATION NO. 1 $106,611.00
Amount: $58,754
Award Description: RECOVERY CHOH PMIS#125585 "CATOCTING AQUEDUCT REHABILITATION" CHESAPEAKE AND OHIO CANAL NATIONAL HISTORIC PARK. THE PURPOSE OF MODIFICATION NO. 0005 IS TO INCORPORATE THE FOLLOWING ITEM AS A RESULT OF A DIFFERING SITE CONDITION: REMOVE EXISTING PRISM WALLS ON THE SOUTHEAST, SOUTHWEST AND NORTHEAST CORNERS OF THE AQUEDUCT AS SHOWN ON ATTACHED DRAWINGS: CHOH 125585 RFP 11 S1, CHOH 125585 RFP 11 S2. NOTE THAT THE EXISTING OUTER WALLS WILL NOT BE DISTURBED. FILL INTERIOR SPACE OF PRISM WALLS WITH FILL CONCRETE AND REBAR REINFORCEMENT AS SHOWN ON DRAWING CHOH 125585 RFP 11 S2. RESET EXISTING STONES ALONG INTERIOR WALLS AS SHOWN ON DRAWING CHOH 125585 S2. ADD $58,754.00
Amount: $148,451
Award Description: NAMA 150274 - REHABILITATE LINCOLN REFLECTING POOL AND SURROUNDING GROUNDS, GRANITE COSTS INCREASES AND CONCRETE TESTING AND INSPECTION REQUIREMENTS.
Amount: $55,775
Award Description: NAMA 150274 - REHABILITATE LINCOLN REFLECTING POOL AND SURROUNDING GROUNDS - TEMP VISITOR ACCESS AND ROOT PRUNING CHANGES
Amount: $382,643
Award Description: NAMA-150274 REHABILITATE LINCOLN MEMORIAL REFLECTING POOL AND SURROUNDING GROUNDS. CHANGES DUE TO DIFFERING SITE CONDITIONS ENCOUNTERED DURING CONSTRUCTION.
Amount: $252,153
Award Description: NAMA 150274 REHABILITATE LINCOLN REFLECTING POOL AND SURROUNDING GROUNDS - DIFFERING SITE CONDITIONS REQUIRING INSTALLATION OF PILE SUPPORTED FOUNDATIONS AT WALLS 1, 2, 3, 4.
Amount: $13,838
Award Description: TAS::14 1041::RAS RECOVERY NAMA 150274 REHABILITATE LINCOLN MEMORIAL REFLECTING POOL AND SURROUNDING GROUNDS. MODIFICATION 0001 ADDS FOR THE RELOCATION OF TWO ADDITIONAL ELM TREES AND ADDITIONAL COSTS OF PERMITS DUE TO FARE STRUCTURE INCREASE BY DDE FOR EROSION AND SEDIMENTATION PLAN.
Amount: $85,346
Award Description: TAS::14 1041::RAS RECOVERY NAMA 150274 REHABILITATE LINCOLN MEMORIAL REFLECTING POOL AND SURROUNDING GROUNDS. MODIFICATION 0002 INCORPORATES NEW TEMPORARY CONSTRUCTION ACCESS OFF INDEPENDENCE AVENUE RELIEVING TRAFFIC CONGESTION ALONG OTHER STREETS.
Amount: $0
Award Description: NAMA 150274 - REHABILITATE LINCOLN REFLECTING POOL AND SURROUNDING GROUNDS. INCORPORATE FAR 52.209-9 "UPDATES OF PUBLICLY AVAILABLE INFORMATION REGARDING RESPONSIBILITY MATTERS (JAN 2011), ALTERNATE I (JAN 2011).
Amount: $253,622
Award Description: NAMA-150274 REHABILITATE LINCOLN REFLECTING POOL AND SURROUNDING GROUNDS - CHANGES DUE TO DIFFERING SITE CONDITIONS ENCOUNTERED AT THE SITE OF THE WORK.
Amount: $0
Award Description: RECOVERY CHOH PMIS#125585 CATOCTIN AQUEDUCT REHABILITATION, CHESAPEAKE AND OHIO CANAL NATIONAL HISTORIC PARK. THIS MODIFICATION INCORPORATES CLAUSE 52.209-9 UPDATES OF PUBLICLY AVAILABLE INFORMATION REGARDING RESPONSIBILITY MATTERS (JAN 2011), ALTERNATE I (JAN 2011).
Amount: $169,442
Award Description: RECOVERY CHOH PMIS#125585 "CATOCTIN AQUEDUCT REHABILITATION" CHESAPEAKE AND OHIO CANAL NATIONAL HISTORIC PARK. THE PURPOSE OF MODIFICATION NO. 0006 IS TO INCORPORATE THE FOLLOWING ITEMS INTO THE CONTRACT: BID ITEM NO. 3 + FOUNDATION VOID REPAIR A. MODIFY THE WORK OF THIS LINE ITEM TO DELETE TWENTY-SIX (26) LINEAR FEET OF FOUNDATION VOID REPAIR. DELETION OF THIS WORK RESULTS IN A CREDIT OF $16,380.00. DEDUCT ($16,380.00) BID ITEM NO. 12 + GROUT FOR FOUNDATION VOID REPAIR AND FOR GROUTING BARS IN EAST AND WEST PIERS A. MODIFY THE WORK OF THIS LINE ITEM TO ADD 1.04 CUBIC YARDS OF GROUT FOR ADDITIONAL GROUTING REQUIRED FOR THE BARS IN THE EAST PIER. ADD $21,320.00 NEW BID ITEM NO. 28 + CONSTRUCT REINFORCED CONCRETE KNEE WALLS AT EAST PIER FOOTING AND ABUTMENT (RPP 9) A. PLACE A CONTINUOUS CONCRETE KNEE WALL BOTH AT THE EAST EDGE OF THE EAST PIER AND ALSO AT THE EAST ABUTMENT OF THE CATOCTIN AQUEDUCT. THERE ARE A CONSIDERABLE NUMBER OF VOIDS RESULTING FROM THE LOSS OF MORTAR BETWEEN THE STONES UNDER BOTH STRUCTURES. ADD $164,502.00
Amount: $12,768
Award Description: RECOVERY CHOH PMIS#125585 CATOCTIN AQUEDUCT REHABILITATION, CHESAPEAKE AND OHIO CANAL NATIONAL HISTORIC PARK. MODIFICATION NO. 4 INCORPORATES THE FOLLOWING ITEM INTO THE CONTRACT: BID ITEM NO. 26 + RETAINING WALL RAILING A. FABRICATE AND INSTALL RAILING ON TOP OF THE NEW RETAINING WALL. SUPPLY APPROXIMATELY 42+OF NEW METAL RAILING TO BE INSTALLED ON TOP OF THE NEW RETAINING WALL AS PER THE ATTACHED DRAWING, SUB SHEET NO. COO, DRAWING NO. 412/82322, SHEET 1 OF 1. THE DETAILS OF THE METAL RAILING SHALL BE AS FOLLOWS: 4+-5+ LONG POSTS ARE MADE OF 2+ SQUARE STAINLESS STEEL TUBE, 5+ OF IT TO BE INSERTED IN 4+ CORE DRILL HOLE IN THE CONCRETE WALL WITH EPOXY GROUT. ++ X 2+ BOTTOM AND TOP FLAT BAR ARE MADE OF STEEL. KEEP CLEAR SPACE OF 4+ BETWEEN TOP OF CONCRETE RETAINING WALL AND BOTTOM FLAT BAR. 7/8+ DIAMETER SOLID STEEL PIQUETS THE ABOVE METAL RAILING SHALL COMPLY WITH THE +PROJECT SPECIFICATIONS +SECTION 05500 +NEW METAL RAILING+.
Amount: -$8,020
Award Description: RECOVERY CHOH PMIS # 125585 "CATOCTING AQUEDUCT REHABILITATION," CHESAPEAKE AND OHIO CANAL NATIONAL HISTORIC PARK. THE PURPOSE OF MODIFICATION NO. 0007 IS TO INCORPORATE THE ITEMS LISTED BELOW INTO THE CONTRACT. PLEASE REFERENCE FAR CLAUSE 52.211-18 VARIATION IN ESTIMATED QUANTITY. BID ITEM NO. 5 CONCRETE FILL A. MODIFY THE WORK OF THIS LINE ITEM TO DELETE SEVENTY-FOUR (74) CUBIC YARDS OF CONCRETE FILL. DEDUCT ($32,190.00) BID ITEM NO. 6 CONCRETE SLAB A. MODIFY THE WORK OF THIS LINE ITEM TO ADD TWENTY-SEVEN (27) CUBIC YARDS OF CONCRETE REQUIRED FOR THE CONCRETE SLAB. ADD $20,250.00 BID ITEM NO. 7 NEW STONE MASONRY FOR SPANDREL WALLS AND COPING STONES A. MODIFY THE WORK OF THIS LINE ITEM TO DELETE 54.98 CUBIC YARDS OF NEW STONE MASONRY. DEDUCT ($224,043.50) BID ITEM NO. 8 EXISTING STONE MASONRY FOR SPANDREL WALLS AND COPING STONES A. MODIFY THE WORK OF THIS LINE ITEM TO ADD 24.55 CUBIC YARDS OF EXISTING STONE MASONRY. ADD $46,645.00 BID ITEM NO. 9 NEW STONE MASONRY FOR ARCH A. MODIFY THE WORK OF THIS LINE ITEM TO DELETE 27.18 CUBIC YARDS OF NEW STONE MASONRY. DEDUCT ($271.80) BID ITEM NO. 10 EXISTING STONE MASONRY FOR ARCH A. MODIFY THE WORK OF THIS LINE ITEM TO DELETE 5.48 CUBIC YARDS OF EXISTING STONE MASONRY. DEDUCT ($54.80) BID ITEM NO. 11 REMOVAL AND RESETTING EXISTING IN PLACE MASONRY A. MODIFY THE WORK OF THIS LINE ITEM TO DELETE REMOVAL AND RESETTING OF 69.45 CUBIC YARDS OF STONE MASONRY. DEDUCT ($694.50) BID ITEM NO. 12 GROUT FOR FOUNDATION VOID REPAIR AND FOR GROUTING BARS IN EAST AND WEST PIERS A. MODIFY THE WORK OF THIS LINE ITEM TO ADD 0.026 CUBIC YARDS OF GROUT FOR ADDITIONAL GROUTING REQUIRED FOR THE BARS IN THE EAST PIER. ADD $533.00 BID ITEM NO. 15 UNDERWATER VOID AND JOINTS REPAIR A. MODIFY THE WORK OF THIS LINE ITEM TO DELETE THE CONTRACT QUANTITY OF THIS ITEM IN ITS ENTIRETY. DEDUCT ($13,200.00) BID ITEM NO. 16 REPOINTING A. MODIFY THE WORK OF THIS LINE ITEM TO ADD 1,447 LINEAR FEET OF QUANTITY FOR REPOINTING. ADD $30,387.00 NEW BID ITEM NO. 29 REBUILD SOUTHEAST AND SOUTHWEST RUBBLE STONE WING WALLS (RPP 12 AND COD 8) A. PROVIDE A NEW LINE ITEM TO REBUILD THE SOUTHEAST AND SOUTHWEST WING WALLS WHICH PROVIDE TRANSITION FROM THE CANAL PRISM TO THE TRUNK OF THE CATOCTIN AQUEDUCT. ADD $51,846.00 NEW BID ITEM NO. 30 REMOVE NORTHEAST RETAINING WALL AND PEDESTRIAN BRIDGE ABUTMENT (RPP 13) A. PROVIDE A NEW LINE ITEM TO REMOVE THE EXISTING STONE MASONRY RETAINING WALL AND CONCRETE PEDESTRIAN BRIDGE ABUTMENT LOCATED ON THE NORTHEAST SIDE OF THE CATOCTIN AQUEDUCT. ADD $76,579.43 NEW BID ITEM NO. 31 DEBRIS REMOVAL (REA 1) A. PROVIDE A NEW LINE ITEM TO REMOVE DEBRIS FROM THE PIERS AND ABUTMENTS OF THE CATOCTIN AQUEDUCT AFTER THE MARCH 10, 2011 HIGH WATER EVENT. ADD $36,193.84 TOTAL DEDUCT FOR MODIFICATION NO. 7 (BID ITEM NO. 5-31): ($8,020.33)
Amount: $84,006
Award Description: NAMA 150274 - REHABILITATE LINCOLN REFLECTING POOL AND SURROUND GROUNDS. CHANGES DUE TO DIFFERING SITE CONDTIONS ENCOUNTERED AT THE SITE OF WORK.
Amount: $673,184
Award Description: NAMA 150274 ARRA, REHABILITATION OF THE LINCOLM MEMORIAL REFLECTING POOL AND GROUNDS, NATIONAL MALL, WASHINGTON, DC PEPCO REQUIRED/DELIVERED ELECTRICAL POWER TO THE PROJECT
Amount: $51,978
Award Description: NAMA 150274 REHABILITATE LINCOLN REFLECTING POOL AND SURROUNDING AREA CHANGES DUE TO DIFFERING SITE CONDITIONS ENCOUNTERED AT WORK SITE.
Amount: $61,765
Award Description: NAMA 150274 RECOVERY DEFINITIZATION OF CHANGES AUTHORIZED BY THE CO DUE TO DIFFERING SITE CONDITIONS
Amount: $498,983
Award Description: NAMA 150274 ARRA REHABILITATE LINCOLN REFLECTING POOL AND SURROUNDING GROUNDS,DUE TO DIFFERING SITE CONDITIONS, THIS MOD AUTHORIZES PERFORMANCE ADJUSTMENTS TO ACCOMMODATE THE ACTUAL PERIMTER GRADE ELEVATIONS
Amount: $114,413
Award Description: NAMA 150274 RECOVERY DIFINITIZATION OF CHANGES AUTHORIZED BY CO DUE TO DIFFERING SITE CONSTIONS
Amount: $225,168
Award Description: NAMA 150274 ARRA REHAB THE LINCOLN REFLECTING POOL AND SURROUNDING GROUNDS: MOD 17 ADDS 47 DAYS TO ADDITIONAL WORK REQUIRED TO INSTALL 17TH ST. SEWER AND LEVEE WORK.
Amount: $223,121
Award Description: NAMA 150274 REHABILITATE LINCOLN REFLECTING POOL&SURROUNDING AREA. CHANGES DUE TO DIFFERING SITE CONDITIONS ENCOUNTERED AT WORK SITE.
Amount: $167,309
Award Description: ARRA NAMA 150274 REHABILITATE LINCOLN REFLECTING POOL: CONSTRUCTION CHANGES TO ACCOMODATE DIFFERING SITE CONDITIONS
Amount: $276,963
Award Description: NAMA 150274 ARRA DUE TO DIFFERING SITE CONDITIONS THIS MOD AUTHORIZES PERFORMANCE ADJUSTMENTS TO ACCOMODATE THE SITE CONDITIONS AS DESIGNATED IN THE SCOPE OF SERVICES.
Amount: $455,251
Award Description: NAMA 150274 RECOVERY CHANGE ORDER WORK DUE TO DIFFERING SITE CONDITIONS AND EXTENSION OF CONTRACT
Amount: $97,968
Award Description: NAMA 150274 ARRA REHABILITATE LINCOLN REFLECTING POLL AND SURROUNDING GROUNDS DIFFERING SITE CONDITION CHANGES
Amount: $0
Award Description: MODIFICATION 0020 IS AN ADMINISTRATIVE MOD TO CORRECT FUNDING CODES ON MODIFICATION 0019

Project Location Detail

Location Information
Latitude, Longitude 0º 0' 0", 0º 0' 0"
Congressional District 00
City DISTRICT OF COLUMBIA
County DISTRICT OF COLUMBIA
State DC
Zip 20024