| Other Awards |
Amount:
$186,148
Award Description: RECOVERY: TAS::12 1142::TAS
UPPER CLEAR BOGGY SITE 34, PONTOTOC COUNTY, OK - THIS IS A TASK ORDER AGAINST A PREVIOUSLY AWARDED (COMPETITIVE, FIRM-FIXED PRICE) A&E IDIQ CONTRACT. THE ORIGINAL IDIQ CONTRACT WAS NOT PLACED IN FPDS BY THE PREVIOUS CONTRACTING OFFICER. ARRA::YES::ARRA |
Amount:
$138,905
Award Description: RECOVERY: TAS::12 1142::TAS COTTONWOOD 15 DECOMMISSIONING DESIGN - THIS TASK ORDER IS ISSUED UNDER AN EXISTING IDIQ (COMPETITIVE). THE ORIGINAL IDIQ DID NOT OBLIGATED FUNDS AND WAS NOT ENTERED INTO FPDS BY THE ORIGINAL CONTRACTING OFFICER. |
Amount:
$171,244
Award Description: RECOVERY: TAS::12 1142::TAS
UPPER CLEAR BOGGY SITE 33, PONTOTOC COUNTY, OK - THIS IS A TASK ORDER AGAINST A PREVIOUSLY AWARDED (COMPETITIVE, FIRM-FIXED PRICE) A&E IDIQ CONTRACT. THE ORIGINAL IDIQ CONTRACT WAS NOT PLACED IN FPDS BY THE PREVIOUS CONTRACTING OFFICER. ARRA::YES::ARRA |
Amount:
$460,396
Award Description: TAS::14 1041::TAS RECOVERY ARCHITECT-ENGINEERING SERVICES FOR DESIGN DEVELOPMENT THROUGH CONSTRUCTION DOCUMENTS AND PERMITTING RELATED TO RESTORATION OF EAST CAPE AND HOMESTEAD CANAL PLUGS (AKA DAMS), EVERGLADES NATIONAL PARK, FLORIDA. NPS PMIS # EVER-152464. |
Amount:
$29,018
Award Description: TAS::14 1041::TAS RECOVERY ARCHITECT-ENGINEERING SERVICES FOR DESIGN DEVELOPMENT THROUGH CONSTRUCTION DOCUMENTS AND PERMITTING RELATED TO RESTORATION OF EAST CAPE AND HOMESTEAD CANAL PLUGS (AKA DAMS), EVERGLADES NATIONAL PARK, FLORIDA. NPS PMIS # EVER-152464. |
Amount:
$182,165
Award Description: TAS::14 1610::TAS FFS PROJECT NUMBER R9VA LEED CONSULTING SERVICES AT THE NATIONAL CONSERVATION TRAINING CENTER |
Amount:
$173,130
Award Description: BOUNDARY SURVEYS FOR WRP - O&R RANCH FOR EASEMENTS |
Amount:
$15,371
Award Description: CONSTRUCTION MANAGEMENT SERVICES FOR ASTON TOWNSHIP DAM REMOVAL (ARRA - EWP). TASK ORDER #2. |
Amount:
$0
Award Description: 8 DAM REHABILITATION ASSESSMENTS |
Amount:
$5,747
Award Description: ASTON TOWNSHIP DAM RESTORATION, PENNSYLVANIA |
Amount:
$0
Award Description: ASTON TOWNSHIP DAM RESTORATION, PENNSYLVANIA |
Amount:
$0
Award Description: TAS: 12 1073 2009 2010: TAS FOR WATERSHED AND FLOOD PREVENT OPERATIONS (INCLUDES WATERSHED OPERATIONS ND FLOODPLAIN EASEMENT PROGRAMS) THIS IS A ONE (1) BASE YEAR AND FOUR (4) OPTION YEARS. |
Amount:
-$249,998
Award Description: TAS: 12 1073 2009 2010: TAS FOR WATERSHED AND FLOOD PREVENT OPERATIONS (INCLUDES WATERSHED OPERATIONS ND FLOODPLAIN EASEMENT PROGRAMS) THIS IS A ONE (1) BASE YEAR AND FOUR (4) OPTION YEARS. |
Amount:
$0
Award Description: TAS: 12 1073 2009 2010: TAS FOR WATERSHED AND FLOOD PREVENT OPERATIONS (INCLUDES WATERSHED OPERATIONS ND FLOODPLAIN EASEMENT PROGRAMS) THIS IS A ONE (1) BASE YEAR AND FOUR (4) OPTION YEARS. |
Amount:
$19,490
Award Description: TAS::12 1142::TAS
RECOVERY INDEPENDENT DESIGN REVIEW, LOST CREEK WATERSHED, STRUCTURE B-2, NEWTON COUNTY, MISSOURI, UNDER CONTRACT AG-3A75-C-09-0022 |
Amount:
$50,515
Award Description: A/E DESIGN REVIEW |
Amount:
$70,351
Award Description: RECOVERY
INDEPENDENT DESIGN REVIEWS OF THREE DAM REHABILITATION DESIGNS IN GEORGIA: SANDY CREEK WATERSHED |
Amount:
$36,100
Award Description: INSPECTION SERVICES REQUIRED DURING WAREHOUSE RENOVATION. DM0031C. |
Amount:
$58,625
Award Description: TAS::14 1035::TAS RECOVERY OLYM 005375, ENVIRONMENTAL SITE ASSESSMENTS FOR TRIBAL WASTE WATER SYSTEM |
Amount:
$48,467
Award Description: RECOVERY VEGITATION MITIGATION MONITORING SERVICES RELATED TO THE "REPLACE FAILING PLUGS (DAMS) AT CAPE SABLE" CONSTRUCTION PROJECT, EVERGLADES NATIONAL PARK, FLORIDA. NPS PMIS # EVER-152464. |
Amount:
$38,890
Award Description: TAS::14 1041::TAS RECOVERY ARCHITECT-ENGINEERING SERVICES FOR DESIGN DEVELOPMENT THROUGH CONSTRUCTION DOCUMENTS AND PERMITTING RELATED TO RESTORATION OF EAST CAPE AND HOMESTEAD CANAL PLUGS (AKA DAMS), EVERGLADES NATIONAL PARK, FLORIDA. NPS PMIS # EVER-152464. MODIFICATION 0003 UPDATED ENVIRONMENTAL PERMITTING, DESIGN AND NEPA DOCS, ETC. PLUS AN ADDITIONAL UPLAND STAGING STUDY WAS ADDED. |
Amount:
$27,681
Award Description: TAS::14 1041::TAS RECOVERY ARCHITECT-ENGINEERING SERVICES FOR DESIGN DEVELOPMENT THROUGH CONSTRUCTION DOCUMENTS AND PERMITTING RELATED TO RESTORATION OF EAST CAPE AND HOMESTEAD CANAL PLUGS (AKA DAMS), EVERGLADES NATIONAL PARK, FLORIDA. NPS PMIS # EVER-152464. |
Amount:
-$12,746
Award Description: RECOVERY EVER PMIS # 152464 - DDS & CDS AND PERMITTING SERVICES TASK ORDER FOR THE "REPLACE TWO FAILED PLUGS (DAMS) AT CAPE SABLE" CONSTRUCTION PROJECT. MODIFICATION 0004 ADDRESSES TWO ISSUES. THE FIRST ISSUE CHANGES THE SCOPE OF WORK BY REQUIRING THE CONTRACTOR TO: DEVELOP REVISED DESIGN DOCUMENTS TO SUPPORT USE OF A SHEETPILE SIDE BANK STABILIZATION AND TO REVISE AND UPDATE SPECIFIC CONSTRUCTION DRAWING SHEETS RESULTING FROM THIS CHANGE; UPDATES AND RE-SUBMITTALS OF FINAL CD DRAWINGS AND SPECIFICATIONS FOR THE SHEETPILE MODIFICATION; DEVELOPMENT OF RISK MANAGEMENT PLANNING SPECIFICATION (013600) AND UPDATE/REVISE OTHER SPECIFICATION SECTIONS TO CONSOLIDATE RISK MANAGEMENT ISSUES; MODIFY THE ENVIRONMENTAL PERMIT DOCUMENTS TO INCLUDE THE NEW SHEETPILE EMBANKMENT DESIGN; ATTEND ON-SITE FIELD VISIT TO BOTH DAM SITES AND PRE-BID CONFERENCE; AND PROVIDE TECHNICAL SUPPORT TO NPS DURING THE BIDDING PHASE OF THE SOLICITATION TO ADDRESS AND RESPOND TO CONTRACTOR QUESTIONS. THE SECOND ISSUE REDUCES THE ORIGINAL SCOPE OF WORK FOR THE FOLLOWING REASONS: COMPLIANCE DELIVERABLES WAS REDUCED DUE TO A DECREASE IN ACTUAL PERMITTING COSTS; BENTHIC SURVEY AND GEOTECHNICAL EVALUATION COSTS WERE DECREASED DUE TO THE ELIMINATION OF THE GEOTECHNICAL EVALUATION PORTION OF THIS MODIFICATION; BENTHIC SURVEY OF OPEN WATER STAGING AREA AND ADDITIONAL UPLAND STAGING AREA EVALUATION COST WERE DECREASED DUE TO THE ELIMINATION OF AN ADDITIONAL UPLAND STAGING AREA REQUIREMENT; A VALUE ENGINEERING WORKSHOP MEETING REQUIREMENT WAS DELETED FROM THE SCOPE OF WORK AFTER THE MEETING WAS NOT REQUIRED; A STAKEHOLDER DESIGN BRIEFING REQUIREMENT WAS DELETED FROM THE SCOPE OF WORK AFTER THE MEETING WAS NOT REQUIRED; AND FUNDING FOR ATTENDANCE AT THE JOINT AGENCY ON-SITE INVESTIGATION MEETING WAS DECREASED DUE TO A DECREASE IN NUMBER OF PERSONNEL ATTENDING THE MEETING. |
Amount:
$69,313
Award Description: RECOVERY, TAS 10 1041::OLYM 005375, MAINTAIN WATER QUALITY AT NIPPON PAPER MILL - PHASE 1, A/E SERVICES DURING CONSTRUCTION. |
Amount:
$208,217
Award Description: RECOVERY EVER PMIS #152464 - - ARCHITECTURAL/ENGINEERING (A/E) CONSTRUCTION-PHASE SERVICES FOR THE "REPLACE TWO FAILED PLUGS (DAMS) AT CAPE SABLE" CONSTRUCTION PROJECT. THE WORK UNDER THIS TASK ORDER IS FOR TITLE III ARCHITECT-ENGINEER SERVICES FOR THE "REPLACE TWO FAILED PLUGS (DAMS) AT CAPE SABLE" CONSTRUCTION PROJECT. THE SELECTED FIRM WILL PROVIDE ALL THE LABOR, EQUIPMENT, AND SUPPLIES REQUIRED TO SATISFY THE REQUIREMENT FOR ARCHITECT-ENGINEER SERVICES DURING THE CONSTRUCTION PHASE OF THE PROJECT FOR RESTORATION OF EAST CAPE AND HOMESTEAD CANAL PLUGS LOCATED IN EVERGLADES NATIONAL PARK, FLORIDA. |
Amount:
$354,124
Award Description: RECOVERY TAS PROJECT NUMBER LDDFR040000 - KOTZEBUE BUILDING IMPROVEMENTS. THIS IS A BUREAU OF LAND MANAGEMENT PROJECT AWARDED AND ADMINISTERED BY USFWS. |
Amount:
$361,142
Award Description: RECOVERY TAS::14 1112::TAS PROJECT NUMBER LACAP080000 - TAYLOR HIGHWAY WATER SYSTEM, LOCATED IN THE VICINITY OF CHICKEN, ALASKA. THIS IS A BUREAU OF LAND MANAGEMENT PROJECT AWARDED AND ADMINISTERED BY USFWS. |
Amount:
$304,106
Award Description: RECOVERY TAS::14 1112::TAS PROJECT NUMBER LDRBC0330000- WILD HORSE AND BRIDGE CONSTRUCTION. |
Amount:
$324,118
Award Description: ARRA - TAS::14 1112::TAS - LITTLE BOOKCLIFFS ACCESS ROAD REPAIRS, MESA COUNTY, CAMEO, COLORADO |
Amount:
$199,341
Award Description: ARRA - TAS::14 1112::TAS - CUTCHARA RECREATION SITE PARKING AND SAFETY CONSTRUCTION PROJECT, HUERFANO, COUNTY, COLORADO |
Amount:
$3,099
Award Description: CUCHARA REC AREA PARKING & SAFETY CONST PROJECT - MOD 0001 |
Amount:
$3,467
Award Description: ADDITIONAL CULVERT WORK AND 14 DAY EXTENSION. |
Amount:
$236,734
Award Description: RECOVERY TAS::14 1112::TAS PROJECT NUMBER LDRBC0290000- RED GULCH ROAD. |
Amount:
$1,244,803
Award Description: ARRA - TAS::14 1112::TAS - CARLSBAD SOLAR WILDLIFE WATERS, EDDY CO.,CARLSBAD,NEW MEXICO |
Amount:
$319,979
Award Description: TAS::14 1610::TAS HAVASU NWR A&E SERVICES |
Amount:
$126,374
Award Description: TAS::14 1610::TAS FFS PROJECT NUMBER R9VA LEED CONSULTING SERVICES AT THE NATIONAL CONSERVATI0N TRAINGING CENTER ADDITIONAL WORK WITH THE SCOPE |
Amount:
$462,674
Award Description: RECOVERY TAS:: 14 1613:: TAS, HELEN MERCURY MINE REMEDIATION, UKIAH, CA |
Amount:
$1,032,230
Award Description: RECOVERY TAS::14-1613:: TAS CONTACT AND SONOMA MERCURY MINES REMEDIATION, UKIAH CA |
Amount:
$0
Award Description: TAS::47 4543::TAS ADMINISTRATIVE MODIFICATION TO IDENTIFY THE WORK TO BE DONE ON THE FOB VERSUS THE COURTHOUSE. |
Amount:
$169,218
Award Description: TAS::47 4543::TAS MODIFICATION TO ADD THIRD-PARTY AIR MONITORING DURING ASBESTOS ABATEMENT. |
Amount:
$7,060,150
Award Description: TAS::47 4543::TAS CONSTRUCTION MANAGEMENT SERVICES FOR THE MODERNIZATION OF THE BYRON G. ROGERS FEDERAL OFFICE BUILDING. |
Amount:
$26,239
Award Description: TAS::47 4543::TAS CONSTRUCTION MANAGEMENT SERVICES FOR THE MODERINIZATION OF THE BYRON G. ROGERS FOB AND COURTHOUSE WINDOW REPLACEMENT. |
Amount:
$0
Award Description: RECOVERY EVER PMIS #152464 - - ARCHITECTURAL/ENGINEERING (A/E) CONSTRUCTION-PHASE SERVICES FOR THE "REPLACE TWO FAILED PLUGS (DAMS) AT CAPE SABLE" CONSTRUCTION PROJECT. THE WORK UNDER THIS TASK ORDER IS FOR TITLE III ARCHITECT-ENGINEER SERVICES FOR THE "REPLACE TWO FAILED PLUGS (DAMS) AT CAPE SABLE" CONSTRUCTION PROJECT. THE SELECTED FIRM WILL PROVIDE ALL THE LABOR, EQUIPMENT, AND SUPPLIES REQUIRED TO SATISFY THE REQUIREMENT FOR ARCHITECT-ENGINEER SERVICES DURING THE CONSTRUCTION PHASE OF THE PROJECT FOR RESTORATION OF EAST CAPE AND HOMESTEAD CANAL PLUGS LOCATED IN EVERGLADES NATIONAL PARK, FLORIDA. MODIFICATION 0001 EXTENDS THE TASK ORDER FROM APRIL 30, 2011, TO JUNE 30, 2011, AT NO COST TO THE GOVERNMENT IN ORDER TO ALLOW THE CONTRACTOR TO FINALIZE POST-CONSTRUCTION WORK. |
Amount:
$0
Award Description: RECOVERY EVER PMIS # 152464 - DDS & CDS AND PERMITTING SERVICES TASK ORDER FOR THE "REPLACE TWO FAILED PLUGS (DAMS) AT CAPE SABLE" CONSTRUCTION PROJECT. MODIFICATION 0005 IS AN ADMINISTRATIVE MODIFICATION TO CORRECT THE CONTRACT NUMBER IN THE IDEAS-EC REPORTING SYSTEM AND TO CHANGE THE CONTRACTING OFFICER FROM ALBERT J. O'MARA TO RICHARD A. BRAUN. |
Amount:
$0
Award Description: ARRA-TAS::14 1112::TAS - CARLSBAD SOLAR WILDLIFE WATERS, EDDY COUNTY, CARLSBAD, NEW MEXICO, MOD 0004 - TIME EXTENSION |
Amount:
$0
Award Description: RECOVERY TAS PROJECT NUMBER LDDFR040000 - KOTZEBUE BUILDING IMPROVEMENTS. THIS IS A BUREAU OF LAND MANAGEMENT PROJECT AWARDED AND ADMINISTERED BY USFWS. |
Amount:
$0
Award Description: ARRA-TAS::14 1112::TAS - LITTLE BOOKCLIFFS ACCESS ROAD REPAIRS, CAMEO, MESA COUNTY, COLORADO - MOD 0002 EXTEND POP |
Amount:
$0
Award Description: ARRA-TAS::14 1112::TAS - CARLSBAD SOLAR WILDLIFE WATERS, EDDY COUNTY, CARLSBAD, NEW MEXICO - MOD 0003 TIME EXTENSION |
Amount:
-$42,467
Award Description: ARRA-TAS::14 1112::TAS - CARLSBAD SOLAR WILDLIFE WATERS, EDDY COUNTY, CARLSBAD, NEW MEXICO - MOD 0001 FINAL DESIGN-BUILD ITEMS, QUANTITIES, AND PRICES |
Amount:
$5,282
Award Description: ARRA - TAS::14 1112::TAS LITTLE BOOKCLIFFS ACCESS ROAD REPAIRS, CAMEO, MESA COUNTY, COLORADO - MOD 0003 - PAYMENT OF CONTRACTOR CLAIM DTD 1/26/2011 |
Amount:
$0
Award Description: ARRA-TAS::14 1112::TAS - CARLSBAD SOLAR WILDLIFE WATERS, EDDY COUNTY, CARLSBAD, NEW MEXICO - MOD 0002 - TIME EXTENSION |
Amount:
$4,226
Award Description: ARRA - TAS::14 1112::TAS LITTLE BOOKCLIFFS ACCESS ROAD REPAIRS, CAMEO, MESA COUNTY, COLORADO - MOD 0001 FOR ADDTL 3.00CY STRUCTURAL CONCRETE |
Amount:
$0
Award Description: MODIFICATION IS REQUIRED TO REVISE THE NTE FOR THIRD PARTY ASBESTOS MONITORING AND PM SERVICES AS ISSUED UNDER MODIFICAITON PS04 FOR THE BYRON G. ROGERS FOB MODERNIZATION LOCATED IN DENVER, COLORADO |
Amount:
$1,100,000
Award Description: TAS::47 4543::TAS CONSTRUCTION MANAGEMENT SERVICES FOR THE MODERNIZATION OF THE BYRON G. ROGERS FEDERAL OFFICE BUILDING. |
Amount:
$11,453
Award Description: MODIFICATION TO INCLUDE ADDITIONAL AIR MONITORING SERVICES FOR THE BYRON G. ROGERS COURTHOUSE WINDOW REPLACEMENT, PROJECT LOCATED IN DENVER, COLORADO. |
Amount:
$0
Award Description: THE PURPOSE OF THIS MODIFICATION IS TO MAKE ADMINISTRATIVE CHANGES TO THE CONTRACT WITHIN THE CONTRACT LINE ITEM (CLIN) STRUCTURE IN ORDER TO FACILITATE THE GOVERNMENT'S CONVERSION TO UPDATED SOFTWARE (FBMS). THIS MODIFICATION MADE CHANGES TO DELIVERY, START, AND/OR END DATES, CHANGING EACH CLIN TO BE CONSISTENT WITH THE CURRENT CONTRACT DATES. THIS MODIFICATION DOES NOT CHANGE ANY REQUIREMENTS, FUNDING, DELIVERY, OR PERFORMANCE DATES OF THE CONTRACT. ALL TERMS AND CONDITIONS REMAIN UNCHANGED. |
Amount:
-$14,136
Award Description: OLYM-005375-3.10 AE SERVICES DURING CONSTRUCTION NIPPON PHASE II ARRA CLOSE-OUT |
Amount:
$0
Award Description: MODIFICATION TO INCLUDE ADDITINAL CMA SERVICES FOR THE COURTHOUSE WINDOW REPLACEMENT PROJECT LOCATED IN DENVER, COLORADO. |
Amount:
$0
Award Description: MODIFICATION TO DEFINITIZE ALL THIRD PARTY ASBESTOS MONITORING SERVICES UNDER THE BYRON G. ROGERS FOB MODERNIZATION PROJECT LOCATED IN DENVER, COLORADO. |