| Other Awards |
Amount:
$22,764,000
Award Description: TAS::57 3307::TAS ARRA::YES::ARRA RECOVERYPROJECT#::_::RP# STUDENT DORMITORY (200 ROOM) AT GOODFELLOW AFB, SAN ANGELO, TX; MULTI-STORY WITH BRICK VENEER AND PREFINISHED STANDING SEAM METAL ROOF SYSTEM. THE DESIGN INCLUDES 200 MODULES (TWO STUDENTS PER ROOM) WITH A SHARED SHOWER/TOILET ROOM, LAUNDRIES, TRAINING MANAGER+S AREA, STORAGE, COMMUNICATIONS NETWORK, AND ALL NECESSARY SUPPORT. SUPPORTING FACILITIES SHALL INCLUDE HVAC, UTILITIES, FIRE PROTECTION, FIRE ALARM SYSTEMS, WIRING FOR COMMUNICATIONS AND CATV, SIDEWALKS, PARKING, LANDSCAPING, AND SITE IMPROVEMENTS. ADD TROOP WALKS TO MOVE MARCHING TROOPS FROM DORM TO EXISTING LATERAL TROOP WALKS. THE BUILDING IS TO BE DESIGNED IN ACCORDANCE WITH ALL DOD FEDERAL, STATE AND LOCAL REGULATIONS, INCLUDING, BUT NOT LIMITED TO THE UNITED FACILITIES GUIDELINES LATEST EDITION, GOODFELLOW AFB, THE AIR FORCE +06 UNACCOMPANIED HOUSING DESIGN GUIDE AND USACE SWL. LOCATED ON GOODFELLOW AIR FORCE BASE, TEXAS, SAN ANGELO TEXAS. |
Amount:
$59,431,336
Award Description: DESIGN AND CONSTRUCTION OF NEW U.S. FEDERAL COURTHOUSE, BILLINGS, MONTANA
TAS::47 4543::TAS |
Amount:
$57,995
Award Description: TAS::47 4543::TAS CONTRACT IS REVISED TO INCLUDE O&M SUPPORT FOR BUILDING ISSUE THAT MAY ARISE AS A RESULT OF THE MODERNIZATION OF THE ROGERS FEDERAL OFFICE BUILDING GIVEN THAT IT SHARES MECHANICAL SYTEMS WITH THE ADJACENT FEDERAL COURTHOUSE. |
Amount:
$505,839
Award Description: TAS::47 4543::TAS RECONFIGURE THE SECURITY ENTRANCE IN THE MAIN LOBBY AS PART OF THE ROGERS MODERNIZATION. |
Amount:
$4,563,427
Award Description: TAS::47 4543::TAS THIS MODIFICATION PROVIDES FOR ADDITIONAL DESIGN-BUILD SERVICES THAT ADDRESS DETERIORATED AND/OR DEFICIENT ITEMS RELATED TO PLAZA PAVING, LANDSCAPING, IRRIGATION SYSTEMS, SECURITY, DRAINAGE, AND PLAZA ELEMENTS; DESIGNING FILLING THE EXISTING WALKER DUCT SYSTEM AND FLOOR LEVELING; UPGRADING THE EXISTING STAIRWELLS TO MEET CURRENT IBC AND NFPA CODES; PROVIDING LOAD BANKS FOR THE EMERGENCY GENERATORS; RELOCATING THE EXISTING CAMERA MONITORING ROOM; PROVIDING ENHANCED UTILITY METERING CAPABILITIES FOR THE ROGERS FOB; UPGRADING THE EXISTING FIRE PUMP AND REPLACING THE EXISTING FIRE SPRINKLER STANDPIPES; AND DESIGNING A CELLULAR SIGNAL BOOSTER AND RADIO AMPLIFICATION SYSTEM. |
Amount:
$1,529,395
Award Description: TAS::47 4543::TAS THIS MODIFICATION WILL PROVIDE FOR THE ONGOING BUILDING SECURITY NECESSARY FOR THE BYRON G. ROGERS FEDERAL OFFICE BUILDING DURING THE CONSTRUCTION PERIOD GIVEN THE CONDITIONS THAT WILL ARISE DUE TO THE PREVIOUSLY EXERCISED MODIFICATION PS04 AND GIVEN THAT THE FEDERAL OFFICE BUILDING IS ADJACENT AND CONNECTED TO THE OCCUPIED FEDERAL COURTHOUSE. |
Amount:
$129,569,364
Award Description: TAS::47 4543::TAS MODERNIZATION OF THE BYRON G. ROGERS FEDERAL OFFICE BUILDING AND THE BYRON G. ROGERS FEDERAL COURTHOUSE WINDOW REPLACEMENT IN DENVER, CO. |
Amount:
$0
Award Description: ADMINISTRATIVE MODIFICATION TO REVISE THE ENDING DATE TO THAT INDICATED IN THE REQUEST FOR PROPOSAL. |
Amount:
$0
Award Description: TAS::47 4543::TAS ADMINISTRATIVE MODIFICATION TO ADD CLAUSE AND CORRECT ACCOUNT NUMBER. |
Amount:
$0
Award Description: TAS::47 4543::TAS ADMINISTRATIVE MOD TO CORRECT THE PERIOD OF PERFORMANCE. |
Amount:
$246,123
Award Description: TAS::47 4543::TAS
RECOVERY - CONSTRUCTION MANAGER AS CONSTRUCTOR (CMC) SERVICES FOR THE MODERNIZATION OF 10 W. JACKSON, 18 W. JACKSON AND 230 S. STATE STREET FEDERAL BUILDINGS LOCATED IN CHICAGO, IL. |
Amount:
$0
Award Description: ADMINISTRATIVE MODIFICATION TO CORRECT FUNDING CODES. |
Amount:
$1,897,783
Award Description: THIS MODIFICATION AWARDS ALTERNATE 12 C FOR NEW ELEVATOR MACHINES AND ALTERNATE 2B, ALLOWANCE TO ENHANCE THE NORTH ENTRY AND LOBBY DESIGN OF 10 W. JACKSON, 18 W. JACKSON AND 230 SOUTH STATE STREET IN CHICAGO, ILLINOIS. |
Amount:
$0
Award Description: THIS MODIFICATION ISSUED A LIMITED NOTICE TO PROCEED FOR WORK ON THE SPRINKLER AND FIRE ALARM SYSTEMS. |
Amount:
$0
Award Description: ADMINISTRATIVE MOD TO MAKE CHANGES TO ACCOUNTING LINE ITEM AMOUNT. |
Amount:
$17,618,729
Award Description: TAS::47 4543::TAS
RECOVERY: CONSTRUCTION MANAGER AS CONSTRUCTOR (CMC) TASK ORDER NUMBER GS-P-05-10-GB-5006, OPTION 1 - CONSTRUCTION PHASE SERVICES FOR THE FOR THE MODERNIZATION OF 10 W. JACKSON, 18 W. JACKSON AND 230 S. STATE STREET FEDERAL BUILDING IN CHICAGO, IL IN THE AMOUNT OF $17,618,729.00. |
Amount:
$381,508
Award Description: THIS MODIFICATION AWARDS ALTERNATE 23B AND ALTERNATE 3C OF THIS CONTRACT. |
Amount:
$44,700
Award Description: MOD TO PROVIDE REPAIR OF THE RETAIL RAMPS AND REMOVAL OF THE SIAMESE CONNECTION AT STATE STREET SOUTH PROJECT. |
Amount:
$1,275,000
Award Description: THIS MODIFICATION INCREASES THE AMOUNT FOR CURTAINWALL CONSTRUCTION FOR THE MODERNIZATION OF 10 W. JACKSON, 18 W. JACKSON AND 230 SOUTH STATE STREET IN CHICAGO, ILLINOIS. |
Amount:
$0
Award Description: MODIFICATION TO ADJUST PAYMENT FROM 23 DAYS TO 14 DAYS. |
Amount:
$3,492,736
Award Description: TAS::47 4543::TAS
CONSTRUCTION MANAGER AS CONSTRUCTOR (CMC)SERVICES AS PART OF THE AMERICAN RECOVERY AND REINVESTMENT ACT (ARRA) PROJECT FOR THE MILITARY ENTRANCE PROCESSING STATION (MEPS) SWING SPACE BUILD-OUT AT THE FEDERAL OFFICE BUILDING IN MINNEAPOLIS, MN; MODIFICATION PS01, EXCERCISE OF OPTION 1. |
Amount:
$48,000
Award Description: TAS::47 4543::TAS
CONSTRUCTION MANAGER AS CONSTRUCTOR (CMC) SERVICES AS PART OF THE AMERICAN RECOVERY AND REINVESTMENT ACT (ARRA) PROJECT THE MILITARY ENTRANCE PROCESSING STATION (MEPS) SWING SPACE BUILD-OUT AT THE FEDERAL OFFICE BUILDING, LOCATED AT 212 THIRD AVENUE SOUTH, MINNEAPOLIS, MINNESOTA; BASE AWARD FOR PRE-CONSTRUCTION SERVICES. |
Amount:
$2,580,428
Award Description: COMPENSATE THE CONTRACTOR FOR GAO PROTEST B-402422 AND ADDITIONAL RESULTING FROM DESIGN REVIEW WORKSHOP MEETINGS. |
Amount:
$0
Award Description: THIS ADMINISTRATIVE MODIFICATION CORRECTS THE PROJECT NUMBER FOR MODIFICATION PS14. |
Amount:
$51,062
Award Description: THIS MODIFICATION PROFIDES FOR RADIOACTIVE MATERIAL DISPOSAL AND ADDITIONAL ASBESTOS ABATEMENT. |
Amount:
$140,659
Award Description: MODIFICATION TO AWARD VARIOUS ALTERNATES IN ACCORDANCE WITH THE GMP PROPOSAL FOR THE MODERNIZATION OF 10 W. JACKSON, 18 W. JACKSON AND 230 S. STATE ST., CHICAGO, ILLINOIS. |
Amount:
$24,579
Award Description: THIS MODIFICATION PROVIDES FOR 400A POWER TO THE NEW SUBWAY RESTAURANT LOCATION IN LIEU OF TEH 200A EXISTING METER. |
Amount:
$0
Award Description: THIS MODIFICATION STIPULATES RENTAL RATES FOR CONTRACTOR OWNED EQUIPMENT. |
Amount:
$0
Award Description: THIS MODIFICATION ALLOWS FOR LIMITED NOTICE TO PROCEED SO THE CONTRACTOR CAN PROCEED WITH WORK ON THE CURTAINWALL SYSTEM. |
Amount:
$158,230
Award Description: CONSTRUCTION MANAGER AS CONSTRUCTOR (CMC) SERVICES AS PART OF THE AMERICAN RECOVERY AND REINVESTMENT ACT (ARRA) PROJECT FOR THE MILITARY ENTRANCE PROCESSING STATION (MEPS) SWING SPACE BUILD-OUT.
PROVIDE VOICE AND DATA ROUGH-IN, RECEPTACLES AND ALL OTHER REQUIREMENTS TO ALLOW VOICE AND DATA SERVICE TO BE PROVIDED TO THE MEPS SPACE. |
Amount:
$0
Award Description: THIS IS AN ADMINISTRATVIE MODIFICATION THAT CHANGES THE BUILDING NUMBER FROM MT5601ZZ TO MT0050ZZ. |
Amount:
$378,607
Award Description: THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE SMART BUILDING TECHNOLOGIES IN THE DESIGN AND CONSTRUCTION OF THE NEW U.S. FEDERAL COURTHOUSE IN BILLINGS, MT. |
Amount:
$0
Award Description: TAS::57 3307::TAS ARRA::YES::ARRA RECOVERYPROJECT#::_::RP# STUDENT DORMITORY (200 ROOM) AT GOODFELLOW AFB, SAN ANGELO, TX; MULTI-STORY WITH BRICK VENEER AND PREFINISHED STANDING SEAM METAL ROOF SYSTEM. THE DESIGN INCLUDES 200 MODULES (TWO STUDENTS PER ROOM) WITH A SHARED SHOWER/TOILET ROOM, LAUNDRIES, TRAINING MANAGER+S AREA, STORAGE, COMMUNICATIONS NETWORK, AND ALL NECESSARY SUPPORT. SUPPORTING FACILITIES SHALL INCLUDE HVAC, UTILITIES, FIRE PROTECTION, FIRE ALARM SYSTEMS, WIRING FOR COMMUNICATIONS AND CATV, SIDEWALKS, PARKING, LANDSCAPING, AND SITE IMPROVEMENTS. ADD TROOP WALKS TO MOVE MARCHING TROOPS FROM DORM TO EXISTING LATERAL TROOP WALKS. THE BUILDING IS TO BE DESIGNED IN ACCORDANCE WITH ALL DOD FEDERAL, STATE AND LOCAL REGULATIONS, INCLUDING, BUT NOT LIMITED TO THE UNITED FACILITIES GUIDELINES LATEST EDITION, GOODFELLOW AFB, THE AIR FORCE +06 UNACCOMPANIED HOUSING DESIGN GUIDE AND USACE SWL. LOCATED ON GOODFELLOW AIR FORCE BASE, TEXAS, SAN ANGELO TEXAS. |
Amount:
$236,259
Award Description: CONTRACT FOR STUDENT DORMITORY (200 ROOM DORM) PN: ACE JCGU093002 AT GOODFELLOW AIR FORCE
BASE, TEXAS.
REFERENCE NO. R00010
MG002 VARIOUS DESIGN CHANGES |
Amount:
-$18,138
Award Description: RECOVERYPROJECT#::AF0475::RP#
(ARRA FUNDED) ACE JCGU093002CONTRACT FOR STUDENT DORMITORY (200 ROOM DORM) PN: ACE JCGU093002 AT GOODFELLOW AIR FORCE BASE, TEXAS.
REFERENCE NO. R00001; MG001 DELETE GOVERNMENT FIELD OFFICE
DELETE GOVERNMENT FIELD OFFICE SECTION 01 52 00.00 44 IN ITS ENTIRETY. |
Amount:
$101,836
Award Description: RECOVERYPROJECT#::ACEJCGU093002::PR#322364
CONTRACT FOR: STUDENT DORMITORY (200 ROOM DORM) PN: ACE JCGU093002 AT GOODFELLOW AIR FORCE BASE, TEXAS.
REFERENCE NO. R00005 MG010 REVISE MECHANICAL EQUIPMENT
A. SCOPE OF WORK
MG010 REVISE MECHANICAL EQUIPMENT
PROVIDE THE FOLLOWING MECHANICAL EQUIPMENT IN LIEU OF THE MECHANICALEQUIPMENT APPROVED DURING THE B-2 DESIGN REVIEWS:
1. AIR COOLED CHILLER (CI-1) - TRANE MODEL RTAC250 HI
2. BOILERS (B-1 AND B-2) - LOCHINVAR MODEL IBN2000
3. AIR COOLED CONDENSING UNITS (CU-1 AND CU-2) - MITSUBISHI VRV CONDENSING UNITS. |
Amount:
$45,000
Award Description: CONTRACT FOR STUDENT DORMITORY (200 ROOM DORM) PN: ACE JCGU093002 AT GOODFELLOW AIR FORCE
BASE, TEXAS.
REFERENCE NO. R00011
MG004 ADD WATER VALVE |
Amount:
$158,050
Award Description: RECOVERYPROJECT#::AF0475:: (ARRA) FUNDED
CONTRACT FOR STUDENT DORMITORY (200 ROOM DORM) PN: ACE JCGU093002 AT GOODFELLOW AIR FORCE BASE, TEXAS.
REFERENCE NO. R00007 MG005 ADD CONSTRUCTION GATE
PROVIDE AND INSTALL CONSTRUCTION GATE IN ACCORDANCE WITH SKETCH MG005, SHEETS 1&2 OF 2. |
Amount:
$0
Award Description: TAS::57 3307::TAS ARRA::YES::ARRA RECOVERYPROJECT#::_::RP# STUDENT DORMITORY (200 ROOM) AT GOODFELLOW AFB, SAN ANGELO, TX; MULTI-STORY WITH BRICK VENEER AND PREFINISHED STANDING SEAM METAL ROOF SYSTEM. THE DESIGN INCLUDES 200 MODULES (TWO STUDENTS PER ROOM) WITH A SHARED SHOWER/TOILET ROOM, LAUNDRIES, TRAINING MANAGER+S AREA, STORAGE, COMMUNICATIONS NETWORK, AND ALL NECESSARY SUPPORT. SUPPORTING FACILITIES SHALL INCLUDE HVAC, UTILITIES, FIRE PROTECTION, FIRE ALARM SYSTEMS, WIRING FOR COMMUNICATIONS AND CATV, SIDEWALKS, PARKING, LANDSCAPING, AND SITE IMPROVEMENTS. ADD TROOP WALKS TO MOVE MARCHING TROOPS FROM DORM TO EXISTING LATERAL TROOP WALKS. THE BUILDING IS TO BE DESIGNED IN ACCORDANCE WITH ALL DOD FEDERAL, STATE AND LOCAL REGULATIONS, INCLUDING, BUT NOT LIMITED TO THE UNITED FACILITIES GUIDELINES LATEST EDITION, GOODFELLOW AFB, THE AIR FORCE +06 UNACCOMPANIED HOUSING DESIGN GUIDE AND USACE SWL. LOCATED ON GOODFELLOW AIR FORCE BASE, TEXAS, SAN ANGELO TEXAS. |
Amount:
$0
Award Description: TAS::57 3307::TAS RECOVERY - 200-ROOM STUDENT DORM, GOODFELLOW AFB, SAN ANGELO, TX ARRA::YES::ARRA |
Amount:
$41,055
Award Description: CONTRACT FOR STUDENT DORMITORY (200 ROOM DORM) PN: ACE JCGU093002 AT GOODFELLOW AIR FORCE
BASE, TEXAS.
REFERENCE NO. R00012
MG006 ADD LIGHTED WALKWAY
MG013 REVISE STAIRWELL DOORS |
Amount:
$55,000
Award Description: RECOVERYPROJECT#::AF0475::(ARRA) FUNDED
CONTRACT FOR STUDENT DORMITORY (200 ROOM DORM) PN: ACE JCGU093002 AT GOODFELLOW AIR FORCE
BASE, TEXAS.
REFERENCE NO. R00004
MG003 ADD BOULDERS
MG009 WEATHER FOR JAN 13 - MAR 31, 2010
MG003 ADD BOULDERS
PROVIDE BOULDERS OR STONE BLOCKS ALONG THE DRAINAGE SWELL TO THE
SOUTH, SOUTH EAST AND EAST OF THE 200 ROOM DORMITORY. BOULDERS
SHALL BE PLACED ON EACH SIDE OF THE DRAINAGE SWELL IN A STAGGERED
PATTERN AND SPACED TO SATISFY ATFP REQUIREMENTS. BOULDER SIZE AND
COLOR SHALL SATISFY ATFP REQUIREMENTS AND BASE LANDSCAPE STANDARDS.
MG009 WEATHER FOR JAN 13 - MAR 31, 2010
WEATHER DELAYS, 20 ADDITIONAL CALENDAR DAYS OCCURRED DURING THE
PERIOD OF JANUARY 13, 2010 THROUGH MARCH 31, 2010. |
Amount:
$15,000
Award Description: RECOVERYPROJECT#::AF0475:: (ARRA)FUNDED
CONTRACT FOR STUDENT DORMITORY (200 ROOM DORM) PN: ACE JCGU093002 AT GOODFELLOW AIR FORCE BASE, TEXAS.
REFERENCE NO. R00009 MG007 INCREASE SERVICE GASLINE SIZE TO 4"
A. SCOPE OF WORK
MG007 INCREASE SERVICE GAS LINE SIZE TO 4"
INCREASE THE SERVICE GAS LINE SIZE PIPE TO A 4" DIAMETER POLYETHYLENE PIPE IN LIEU OF A 2" DIAMETER PIPE IN ACCORDANCE WITH ATTACHED DRAWING C-103. |
Amount:
$20,000
Award Description: RECOVERYPROJECT#::AF0475::(ARRA) FUNDED
CONTRACT FOR STUDENT DORMITORY (200 ROOM DORM) PN: ACE JCGU093002 AT GOODFELLOW AIR FORCE BASE, TEXAS.
REFERENCE NO. R00008 MG011 DESIGN BUILD SEWAGE LIFT STATION
A. SCOPE OF WORK
MG011 DESIGN BUILD SEWAGE LIFT STATION
DESIGN AND CONSTRUCT A SEWAGE LIFT STATION TO SERVICE THE 200 ROOM DORMITORY. LIFT STATION AND PUMPS SHALL BE SIZED TO ACCOMODATE FUTURE CAPACITY OF THE ADJACENT 100 ROOM DORM AS REQUIRED BY THE RFP. |
Amount:
$0
Award Description: ADMINISTRATIVE MODIFICATION TO CORRECT FUNDING CODES. |
Amount:
$52,948
Award Description: MODIFICATION TO STUDY OPTIONS FOR TEMPERING THE NEW COURTHOUSE GARAGE IN A MANNER THAT HAS A NEAR +NET ZERO+ IMPACT TO THE EXISTING PLANNED ENERGY USAGE FOR THE BUILDING. |
Amount:
$0
Award Description: CHANGES CONTRACTOR DUNS AND TO AUTHORIZE PAYMENT FOR MATERIALS STORED AT AN OFF-SITE LOCATION IN ACCORDANCE WITH FAR 52.232-5, PAYMENTS UNDER FIXED-PRICE CONSTRUCTION CONTRACTS |
Amount:
$521,790
Award Description: ADDITIONAL WITH-IN SOCPE CHANGES TO DB CONTRACT. |
Amount:
$0
Award Description: ADMIN MOD |
Amount:
$858,579
Award Description: ADD SMART BUILDING FEATURES TO BILLINGS COURTHOUSE |
Amount:
-$612,589
Award Description: DELETE SEVERAL REQUIREMENTS IN ORDER TO FUND PURCHASE FOR USMS VIA SEPARATE ACTION. |
Amount:
$3,348,932
Award Description: ADDITIONAL REQUIREMENTS FOR TEMPERED GARAGE, MARSHALLS SERVICE EQUIPMENT, PHOTOVOLTAICS, ETC. |
Amount:
$633,129
Award Description: TAS::47 4543::TAS DESIGN BUILD SERVICES FOR THE MODERNIZATION OF THE BYRON G. ROGERS FEDERAL OFFICE BUILDING. |
Amount:
$104,879
Award Description: THIS MODIFICATION IS FOR THE FOLLOWING CHANGES: 1. CHANGES TO BUILDING METERING AND CONTROLS 2. CHANGES TO COOLING TOWER EQUIPMENT 3. PROVIDE A 2 HOUR RATED ASSEMBLY AT THE EXISTING MECHANICAL SHAFT OF 10 W. JACKSON AT THE FIRST AND SIXTH FLOORS. |
Amount:
$16,382
Award Description: FOR THE RELOCATION OF THE STORM RISERS LOCATED AT 10W JACKSON STREET IN CHICAGO IN ACCORDANCE WITH THE CHANGES IN ASI 22. |
Amount:
$29,416
Award Description: THIS MODIFICATION IS FOR THE REMOVAL OF EXISTING STEAM AND PLUMBING LINES LOCATED IN THE EXISTING MECHANICAL SHAFT, WHICH HAVE BEEN VERIFIED AS ABANDONED OR NOT SCHEDULDED FOR REUSE. |
Amount:
$471,122
Award Description: FOR REPAIR OF THE DETERIORATED VAULTED SIDEWALK AT 230 S. STATE. THE SCOPE IS BASED UPON A STUDY COMPLETED BY 4240/WJE DATED OCTOBER 15, 2010. THIS REPAIR WILL FOLLOW THE RECOMMENDATIONS IN OPTION #2. |
Amount:
$161,513
Award Description: THIS MODIFICATION PROVIDES AN ALLOWANCE FOR UNFORSEEN SITE CONDITIONS, INCLUDING BUT NOT LIMITED TO CONDITIONS RELATED TOE THE ELEVATOR AND CURTAINWALLS AND SIDEWALK VAULT WORK. |
Amount:
$23,185
Award Description: ADDITIONAL $23,185.00 ABOVE THE GMP ALLOWANCE OF $100,000.00 FOR FLOOR PREPARATION AND UNDERLAYMENT FOR FINAL FINISH FLOORING. |
Amount:
$605,000
Award Description: THIS MODIFICATON IS FOR THE BUILD OUT OF THE NEW COMED VAULT AT 10W. JACKSON, INCLUDING, BUT NOT LIMITED TO, EXTENDING ELECTRICAL FEEDER RUNS, RELOCATION OF WATER, STORM/SANITARY AND HOIST BEAM. THIS MODIFICATION ALSO PROVIDES FUNDING FOR COMED CAPITAL COSTS RELATED TO LABOR AND INSTALLATION OF EQUIPMENT IN THE NEW BASEMENT VAULT. |
Amount:
$0
Award Description: ADMINISTRATIVE MODIFICATION IS ISSUED TO MAKE CORRECTIONS THE THE ACCOUNTING LINES IN MODIFICATION PA37. |
Amount:
$45,424
Award Description: THIS MODIFICATION RELOCATES TWO CONDENSING UNITS SERVING GARRETT'S AND GNC CURRENTLY LOCATED IN THE COURTYARD BEHIND 18 W. JACKSON TO THE ROOFTOP OF 18 W. JACKSON. THIS IS A PRICE TO BE DETERMINED LATER, NOT TO EXCEED AMOUNT. |
Amount:
$176,260
Award Description: MODIFICATION TO AUTHORIZE A TIME EXTENSION THAT WILL NOT EXCEED FIVE MONTHS PAST CURRENT COMPLETION NECESSARY BECAUSE OF DELAYS ASSOCIATED WITH THE DELIVERY OF COMED 480V SERVICE. |
Amount:
$50,000
Award Description: PROVIDES AND ALLOWANCE TO ADDRESS EXISTING LOBBY ELEVATION CHANGES TO MEET FIRE AND LIFE SAFETY AND EGRESS REQUIREMENTS, ADDRESS ALIGNMENT WITH EXISTING STAIRS, ELEVATORS AND QUINCY COURT. |
Amount:
$48,592
Award Description: THIS MODIFICATION PROVIDES 400 AMP ELECTRICAL SERVICE TO RETAIL SPACE 113 (MRS. FIELDS). |
Amount:
$11,133
Award Description: GS-05P-09-GB-D-0033/GS-P-05-10-GB-5019/PS04
THIS MODIFICATION INCORPORATES THE FOLLOWING:
CE5004: $11,133.00
1) REVISE FITNESS ROOM AND DELETE GAME ROOM.
2) REMOVE EXISTING CHAIR RAIL PER RFI #6.
3) REMOVE EXISTING LUMBER FRAMED WALL AT GRID LINE K/11 AND REPLACE PER RFI #8 RESPONSE BY HGA DATED 1/10/11.
4) ADJUST PARTITION WALL LOCATION TO ACCOUNT FOR CONSTRUCTION JOINTS PER RFI #9 RESPONSE BY HGA DATED 1/10/11. MARK AS-BUILT DRAWINGS TO REFLECT CHANGE.
5) SUBSTITUTE ROUND DUCTWORK IN PLACE OF RECTANGULAR AS SHOWN ON PLANS. CONSTRUCTION SHALL BE IN COMPLIANCE WITH SPEC. SECTION 233113 AND RFI #18 RESPONSE BY HGA DATED 1/17/11. MARK AS-BUILT DRAWINGS TO REFLECT CHANGES.
6) ADD RETURN GRILLE AND TRANSFER DUCT FOR ROOM 240 PER RFI #21 RESPONSE BY HGA DATED 1/17/11. MARK AS-BUILT DRAWINGS TO REFLECT CHANGE.
7) MODIFY DETAIL 17/A302 TO REFLECT CHANGES SHOWN IN RFI #27 RESPONSE AND SKETCH SK-1 DATED 1/20/11 PER HGA.
8) ADD CONCRETE TOPPING TO AREA INDICATED IN RFI #25
9) PROVIDE ARCHITECTURAL/MECHANICAL AND ELECTRICAL CHANGES OUTLINED IN BULLETIN #2 BY HGA DATED 1/10/11. |
Amount:
$43,041
Award Description: GS-05P-09-GB-D-0033/GS-P-05-10-GB-5019/PS07
CONSTRUCTION MANAGER AS CONSTRUCTOR (CMC) SERVICES FOR THE MILITARY ENTRANCE PROCESSING STATION (MEPS) SWING SPACE BUILD-OUT AT THE FEDERAL OFFICE BUILDING IN MINNEAPOLIS, MINNESOTA
CM5008, CM5009, CM5010 |
Amount:
$139,148
Award Description: GS-05P-09-GB-D-0033/ARRA - MEPS BUILD-OUT IN MN/CM5011, CM5012, CM5013 PDL |
Amount:
$65,819
Award Description: GS-05P-09-GB-D-0033/GS-P-05-10-GB-5019/PS06
CONSTRUCTION MANAGER AS CONSTRUCTOR (CMC) SERVICES FOR THE AMERICAN RECOVERY AND REINVESTMENT ACT OF 2009 PROJECT: MILITARY ENTRANCE PROCESSING STATION (MEPS) SWING SPACE BUILD-OUT AT THE FEDERAL OFFICE BUILDING (FOB) IN MINNEAPOLIS, MINNESOTA - CE5005
MODIFICATION PS06 IS HEREBY ISSUED AS A FIRM FIXED PRICE SUPPLEMENTAL AGREEMENT BETWEEN M.A. MORTENSON COMPANY AND THE GENERAL SERVICES ADMINISTRATION TO INCORPORATE YOUR PROPOSAL DATED MARCH 1, 2011 FOR CE5007 IN THE AMOUNT OF $65,819. CE5007 MODIFIES THE SCOPE OF WORK TO INCORPORATE CHANGES INDICATED IN HGA'S RESPONSES TO RFI 22 AND 22R (ATTACHED) DATED JANUARY 26, 2011 AND FEBRUARY 16, 2011 RESPECTIVELY. |
Amount:
$17,508
Award Description: CE5006 MODIFIES THE SCOPE OF WORK TO INCORPORATE CHANGES INDICATED IN HGA'S RESPONSES TO THE REFERENCED REQUESTS FOR INFORMATION (RFI) |
Amount:
-$894,104
Award Description: CONSTRUCTION MANAGER AS CONSTRUCTOR (CMC) SERVICES AS PART OF THE AMERICAN RECOVERY AND REINVESTMENT ACT (ARRA) PROJECT FOR THE MILITARY ENTRANCE PROCESSING STATION (MEPS) SWING SPACE BUILD-OUT IN MINNEAPOLIS, MINNESOTA
THIS MODIFICATION CONVERTS THE GUARANTEED MAXIMUM PRICE TO A FIRM FIXED PRICE CONTRACT. |
Amount:
$0
Award Description: THIS ADMINISTRATIVE MODIFICATION EXTENDS THE ULTIMATE COMPLETION DATE TO PROVIDE FOR PUNCHLISTING AND FINANCIAL CLOSEOUT. |
Amount:
$3,268
Award Description: GS-05P-09-GB-D-0033/GS-P-05-10-GB-5019/PS05
CONSTRUCTION MANAGER AS CONSTRUCTOR (CMC) SERVICES FOR THE AMERICAN RECOVERY AND REINVESTMENT ACT OF 2009 PROJECT: MILITARY ENTRANCE PROCESSING STATION (MEPS) SWING SPACE BUILD-OUT AT THE FEDERAL OFFICE BUILDING (FOB) IN MINNEAPOLIS, MINNESOTA - CE5005
MODIFICATION PS05 IS HEREBY ISSUED AS A FIRM FIXED PRICE SUPPLEMENTAL AGREEMENT BETWEEN M.A. MORTENSON COMPANY AND THE GENERAL SERVICES ADMINISTRATION TO INCORPORATE YOUR PROPOSAL DATED FEBRUARY 24, 2011 FOR CE5005 IN THE AMOUNT OF $3,268. CE5005 MODIFIES THE SCOPE OF WORK TO INCORPORATE CHANGES INDICATED IN HGA'S RESPONSES TO RFI 19 AND 19R (ATTACHED) DATED JANUARY 28, 2011 AND FEBRUARY 4, 2011 RESPECTIVELY. |
Amount:
$14,724
Award Description: GS-05P-09-GB-D-0033/GS-P-05-10-GB-5019/PS11 - CM5017
CONSTRUCTION MANAGER AS CONSTRUCTOR (CMC) SERVICES FOR THE MILITARY ENTRANCE PROCESSING STATION (MEPS) SWING SPACE BUILD-OUT AT THE FEDERAL OFFICE BUILDING IN MINNEAPOLIS, MINNESOTA - MODIFICATION PS11
PS11 IS BEING ISSUED AS A FIRM FIXED PRICE SUPPLEMENTAL AGREEMENT BETWEEN M.A. MORTENSON COMPANY AND THE GENERAL SERVICES ADMINISTRATION TO PROVIDE THE WORK LISTED IN CM5017. |
Amount:
-$24,760
Award Description: PS10 IS BEING ISSUED AS A FIRM FIXED PRICE SUPPLEMENTAL AGREEMENT BETWEEN M.A. MORTENSON COMPANY AND THE GENERAL SERVICES ADMINISTRATION TO PROVIDE FOR THE FOLLOWING ACTIONS:
A) FIRM UP PRICING FROM PC09, INCLUDING CE5011, CE5012, AND CE5013, AT A CREDIT OF $55,625.00.
B) INCORPORATE CE5014 AT A COST OF $36,611.00, AND EXTEND THE SUBSTANTIAL COMPLETION DATE OF THE CONTRACT BY NINE (9) DAYS TO MAY 13, 2011.
C) INCORPORATE CM5015 AT A COST OF $472.00.
D) INCORPORATE CM5016 AT A CREDIT OF $6,218.00 |
Amount:
$10,000
Award Description: MODIFICATION TO INCREASE THE TENANT IMPROVEMENTS FOR THE BYRON G. ROGERS MODERNIZATION PROJECT LOCATED IN DENVER, COLORADO. |
Amount:
$498,917
Award Description: MODIFICATION TO INCLUDE FUNDING TO SUPPORT INCREASE TENANT IMPROVEMENT COSTS AND DEFINITIZATION OF PCO 32 FOR DESIGN COSTS ASSOCIATED WITH THE RE-STACK OF TENANTS. PROJECT IN LOCATED IN DENVER, COLORADO. |
Amount:
$137,603
Award Description: TAS::47 4543::TAS MODERNIZATION OF THE BYRON G. ROGERS FEDERAL OFFICE BUILDING, ADDED COSTS FOR EARLY START OF ABATEMENT INVESTIGATION WHILE THE BUILDING WAS STILL OCCUPIED AND FOR ADDED HHS DESIGN SERVICES. |
Amount:
$109,555
Award Description: TAS::47 4543::TAS DESIGN BUILD SERVICES FOR THE MODERNIZATION OF THE BYRON G. ROGERS FEDERAL OFFICE BUILDING. |
Amount:
$0
Award Description: MODIFICATION TO INCLUDE THE REMOVAL OF CABELING IN THE ABANDONED WALKER DUCTS AND FILL/ENCAPSULATE ABANDONED WALKER DUCTS FOR THE BUYRON G. ROGERS, FEDERAL OFFICE BUILDING, DENVER, COLORADO. |
Amount:
$55,200
Award Description: MODIFICATION UNDER THE BYRON G. ROGERS MODERNIZATION PROJECT TO INCLUDE ADDITIONAL FUNDING FOR INCREASED TENANT IMPROVEMENTS. PROJECT IS LOCATED IN DENVER COLORADO. |
Amount:
$8,307,308
Award Description: TAS::47 4543::TAS DESIGN BUILD SERVICES FOR THE MODERNIZATION OF THE BYRON G. ROGERS FEDERAL OFFICE BUILDING. |
Amount:
$140,090
Award Description: TAS::47 4543::TAS WINDOW REPLACEMENT AT THE BYRON G. ROGERS FEDERAL COURTHOUSE. THIS MODIFICATION FUNDS COST ASSOCIATED WITH MOLD ABATEMENT AT THE WINDOWS. |
Amount:
$0
Award Description: THIS MODIFICATION INCUDES ADDITIONAL SERVICES AS FOLLOWS; 1) ELEVATOR CREDIT, 2) MAJOR ENCUMBRANCE PERMIT, 3) ENCAPSULATED ACM REMOVAL, AND 4) AN INCREASE TO TENANT IMPROVEMENT SCOPE. ALL WORK WILL BE PERFOMED AT THE BYRON G. ROGERS BUILDING LOCATED IN DENVER, COLORADO. |
Amount:
$42,018
Award Description: TAS::57 3307::TAS ARRA::YES::ARRARECOVERYPROJECT#::322364
CONTRACT FOR STUDENT DORMITORY (200 ROOM DORM) PN: ACE JCGU093002 AT GOODFELLOW AIR FORCE BASE, TEXAS.
REFERENCE NO. R00017
MG022 MISC. CHANGES
A. SCOPE OF WORK
MG022 MISC. CHANGES
ITEM 1. PROVIDE A PUSH BUTTON OVER RIDE SWITCH FOR THE TROOPWALK AT APACHE AND VALIANT INCLUDING PEDESTAL, MOUNTING POLES AND HARDWARE.
ITEM 2. LOWER CONCRETE STORM DRAIN, BESIDE KEARNEY BLVD., SO AS TO BE FLUSH WITH THE TROOPWALK.
ITEM 3. RAISE MANHOLE G.
ITEM 4. RETEXTURE/TOUCHUP PAINT AS NECESSARY AFTER MOVE-IN.
ITEM 5. REMOVE/REPLACE DAMAGED VCT AFTER MOVE-IN.
ITEM 6. FURNISH AND INSTALL CORNER GUARDS (3 PER ROOM). |
Amount:
$246,566
Award Description: TAS::57 3307::TAS ARRA::YES::ARRA RECOVERYPROJECT#::38862::
2009 AMERICAN RECOVERY AND REINVESTMENT ACT (ARRA)PROJECT NUMBER 38862, CONTRACT FOR STUDENT DORMITORY (200 ROOM DORM) PN: ACE JCGU093002 AT GOODFELLOW AIR FORCE BASE, TEXAS.
REFERENCE NO. R00014 MG018 DEFINITIZE CL0108, DB SEWAGE LIFT STA
A. SCOPE OF WORK
MG018 DEFINITIZE CL0108, DB SEWAGE LIFT STA
DEFINITIZE MODIFICATION CL0108, "DESIGN BUILD SEWAGE LIFT STATION" ISSUED IN THE AMOUNT OF $20,000.00. THIS MODIFICATION IS TO DEFINITIZE THE CONSTRUCTION COSTS RELATED TO ADDING A SEWAGE LIFT STATION WITHIN THE SCOPE OF WORK ASSOCIATED WITH MG011. THIS DEFINITIZATION WILL ADD $246,566.00 TO THE CONTRACT. |
Amount:
-$1,330
Award Description: TAS::57 3307::TAS ARRA::YES::ARRA RECOVERYPROJECT#::38862::
2009 AMERICAN RECOVERY AND REINVESTMENT ACT (ARRA)PROJECT NUMBER 38862, 200-ROOM STUDENT DORM, GOODFELLOW AFB, SAN ANGELO, TX CONTRACT FOR STUDENT DORMITORY (200 ROOM DORM) PN: ACE JCGU093002 AT GOODFELLOW AIR FORCE BASE, TEXAS.
REFERENCE NO. R00016
MG020 MISCELLANEOUS CHANGES
MG021 WEATHER FOR SEPT 2010 - FEB 2011
SEE PAGE 2.
A. SCOPE OF WORK
MG020 MISCELLANEOUS CHANGES
ITEM 1. PROVIDE A FIRE HYDRANT EXTENSION RISER TO MATCH FINAL GRADE.
ITEM 2. EXTEND CATHODIC PROTECTION TEST PIT TO MATCH FINAL GRADE.
ITEM 3. DELETE THE LAWN SPRINKLERS SOUTH OF THE TROOP WALK ON THE SOUTH SIDE OF THE BUILDING.
MG021 WEATHER FOR SEPT 2010 - FEB 2011
WEATHER DELAYS - 12 ADDITIONAL CALENDAR DAYS OCCURRED DURING THE PERIOD OF SEPTEMBER 1, 2010 TO FEBRUARY 28, 2011. |
Amount:
$45,604
Award Description: TAS::57 3307::TAS ARRA::YES::ARRA RECOVERYPROJECT#::38862::
2009 AMERICAN RECOVERY AND REINVESTMENT ACT (ARRA)PROJECT NUMBER 38862, 200-ROOM STUDENT DORM, GOODFELLOW AFB, SAN ANGELO, TX MG015 WEATHER APRIL 1ST THRU AUGUST 31ST, 2010
WEATHER DELAYS, 11 ADDITIONAL CALENDAR DAYS OCCURRED DURING THE PERIOD OF APRIL 1, 2010 THROUGH AUGUST 31, 2010.
MG017 DEFENITIZE CL0111, ADD WATER VALVE
DEFINITIZE MODIFICATION CL0111, "ADD WATER VALVE" ISSUED IN THE AMOUNT OF $45,000.00. THIS MODIFICATION IS TO DEFINITIZE THE CONSTRUCTION COSTS RELATED TO ADDING A REMOTELY CONTROLLED WATER VALVE WITHIN THE SCOPE OF WORK ASSOCIATED WITH MG0004. THIS DEFINITIZATION WILL ADD $45,604.00 TO THE CONTRACT. |
Amount:
-$7,277
Award Description: TAS::57 3307::TAS ARRA::YES::ARRA RECOVERYPROJECT#::322364::PR#
CONTRACT FOR ARRA STUDENT DORMITORY (200 ROOM DORM) AT GOODFELLOW AIR FORCE BASE, TEXAS. PN: ACE JCGU093002 REFERENCE NO. R00015 MG016 DR-18 PVC PIPE.
A. SCOPE OF WORK
MG016 DR-18 PVC PIPE
USE PVC PRESSURE CLASS 150 (DR 18) PIPE AND FITTINGS IN LIEU OF PVC PIPE AND FITTINGS PRESSURE CLASS 200 (DR 14) AS SPECIFIED IN SECTION 33 11 00, WATER DISTRIBUTION, PARAGRAPH 2.1.1.1. FOR THE FOLLOWING LOCATIONS.
WATERLINE A. BEGINNING AT EXISTING SAN ANGELO WATERLINE AT SOUTH CHADBOURNE, STA 1+00 AND ENDING AT W.VALIANT ST. AND APACHE, STA 17+32, APPROXIMATELY 1632 LF OF 12 INCH AWWA C900, PRESSURE CLASS 200 (DR-14)
WATERLINE B. BEGINNING AT KICKAPOO AND APACHE, STA 1+00, AND ENDING AT W. VALIANT ST AND KICKAPOO, STA 12+00, APPROXIMATELY 11 LF OF 12 INCH AWWA C900, PRESSURE CLASS 200 (DR-14)
WATERLINE C. BEGINNING AT APACHE AND SERVICE ROAD, STA 1+00 AND ENDING AT KICKAPOO AND THE SERVICE ROAD, STA 5+90, APPROXIMATELY 490 LF OF 8 INCH AWWA C900, PRESSURE CLASS 200, (DR-14). BEGINNING AT THE SERVICE ROAD TO THE DORM, APPROXIMATELY 204 LF OF 4 INCH AWWA C900, PRESSURE CLASS 200 (DR-14) |
Amount:
$0
Award Description: MODIFICATION ISSUED TO PROVIDE ABATEMENT OF ADDITIONAL ASBESTOS FLOOR MASTIC. |
Amount:
$0
Award Description: THIS MODIFICATION IS FOR 5 CHANGES IN CE5036; PROVIDING A DIAGONAL ORIENTATION TO THE ENTRANCE PEDIMENT, PROVIDE FIRE PROTECTION COVERAGE AT THE MEZANINE, ADDITIONAL GRATING COVERAGE AT THE ELEVATOR POTS, INCREASED LIGHTING AND A HIGHER CAPACITY SUMP PUMP, AND PROVIDE DRYWALL ENCLOSURES FOR SELECTED STORM RISERS. |
Amount:
$0
Award Description: MODIFICATION ISSUED TO PROVIDE REPAIRS TO GRANITE AT THE HISTORIC CURTAINWALL. |
Amount:
$0
Award Description: THIS ADMINISTRATIVE MODIFICATION ALLOWS AN EXCEPTION TO THE BUY AMERICAN ACT FOR ELEVATOR MOTORS FROM CHINA. |
Amount:
$126,261
Award Description: ADD FUNDS FOR SEVERAL RFP'S |
Amount:
$0
Award Description: ADMIN MOD TO CORRECT A VARIANCE IN PEGASYS |
Amount:
$0
Award Description: MODIFICATION TO ADD AN RWA NUMBER. |
Amount:
$951,465
Award Description: ADD AND REMOVE FUNDS FOR SERVERAL RFP'S |
Amount:
$0
Award Description: MODIFICATION TO TRANSFER GUARD SERVICES FROM THE BYRON G. ROGERS FOB TO THE COURTHOUSE WINDOW REPLACEMENT. ALL SERVICES ARE BEING PERFORMED UNDER THE BYRON G. ROGERS MODERNIZATION LOCATED IN DENVER, COLORADO. |
Amount:
$0
Award Description: MODIFICATION TO THE BYRON G. ROGERS MODERNIZATION PROJECT TO INCORPORATE THE SCHEDULE FOR THE COURTHOUSE WINDOW REMPLACEMENT. PROJECT LOCATED IN DENVER, COLORADO. |
Amount:
$0
Award Description: MODIFICSTION TO INCLUDE ENRD REDESIGN FOR THE BYRON G. ROGERS MODERNIZATION PROJECT LOCATED IN DENVER, COLORADO. |
Amount:
$0
Award Description: MODIFICATION TO THE ARRA BYRON G. ROGERS FOB MODERNIZATION TO DEFINITIZE THE GREEN TECHNOLOGY ALLOWANCE. PROJECT IS LOCATED IN DENVER COLORADO. |
Amount:
$24,741
Award Description: MODIFICATION TO INCLUDE MINIOR TENANT IMPROVEMENT CHANGES TO THE JOINT UNSE AND FIELD OFFICE SPACE LOCATED IN THE BYRON G. ROGERS FEDERAL OFFICE BUILDING LOCATED IN DENVER, COLORADO. |
Amount:
$0
Award Description: MODIFICATION TO THE BYRON G. ROGERS ARRA MODERNIZATION PROJECT TO INCLUDE A SUBSCRIPTION RENEWAL FOR DRCHECKS TO BE USED FOR DESIGN DOCUMENT ASSISTANCE. PROJECT IS LOCATED IN DENVER, COLORADO. |
Amount:
$0
Award Description: MODIFICATION TO INCORPORATED INTO THE CONTRACT THE TENANT CONDITIONS PROPOSAL FOR THE BYRON G. ROGERS MODERNIZATION PROJECT LOCATED IN DENVER, COLORADO. |
Amount:
$0
Award Description: MODIFICATION TO DEFINITIZE THE TENANT IMPROVEMENT COSTS FOR THE BRYRON G. ROGERS JOINT USE SPACE. PROJECT IS LOCATED IN DENVER COLORADO. |
Amount:
$0
Award Description: MODIFICATION TO DEFINITIZE THE GSA FIELD OFFICE TENANT IMPROVEMENT COSTS FOR THE BYRON G. ROGERS MODERNIZATION PROJECT LOCATED IN DENVER COLORADO. |
Amount:
$0
Award Description: MODIFICATION TO DEFINITIZE PCO 9 FOR THE SECURITY DESK RECONFIGURATION FOR THE BYRON G. ROGERS MODERNIZATION PROJECT LOCATED IN DENVER, COLORADO. |
Amount:
$0
Award Description: MODIFICATION TO DEFINITIZE PCOS 1-8 (ISSUED AS A NTE UNDER MODIFICATION PS08) FOR THE BYRON G. ROGERS MODERNIZATION PROJECT LOCATED IN DENVER, COLORADO. |
Amount:
$0
Award Description: MODIFICATION TO INCLUDE GUARD SERVICES, INCORPORATE DOL LABOR RATES, ICE REDESIGN SERVICES, COMMUNICATION SYSTEM RELOCATION, DELETION OF ELEVATOR CAPTIVATE SYSTEM, AND MINOR ELECTRICAL MODIFICATIONS TO THE BYRON G. ROGERS MODERNIZATION LOCATED IN DENVER, COLORADO. |
Amount:
$0
Award Description: MODIFICATION TO THE BYRON G. ROGERS MODERNIZATION PROJECT TO DEFINITIZE THE TENANT IMPROVEMENTS FOR THE MAIL AND SECURITY ROOMS. PROJECT IS LOCATED IN DENVER, COLORADO. |
Amount:
$0
Award Description: MODIFICATION TO INCORPORATE DOL 3RD FLOOR RE-DESIGN SERVICES. |
Amount:
$0
Award Description: GS05P09GBD0033/GSP0510GB5006, CONSTRUCTION MANAGER AS CONSTRUCTOR (CMC) SERVICES FOR THE MODERNIZATION OF 10 W. JACKSON, 18 W. JACKSON AND 230 S. STATE ST., CHICAGO, ILLINOIS, MODIFICATION NUMBER PS74 FOR CE5039. THIS MODIFICATION, PS74, IS BEING ISSUED TO COMPLETE THE FOLLOWING WORK ITEM: PCO 160.2, ASI 80, AND PCO 165, RFI368. |
Amount:
$0
Award Description: MODIFICATION ISSUED TO CHANGE ACCOUNTING LINE ITEMS. |
Amount:
$0
Award Description: FOR MISCELLANOUS CHANGES AT THE 10W ARRA PROJECT, INCLUDING 2 CREDITS. |
Amount:
$0
Award Description: MODIFICATION ISSUED TO CANCEL WORK ASSOCIATED WITH MODIFICATION PS28 AND FUNDING REALLOCATED TO CONTINGENCY. |
Amount:
$0
Award Description: GS05P09GBD0033/GSP0510GB5006, CONSTRUCTION MANAGER AS CONSTRUCTOR (CMC) SERVICES FOR THE MODERNIZATION OF 10 W. JACKSON, 18 W. JACKSON AND 230 S. STATE ST., CHICAGO, ILLINOIS, MODIFICATION NUMBER PS76 FOR CE5042. MODIFICATION ISSUED TO COMPLETE THE FOLLOWING WORK ITEMS: PCO 155 ASI78, PCO 163, PCO 166 RFI 372, PCO 167 ASI 75, PCO 171.2 ASI83, PCO 179 RFI363, PCO 180 AND PCO 182.1 ASI84. |
Amount:
$0
Award Description: RHIS MODIFICATION AUTHORIZES WORK ON PCO 156 AND PROVIDES A CREDIT FOR PCO'S 174, 176, 177 AND 178. |
Amount:
$0
Award Description: FOR SANDBLASTING OF QUINCY COURT AND REPLACEMENT OF THE CONCRETE BENCHES. |
Amount:
$0
Award Description: THIIS MODIFICATION IS FOR VARIOUS CHANGES ORDERS, INCLUDING PCO'S 159, 170, 181, 185, 188, 189 AND 191. THERE IS NO CHANGE TO THE VALUE OF THE CONTRACT AS A RESULT OF THESE CHANGE ORDERS. |
Amount:
$100,577
Award Description: GS05P09GBD0033/GSP0510GB5006, CONSTRUCTION MANAGER AS CONSTRUCTOR (CMC) SERVICES FOR THE MODERNIZATION OF 10 W. JACKSON, 18 W. JACKSON AND 230 S. STATE ST., CHICAGO, ILLINOIS.
THIS ADMINISTRATIVE MODIFICATION, PA66 IS HEREBY ISSUED TO CHANGE A PORTION OF THE ACCOUNTING LINE ITEM ON MODIFICATION PS57 AS SHOWN BELOW:
1) OBLIGATE $100,577.00 TO LNUM 16
A MODIFICATION PA65 HAS BEEN ISSUED TO DE-OBLIGATE THE $100,577.00 FROM LNUM 42. |
Amount:
$0
Award Description: CMC SERVICES FOR THE MODERNIZATION OF 10 W. JACKSON, 18 W. JACKSON AND 230 S. STATE ST, CHICAGO, ILLINOIS. MODIFICATION ISSUED TO MODIFY RECEPTION 601 TO ELIMINATE THE STRETCHED FABRIC CEILING AND FABRIC WRAPPED PANEL WALL SYSTEM, REPLACE WITH DRYWALL CEILING AND WALL PANEL. LIGHTING SHALL ALSO BE REPLACED WITH DOWNLIGHTS AS DESCRIBED ON FEFERENCED DOCUMENTS AND WILL NOT BE ON THE DALI SYSTEM. |
Amount:
$0
Award Description: MODIFICATION TO PROVIDE VARIOUS MINOR CONSTRUCTION RELATED SCOPE CHANGES. |
Amount:
$0
Award Description: THIS MODIFICAIOTN PROVIDES FOR MILLWORK REVISIONS TO THE LOBBY SECURITY DESK AND TO ROOM 210 CABINETS AND COUNTERTOPS; RETAINS THE SQUARE FIRE DEPARTMENT CONNECTION AT THE JACKSON STREET SERVICE ENTRANCE; FINALIZES THE RETAIL DUCTWORK IN THE SERVICE CORRIDOR INCLUDING LOUVER CONTROLS, AND COMPLETES THE AIPHONE SUBSTITUTION AT THE QUINCY COURT MAIN ENTRANCE BOLLARD TO INCLUDE A TILTING CAMERA. |
Amount:
$0
Award Description: THIS MODIFICATION ALLOWS FOR THE COMPLETION OF 4 OF THE 5 ITEMS ON CE5029. ITEM NUMBER 3 FOR THE SLAB EXTENSIONS WILL BE COMPLETED ON ANOTHER MODIFICATION. |
Amount:
$0
Award Description: MODIFICATION TO PROVIDE CHANGES IN THE SCOPE OF WORK. |
Amount:
$0
Award Description: THIS MODIFICATION CHANGES THE REQUIREMENTS FOR THE FINAL PARTNERING SESSION. |
Amount:
-$100,577
Award Description: GS05P09GBD0033/GSP0510GB5006, CONSTRUCTION MANAGER AS CONSTRUCTOR (CMC) SERVICES FOR THE MODERNIZATION OF 10 W. JACKSON, 18 W. JACKSON AND 230 S. STATE ST., CHICAGO, ILLINOIS, MODIFICATION NUMBER PA65. THIS ADMINISTRATIVE MODIFICATION, PA65 IS HEREBY ISSUED TO CHANGE A PORTION OF THE ACCOUNTING LINE ITEM ON MODIFICATION PS57 AS SHOWN BELOW:
1) DE-OBLIGATE $100,577.00 FROM LNUM 42
A MODIFICATION PA66 WILL BE ISSUED TO OBLIGATE THE $100,577.00 TO LNUM 16. |
Amount:
$0
Award Description: GS05P09GBD0033/GSP0510GB5006, CONSTRUCTION MANAGER AS CONSTRUCTOR (CMC) SERVICES FOR THE MODERNIZATION OF 10 W. JACKSON, 18 W. JACKSON AND 230 S. STATE ST., CHICAGO, ILLINOIS, MODIFICATION NUMBER PS75 FOR CE5011. THIS MODIFICATION IS BEING ISSUED TO FIRM UP THE PRICE FOR CE5011. |
Amount:
$0
Award Description: THIS MODIFICATION AUTHORIZES COMPLETION OF 3 CHANGES (PCO 127.2, 144.1 AND 152) AS IDENTIFIED ON MORTENSON'S 1137 DATED MAY 31, 2012. |
Amount:
$0
Award Description: GS05P09GBD0033/GSP0510GB5006, CONSTRUCTION MANAGER AS CONSTRUCTOR (CMC) SERVICES FOR THE MODERNIZATION OF 10 W. JACKSON, 18 W. JACKSON AND 230 S. STATE ST., CHICAGO, ILLINOIS. MODIFICATION ISSUED FIRM UP THE PRICE OF CE5041. |
Amount:
$0
Award Description: GS05P09GBD0033/GSP0510GB5006, CONSTRUCTION MANAGER AS CONSTRUCTOR (CMC) SERVICES FOR THE MODERNIZATION OF 10 W. JACKSON, 18 W. JACKSON AND 230 S. STATE ST., CHICAGO, ILLINOIS.
MODIFICATION ISSUED TO MODIFY AND SUPPLEMENT THE FINISHES AT THE NORTH AND SOUTH STAIRWELLS AND AT STAIR #3, PROVIDE HARDWARE CHANGES AT THE WILSON PARTITIONS DUE TO STILE WIDTH AND CARD READER CONFLICTS, PER ON SITE REVIEW, DELETE THE SCOPE OF WORK FOR REPAIRS OF THE OPERABLE GLASS BLOCK WINDOWS AT 230 S. STATE STREET. |
Amount:
$0
Award Description: GS05P09GBD0033/GSP0510GB5006, CONSTRUCTION MANAGER AS CONSTRUCTOR (CMC) SERVICES FOR THE MODERNIZATION OF 10 W. JACKSON, 18 W. JACKSON AND 230 S. STATE ST., CHICAGO, ILLINOIS, MODIFICATION NUMBER PS84 FOR CE5048. MODIFICATION ISSUED TO AUTHORIZE MORTENSON TO PROCEED WITH THE WORK IDENTIFIED ON YOUR SIGNED GSA FORM 1137 DATED OCTOBER 25, 2012, ITEMS 1 THRU 8 FOR CE 5048. |
Amount:
$0
Award Description: GS05P09GBD0033/GSP0510GB5006, CONSTRUCTION MANAGER AS CONSTRUCTOR (CMC) SERVICES FOR THE MODERNIZATION OF 10 W. JACKSON, 18 W. JACKSON AND 230 S. STATE ST., CHICAGO, ILLINOIS, MODIFICATION ISSUED TO EXTEND THE CONTRACT COMPLETION TO: DECEMBER 31, 2013. THE PURPOSE OF THIS EXTENSION IS TO ALLOW GSA TIME TO PROPERLY CLOSE OUT THE CONTRACT. |
Amount:
$67,761
Award Description: MODIFICATION TO ADD ADDITIONAL FUNDS FOR NEEDED ITEMS, AND DE-OBLIGATION OF FUNDS. |
Amount:
$17
Award Description: MOD TO ADD ADDITIONAL MONEY THAT WAS LEFT OFF OF PS16 |
Amount:
$87,744
Award Description: CHANGES AT BILLINGS CTHS. BILLINGS MT |
Amount:
$0
Award Description: MODIFICATION TO CORRECT ACCOUNTING CODES. |
Amount:
$0
Award Description: MODIFICATION TO INCORPORATE 12% DESIGN FEES FOR THE SEC, PTO AND USMS - AUDIT TENANT SPACE IN ACCORDANCE WITH MODIFICATION PS42. DESIGN FEES WILL BE DEFINITIZED (12% OF COMPETED CONSTRUCTION COSTS) WHEN FINAL CONSTRUCTION COSTS ARE DEFINITIZED. WORK IS PERFORMED FOR THE BYRON G. ROGERS MODERNIZATION PROJECT LOCATED IN DENVER, COLORADO. |
Amount:
$0
Award Description: MODIFICATION TO INCORPORATE THE WHITE BOX CREDIT AND DEFINTIZE THE NOT TO EXCEED ISSUED FOR THE ACCELERATION OF DEMOLITION AND ABATEMENT FOR THE BYRON G. ROGERS MODERNIZATION PROJECT LOCATED IN DENVER, COLORADO. |
Amount:
$0
Award Description: MODIFICATION TO INCORPORATE A FIXED PERCENTAGE DESIGN FEE FOR THE TENANT IMPROVEMENTS FOR FLOORS 8-18 AND A PORTION OF FLOOR 1 OF THE BRYON G. ROGERS FEDERAL OFFICE BUILDING LOCATED IN DENVER, COLORADO. |
Amount:
$0
Award Description: MODIFICATION TO DEFINTIZE THE PRE-DESIGN, CONCEPT DESIGN AND DESIGN DEVELOPMENT FOR THE BYRON G. ROGERS FOB MODERNIZATION LOCATED IN DENVER, COLORADO. |
Amount:
$420,000
Award Description: MODIFICATION TO REPLENISH TENANT ALLOWANCE FUNDS USED TO AWARD THE SPRAY ON FIREPROOFING UNFORESEEN SIGHT CONDITION FOR THE BYRON G. ROGERS MODERNIZATION PROJECT LOCATED IN DENVER, COLORADO. |
Amount:
$0
Award Description: MODIFICATION TO REPLENISH THE TENANT ALLOWANCE FUND FOR THE BYRON G. ROGERS MODERNIZATION PROJECT LOCATED IN DENVER, COLORADO. |
Amount:
$0
Award Description: MODIFICATION TO UNILATERALLY CORRECT THE CHANGE ISSUED UNDER MODIFICATION PC35 FOR THE BYRON G. ROGERS FEDERAL OFFICE BUILDING SPRAY ON FIREPROOFING CODE UNFORSEEN SITE CONDITION. PROJECT LOCATED IN DENVER, COLORADO. |