Skip to content Skip to footer site map
Navigate Up

Recovery.gov - Track the Money

Recovery.gov is the U.S. government's official website that provides easy access to data
related to Recovery Act spending and allows for the reporting of potential fraud, waste, and abuse.

contract- RECIPIENT AWARD SUMMARY

HOWARD W. PENCE, INC.

Clarification of Codes


AWARD OVERVIEW

AWARD OVERVIEW
Agency Name: US Army Corps of Engineers Project Location: WILL
Award Number: CD01 Project Location - State: IL
Funding Amount: $272,171 Project Location - Zip Code: 604414118
Ending Date: 2013-01-01 Congressional District: 13

RECIPIENT INFORMATION (AWARD)

RECIPIENT INFORMATION (AWARD)
Recipient Name: HOWARD W. PENCE, INC.
Recipient Address: 342 E DIXIE
Recipient City: ELIZABETHTOWN
Recipient State: KY
Recipient Zip Code: 427018825
Congressional District: KY-02

DESCRIPTION OF WORK/SERVICE PERFORMED

TAS::96 3134::TAS ARRA::YES::ARRA RECOVERYPROJECT#::76134::RP# MAJOR REHABILITATION, CONTROLLING WORKS, STAGE II, LOCKPORT POOL, ILLINOIS WATERWAY, LOCKPORT, WILL COUNTY, ILLINOIS.

PURCHASER INFORMATION (AWARD)

PURCHASER INFORMATION (AWARD)
Contracting Office ID: W912EK
Contracting Office Name: W07V ENDIST ROCK ISLAND
Contracting Office Region: NO REGI
TAS Major Program: 3675

CONTRACT INFORMATION (AWARD)

CONTRACT INFORMATION (AWARD)
Date Signed: 2011-07-09
Effective Date: 2011-06-30
Current Completion Date: 2013-01-01
Ultimate Completion Date: 2013-01-01
Award Type: DELIVERY ORDER
Reason For Modification: CHANGE ORDER
Type of Contract Pricing: FIRM FIXED PRICE
Last Date to Order:
Funding Agency ID: 96CE
Funding Office ID: W912EK
Funding Office Name: Rock Island
Number of Offers Received: 11

PRODUCT OR SERVICE INFORMATION (AWARD)

PRODUCT OR SERVICE INFORMATION (AWARD)
Product Code: Z199
Product Description: MAINT-REP-ALT/MISC BLDGS
NAICS Code: 236220
NAICS Description: COMMERCIAL AND INSTITUTIONAL BUILDING CONSTRUCTION

COMPETITION INFORMATION (AWARD)

COMPETITION INFORMATION (AWARD)
Extent Competed: FULL AND OPEN COMPETITION AFTER EXCLUSION OF SOURCES
Reason Not Competed: Not Reported
Solicitation Procedure: NEGOTIATED PROPOSAL/QUOTE
Type of Set Aside: HUBZONE SET-ASIDE
Statutory Exception to Fair Opportunity:
Type of Contract Pricing: FIRM FIXED PRICE

PREFERENCE PROGRAMS (AWARD)

Business Size Determination: SMALL BUSINESS

TRANSACTIONS

TRANSACTIONS

Other Awards

Other Awards
Amount: $949,967
Award Description: TAS::96 3135::TAS REPAIRS TO WASTEWATER TREATMENT PLANT, DOG CREEK SHOWERHOUSE, RESTROOMS AND DUMP STATIONS, NOLIN RIVER LAKE, BEE SPRING, KY
Amount: $43,786
Award Description: TAS::96 3135::TAS VISITOR CENTER PARKING LOT, GREEN RIVER LAKE, CAMPBELLSVILLE, KY
Amount: $0
Award Description: TAS::96 3135::TAS CORRECTION TO ADMINISTRATIVE ERRORS ON ORIGINAL TASK ORDER, PORT OLIVER RECREATION AREA PHASE II PROJECT, BARREN RIVER LAKE, 11088 FINNEY ROAD, GLASGOW, KY 42141-9642
Amount: $178,793
Award Description: TAS::96 3135::TAS REPAIRS TO VISITOR CENTER RESTROOM, GREEN RIVER LAKE, CAMPBELLSVILLE, KY
Amount: $1,441,927
Award Description: TAS::96 3135::TAS PORT OLIVER RECREATION AREA PHASE II PROJECT, BARREN RIVER LAKE, 11088 FINNEY ROAD, GLASGOW, KY 42141-9642
Amount: $173,836
Award Description: TAS::96 3135::TAS RENOVATIONS TO BIG OAK RESTROOMS AT GREEN RIVER LAKE, CAMPBELLSVILLE, KY
Amount: $449,319
Award Description: TAS::96 3135::TAS PAVING OF CAMPGROUND AREAS AND MAINTENANCE SHOP AREA, NOLIN RIVER LAKE, 2150 NOLIN DAM ROAD, BEE SPRING, KY 42207-9339
Amount: $67,277
Award Description: MODIFICAION 0001 PROVIDES AN INCREASE IN THE NUMBER OF WELDING BOOTHS FROM TWELVE (12) TO EIGHTEEN (18) FOR THE WELDING SHOP, BUILDING 8 AT THE GREAT ONYX JOB CORP CENTER IN MAMMOTH CAVE, KY.
Amount: $488,567
Award Description: TAS::16 0182::TAS JOB CORPS-ADMIN., OPERATIONS, CONSTRUCTION-RECOVERY ACT
Amount: $136,416
Award Description: TAS::21 2022::TAS ARRA::YES::ARRA BUILDING 3713 CHANGES (OVERLAY EXISTING CERAMIC TILE, INSTALL NEW STORAGE CABINETS, REPLACE EXISTING RUBBER BASE), 1ST BRIGADE VOLAR BARRACKS RENOVATION, FT. CAMPBELL, KY
Amount: $13,640
Award Description: TAS::21 2022::TAS ARRA::YES::ARRA CREDIT FOR INSTALLING 5" SINKS RATHER THAN 7"; REPLACE DRYWALL BEHIND EXISTING KITCHEN CABINETS, 1ST BRIGADE VOLAR BARRACKS RENOVATION, FT. CAMPBELL, KY
Amount: $12,514
Award Description: TAS::21 2022::TAS ARRA::YES::ARRA INSTALL SUPPORT CLIPS ON CUPOLA SUPPORT WALL FOR EXISTING ROOF PURLINS, 1ST BRIGADE VOLAR BARRACKS RENOVATION, FT. CAMPBELL, KY
Amount: $321,490
Award Description: TAS::21 2022::TAS ARRA::YES::ARRA CORRECT ELECTRICAL DEFICIENCIES, 1ST BRIGADE VOLAR BARRACKS RENOVATION, FT. CAMPBELL, KY
Amount: $371,022
Award Description: TAS::21 2022::TAS ARRA::YES::ARRA UPGRADE PRIVACY DOORS, 1ST BRIGADE VOLAR BARRACKS RENOVATION, FT. CAMPBELL, KY
Amount: $15,215,835
Award Description: TAS::21 2022::TAS 1ST BRIGADE VOLAR BARRACKS RENOVATION, OPERATION AND MAINTENANCE, ARMY, RECOVERY ACT, FT. CAMPBELL, KY
Amount: $99,000
Award Description: TAS::21 2022::TAS ARRA::YES::ARRA MOVE FURNITURE, STORE AND RESET AFTER CONSTRUCTION COMPLETE, 1ST BRIGADE VOLAR BARRACKS RENOVATION, FT. CAMPBELL, KY
Amount: $0
Award Description: TAS::21 2022::TAS ARRA::YES::ARRA SUPPLY ELECTRICAL POWER FOR NEW HVAC UNITS, 1ST BRIGADE VOLAR BARRACKS RENOVATION, FT. CAMPBELL, KY
Amount: -$1,339
Award Description: TAS::21 2022::TAS ARRA::YES::ARRA INSTALL DRYWALL AND FRAMING, INSTALL DOOR SIGNS, RELOCATE LIGHT SWITCHES AND THERMOSTATS, PART II FINAL, 1ST BRIGADE VOLAR BARRACKS RENOVATION, FT. CAMPBELL, KY
Amount: $199,929
Award Description: TAS::21 2022::TAS ARRA::YES::ARRA CHANGES TO DUCTWORK, 1ST BRIGADE VOLAR BARRACKS RENOVATION, FT. CAMPBELL, KY
Amount: $436,603
Award Description: TAS::21 2022::TAS ARRA::YES::ARRA INSTALL FRAMING AND DRYWALL, FABRICATE NEW DUCTWORK, INSTALL VCT FLOOR TILE, INSTALL SUSPENDED CEILING AND INSTALL DOOR SIGNS ON EXTERIOR DOORS, 1ST BRIGADE VOLAR BARRACKS RENOVATION, FT. CAMPBELL, KY
Amount: $530,139
Award Description: TAS::96 3134::TAS ARRA::YES::ARRA IN SUPPORT OF U.S. ARMY CORPS OF ENGINEERS CIVIL CONSTRUCTION PROGRAM PROVIDE ALL LABOR, MATERIALS AND EQUIPMENT FOR THE OHIO RIVER GREENWAY PROJECT, CLARKSVILLE, IN
Amount: $7,141,982
Award Description: RECOVERYPROJECT#::76134::RP# MAJOR REHABILITATION, STAGE II CONTROLLING WORKS, LOCKPORT POOL, ILLINOIS WATERWAY, LOCKPORT, WILL COUNTY, IL. THE PROJECT CONSISTS OF, BUT IS NOT LIMITED TO THE FOLLOWING: CLEARING AND GRUBBING, REMOVAL OF DEBRIS, TUCKPOINTING, REPAIR AND REPLACEMENT OF STONE MASONRY, PCC REPAIR TO EXISTING BULKHEADS, REPAIR OF EXISTING BULLNOSES, GATE TOWER REPAIRS, AND OTHER CONCRETE REPAIRS. THE WORK WILL TAKE PLACE ON THE CONTROLLING WORKS BUILDING LOCATED IN LOCKPORT, IL. P2# 139402
Amount: $13
Award Description: RECOVERYPROJECT#::76134::RP# MAJOR REHABILITATION, STAGE II CONTROLLING WORKS, LOCKPORT POOL, ILLINOIS WATERWAY, LOCKPORT, WILL COUNTY, IL. THE REASON FOR THIS MODIFICATION IS TO CORRECT THE BID SCHEDULE, THE TOTAL COST OF THIS CONTRACT WAS INCREASED BY $13.21 FROM $7,141,982.39 TO $7,141,995.60. THE PROJECT CONSISTS OF, BUT IS NOT LIMITED TO THE FOLLOWING: CLEARING AND GRUBBING, REMOVAL OF DEBRIS, TUCKPOINTING, REPAIR AND REPLACEMENT OF STONE MASONRY, PCC REPAIR TO EXISTING BULKHEADS, REPAIR OF EXISTING BULLNOSES, GATE TOWER REPAIRS, AND OTHER CONCRETE REPAIRS. THE WORK WILL TAKE PLACE ON THE CONTROLLING WORKS BUILDING LOCATED IN LOCKPORT, IL. P2# 139402
Amount: $0
Award Description: TAS::96 3135::TAS ZERO-DOLLAR ADMINISTRATIVE MODIFICATION TO CHANGE CONTRACTING OFFICER'S REPRESENTATIVE ON CONTRACT, PORT OLIVER RECREATION AREA PROJECT, PHASE II, BARREN RIVER LAKE, GLASGOW, KY
Amount: $1,252,033
Award Description: TAS::97 0501::TAS ARRA::YES::ARRA REPLACE HVAC SYSTEMS IN TWO BUILDINGS WITH GROUND COUPLED GEOTHERMAL SYSTEMS, FT. KNOX ECIP PHASE 5
Amount: $0
Award Description: TAS::21 2022::TAS ARRA::YES::ARRA RELOCATE PULL STATIONS; REPLACE EXIT LIGHTS; DELETE REPLACEMENT OF DOOR FRAMES, 1ST BRIGADE VOLAR BARRACKS RENOVATION, FT. CAMPBELL, KY
Amount: $0
Award Description: TAS::21 2022::TAS ARRA::YES::ARRA CASE 0012 CREDIT FOR LABOR, MATERIALS AND EQUIPMENT TO INSTALL SMOKE DETECTORS; INSTALL METAL HALIDE LAMP LUMINARIES; PAINT CEILING AND WALLS IN STAIRWELLS AND CORRIDORS; PROVIDE LABOR OVERTIME TO PREPARE ROOMS FOR EARLY OCCUPANCY, 1ST VOLAR BARRACKS RENOVATION, FT. CAMPBELL, KY
Amount: $225,296
Award Description: TAS::21 2022::TAS ARRA::YES::ARRA CASE 0011-3 INSTALL ONE-HOUR RATED FIRE DOORS COMPLETE WITH VISION LITE; INSTALL NEW SMOKE DETECTORS WITH CONDUIT AND WIRING; REMOVE AND STORE 1400 PIECES OF EXCESS ROOM FURNITURE, PART II FINAL, 1ST BRIGADE VOLAR BARRACKS RENOVATION, FT. CAMPBELL, KY
Amount: $2,761
Award Description: TAS::21 2022::TAS ARRA::YES::ARRA CASE 00013 CHANGE HVAC CONTROLS TO MONITOR WATER TEMPERATURE IN MECHANICAL ROOM; DELETE REQUIREMENT TO PROVIDE SHUTDOWN PROTOCOLS FOR HVAC UNIT DURING SUMMER MODE; CREDIT FOR DELETION OF FLOOR PAINT IN BUILDING 4067, 1ST BRIGADE VOLAR BARRACKS RENOVATION, FT. CAMPBELL, KY
Amount: $500,000
Award Description: TAS::21 2022::TAS ARRA::YES::ARRA INSTALL FIRE DOORS, PART I NOTICE TO PROCEED, 1ST BRIGADE VOLAR BARRACKS RENOVATION, FT. CAMPBELL, KY
Amount: $207,148
Award Description: TAS::21 2022::TAS ARRA::YES::ARRA CASE 0011-2 INSTALL 240 ONE-HOUR RATED FIRE DOORS WITH VISION LITE, PART I SUPPLEMENT I ADD SMOKE DETECTORS WITH NEW CONDUIT AND WIRING TO CONNECT TO FIRE ALARM PANEL, 1ST BRIGADE VOLAR BARRACKS RENOVATION, FT. CAMPBELL, KY
Amount: -$1,418
Award Description: TAS::96 3134::TAS ARRA::YES::ARRA RECOVERYPROJECT#::76134::RP# CONTRACT FOR MAJOR REHABILITATION, CONROLLING WORKS, STAGE II, LOCKPORT POOL, ILLINOIS WATERWAY, LOCKPORT, WILL COUNTY, ILLINOIS AT LOCKPORT, IL. THIS MODIFICATION REDUCES THE AMOUNT OF THE CONTRACT FOR REMOVAL OF WATERSTOP ON BULLNOSES.
Amount: $18,500
Award Description: TAS::96 3134::TAS ARRA::YES::ARRA RECOVERYPROJECT#::76134::RP# MAJOR REHABILITATION, CONTROLLING WORKS, STAGE II, LOCKPORT POOL, ILLINOIS WATERWAY, LOCKPORT, WILL COUNTY, ILLINOIS. MODIFICATION FOR DISPOSAL OF ALL METAL MATERIALS FROM THE CLEARING AND GRUBBING OPERATIONS.
Amount: $51,267
Award Description: TAS::96 3134::TAS ARRA::YES::ARRA RECOVERYPROJECT#::76134::RP# MAJOR REHABILITATION, CONTROLLING WORKS, STAGE II, LOCKPORT POOL, ILLINOIS WATERWAY, WILL COUNTY, ILLINOIS. MODIFICATION FOR SPOT ABATE LEAD PAINT LOWER WALKWAY.
Amount: $29,647
Award Description: TAS::96 3134::TAS ARRA::YES::ARRA RECOVERYPROJECT#::76134::RP# CONTRACT FOR MAJOR REHABILITATION, CONTROLLING WORKS, STAGE II, LOCKPORT POOL, ILLINOIS WATERWAY, LOCKPORT, WILL COUNTY, ILLINOIS AT LOCKPORT, IL. THIS MODIFICATION INCREASES FUNDS FOR SHELF ANGLE MODIFICATION.
Amount: $0
Award Description: TAS::96 3134::TAS ARRA::YES::ARRA RECOVERYPROJECT#::76134::RP# MAJOR REHABILITATION, CONTROLLING WORKS, STAGE II, LOCKPORT POOL, ILLINOIS WATERWAY, LOCKPORT, WILL COUNTY, ILLINOIS. THIS MODIFICATION ADDS AMERICAN RECOVERY AND REINVESTMENT ACT CLAUSES TO THIS TASK ORDER AS STATED ON THE ORIGINAL CONTRACT AWARD.
Amount: $272,171
Award Description: TAS::96 3134::TAS ARRA::YES::ARRA RECOVERYPROJECT#::76134::RP# MAJOR REHABILITATION, CONTROLLING WORKS, STAGE II, LOCKPORT POOL, ILLINOIS WATERWAY, LOCKPORT, WILL COUNTY, ILLINOIS.
Amount: $0
Award Description: TAS::96 3134::TAS ARRA::YES::ARRA RECOVERYPROJECT#::76134::RP# CONTRACT FOR MAJOR REHABILITATION, CONTROLLING WORKS, LOCKPORT POOL, STAGE II, WILL COUNTY, ILLINOIS. THIS MODIFICATION ADDS ADDITIONAL WAGE RATES AND CLASSIFICATIONS PER THE US DOL, WAGE AND HOUR DIVISION.
Amount: $3,287
Award Description: TAS::96 3134::TAS ARRA::YES::ARRA CASE 004 RAISE CATCH BASINS 5, 6, 8 AND 9 TO REVISED ELEVATIONS AS SPECIFIED IN SCOPE OF WORK, OHIO RIVER GREENWAY PROJECT, CLARKSVILLE SEGMENT, CLARKSVILLE, IN
Amount: $0
Award Description: TAS: 96 3134: TAS ARRA: YES: :ARRA OHIO RIVER GREENWAY CLARKSVILLE, IN
Amount: $0
Award Description: ARRR OHIO RIVER GREENWAY CLARKSVILLE, IN
Amount: $14,358
Award Description: TAS::96 3135::TAS ARRA::YES::ARRA INSTALL BOX INLETS, PORT OLIVER PROJECT, PHASE II, BARREN RIVER LAKE, KY
Amount: $0
Award Description: TAS::96 3135::TAS ARRA::YES::ARRA TIME EXTENSION DUE TO WEATHER DELAY, PORT OLIVER RECREATION AREA RENOVATION, PHASE II, BARREN RIVER LAKE, KY
Amount: $41,622
Award Description: TAS::96 3135::TAS ARRA::YES::ARRA CLEAN AND RESTORE ALL BUILDINGS, BOARDWALKS AND NEW CONSTRUCTION TO CONDITION PRIOR TO HEAVY RAINS AND FLOODING, PORT OLIVER PROJECT, PHASE II, BARREN RIVER LAKE, KY
Amount: $0
Award Description: TAS::96 3135::TAS ARRA::YES::ARRA REPAIR HANDRAILS IN ALL AREAS, PORT OLIVER PROJECT, PHASE II, BARREN RIVER LAKE, KY (NO ARRA FUNDS OBLIGATED)
Amount: $0
Award Description: TAS::97 0501::TAS ARRA::YES::ARRA INCORPORATE CORRECT WAGE DETERMINATION, HVAC SYSTEM REPLACEMENT, ECIP PHASE 5, BUILDING 2601, FT. KNOX, KY
Amount: $0
Award Description: ARRA FUNDED
Amount: $13,362
Award Description: TAS::97 0501::TAS ARRA::YES::ARRA CASE 002 INSTALL BATHROOM EXHAUST FANS IN 24 ROOMS NOT INCLUDED IN ORIGINAL TASK ORDER AND DEMOLISH EXISTING COMMON EXHAUST FANS LOCATED ON ROOF, AND CREDIT FOR 52 FAN GRILLS TO BE REPLACED BUT DEEMED SUFFICIENT FOR USE, ECIP, PHASE 5A, BUILDING 2601, FT. KNOX, KY
Amount: -$5,230
Award Description: TAS::96 3134::TAS ARRA::YES::ARRA RECOVERYPROJECT#::76134::RP# CONTRACT FOR MAJOR REHABILITATION, CONTROLLING WORKS, STAGE II, LOCKPORT POOL, ILLINOIS WATERWAY, LOCKPORT, WILL COUNTY, ILLINOIS AT LOCKPORT, IL. THIS MODIFICATION DECREASES THE AMOUNT OF THE CONTRACT DUE TO GATE 1 SILL MODIFICATION.
Amount: -$5,230
Award Description: TAS::96 3134::TAS ARRA::YES::ARRA RECOVERYPROJECT#::76134::RP# CONTRACT FOR MAJOR REHABILITATION, CONTROLLING WORKS, STAGE II, LOCKPORT POOL, ILLINOIS WATERWAY, LOCKPORT, WILL COUNTY, ILLINOIS AT LOCKPORT, IL. THIS MODIFICATION DECREASES THE AMOUNT OF THE CONTRACT DUE TO GATE 5 SILL MODIFICATION.
Amount: -$10,636
Award Description: TAS::96 3134::TAS ARRA::YES::ARRA RECOVERYPROJECT#::76134::RP# CONTRACT FOR MAJOR REHABILITATION, CONSTROLLING WORKS, STAGE II, LOCKPORT POOL, ILLINOIS WATERWAY, LOCKPORT, WILL COUNTY, ILLINOIS AT LOCKPORT, IL. THIS MODIFICATION DECREASES FUNDS DUE TO GATE 6 SILL MODIFICATION.
Amount: -$10,636
Award Description: TAS::96 3134::TAS ARRA::YES::ARRA RECOVERYPROJECT#::76134::RP# CONTRACT FOR MAJOR REHABILITATION, CONTROLLING WORKS, STAGE II, LOCKPORT POOL, ILLINOIS WATERWAY, LOCKPORT, WILL COUNTY, ILLINOIS AT LOCKPORT, IL. THIS MODIFICATION DECREASES FUNDS FOR GATE 7 SILL MODIFICATION.
Amount: -$7,465
Award Description: TAS::96 3134::TAS ARRA::YES::ARRA RECOVERYPROJECT#::76134::RP# MAJOR REHABILITATION, CONTROLLING WORKS, STAGE II, LOCKPORT POOL, ILLINOIS WATERWAY, LOCKPORT, WILL COUNTY, ILLINOIS. MODIFICATION FOR SPECIFICATION CHANGE TO ALLOW POWER TOOLS.
Amount: -$5,230
Award Description: TAS::96 3134::TAS ARRA::YES::ARRA RECOVERYPROJECT#::76134::RP# CONTRACT FOR MAJOR REHABILITATION, CONTROLLING WORKS, STAGE II, LOCKPORT POOL, ILLINOIS WATERWAY, LOCKPORT, WILL COUNTY, ILLINOIS AT LOCKPORT IL. THIS MODIFICATION DECREASES FUNDS FOR GATE 4 SILL MODIFICATION.
Amount: -$5,230
Award Description: TAS::96 3134::TAS ARRA::YES::ARRA RECOVERYPROJECT#::76134::RP# CONTRACT FOR MAJOR REHABILITATION, CONTROLLING WORKS, STAGE II, LOCKPORT POOL, ILLINOIS WATERWAY, LOCKPORT, WILL COUNTY, ILLINOIS AT LOCKPORT, IL. THIS MODIFICATION DECREASES THE AMOUNT OF THE CONTRACT DUE TO GATE 2 SILL MODIFICATION.
Amount: -$5,230
Award Description: TAS::96 3134::TAS ARRA::YES::ARRA RECOVERYPROJECT#::76134::RP# CONTRACT FOR MAJOR REHABILITATION, CONTROLLING WORKS, STAGE II, LOCKPORT POOL, ILLINOIS WATERWAY, LOCKPORT, WILL COUNTY, ILLINOIS AT LOCKPORT, IL. THIS MODIFICATION DECREASES FUNDS FOR GATE 3 SILL MODIFICATION.
Amount: -$1,500
Award Description: TAS::96 3134::TAS ARRA::YES::ARRA RECOVERYPROJECT#::76134::RP# CONTRACT FOR MAJOR REHABILITATION, CONTROLLING WORKS, STAGE II, LOCKPORT POOL, ILLINOIS WATERWAY, LOCKPORT, WILL COUNTY, ILLINOIS. AT LOCKPORT, IL. THIS MODIFICATION DECREASES THE AMOUNT OF THE CONTRACT FOR INSTALLATION OF NEW WALKWAY AND VEQ AND INSTALL NEW LIMESTONE CAP.
Amount: -$38,696
Award Description: TAS::96 3134::TAS ARRA::YES::ARRA RECOVERYPROJECT#::76134::RP# CONTRACT FOR MAJOR REHABILITATION, CONTROLLING WORKS, STAGE II, LOCKPORT POOL, ILLINOIS WATERWAY, LOCKPORT, WILL COUNTY, ILLINOIS AT LOCKPORT, IL. THIS MODIFICATION DECREASES FUNDS DUE TO PIER BN 0/1 AND BN 16 CHANGES.
Amount: $267,190
Award Description: TAS::96 3134::TAS ARRA::YES::ARRA RECOVERYPROJECT#::076134::RP# CONTRACT FOR MAJOR REHABILITATION, CONTROLLING WORKS, STAGE II, LOCKPORT POOL, ILLINOIS WATERWAY, LOCKPORT, WILL COUNTY, ILLINOIS AT LOCKPORT, IL. THIS MODIFCATION INCREASES FUNDS FOR TIME IMPACT AND CLAIM SETTLEMENT.

Project Location Detail

Location Information
Latitude, Longitude 0º 0' 0", 0º 0' 0"
Congressional District 13
City WILL
County WILL
State IL
Zip 60441