| Other Awards |
Amount:
$11,343,250
Award Description: TAS::96 3135::TAS REPAIR AND REPAINTING OF TAINTER GATES AT WHITNEY LAKE, CLIFTON, TEXAS |
Amount:
$4,130,700
Award Description: TAS::96 3135::TAS RECOVERY - REPAIR BULKHEAD PT PLEASANT CANAL NJIWNJ |
Amount:
$54,405
Award Description: RECOVERY-FLATIRON PP PENSTOCK RECOATINGS. TAS::14 0681::TAS, BUREAU PROJECT ID NO. 10.00. DUNS#055473797. MODIFICATION NEEDED TO INCLUDE THE FURNISHING AND INSTALLATION OF 16 ADDITIONAL FLOWMETERS ORIGINALLY NOT INCLUDED IN THE SOLICITATION BY THE GOVERNMENT. |
Amount:
-$1
Award Description: MODIFICATION REQUIRED TO DEOBLIGATE REMAINING OF FUNDS UNDER OLD COST STRUCTURE. TAS::14 0681::TAS, BUREAU PROJECT ID # 10.000 |
Amount:
$12,235,100
Award Description: RECOVERY-FLATIRON POWERPLANT, RECOATING AND RELINING OF PENSTOCKS 1 AND 2, COLORADO-BIG THOMPSON PROJECT, COLORADO. (TAS::14 0681::TAS, BUREAU PROJECT IDENTIFICATION NUMBER 10.000) THIS PROJECT IS FUNDED BY THE AMERICAN RECOVERY AND REINVESTMENT ACT OF 2009 (ARRA). THE PRINCIPAL COMPONENTS OF THE WORK CONSIST OF: REMOVING COATING SYSTEM FROM EXTERIOR OF PENSTOCKS NOS. 1 AND 2, INCLUDING REMOVING, HANDLING, AND DISPOSING OF PAINT CONTAINING LEAD AND OTHER HEAVY METALS. PREPARING SURFACE AND APPLYING NEW COATING SYSTEM TO EXTERIOR OF PENSTOCKS NOS. 1 AND 2. REMOVING AND DISPOSING OF LINING SYSTEM FROM INTERIOR OF PENSTOCKS NOS. 1 AND 2, INCLUDING REMOVING, HANDLING, AND DISPOSING OF PAINT CONTAINING COAL TAR PRODUCTS. PREPARING SURFACE AND APPLYING NEW LINING SYSTEM TO INTERIOR OF PENSTOCKS NOS. 1 AND 2. REMOVING AND DISPOSING OF COATING SYSTEM FROM STEEL WORK PLATFORM SUPPORTS, STAIRS, AND HANDRAILS AT VALVE STRUCTURE AND UPSTREAM OF ANCHOR NO. 14; PREPARING SURFACE AND RECOATING. REMOVING COATING SYSTEM FROM THE INTERIOR AND EXTERIOR OF THE 84-INCH BUTTERFLY VALVES, INCLUDING REMOVING, HANDLING, AND DISPOSING OF PAINT CONTAINING LEAD AND OTHER HEAVY METALS. PREPARING SURFACE AND RECOAT THE INTERIOR AND EXTERIOR OF THE 84-INCH BUTTERFLY VALVES.
|
Amount:
$0
Award Description: MODIFICATION NEEDED TO REDUCE ' ON PAPER ONLY" THE PAYMENT COMPLETED BY VOUCHER #1. NO OBLIGATION NEEDED.
TAS::14 0681::TAS, BUREAU PROJECT ID # 10.000 |
Amount:
-$9,999,999
Award Description: MOD REQUIRED TO CHANGE COST STRUCTURE ONLY. TAS::14 0681::TAS, BUREAU PROJECT ID # 10.000 |
Amount:
-$1
Award Description: MOD 4 DEOBLIGATES THE REMAINING BALANCE UNDER THE OLD COST STRUCTURE. TAS::14 0681::TAS, BUREAU PROJECT ID # 10.000 |
Amount:
-$2,235,100
Award Description: MOD 2 CHANGES THE COST STRUCTURE (COST AUTHORITY).
TAS::14 0681::TAS, BUREAU PROJECT ID # 10.000 |
Amount:
-$9,999,999
Award Description: MOD 1 CHANGES THE COST STRUCTURE (COST AUTHORITY) AND ADD CLAUSE 52.204-11 (FEDERAL REPORTING) DEVIATION - MARCH 2010 TO THE CONTRACT. TAS::14 0681::TAS, BUREAU PROJECT ID # 10.000 |
Amount:
$12,155,807
Award Description: MODIFICATION NEEDED TO REOBLIGATE THE FUNDS UNDER THE CORRECTED COST STRUCTURE. (THE FUNDS WERE DE-OBLIGATED BY MOD 5, AND 6)
TAS::14 0681::TAS, BUREAU PROJECT ID # 10.000 |
Amount:
$0
Award Description: RECOVERY-FLATIRON PENSTOCKS RECOATING. TAS::14 0681::TAS, BUREAU PROJECT ID NO. 10.000 - THIS MODIFICATION IS NEEDED TO CORRECT THE AMOUNT IN IDEAS-PD TO MATCH THE FUNDING IN FFS.
DUNS# 055473797 |
Amount:
-$2,155,807
Award Description: MODIFICATION NEEDED TO CHANGE COST STRUCTURE ONLY.
TAS::14 0681::TAS, BUREAU PROJECT ID # 10.000 |
Amount:
$12,235,100
Award Description: MOD 3 REOBLIGATES FUNDING UNDER A DIFFERENT COST STRUCTURE (COST AUTHORITY). TAS::14 0681::TAS, BUREAU PROJECT ID # 10.000 |
Amount:
$16,000
Award Description: RECOVERYPROJECT#::19920::RP#
ADDITIONAL STRUCTURAL STEEL REPAIRS - ABATEMENT & PAINTING OF TAINTER GATES |
Amount:
$3,821,465
Award Description: RECOVERYPROJECT#::19920::RP#
ABATEMENT & PAINTING OF TAINTER GATES - ADDED ADDITIONAL FUNDING FOR CLINS 7009, ADDITIONAL STRUCTURAL REPAIRS AND 7010, TIME & MATERIALS. |
Amount:
$304,000
Award Description: RECOVERYPROJECT#::19920::RP#
TIME AND MATERIALS - ABATEMENT & PAINTING OF TAINTER GATES |
Amount:
$0
Award Description: TAS::14 0681::TAS - BUREAU IDENTIFICATION NUMBER: 10.000
MOD FOR A TIME EXTENSION DUE TO GOV'T DELAY IN DEWATERING PENSTOCK 1 - KTR MOVED CONTAINMENT IN PREPARATION AND HAD TO REMOVED TWICE. |
Amount:
$12,000
Award Description: TAS::14 0681::TAS BUREAU ID NUMBER 10.000
THIS MODIFICATION DIRECTS THE CONTRACTOR TO FURNISH CREVRON SEALS FOR THE PENSTOCKS AT POWERPLANT AND INSTAKE VALVES. |
Amount:
$0
Award Description: TAS::14 0681::TAS - BUREAU ID 10.000 (ARRA) DUNS 055473797 MOD TO EXECUTED A TIME EXTENSION IN LIEU OF WORKING SUNDAYS. GOV'T DOES NOT HAVE AN INSPECTOR FOR SUNDAY WORK. |
Amount:
$0
Award Description: TAS::14 0681::TAS BUREAU ID NUMBER 10.000
THIS MODIFICATION CHANGES THE COATINGS TABULATION REQUIREMENTS AT NO ADDITIONAL COST TO THE GOVERNMENT. |
Amount:
$250,000
Award Description: TAS::14 0681::TAS BUREAU ID NUMBER 10.000
THE CONTRACTOR IDENTIFIED HAZARDOUS WASTE MATERIAL FROM THE REMOVAL OF THE EXTERIOR COATING OF THE PENSTOCKS. THIS MODIFICATION DIRECTS THE CONTRACTOR TO DISPOSE OF HAZARDOUS WASTE MATERIAL, IN ACCORDANCE WITH THE SPECIFICATIONS. |
Amount:
$5,976
Award Description: TAS::14 0681::TAS BUREAU ID #10.000 - RECOVERY ACT FUNDS.
THIS MOD AUTHORIZES THE CHANGE FROM A SINGLE CONDUCTOR CABLE TO A MULTI CONDUCTOR CABLE. |
Amount:
$0
Award Description: TAS::96 3135::TAS; REPAIR BULKHEAD PT PLEASANT CANAL NJIWNJ; MOD P1 FOR 21 ADD'L WEATHER DAYS |
Amount:
$0
Award Description: REPAIR BULKHEAD PT PLEASANT CANAL NJIWNJ (LI'S 4,7,&10 ADJS) |
Amount:
-$110,000
Award Description: TAS:: 96 3135::TAS ARRA::YES::ARRA RECOVERYPROJECT#::19920::RP#
ABATEMENT&PAINTING OF TAINTER GATES - REDUCE FUNDING FOR CLIN 7010, TIME AND MATERIALS |
Amount:
$121,424
Award Description: REPAIR BULKHEAD PT PLEASANT CANAL NJIWNJ MOD NO. P00007 |
Amount:
$76,320
Award Description: REPAIR BULKHEAD PT PLEASANT CANAL NJIWNJ MOD NO. P00005 |
Amount:
$0
Award Description: REPAIR BULKHEAD PT PLEASANT CANAL NJIWNJ |
Amount:
-$628,500
Award Description: TAS::96 3135:: TAS ARRA::YES::ARRA RECOVERY PROJECT#::19920::RP# DEOBLIGATING FUNDS FROM CLIN 7010, TIME AND MATERIALS |
Amount:
$0
Award Description: TAS::14 0681::TAS - THIS MODIFICATION REVISED THE REQUIREMENTS IN SECTION 11285 REGARDING THE GALLONS PER MINUTE DURING TESTING OF THE BUTTERLY VALVES. TAS::14 0681::TAS |
Amount:
$0
Award Description: CRITICAL FUNCTIONS - TAS::14 0681::TAS MODIFICATION NECESSARY TO ADJUST FUNDING IN IDEAS-PD TO MATCH THE ACTUAL FINAL CONTRACT AMOUNT RELFECTED IN FFS. THIS IS DUE TO A GLITCH IN DEOBLIGATING MOD 20 IN FFS. TAS::14 0681::TAS BUREAU ID 10.000 |
Amount:
$0
Award Description: CRITICAL FUNCTIONS - MODIFICATION TO DEOBLIGATE FUNDS IN FFS (SEE MOD 20). THE SYSTEM DID NOT DEOBLIGATE THE FUNDS WHEN MOD 20 WAS EXECUTED. TAS::14 0681::TAS BUREAU ID 10.000 |
Amount:
$1,582,395
Award Description: TAS::14 0681::TAS - BUREAU IDENTIFICATION NO. 10.000
THIS MODIFICATION EXECUTES AN EQUITABLE ADJUSTMENT TO THE CONTRACTOR FOR GOVERNMENT-CAUSED DELAYS DURING THE ON-SITE PERFORMANCE OF THE WORK. TAS::14 0681::TAS |
Amount:
-$9,433
Award Description: TAS::14 0681::TAS CRITICAL FUNCTION RECOVERY MODIFICATION DEFINITIZES MOD 16 - CONTRACTOR PROVIDED CHEVRON SEALS FOR THE POWERPLANTS AND INTAKE VALVES - MATERIAL ONLY. TAS::14 0681::TAS BUREAU ID 10.000 |
Amount:
-$2,571
Award Description: TAS::14 0681::TAS CRITICAL FUNCTION RECOVERY - THIS MODIFICATION DEFINITIZES MOD 15 - HAZARDOUS MATERIAL DISPOSAL CHARGES TO BE REFUNDED TO THE CONTRACTOR AS REQUIRED BY THE CONTRACT. |
Amount:
$180,915
Award Description: REPAIR BULKHEAD PT PLEASANT CANAL NJIWNJ; ADD'L LI'S 13-15 |
Amount:
$354,170
Award Description: REPAIR BULKHEAD PT PLEASANT CANAL NJIWNJ MOD NO. P00009 |
Amount:
$39,000
Award Description: REPAIR BULKHEAD PT PLEASANT CANAL NJIWNJ |