contract- RECIPIENT AWARD SUMMARY
| AWARD OVERVIEW |
|
Agency Name: US Army Corps of Engineers |
Project Location:
LANE |
|
Award Number: 0005 |
Project Location - State: OR |
|
Funding Amount:
$136,045 |
Project Location - Zip Code: 974130101 |
|
Ending Date:
2011-05-06 |
Congressional District: 04 |
RECIPIENT INFORMATION (AWARD)
| RECIPIENT INFORMATION (AWARD) |
|
Recipient Name:
|
SAYBR CONTRACTORS, INC. |
|
Recipient Address:
|
3852 S 66TH ST |
|
Recipient City:
|
TACOMA |
|
Recipient State:
|
WA |
|
Recipient Zip Code:
|
984092408 |
|
Congressional District:
|
WA-06 |
DESCRIPTION OF WORK/SERVICE PERFORMED
TAS::96 3135::TAS ARRA::YES::ARRA RECOVERYPROJECT#::322573::RP# BONNET AND GATE REPAIR PHASE I TO BEGIN NOVEMBER 2010.
PURCHASER INFORMATION (AWARD)
| PURCHASER INFORMATION (AWARD) |
| Contracting Office ID: |
W9127N |
| Contracting Office Name: |
W071 ENDIST PORTLAND |
| Contracting Office Region: |
NO REGI |
| TAS Major Program: |
3676 |
CONTRACT INFORMATION (AWARD)
| CONTRACT INFORMATION (AWARD) |
| Date Signed: |
2010-12-12 |
| Effective Date: |
2010-12-10 |
| Current Completion Date: |
2011-05-06 |
| Ultimate Completion Date: |
2011-05-06 |
| Award Type: |
DELIVERY ORDER |
| Reason For Modification: |
SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE |
| Type of Contract Pricing: |
FIRM FIXED PRICE |
| Last Date to Order: |
|
| Funding Agency ID: |
96CE |
| Funding Office ID: |
W9127N |
| Funding Office Name: |
Portland |
| Number of Offers Received: |
1 |
PRODUCT OR SERVICE INFORMATION (AWARD)
| PRODUCT OR SERVICE INFORMATION (AWARD) |
|
Product Code:
|
Y300 |
|
Product Description:
|
CONSTRUCT/RESTORATION |
|
NAICS Code:
|
237990 |
|
NAICS Description:
|
OTHER HEAVY AND CIVIL ENGINEERING CONSTRUCTION |
COMPETITION INFORMATION (AWARD)
| COMPETITION INFORMATION (AWARD) |
|
Extent Competed:
|
NOT AVAILABLE FOR COMPETITION |
|
Reason Not Competed:
|
AUTHORIZED BY STATUTE |
|
Solicitation Procedure:
|
ONLY ONE SOURCE |
|
Type of Set Aside:
|
8(A) SOLE SOURCE |
|
Statutory Exception to Fair Opportunity:
|
|
|
Type of Contract Pricing:
|
FIRM FIXED PRICE |
PREFERENCE PROGRAMS (AWARD)
Business Size Determination: SMALL BUSINESS
| Other Awards |
Amount:
$478,061
Award Description: TAS::14 1041::TAS RECOVERY OLYM-OLYMPIC NATIONAL PARK-ELWHA HEIGHTS WATER CONNECTION. CONSTRUCT ELWHA HEIGHTS WATER DISTRIBUTION LINE AND APPURTENANT VALVES, FIRE HYDRANTS, PRIVATE WATER SERVICES, AND THE CONSTRUCTION OF APPROXIMATELY 4,000 FEET OF 8-INCH POTABLE WATER DISTRIBUTION LINE, 4 FIRE HYDRANTS, CONNECTION TO WATER METERS, APPURTENANT VALVES AND SMALLER WATER SERVICE LINES. THE PROJECT ALSO INCLUDES CLEARING AND GRUBBING, INSTALLATION OF WATER DISTRIBUTION LINE AND APPURTENANCES, CLEANUP, AND SITE RESTORATION. A 25-FOOT SECTION OF THE WATER LINE WILL BE CONSTRUCTED USING TRENCHLESS TECHNIQUES TO PROTECT SURFACE FEATURES IN THAT AREA. ONCE COMPLETED, THE OWNER/OPERATOR WILL BE THE DRY CREEK WATER ASSOCIATION. |
Amount:
$675,096
Award Description: TAS::96 3135::TAS. TASK ORDER AWARD FROM CONSTRUCTION IDIQ. DESIGN/BUILD NEW HYDRAULIC SYSTEM FOR THE REGULATING OUTLET GATES AT THE BLUE RIVER DAM. REFURBISH HYDRAULIC CYLINDERS. |
Amount:
$1,037,481
Award Description: CONTRACTOR TO REHABILITATE BOULDER CREEK TRAIL, INCLUDING REMOVAL OF EXISTING ASPHALT FROM THE ABANDONED ROADWAY PRISM, REMOVAL OF EXISTING CULVERTS, PLACEMENT OF STRUCTURES AT STREAM CROSSINGS, AND DESIGN, SUPPLY, AND PLACEMENT OF A 150-FOOT SUSPENSION BRIDGE AT CRYSTAL CREEK. COMPLETION DATE ONLY AN ESTIMATE AT THIS TIME UNTIL THE NOTICE TO PROCEED IS ISSUED INCORPORATING THE AGREED UPON SCHEDULE OF CONSTRUCTION TO BE DISCUSSED DURING THE PRE-CONSTRUCTION MEETING. |
Amount:
$171,004
Award Description: TAS::14 1035::TAS RECOVERY MORA PMIS # 72360 NEW FLOORING, DOORS, AND CASEWORK AT MOUNT RAINIER NATIONAL PARK, SUNRISE VISITOR CENTER RELATED TO INSTALLATION OF NEW EXHIBITS. |
Amount:
$8,749
Award Description: ADDITIONAL WITHIN SCOPE WORK, VARIOUS ADDITIONS AND DEDUCTIONS. |
Amount:
$114,312
Award Description: TAS::14 1035::TAS RECOVERY NOCA PMIS #148154
IN 2008, WE HIRED A CONTRACTOR TO EVALUATE THE STEHEKIN LANDING FUEL SYSTEM AND ASSOCIATED MONITORING SYSTEM, PUMPS, PIPING, ETC. THIS CONTRACT WILL IMPLEMENT THE REPORT'S RECOMMENDATIONS TO BRING THE SYSTEM INTO COMPLIANCE WITH STATE REGULATIONS. SPECIFICALLY, THIS PROJECT CORRECTS IDENTIFIED DEFICIENCIES AND SUGGESTS UPGRADES TO IMPROVE THE STEHEKIN LANDING UNLEADED FUEL SYSTEM. THE SYSTEM CONSISTS OF ONE (1) 6,000 GAL. UNDERGROUND UNLEADED FUEL TANK, MONITORING SYSTEM, TWO (2) FUEL PUMPS (ONE ON LAND AND ONE ON THE DOCK) AND ALL ASSOCIATED PIPING. |
Amount:
-$27,278
Award Description: RECOVERY, TAS::14 1041:: OLYM, RESTORE ELWHA RIVER ECOSYSTEM AND FISHERIES PROGRAM, ELWHA HEIGHTS, DEOBLIGATION MODIFICATION AND CONTRACT CLOSE-OUT |
Amount:
-$3,159
Award Description: MODIFICATION TO PUMP ASSESSMENT AND REPAIR PROJECT DECREASES TASK ORDER BY $3,159.52. |
Amount:
$57,767
Award Description: TAS::14 1610::TAS
ARRA - ASSESS AND REPAIR OR REPLACE PUMP AT MAKAH NFH |
Amount:
$5,750
Award Description: RECOVERY - TAS::14 1610::TAS
REPLACE ROOF ON HATCHERY FEED BUILDING AT QUINAULT NATIONAL FISH HATCHERY |
Amount:
$0
Award Description: RECOVERY FFS PROJECT # R1PX
EXTEND DELIVERY DATE TO 08/31/10 FOR THE ROOF REPLACEMENT AT QUINAULT NATIONAL FISH HATCHERY. |
Amount:
$16,527
Award Description: RECOVERY FFS PROJECT # R1PX TAS::14 1610::TAS
PROVIDE ADDITIONAL ELECTRIC FURNACE AT QUINAULT NATIONAL FISH HATCHERY |
Amount:
$122,558
Award Description: RECOVERY - TAS::14 1610::TAS
REPLACE ROOF ON HATCHERY FEED BUILDING AT QUINAULT NATIONAL FISH HATCHERY |
Amount:
$55,631
Award Description: RECOVERY - TAS::14 0910 1610::TAS, PROJECT # R1GB, TIER 1 ENERGY UPGRADES AT WILLIAM FINLEY, ANKENY, AND BASKETT SLOUGH NWR'S. |
Amount:
$6,955
Award Description: TAS::96 3135::TAS ARRA::YES::ARRA RECOVERYPROJECT#::322573::RP# REFURBISH BLUE RIVER RO GATE HYDRAULIC SYSTEM, THE BLUE RIVER RO GATE HYDRAULIC SYSTEM IS UNRELIABLE AND IN NEED OF FREQUENT REPAIR, MANY COMPONENTS ARE OBSOLETE. RO GATES ARE ONLY NON-EMERGENCY PASSAGE MAINTAINING RIVER FLOW/FLOOD CONTROL. SYSTEM NEEDS TO BE REFURBISHED TO PROVIDE SAFE AND RELIABLE RO GATE OPERATION REPAIRS TO BE CONTRACTED USING ARRA FUNDING. |
Amount:
-$15,994
Award Description: TAS::96 3135::TAS. TASK ORDER AWARD FROM CONSTRUCTION IDIQ. DESIGN/BUILD NEW HYDRAULIC SYSTEM FOR THE REGULATING OUTLET GATES AT THE BLUE RIVER DAM. REFURBISH HYDRAULIC CYLINDERS. |
Amount:
$142,165
Award Description: TAS::96 3135::TAS ARRA::YES::ARRA RECOVERYPROJECT#::324667::RP# BONNEVILLE SPILLWAY GATE PIT REPAIR THIS MODIFICATION IS FOR ADDITIONAL TIME TO REMOVE THE GRIT, DESIGN CHANGES AND SCHEDULE INTERRUPTIONS FOR FISH PASSAGE; RECONFIGURE AND INSTALL THE STAIRWAY FROM THE SOUTH STORAGE PIT TO THE DOORWAY; AND RECONFIGURE AND RELOCATE ELECTRICAL PANELS IN THE SOUTH STORAGE PIT. |
Amount:
$2,376,542
Award Description: TAS::96 3135::TAS RECOVERYPROJECT#::324667::RP BONNEVILLE GATE PIT CLEANUP, RESTORATION, AND SHORING UP OF PIT |
Amount:
$0
Award Description: TAS::96 3135::TAS RECOVERYPROJECT#::324667::RP BONNEVILLE SPILLWAY GATE PIT REPAIR, CLEAN-UP, AND SHORING ARRA::YES::ARRA |
Amount:
$4,669
Award Description: DESIGN AND SAFETY IMPROVEMENTS AT SUNRISE VISITOR CENTER, MOUNT RAINIER NATIONAL PARK. WORK INCLUDES CABINET MODIFICATIONS AND FLOOR TRIM. |
Amount:
$13,175
Award Description: ADDED DESIGN AND SAFETY IMPROVEMENTS AT MOUNT RAINIER NATIONAL PARK SUNRISE VISITOR CENTER. GLASS TOPS, REDO FLOOR SLOPE, POSTER CLIPS, FLOOR PATCH, AND WOOD SNOW SHUTTERS. |
Amount:
$136,045
Award Description: TAS::96 3135::TAS ARRA::YES::ARRA RECOVERYPROJECT#::322573::RP# BONNET AND GATE REPAIR PHASE I TO BEGIN NOVEMBER 2010. |
Amount:
$110,716
Award Description: TAS::96 3135::TAS ARRA::YES::ARRA RECOVERY PROJECT#::322573:: RP# BLUE RIVER REGULATING GATE OUTLET DESIGN BUILD AWARD DOCUMENT- TO INCREASE SKILLED CRAFT HOURS ITEM 0008 AND EXTEND CONTRACT PERIOD OF PERFORMANCE UNTIL 31 JULY 2011 |
| Location Information |
| Latitude, Longitude |
0º 0' 0",
0º 0' 0" |
| Congressional District |
04 |
| City |
LANE |
| County |
LANE |
| State |
OR |
| Zip |
97413 |
|