| Other Awards |
Amount:
$294,869
Award Description: TAS::14 1035::TAS RECOVERY KEWE PMIS 152272 DESIGN SERVICES FOR REHABILITATION OF UNION BLDG |
Amount:
$4,811
Award Description: TAS::14 1041::TAS RECOVERY
MISC MEETINGS/SCOPING TRIP FOR DESIGN DOCUMENTS |
Amount:
$374,819
Award Description: TAS::47 4543::TAS. CONSTRUCTION ADMINISTRATION SERVICES. |
Amount:
$2,950,000
Award Description: TAS::47 4543::TAS. PROVIDE ARCHITECTURAL AND ENGINEERING SERVICES FOR THE ROBERT SMITH VANCE FBCT IN BIRMINGHAM, ALABAMA. |
Amount:
$725,000
Award Description: CONSTRUCTION ADMINISTRATION SERVICES. |
Amount:
$0
Award Description: FOLS, REHAB HS-9, AE SERVICES DURING CONSTRUCTION, TIME EXTENSION TO ALIGN WITH RELATED CONSTRUCTION PROJECT. |
Amount:
$22,261
Award Description: MODIFICATION TO ADD TO THE CURRENT SCOPE AND INCREASE THE CONTRACT VALUE. |
Amount:
$0
Award Description: MODIFICIATION TO INCLUDE ARRA CLAUSES. TAS::47 4543::TAS |
Amount:
$387,306
Award Description: MODIFICATION TO AUTHORIZE ADDITIONAL DESIGN SERVICES FOR MULTIPLE FLOOR PLANS. |
Amount:
$160,744
Award Description: MODIFICATION TO PROVIDE DESIGN SERVICES FOR RELOCATION OF BUILDING TENANTS DURING CONSTRUCTION |
Amount:
$95,900
Award Description: AV MODIFICATION |
Amount:
$561,652
Award Description: ADDITIONAL FIRE PROTECTION AND SECURITY CONSULTANT SERVICES |
Amount:
-$16,220
Award Description: OTHER FUNCTION
VANCE FEDERAL BUILDING&COURTHOUSE REHABILITATION BIRMINGHAM, AL
THE PURPOSE OF THIS MODIFICATION IS TO AUTHORIZE THE CONTRACTOR TO PERFORM THE FOLLOWING ADDITIONAL SERVICES. DESIGN SERVICES FOR REDESIGN OF THE FPS SPACE FROM THE EXISTING 1,600 S.F. TO 600 S.F. IN ACCORDANCE WITH THE ATTACHED SCOPE OF WORK DATED AUGUST 7, 2012, YOUR PROPOSAL DATED AUGUST 17, 2012 AND CURRENT BASE CONTRACT REQUIREMENTS. |
Amount:
$0
Award Description: THE PURPOSE OF THIS MODIFICATION IS TO CORRECT THE FAR AUTHORITY ON MODIFICATION PS07, PS08, PS 09 AND PS10. THE FAR AUTHORITY IS HEREBY CHANGED FROM MUTUAL AGREEMENT TO FAR 52.243-1 ALTERNATE III FOR THE ROBERT S VANCE FB/CTHS PROJECT IN BIRMINGHAM, AL. |
Amount:
$0
Award Description: MODIFICATION FOR ADDITIONAL LEED REGUIREMENTS, CHOAL CHUTE DESIGN. SERVICES FOR THE ROBERT S VANCE FB-CTH, BIRMINGHAM, AL |
Amount:
-$433,896
Award Description: MODIFICATION TO REMOVE SECURITY AND FIRE PROTECTION CONSULTANT SERVICES. |
Amount:
$0
Award Description: MODIFICATION TO AUTHORIZE ADDITIONAL STRUCTURAL ENGINEER SITE VISITS DURING CONSTRUCTION PHASE SERVICES. |
Amount:
$6,078
Award Description: MODIFICATION TO ADD DESIGN SERVICES FOR CHILLER REPLACEMENT. |
Amount:
$0
Award Description: MODIFICATION TO ADD TENANT ANALYSIS AND DELETE SECURITY SECURITY SERVICES |
Amount:
$16,220
Award Description: RECOVERY: OT ( OTHER THAN)
THE PURPOSE OF THIS MODIFICATION IS TO CORRECT MODIFICATION PS 17 IN COMPRIZON ONLY. LINE ITEM 0014 WAS INADVERTANTLY ADDED TO THE MODIFICATION DURING VALIDATION. THE CORRECT TOTAL OF MODFICIATION PS 17 IS $0 NOT (-)$16,220. |
Amount:
$96,712
Award Description: RECOVERY: OF ( OTHER FUNCTIONS)
THE PURPOSE OF THIS MODIFICATION IS TO AUTHORIZE ADDITIONAL STRUCTURAL CONSTRUCTION SERVICES FOR THE HIGH PERFORMANCE GREEN BUILDING RENOVATION OF THE ROBERT S VANCE FEDERAL BUILDING/COURTHOUSE IN BIRMINGHAM, ALABAMA. |
Amount:
$92,811
Award Description: RECOVERY: OF (OTHER FUNCTIONS)
THE PURPOSE OF THIS MODIFICATION IS TO AUTHORIZE THE CONTRACTOR TO PERFORM ADDITIONAL CONSTRUCTION ADMINISTRATION AND CLOSE-OUT SERVICES FOR THE HIGH PERFORMANCE GREEN BUILDING RENOVATION OF THE ROBERT S VANCE FEDERAL BUILDING/COURTHOUSE IN BIRMINGHAM, ALABAMA. SERVICES SHALL BE PERFORMED IN ACCORDANCE WITH CONTRACTOR'S PROPOSAL DATED 12/13/12 AND THE ATTACHED SCOPE OF SERVICES DATED 11/26/12 AS FOLLOWS:
1) ADDITIONAL SITE VISITS FOR PROJECT QUALITY AND SCHEDULE COMPLIANCE.
PRIME: QUINN EVANS ARCHITECTS
$24,080.96
CONSULTANT: LBYD
$405.58
CONSULTANT: PROTECTION ENGINEERING GROUP
$9,265.18
CONSULTANT: GARY STEFFY LIGHTING DESIGN
$2,024.89
CONSULTANT: VERTRAN
$3,727.32
TOTAL COST: $39,504.93
2)SUBSTANTIAL COMPLETION TENANT WALK-THROUGH
PRIME: QUINN EVANS ARCHITECTS
$7,943.76
3)PUNCH LIST PARTICIPATION
PRIME: QEA
$64,206.84
CONSULTANT: HHB
$11,631.73
CONSULTANT: GSLD
$2,907.44
CONSULTANT: LBYD
$406.58
CONSULTANT: PROTECTION ENGINEERING GROUP:
$6,011.03
CONSULTANT: VERTRAN
$2,832.61
CONSULTANT: NIMROD LONG&ASSOCIATES
$524.38
CONSULTANT: KAHN SOUTH
$3,625.00
TOTAL: $92,145.61
TOTAL COST OF THESE ADDITIONAL SERVICES IS $139,594.30
4. DEOBLIGATE REMAINING FIRE PROTECTION INSPECTION SERVICES -CLIN 0007 - FIRE PROTECTION INSPECTIONS SERVICES ARE NO LONGER NEEDED AND ALL FUNDS ARE DEOBLIGATED IN THE AMOUNT OF $46,782.45.
THE TOTAL COST OF THIS MODIFICATION IS A FIRM FIXED AMOUNT OF $92,811.85 ($139,594.30 - $46,782.45).
THE NEW CONTRACT TOTAL IS INCREASED FROM $4,849,867.25 TO $4,942,678.70.
ADDITIONAL SERVICES INCLUDED IN THIS MODIFICATION ARE NOT INCLUDED IN THE 6% DESIGN FEE.
THE CONTRACT COMPLETION DATE REMAINS UNCHANGED: MAY 30, 2013.
ALL OTHER TERMS AND CONDITIONS REMAIN UNCHANGED.
CONTRACTOR'S RELEASE: IN CONSIDERATION OF THIS MODIFICATION AGREED TO HEREIN AS COMPLETE EQUITABLE ADJUSTMENT AS DESCRIBED ABOVE, QUINN EVANS ARCHITECTS, HEREBY RELEASES THE GOVERNMENT FROM ANY AND ALL LIABILITY UNDER THIS CONTRACT FOR FURTHER EQUITABLE ADJUSTMENTS ATTRIBUTABLE TO SUCH FACTS OR CIRCUMSTANCES GIVING RISE TO THIS MODIFICATION. |
Amount:
$0
Award Description: ADMINISTRATIVE ACTION TO CORRECT RWA FUNDING. |