Skip to content Skip to footer site map
Navigate Up

Recovery.gov - Track the Money

Recovery.gov is the U.S. government's official website that provides easy access to data
related to Recovery Act spending and allows for the reporting of potential fraud, waste, and abuse.

contract- RECIPIENT AWARD SUMMARY

OTAK INCORPORATED (8869)

Clarification of Codes


AWARD OVERVIEW

AWARD OVERVIEW
Agency Name: Department of the Interior Project Location: CLACKAMAS
Award Number: INL09PD01479 Project Location - State: OR
Funding Amount: $99,948 Project Location - Zip Code: 970355217
Ending Date: 2010-01-20 Congressional District: 05

RECIPIENT INFORMATION (AWARD)

RECIPIENT INFORMATION (AWARD)
Recipient Name: OTAK INCORPORATED (8869)
Recipient Address: 17355 SW BOONES FERRY RD.
Recipient City: LAKE OSWEGO
Recipient State: OR
Recipient Zip Code: 970355217
Congressional District: OR-05

DESCRIPTION OF WORK/SERVICE PERFORMED

TAS::14 1112::TAS RECOVERY - LOAD RATED BRIDGE EVALUATION - STRUCTURAL EVALUATIONS AND CORRECTIVE ACTION RECOMMENDATIONS FOR IDENTIFIED LOAD RATED VEHICLES BRIDGES LOCATED IN WESTERN OREGON.






TRANSACTIONS

TRANSACTIONS

Other Awards

Other Awards
Amount: $37,788
Award Description: TAS::14 1041::TAS RECOVERY MEVE PMIS # 116395 TECHNICAL ANALYSIS AND RECOMMENDATIONS FOR THE PURCHASE OF THREE ALTERNATIVE-FUEL VEHICLES, MESA VERDE NATIONAL PARK, COLORADO.
Amount: $98,856
Award Description: TAS::14 1041::TAS ARRA RECOVERY THE WORK OF THIS PROJECT CONSISTS OF DEVELOPING CONSTRUCTION DOCUMENTS FOR MULTIPLE ROUTES WITHIN ACADIA NATIONAL PARK AND ASSEMBLING THOSE DOCUMENTS INTO ONE COMPLETE PACKAGE FOR CONSTRUCTION. THE PROJECT GENERALLY CONSISTS OF: PREPARATION OF CONSTRUCTION DOCUMENTS IN TABULAR FORMAT FOR ROAD REHABILITATION ON APPROXIMATELY 37 ROUTES BASED ON THE PAVEMENT MANAGEMENT REPORT PROVIDED BY THE NPS USING THE MINIMUM DESIGN REQUIRED TO PROVIDE CLEAR DIRECTION TO THE CONSTRUCTION CONTRACTOR. ESTIMATING THE COST FOR CONSTRUCTION THE CONTRACTING PACKAGE.
Amount: $89,433
Award Description: TAS::14 1041::TAS RECOVERY REPAIR DAMAGED CULVERTS AND ASSOCIATED HEADWALLS CONSTRUCTION DOCUMENT SERVICES
Amount: $30,470
Award Description: TAS::14 1041::TAS RECOVERY REPAIR DAMAGED CULVERTS AND ASSOCIATED HEADWALLS CONSTRUCTION DOCUMENT SERVICES
Amount: $20,203
Award Description: TAS::14 1041::TAS RECOVERY SHEN PMIS #S 150596, 150592, 150521, 150532, 150414, 150618, 151860, 151385, 152720, 152728, 151068 ROAD REHABILITATION CONSTRUCTION DOCUMENT SERVICES, SHENANDOAH NATIONAL PARK, VIRGINIA MODIFICATION TO ADD THREE PARKING AREAS TO EXISING SCOPE OF SERVICES.
Amount: $649,927
Award Description: TAS::14 1041::TAS RECOVERY SHEN 150592 ROAD REHAB CONSTRUCTION DOCUMENT SERVICES THE WORK OF THIS PROJECT CONSISTS OF DEVELOPING CONSTRUCTION DOCUMENTS FOR MULTIPLE ROUTES WITHIN SHENANDOAH NATIONAL PARK AND ASSEMBLING THOSE DOCUMENTS INTO PACKAGES FOR CONSTRUCTION. THE PROJECT GENERALLY CONSISTS OF: PREPARATION OF CONSTRUCTION DOCUMENTS FOR ROAD REHABILITATION ON APPROXIMATELY 60 ROUTES BASED ON THE PAVEMENT MANAGEMENT REPORT PROVIDED BY THE NPS. THE PACKAGES SHALL BE PREPARED IN PRIORITY ORDER AND DELIVERED ON A STAGGERED SCHEDULE TO ALLOW CONSTRUCTION CONTRACTING TO BEGIN AS SOON AS POSSIBLE; PREPARING CONTRACTING PACKAGES USING THE RECOMMENDED PROJECT GROUPINGS SHOWN BELOW AS A BASIS BUT PROVIDING ALTERNATE RECOMMENDATIONS AS APPROPRIATE; AND, ESTIMATING THE COST FOR CONSTRUCTION FOR EACH CONTRACTING PACKAGE.
Amount: $39,193
Award Description: TAS::14 1112::TAS RECOVERY SALEM DISTRICT OFFICE WINDOWS/SKYLIGHTS RENOVATION. WORK IS TO GATHER AND COMPILE INFORMATION ABOUT THE EXISTING WINDOWS, SKYLIGHTS, AND ENTRY WAY AND MAKE RECOMMENDATIONS FOR REPAIR OR REPLACEMENT.
Amount: $144,812
Award Description: TAS::14 1112::TAS - RECOVERY - GREEN MOUNTAIN LOOKOUT REPLACEMENT. WORK CONSISTS OF DESIGN OF REPFLACEMENT FACILLITIES FOR THE EXISTING GREEN MOUNTAIN FIRE LOOKOUT.
Amount: $55,730
Award Description: TAS::14 1112::TAS RECOVERY - SALEM DISTRICT OFFICE HEATING/DOMESTIC HOT WATER SYSTEM RETROFIT - A-E SHALL CONDUCT A HEATING LOAD VERIFICATION OF EXISTING BUILING, EVALUATE NEW ENERGY EFFICIENT HEATING/DOMESTIC HOT WATER SYSTEMS, DESIGN AND PREPARE CONSTRUCTION CONTRACTS DRAWINGS, SPECIFICATION, AND COST ESTIMATE FOR UPGRADING THE SYSTEM.
Amount: $54,035
Award Description: TAS::14 1112::TAS RECOVERY - NHOTIC GREEN PLAN - WORK CONSISTS OF THE PURPOSE OF THIS INVESTIGATION AND SITE VISIT IS TO DETERMINE AND RECOMMEND CORRECTIVE MEASURES THAT WILL BRING THE NHOTIC INTO COMPLIANCE WITH E.O. 13423, SECTION 2(F) AND ESTIMATE THE COSTS REQUIRED FOR DESIGN, CONSTRUCTION, AND/OR RETROFITTING.
Amount: $124,032
Award Description: TAS::14 1112::TAS RECOVERY - ROSEBURG HVAC SYSTEM RETROFIT, A-E TO CONDUCT A COMPREHENSIVE EVALUATION OF THE EXISTING HVAC SYSTEM AND DEVELOP A PLAN FOR THE SYSTEM RETROFIT, DESIGN AND PREPARE SPECIFICATIONS.
Amount: $99,948
Award Description: TAS::14 1112::TAS RECOVERY - LOAD RATED BRIDGE EVALUATION - STRUCTURAL EVALUATIONS AND CORRECTIVE ACTION RECOMMENDATIONS FOR IDENTIFIED LOAD RATED VEHICLES BRIDGES LOCATED IN WESTERN OREGON.
Amount: $70,333
Award Description: TAS::12 1102::TAS RECOVERY-DESCHUTES HQ/FORT ROCK RANGER DISTRICT-DESCHUTES MARKET ROAD IMPROVEMENTS DESIGN. THIS MODIFICATION IS REQUIRED TO MEET CITY OF BEND DESIGN STANDARDS. WORK INCLUDES SUPPLEMENTAL A/E SERVICES TO INCLUDE GEOTECHNICAL, PLANNING, SURVEYING AND CIVIL ENGINEERING AT THE BEND PINE ADMINISTRATION SITE, OTAK PROJECT NO. 14640.
Amount: $0
Award Description: TAS::12 1102::TAS RECOVERY-DESCHUTES HQ/FORT ROCK RANGER DISTRICT-DESCHUTES MARKET ROAD IMPROVEMENTS DESIGN. MODIFICATION 0007 EXTENDS THE PERFORMANCE PERIOD THROUGH 1/30/2011 TO ALLOW FOLLOW-ON INSPECTION.
Amount: $0
Award Description: NATIONWIDE IDIQ TO SUPPORT THE TRANSPORTATION PROGRAM, MULTIPLE AWARD ALONG WITH HDR AND DAVID EVANS ADD ARRA REPORTING LANGUAGE 52.204.11 AND EXECUTIVE ORDER #13513
Amount: $9,479
Award Description: TAS::14 1041 TAS:: RECOVERY SHEN-150618 ADDITIONAL DESIGN SERVICES TO RE-EVALUATE SPECIFIED TREATMENTS FOR THE ELKWALLOW PICNIC GROUND DUE TO ROAD SURFACE CRACKING, SUBGRADE PUMPING AND LIMITED PRESENCE OF AGGREGATE BASE COURSE IN SOME AREAS, ROAD REHABILITATION, PHASE 4, SHENANDOAH NATIONAL PARK, VIRGINIA.
Amount: $0
Award Description: SHEN-150618 DESIGN SERVICES TO RE-EVALUATE PROPOSED TREATMENTS FOR ELKWALLOW PICNIC GROUND AND TO DEVELOP TECHNICAL RECOMMENDATIONS. MOD 1: CORRECT ACCOUNTING AND APPROPRIATION DATA ON LINE NUMBER 1.
Amount: $8,688
Award Description: RECOVERY ACAD PMIS# 151121 PERIOD OF PERFORMANCE IS EXTENDED AND TOTAL CONTRACT VALUE IS INCREASED FOR REQUEST OF EQUITABLE ADJUSTMENT.
Amount: -$1,397
Award Description: TAS::14 1041::TAS ARRA RECOVERY THE WORK OF THIS PROJECT CONSISTS OF DEVELOPING CONSTRUCTION DOCUMENTS FOR MULTIPLE ROUTES WITHIN ACADIA NATIONAL PARK AND ASSEMBLING THOSE DOCUMENTS INTO ONE COMPLETE PACKAGE FOR CONSTRUCTION. THE PROJECT GENERALLY CONSISTS OF: PREPARATION OF CONSTRUCTION DOCUMENTS IN TABULAR FORMAT FOR ROAD REHABILITATION ON APPROXIMATELY 37 ROUTES BASED ON THE PAVEMENT MANAGEMENT REPORT PROVIDED BY THE NPS USING THE MINIMUM DESIGN REQUIRED TO PROVIDE CLEAR DIRECTION TO THE CONSTRUCTION CONTRACTOR. ESTIMATING THE COST FOR CONSTRUCTION THE CONTRACTING PACKAGE.
Amount: $8,134
Award Description: RECOVERY ACAD PMIS# 151121 PERIOD OF PERFORMANCE IS EXTENDED AND TOTAL CONTRACT VALUE IS INCREASED IN RESPONSE TO THE REQUEST FOR EQUITABLE ADJUSTMENT.
Amount: $0
Award Description: TAS::14 1041::TAS RECOVERY SHEN 150592 ROAD REHAB CONSTRUCTION DOCUMENT SERVICES MOD 2: EXTEND THE PERIOD OF PERFORMANCE FROM 12/31/09 TO 1/31/10 TO ACCOMODATE FINAL REVIEW PERIOD, AT NO COST TO EITHER PARTY. THE WORK OF THIS PROJECT CONSISTS OF DEVELOPING CONSTRUCTION DOCUMENTS FOR MULTIPLE ROUTES WITHIN SHENANDOAH NATIONAL PARK AND ASSEMBLING THOSE DOCUMENTS INTO PACKAGES FOR CONSTRUCTION. THE PROJECT GENERALLY CONSISTS OF: PREPARATION OF CONSTRUCTION DOCUMENTS FOR ROAD REHABILITATION ON APPROXIMATELY 60 ROUTES BASED ON THE PAVEMENT MANAGEMENT REPORT PROVIDED BY THE NPS. THE PACKAGES SHALL BE PREPARED IN PRIORITY ORDER AND DELIVERED ON A STAGGERED SCHEDULE TO ALLOW CONSTRUCTION CONTRACTING TO BEGIN AS SOON AS POSSIBLE; PREPARING CONTRACTING PACKAGES USING THE RECOMMENDED PROJECT GROUPINGS SHOWN BELOW AS A BASIS BUT PROVIDING ALTERNATE RECOMMENDATIONS AS APPROPRIATE; AND, ESTIMATING THE COST FOR CONSTRUCTION FOR EACH CONTRACTING PACKAGE.
Amount: -$9,517
Award Description: RECOVERY MEVE-116395 TECHNICAL ANALYSIS AND RECOMMENDATIONS FOR PURCHASE OF THREE ALTERNATIVE-FUEL VEHICLES, MESA VERDE NATIONAL PARK MOD 2: THE PURPOSE OF THIS MODIFICATION IS TO DELETE SEVERAL TRIPS TO INSPECT THE PHOTO VOLTAIC VEHICLE, DELETE TASK 2.6 FOR ASSISTANCE IN REVIEWING SUBMITTAL DOCUMENTS FOR THE BIODIESEL TRAM AND TRAILER UNITS, ADD A PRE-MAUNFACTURING CONFERENCE, AND ADD A WAYSIDE EXHIBIT SITE VISIT AND PLANNING MEETING.
Amount: $0
Award Description: TAS::14 1041 TAS RECOVERY. ROAD REHABILITATION CONSTRUCTION DOCUMENT PREPARATION, SHENANDOAH NATIONAL PARK, VIRGINIA. THE PURPOSE OF THIS MODIFICATION IS TO EXTEND THE PROJECT COMPLETION DATE TO MARCH 31, 2010 TO ACCOMODATE AN EXTENDED NPS REVIEW PERIOD, AT NO COST TO EITHER PARTY.
Amount: $37,006
Award Description: RECOVERY ACAD PMIS# 151121/152170 THIS WORK CONSISTS OF TITLE III SERVICES REQUIRED FOR THE ROAD AND CULVERT CONSTRUCTION PROJECT.
Amount: $339,327
Award Description: WY RECOVERY RAWLINS/ROCK SPRINGS VRM TAS::14 1108::TAS
Amount: $844,683
Award Description: VISUAL RESOURCE INVENTORY SOLAR (ARRA) TAS::14 1108::TAS
Amount: $108,868
Award Description: RECOVERY WY CAMOUFLAGE DEMONSTRATION TAS::14 1108::TAS
Amount: $9,433
Award Description: RECOVERY - HEATING/DOMESTIC HOT WATER SYSTEM RETROFIT TAS::14 1112::TAS
Amount: $0
Award Description: ARRA - IDIQ CONTRACT - A&E NHOTIC
Amount: $20,624
Award Description: RECOVERY-AE CONST. MANAGEMENT SERVICES TAS::14 1112::TAS
Amount: $48,106
Award Description: RECOVERY - LOAD RATED BRIDGE EVALUATION TAS::14 1112::TAS
Amount: $0
Award Description: TAS::14 1112::TAS A-E NHOTIC GREEN PLAN
Amount: $0
Award Description: A&E CONTRACT NHOTIC GREEN PLAN
Amount: $0
Award Description: RECOVERY - LEED REPLACEMENT FIRE CACHE FACILITIES DESIGN
Amount: $561,319
Award Description: RECOVERY - LEED REPLACEMENT FIRE CACHE FACILITIES DESIGN TAS::14 1112::TAS
Amount: $70,876
Award Description: TAS::14 1112::TAS - RECOVERY-DESIGN OF POLLEN LAB REPLACEMENT
Amount: $0
Award Description: RECOVERY SPOKANE TURN POINT LEAD PAINT
Amount: $0
Award Description: RECOVERY SPOKANE TURN POINT LEAD PAINT
Amount: $69,671
Award Description: RECOVERY SPOKANE TURN POINT LEAD PAINT TAS::14 1112::TAS
Amount: $0
Award Description: RECOVERY SPOKANE TURN POINT LEAD PAINT
Amount: $8,360
Award Description: RECOVERY - LEED REPLACEMENT FIRE CACHE FACILITIES DESIGN TAS::14 1112::TAS
Amount: $25,790
Award Description: RECOVERY SDO WINDOWS/SKYLIGHTS A-E T.O. TAS::14 1112::TAS
Amount: $72,394
Award Description: RECOVERY-YONA-GSA SECURITY SYSTEM TAS::14 1112::TAS
Amount: $50,633
Award Description: RECOVERY - ROSEBURG HVAC SYSTEM RETROFIT TAS::14 1112::TAS
Amount: $0
Award Description: RECOVERY - ROSEBURG HVAC SYSTEM RETROFIT
Amount: $9,516
Award Description: RECOVERY - ROSEBURG HVAC SYSTEM RETROFIT TAS::14 1112::TAS
Amount: $0
Award Description: VISUAL RESOURCE INVENTORY SOLAR (ARRA)

Project Location Detail

Location Information
Latitude, Longitude 0º 0' 0", 0º 0' 0"
Congressional District 05
City CLACKAMAS
County CLACKAMAS
State OR
Zip 97035