| Other Awards |
Amount:
$198,160
Award Description: TAS::57 3404::TAS
RECOVERY-- CZQZ980182 REPAIR ROOF CHILD DEVELOPMENT CENTER, B76 ARRA::YES::ARRA |
Amount:
$330,190
Award Description: TAS::57 3404::TAS
RECOVERY-- CZQZ030366 - REPAIR ROOF TEMPORARY LIVING FACILITY, B1818 ARRA::YES::ARRA |
Amount:
$0
Award Description: TAS::12 1102::TAS
ARRA PROJECT, NFSR 150, RECONDITION AND SURFACE, INCLUDES SEVERAL ROAD FEATURES |
Amount:
$2,437,966
Award Description: TAS::12 1102::TAS
ARRA PROJECT, NFSR 150, RECONDITION AND SURFACE, INCLUDES SEVERAL ROAD FEATURES |
Amount:
$170,013
Award Description: TAS::12 1102::TAS RESTROOM FACILITY REPLACEMENT - MCGAFFEY CG (SITE CONSTRUCTION) - CIM #0303-12F
FOR CAPITAL IMPROVEMENT&MAINTENANCE |
Amount:
$26,787
Award Description: TAS::12 1102::TAS FOR CAPITAL IMPROVEMENT & MAINTENANCE
RESTROOM FACILITY REPLACEMENT - MCGAFFEY CG (SITE CONSTRUCTION) - CIM #0303-12F
THE PURPOSE OF THIS MODIFICATION IS TO FUND THE ADDITIONAL RIP RAP REQUIRED TO PROTECT SLOPES AT SITE'S 8,9,10, AND 12 AS WELL AS BASECOARSE MATERIAL FOR PULL OUTS AT TOILET SITES TO MITIGATE RESOURCE DAMAGE. THE PRICE FOR THIS ADDITIONAL WORK AS AGREED UPON BY ALL PARTIES IS $26,787.06.
THEREFORE, THE CONTRACT AWARD AMOUNT OF $170,013.72 IS INCREASED TO $196,800.78. AN INCREASE OF $26,787.06.
ALL OTHER TERMS AND CONDITIONS REMAIN UNCHANGED. |
Amount:
$3,546,003
Award Description: ARRA ACTIVITY NO. 097.000 TAS::14 0681::TAS ISLETA REACH HABITAT RESTORATION INCLUDES CONSTRUCTION OF VARIOUS HABITAT BENEFITING THE RIO GRANDE SILVERY MINNOW AND THE SOUTHWESTERN WILLOW FLYCATCHER UNDER THE PROGRAMMATIC RESPONSIBILITY OF THE MIDDLE RIO GRANDE ENDANGERED SPECIES COLLABORATIVE PROGRAM. ACTIVITIES UNDER THE TASK ORDER INCLUDES EXCAVATION OF EMBAYMENTS AND BACKWATER FEATURES; LOWERING BANK LINES AND SMALL CHANNELS THROUGH FLOODPLAIN AREAS, AND CREATING ADDITIONAL HABITAT FEATURES FOR ENDANGERED SPECIES DURING PROLONGED DEWATERING AND NO-FLOW PERIODS. |
Amount:
$0
Award Description: ARRA ACTIVITY NO. 101.000 TAS::14 0681::TAS RIO GRANDE SILVERY MINNOW SANCTUARY SECURITY FENCING |
Amount:
$362,222
Award Description: ARRA ACTIVITY NO. 101.000 TAS::14 0681::TAS RIO GRANDE SILVERY MINNOW SANCTUARY SECURITY FENCING. CONSTRUCTION OF PERIMETER FENCING AROUND THE MIDDLE RIO GRANDE ENDANGERED SPECIES COLLABORATIVE PROGRAM'S MINNOW SANCTUARY. REQUIREMENT INCLUDES MOBILIZATION AND DEMOBILIZATION OF HEAVY EQUIPMENT, INSTALLATION OF GAME FENCING MATERIALS, AND OTHER RELATED PREPARATION WORK. |
Amount:
$0
Award Description: RECOVERY - ADMINISTRATIVE MODIFICATION TO NOTIFY CONTRACTOR OF CHANGE IN MEANS BY WHICH FUTURE FUNDS MAY BE OBLIGATED TO THE TASK ORDER. TAS::14 0681::TAS BUREAU PROJECT NUMBER: 76.000.
|
Amount:
$784,752
Award Description: RECOVERY: FOR THE SUPPLY, HAULING, AND STOCKPILING OF 20,142 TONS OF 16" NOMINAL SIZE RIPRAP AT THE BERNALILLO STOCKPILE SITE TO BE USED FOR PREVENTING RIO GRANDE RIVER EMBANKMENT EROSION AT THE FOLLOWING RIVER REACHES: SANDIA INDIAN PUEBLO; SANTA DOMINGO INDIAN PUEBLO; SANTA ANA INDIAN PUEBLO; AND SAN FELIPE INDIAN PUEBLO. TAS::14 0681::TAS BUREAU PROJECT NUMBER: 76.000.
|
Amount:
$0
Award Description: RECOVERY - ADMINISTRATIVE MODIFICATION TO NOTIFY CONTRACTOR OF CHANGE IN MEANS BY WHICH FUTURE FUNDS MAY BE OBLIGATED TO THE TASK ORDER. TAS::14 0681::TAS
BUREAU PROJECT NUMBER: 75.000.
|
Amount:
-$1,066
Award Description: +RECOVERY - LOADING, HAULING, DUMPING AND SPREADING OF AN ADDITIONAL 10,745.36 TONS OF BORROW FILL MATERIAL FOR THE PURPOSE OF REPAIRING ROADS ON HAUL ROUTES AND ADDITIONAL LEVEE REPAIRS OVER AND ABOVE THE ORIGINAL TASK ORDER QUANTITIES. DEFINITIZATION OF MODIFICATION 0001.
TAS::14 0681::TAS. BUREAU PROJECT NUMBER: 75.000+ |
Amount:
$149,999
Award Description: RECOVERY - CHANGE ORDER TO AUTHORIZE CONTRACTOR TO USE LEVEE FILL MATERIAL FOR REPAIRING ROADS DAMAGED FROM WEIGHT OF HAULING TRUCKS. TAS::14 0681::TAS
BUREAU PROJECT NUMBER: 75.000.
|
Amount:
$1,772,541
Award Description: RECOVERY - LOADING, HAULING AND DUMPING OF 126,000 TONS OF BURROW MATERIAL FROM VALVERDE PIT TO BOSQUE DEL APACHE LEVEE TO BE USED FOR STRENGTHENING THE EMBANKMENT STRUCTURES OF THE LEVEE. GOVERNMENT PERSONNEL ARE RESPONSIBLE FOR SPREADING THE MATERIAL, WHILE CONTRACTOR TRUCKS USING THE LEVEE AS A THOROUGHFARE WILL COMPACT THE SPREAD BORROW MATERIAL. TAS::14 0681::TAS
BUREAU PROJECT NUMBER: 75.000.
|
Amount:
-$161,347
Award Description: ARRA ACTIVITY NO. 097.000 TAS::14 0681::TAS ISLETA REACH HABITAT RESTORATION CLOSEOUT |
Amount:
-$3,205
Award Description: ARRA ACTIVITY NO. 101.000 TAS::14 0681::TAS RIO GRANDE SILVERY MINNOW SANCTUARY SECURITY FENCING |
Amount:
-$4,537
Award Description: PROJECT CZQZ090177; ADAL BUILDING 622 FO |