Skip to content Skip to footer site map
Navigate Up

Recovery.gov - Track the Money

Recovery.gov is the U.S. government's official website that provides easy access to data
related to Recovery Act spending and allows for the reporting of potential fraud, waste, and abuse.

contract- RECIPIENT AWARD SUMMARY

ATLANTIC MARINE CONSTRUCTION COMPANY, INC.

Clarification of Codes


AWARD OVERVIEW

AWARD OVERVIEW
Agency Name: Department of Defense--Military Project Location: CUMBERLAND
Award Number: 0023 Project Location - State: NC
Funding Amount: $1,706,840 Project Location - Zip Code: 283082320
Ending Date: 2010-06-22 Congressional District: 02

RECIPIENT INFORMATION (AWARD)

RECIPIENT INFORMATION (AWARD)
Recipient Name: ATLANTIC MARINE CONSTRUCTION COMPANY, INC.
Recipient Address: 3465 CHANDLER CREEK RD
Recipient City: VIRGINIA BEACH
Recipient State: VA
Recipient Zip Code: 234532885
Congressional District: VA-02

DESCRIPTION OF WORK/SERVICE PERFORMED

TAS::57 3404::TAS REPAIR 43RD MSG PARKING - POPE AFB ARRA::YES::ARRA






TRANSACTIONS

TRANSACTIONS

Other Awards

Other Awards
Amount: $131,975
Award Description: TAS::21 2022::TAS REPLACE ROOFS - BUILDING 328
Amount: $1,144,848
Award Description: TAS::21 2022::TAS RECOVERYPROJECT#::38897::RP# INTERIOR BUILDING RENOVATION - BLDG 72 - 199TH INF BDE, FORT BENNING, GA
Amount: $1,679,325
Award Description: TAS::21 2022::TAS RECOVERYPROJECT#::33117::RP# REPAIR OF STORM SEWER FROM SIGERFOOS TO WOLD AT FORT BENNING, GA
Amount: $299,757
Award Description: TAS::21 2022::TAS REROOF BLDG 93 FORT BENNING, GA
Amount: $414,255
Award Description: TAS::21 2022::TAS RE-ROOF BLDG 241 FORT BENNING, GA
Amount: $470,937
Award Description: TAS::21 2022::TAS REPAIR 4TH BCT HQ FLAGSHIP BLDG C-1137
Amount: $149,521
Award Description: TAS::21 2022::TAS REPAIR/ RENOVATE BLDG C-8344 BARRACKS/COF FOR 4TH BCT
Amount: $516,623
Award Description: TAS::21 2022::TAS RECOVERYPROJECT#::33116::RP# REPAIR STORM SEWER DRAINS FROM LUMPKIN TO YEAGER AT FORT BENNING, GA
Amount: $8,389,989
Award Description: TAS::21 2051::TAS RECOVERYPROJECT#::154763::RP# CDC FT BRAGG PN70665
Amount: $10,949,190
Award Description: TAS::21 2051::TAS RECOVERYPROJECT#::154870::RP#CDC FT HOOD PN71009
Amount: $165,594
Award Description: TAS::57 3404::TAS REPAIR/UPGRADE GATE 18, YELLOW RAMP
Amount: $1,684,616
Award Description: TAS::57 3404::TAS REPAIR CAC ROOF POPE AFB
Amount: $204,855
Award Description: TAS::57 3404::TAS REPAIR/UPGRADE GATE 6, BLUE RAMP, POPE AIR FORCE BASE, NC ARRA::YES::ARRA
Amount: $1,706,840
Award Description: TAS::57 3404::TAS REPAIR 43RD MSG PARKING - POPE AFB ARRA::YES::ARRA
Amount: $6,635,021
Award Description: TAS::96 3135::TAS RECOVERYPROJECT#::18530::RP# TAINTER GATES INSPECTION, REPAIR, AND PAINTING, RICHARD B. RUSSELL DAM, GEORGIA AND SOUTH CAROLINA
Amount: $0
Award Description: TAS::96 3135::TAS DRAFT TUBE CRANE CORROSION REPAIR
Amount: $321,767
Award Description: TAS::96 3135::TAS DRAFT TUBE CRANE CORROSION REPAIR& DRIVETRAIN REBUILD, RICHARD B. RUSSELL DAM, GA
Amount: $1,911,178
Award Description: TAS::96 3135::TAS RECOVERYPROJECT#::18530::RP# PAVE POWERPLANT ENTRANCE ROAD, RICHARD B. RUSSELL POWERPLANT, ELBERTON, GA
Amount: $0
Award Description: TAS::96 3135::TAS INSPECT, CLEAN,DRILL, AND GROUT PENSTOCK
Amount: $393,622
Award Description: TAS::96 3135::TAS INSPECT, CLEAN,DRILL, AND GROUT PENSTOCK AT RICHARD B RUSSELL DAM
Amount: $3,913,169
Award Description: TAS::96 3135::TAS RECOVERYPROJECT#::03350::RP# INSPECTING, REPAIRING, AND REPAINTING TAINTER GATES AT J. STROM THURMOND DAM, COLUMBIA COUNTY, GA
Amount: $49,415
Award Description: RECOVERYPROJECT#::33117::RP# REPAIR OF STORM SEWER FROM SIGERFOOS TO WOLD AT FORT BENNING, GA
Amount: $13,655
Award Description: TAS::21 2022::TAS ARRA::YES::ARRA RECOVERYPROJECT#::33117::RP# REPAIR OF STORM SEWER FROM SIGERFOOS TO WOLD AT FORT BENNING, GA
Amount: $18,999
Award Description: TAS::21 2022::TAS ARRA::YES::ARRA RECOVERYPROJECT#::33117::RP# REPAIR OF STORM SEWER FROM SIGERFOOS TO WOLD AT FORT BENNING, GA
Amount: $21,588
Award Description: TAS::21 2022::TAS RE-ROOF BLDG 241 FORT BENNING, GA
Amount: -$30
Award Description: TAS::21 2022::TAS ARRA::YES::ARRA RECOVERYPROJECT#::1320R800181 ::RP# RE-ROOF BLDG 241
Amount: -$49,459
Award Description: TAS::21 2020::TAS ARRA::YES::ARRA RECOVERYPROJECT#::330295::RP# A2048 RENOVATE COMMAND SUITE, BLDG 9810 FORT JACKSON.
Amount: $253,644
Award Description: RECOVERYPROJECT#:: 330295 ::RP# A2048 RENOVATE COMMAND SUITE, BLDG 9810 FORT JACKSON.
Amount: $30,143
Award Description: RECOVERYPROJECT#::34488::RP# 4TH BCT BARRACKS FLAGSHIP
Amount: $727,718
Award Description: RECOVERYPROJECT#::34488::RP# 4TH BCT BARRACKS FLAGSHIP
Amount: $7,218
Award Description: TAS::21 2022::TAS ARRA::YES:ARRA REPAIR 4TH BCT HQ FLAGSHIP BLDG C-1137
Amount: $8,025
Award Description: TAS::21 2022::TAS REPAIR 4TH BCT HQ FLAGSHIP BLDG C-1137
Amount: $0
Award Description: TAS::21 2022::TAS ARRA::YES::ARRA RECOVERYPROJECT#::1320A601920::RP# (CON) REPAIR 4TH BCT BLDG C-1137
Amount: $62,827
Award Description: TAS::57 3404::TAS REPAIR/UPGRADE GATE 18, YELLOW RAMP
Amount: $12,504
Award Description: TAS::57 3404::TAS ARRA::YES::ARRA REPAIR CAC ROOF POPE AFB
Amount: $37,566
Award Description: TAS::57 3404::TAS ARRA::YES::ARRA REPAIR CAC ROOF POPE AFB
Amount: $0
Award Description: TAS::96 3135::TAS ARRA::YES::ARRA RECOVERYPROJECT#::18530::RP# TAINTER GATES INSPECTION, REPAIR, AND PAINTING, RICHARD B. RUSSELL DAM, GEORGIA AND SOUTH CAROLINA
Amount: $118,677
Award Description: TAS::96 3135::TAS ARRA::YES::ARRA RECOVERY PROJECT#::18530::RP# TAINTER GATES INSPECTION, REPAIR, AND PAINTING, RICHARD B. RUSSELL DAM, GEORGIA AND SOUTH CAROLINA
Amount: $564,257
Award Description: TAS::96 3135::TAS ARRA::YES::ARRA RECOVERY PROJECT#::18530::RP# TAINTER GATES INSPECTION, REPAIR, AND PAINTING, RICHARD B. RUSSELL DAM, GEORGIA AND SOUTH CAROLINA
Amount: $7,482
Award Description: TAS::96 3135::TAS ARRA::YES::ARRA RECOVERYPROJECT#::18530::RP# REPAIR & OVERLAY POWER PLANT ACCESS ROAD
Amount: $0
Award Description: TAS::96 3135::TAS RECOVERYPROJECT#::18530::RP# PAVE POWERPLANT ENTRANCE ROAD, RICHARD B. RUSSELL POWERPLANT, ELBERTON, GA
Amount: $58,578
Award Description: RECOVERYPROJECT#::18530::RP# REPAIR & OVERLAY POWER PLANT ACCESS ROAD
Amount: $0
Award Description: TAS::96 3135::TAS RECOVERYPROJECT#::18530::RP# PAVE POWERPLANT ENTRANCE ROAD, RICHARD B. RUSSELL POWERPLANT, ELBERTON, GA
Amount: $59,357
Award Description: TAS::96 3135::TAS INSPECT, CLEAN,DRILL, AND GROUT PENSTOCK AT RICHARD B RUSSELL DAM
Amount: $26,925
Award Description: TAS::96 3135::TAS ARRA::YES::ARRA INSPECT, CLEAN,DRILL, AND GROUT PENSTOCK AT RICHARD B RUSSELL DAM
Amount: $0
Award Description: TAS::96 3135::TAS ARRA::YES::ARRA INSPECT, CLEAN,DRILL, AND GROUT PENSTOCK
Amount: $1,233,300
Award Description: TAS::96 3135::TAS ARRA::YES::YES RECOVERY PROJECT#::OPSH-09-08::#RP PROVIDE ALL LABOR, MATERIALS, AND EQUIPMENT NECESARY FOR WELDING TO CORRECT DEFECTIVE AND DETERIORATED STRUCTURAL WELDS ON CRITICAL MEMBERS WHICH ARE IN EXCESS OF THE CONTRACTUAL ALLOWANCE OF 10 1F PER GATE FOR TAINTER GATES 1 THROUGH 23.
Amount: $39,718
Award Description: ARRA CDC FT BRAGG PN70665
Amount: $3,627
Award Description: ARRA CDC FT BRAGG PN70665
Amount: $4,198,847
Award Description: TAS::21 2051::TAS ARRA::YES::ARRA ADDITION TO CHILD DEVELOPMENT CENTER, DETROIT ARSENAL, MI
Amount: $473,839
Award Description: TAS::96 3135::TAS ARRA::YES::YES RECOVERY PROJECT#::03350::#RP REFERENCE NO. R00002 G002 WORK DELAY FOR BRIDGE INSPECTION
Amount: $30,174
Award Description: TAS::96 3135::TAS ARRA::YES::YES RECOVERY PROJECT#::03350::#RP REFERENCE NO. R00002 G002 WORK DELAY FOR BRIDGE INSPECTION
Amount: -$13,466
Award Description: TAS::21 2051::TAS ARRA::YES::ARRA MODIFICATION TO REDUCE FOUNDATION DEPTH, REMOVE CATV CABLING, REMOVE PARKING SIGNS, AND REVISE ENERGY REDUCTION REQUIRMENTS.
Amount: $13,408
Award Description: TAS::21 2051::TAS ARRA::YES::ARRA MOD TO REMOVE DDC AND TRIDIUM CNTROLS EXCLUSIONS AND INCLUDE REQUIREMENTS PERTAINING TO UTILIZATION OF THE EXISTING TRIDIUM JACE UTILITY MONITORING&CONTROL SYSTEMS.
Amount: $3,683
Award Description: TAS::21 2009::TAS ARRA::YES::ARRA REVISE LINE #9 FROM THE CONTRACTOR'S "EXCEPTIONS TO THE RFP FOR THE DETROIT ARSENAL CDC ADDITION¿ TO READ AS FOLLOWS:¿THE CONTRACTOR MAY USE THE EXISTING FIRE FLOW DATA CONDUCTED BY THE RFP DEVELOPER; HOWEVER IS RESPONSIBLE FOR HAVING A SENIOR FIRE PROTECTION ENGINEER VISIT THE SITE FOR CONDUCTING QUALITY CONTROL AS PART OF THE ACCEPTANCE TESTING OF THE FIRE SUPPRESSION SYSTEM.¿ ITEM 2 REMOVE THE REQUIREMENT FOR THE DESIGN/BUILD CONTRACTOR TO RETAIN THE SERVICES OF AN INDEPENDENT TESTING LABORATORY TO PERFORM A NESHAP INSPECTION TO IDENTIFY THE PRESENCE OF ASBESTOS.
Amount: $0
Award Description: TAS::21 2051::TAS ARRA::YES::ARRA MODIFICATION TO INCOPORATE THE CORRECT WAGE DETERMINATION
Amount: $0
Award Description: BASE
Amount: $46,361
Award Description: TAS::21 2051::TAS ARRA::YES::ARRA MODIFICATION TO EXPAND INTERCOM SYSTEM AND LIGHTING PROTECTION AT THE EXISTING FACILITY
Amount: $20,073
Award Description: TAS::21 2051::TAS ARRA::YES::ARRA ADDITION TO THE CHILD DEVELOPMENT CENTER AT THE DETROIT ARSENAL, WARREN, MICHIGAN MODIFICATION ISSUED TO PROVIDE FOR ADDITIONAL INTERCOM REQUIREMENTS.
Amount: -$61,875
Award Description: TAS::21 2051::TAS ARRA::YES::ARRA MODIFICATION TO REVISE SOIL DISPOSAL REQUIRMENTS.
Amount: $6,972
Award Description: TAS::21 2051::TAS ARRA::YES::ARRA MOD FOR LIGHTNING PROTECTION SYSTEM AT THE EXISTING FACILITY.

Project Location Detail

Location Information
Latitude, Longitude 0º 0' 0", 0º 0' 0"
Congressional District 02
City CUMBERLAND
County CUMBERLAND
State NC
Zip 28308