Amount:
$1,849,177
Award Description: TAS::14 1041::TAS RECOVERY STEA 20234 THIS CONTRACT INVOLVES DISASSEMBLY OF EQUIPMENT COMPONENTS REQUIRED TO ACCESS AND REMOVE ASBESTOS-CONTAINING MATERIALS (ACM)WITHIN ASBESTOS CONTAINMENT WORK AREAS; ABATEMENT OF ACM; REASSEMBLY OF COMPONENTS OF EACH PIECE OF EQUIPMENT; RE-INSULATION OF PIPING ON PASSENGER CARS, REPAIR OF PASSENGER CARS AT STEAMTOWN NATIONAL HISTORIC SITE. |
Amount:
$179,423
Award Description: TAS::14 1041::TAS RECOVERY GEGR 080162A DESIGN + BUILD MISCELLANEOUS RESTORATION AND REHABILITATION; GENERAL GRANT NATIONAL MEMORIAL, KINGS COUNTY, NEW YORK; THIS NG MODIFICATION INCORPORATES ARRA FUNDING.
GEGR 080162A, GENERAL GRANT NATIONAL MEMORIAL, MISCELLANEOUS RESTORATION AND REHABILITATION, INSTALL NEW PRIMARY ELECTRICAL SERVICE, ELIMINATE WATER INFILTRATION, MOLD REMEDIATION ANDREHABILITATION OF LOWER LEVEL ADMINISTRATIVE SECTION |
Amount:
$13,132,665
Award Description: TAS::68 8195::TAS FOR PROCUREMENT OF ENVIRONMENTAL REMEDIATION SERVICES FOR MULTIPLE PROPERTIES IN OMAHA, NEBRASKA WITH ELEVATED BLOOD LEVELS (EBL) WHOSE NON-FOUNDATION SOIL CONTAINS GREATER THAN OR EQUAL TO 400 MG/KG LEAD AND FOR PRE-IDENTIFIED "HIGHLY CONTAMINATED PROPERTIES", WITH NO EBL CONTAINING NON-FOUNDATION SOIL GREATER THAN OR EQUAL TO 800 MG/KG LEAD. REMEDIATION WILL INCLUDE: 1) PRE-REMOVAL ACTIONS; 2) REMOVAL; AND, 3) POST-REMOVAL ACTIONS. EPA'S OBJECTIVE IS TO ACHIEVE "PROPERTY CLOSEOUT", WHICH REQUIRES REMOVING LEAD-CONTAMINATED SOIL FROM SELECT PROPERTIES UNTIL AN AVERAGE CONCENTRATION OF 400 PPM IS REACHED IN NEAR-SURFACE SOILS AND RESTORING THE AFFECTED PROPERTY TO PRE-REMOVAL CONDITIONS. THE CONTRACTOR SHALL BE REQUIRED TO COMPLY WITH ALL APPLICABLE FEDERAL, STATE AND LOCAL LAWS AND REGULATIONS. REMEDIATIONS SHALL BE CONDUCTED PURSUANT TO THE COMPREHENSIVE ENVIRONMENTAL RESPONSE, COMPENSATION, AND LIABILITY ACT (CERCLA), AS AMENDED BY THE SUPERFUND AMENDMENTS AND REAUTHORIZATION ACT (SARA), AND NATIONAL CONTINGENCY PLAN (NCP) REQUIREMENTS. ARRA::YES::ARRA |
Amount:
$32,033
Award Description: RECOVERY STEA PMIS #20234 STABILIZATION OF HISTORIC RAIL EQUIPMENT AND REMOVAL OF ASBESTOS AT STEAMTOWN NATIONAL HISTORIC SITE. THE WORK OF THIS MODIFICATION 0002 CONSISTS OF ADDITIONAL CONSTRUCTION ACTIVITIES FOR THE DISASSEMBLY, REMEDIATION AND REASSEMBLY OF THREE ENGINES. |
Amount:
$0
Award Description: RECOVERY STEA-20234 THIS MODIFICATION 0001 INCORPORATES FAR CLAUSE 52.204-11, AMERICAN RECOVERY AND REINVESTMENT ACT - REPORTING REQUIREMENTS (MAR 2010 DEVIATION) INTO THE CONTRACT. |
Amount:
$146,637
Award Description: RECOVERY STEA-20234 STABILIZATION OF HISTORIC RAIL EQUIPMENT AND REMOVAL OF ASBESTOS, STEAMTOWN NATIONAL HISTORIC SITE. REPLACEMENT OF DETERIORATED METAL MATERIAL ON ENGINES, DELETION OF REQUIREMENT FOR CONSTRUCTION OF WORK AREA C, DISASSEMBLY, REMEDIATION AND REASSEMBLY OF TWO ENGINES. |
Amount:
$0
Award Description: TAS::96 3134::TAS ARRA::YES::ARRA |
Amount:
$5,150,358
Award Description: TAS::96 3134::TAS RECOVERYPROJECT#::153882::RP#
LOCK AND DAM 3 UPPER EMBANKMENTS PROJECT WILL INCLUDE RECONSTRUCTING NINE CHANNEL CLOSURES, ALONG APPROXIMATELY 2.25 MILES OF THE WISCONSIN EMBANKMENT UPSTREAM OF LOCK & DAM 3 ON THE MISSISSIPPI RIVER. |
Amount:
$0
Award Description: TAS::96 3134::TAS RECOVERYPROJECT#::153882::RP#
LOCK AND DAM 3 UPPER EMBANKMENTS PROJECT ARRA::YES::ARRA |
Amount:
$0
Award Description: TAS::96 3134::TAS RECOVERYPROJECT#::153882::RP#
LOCK AND DAM 3 UPPER EMBANKMENTS PROJECT ARRA::YES::ARRA |
Amount:
-$7,149
Award Description: TAS::96 3134::TAS ARRA::YES::ARRA RECOVERYPROJECT#::153882::RP#
LOCK AND DAM 3 UPPER EMBANKMENTS PROJECT WILL INCLUDE RECONSTRUCTING NINE CHANNEL CLOSURES, ALONG APPROXIMATELY 2.25 MILES OF THE WISCONSIN EMBANKMENT UPSTREAM OF LOCK & DAM 3 ON THE MISSISSIPPI RIVER. THE CLOSURE STRUCTURES CONSIST OF APPROXIMATELY 1,200 FEET OF SHEET PILE DRIVEN TO A DEPTH OF 40 FEET. CONSTRUCT RIPRAP EROSION PROTECTION ALONG THE ADJACENT EMBANKMENTS. CONSTRUCT A CONCRETE CONTROL STRUCTURE OF APPROXIMATE DIMENSIONS OF 40 FEET LONG BY 7 FEET DIAMETER. IMPROVE THE EXISTING ACCESS TRAIL VEHICLE ROADWAY.
MOD R-001 VECP - SHEET PILE SECTION REVISION
|
Amount:
-$42,075
Award Description: TAS::96 3134::TAS ARRA::YES::ARRA RECOVERYPROJECT#::153882::RP#
LOCK AND DAM 3 UPPER EMBANKMENT PROJECT INCLUDES RECONSTRUCTING OF NINE CHANNEL CLOSURES, ALONG APPROXIMATELY 2.25 MILES OF THE WISCONSIN EMBANKMENT UPSTREAM OF LOCK & DAM 3 ON THE MISSISSIPPI RIVER. THE CLOSURE STRUCTURES CONSIST OF APPROXIMATELY 1,200 FEET OF SHEET PILE DRIVEN TO A DEPTH OF 40 FEET. CONSTRUCT RIPRAP EROSION PROTECTION ALONG THE ADJACENT EMBANKMENTS. CONSTRUCT A CONCRETE CONTROL STRUCTURE OF APPROXIMATE DIMENSIONS 40 FEET LONG BY 7 FEET DIAMETER. IMPROVE THE EXISTING ACCESS TRAIL VEHICLE ROADWAY.
MOD R-003 VECP - CULTURAL RESOURCE AREA REDUCTIONS |
Amount:
$957,230
Award Description: TAS::96 3134::TAS ARRA::YES::ARRA POTASH LAKE WEIR REPAIR OAKLAND NEW JERSEY |
Amount:
$910,356
Award Description: TAS:: 96 3135::TAS ARRA::YES::ARRA RECOVERYPROJECT#::12329::RP# UNDERGROUND STORAGE TANK REMOVAL AND REPLACEMENT WITH NEW FUELING SYSTEM |
Amount:
$0
Award Description: RECOVERY STEA-20234, STABILIZATION OF HISTORIC RAIL EQUIPMENT AND REMOVAL OF ASBESTOS. THIS MODIFICATION ADDS AN ADDITIONAL THIRTY (30) CALENDAR DAYS OF CONTRACT TIME. |
Amount:
-$3,676
Award Description: TAS::96 3134::TAS ARRA::YES::ARRA RECOVERYPROJECT#::153882::RP# LOCK #3 SPOT DIKES PROJECT. LOCATED ON THE MISSISSIPPI RIVER MILE 796.9 NEAR RED WING MN. THE PROJECT INCLUDES RECONSTRUCTING OF NINE CHANNEL CLOSURES, ALONG APPROXIMATELY 2.25 MILES OF THE WISCONSIN EMBANKMENT UPSTREAM OF LOCK&DAM 3 ON THE MISSISSIPPI RIVER. THE CLOSURE STRUCTURES CONSIST OF APPROXIMATELY 1,200 FEET OF SHEET PILE DRIVEN TO A DEPTH OF 40 FEET. CONSTRUCT RIPRAP EROSION PROTECTION ALONG ADJACENT EMBANKMENTS. CONSTRUCT A CONCRETE CONTROL STRUCTURE OF APPROXIMATE DIMENSIONS 40 FEET LONG BY 7 FEET DIAMETER. IMPROVE THE EXISTING ACCESS TRAIL VEHICLE ROADWAY.
R-008 VECP FOR CULTURAL RESOURCE AREA |
Amount:
$6,372
Award Description: TAS::96 3134::TAS ARRA::YES::ARRA RECOVERYPROJECT#::153882::RP#
LOCK AND DAM 3 UPPER EMBANKMENTS SPOT DIKES PROJECT LOCATED ON THE MISSISSIPPI RIVER NEAR REDWING MN. PROJECT INCLUDES RECONSTRUCTING OF NINE CHANNEL CLOSURES, ALONG APPROX 2.25 MILES OF THE WI EMBANKMENT UPSTREAM OF L/D 3 ON THE MISSISSIPPI RIVER. THE CLOSURE STRUCTURES CONSIST OF APPROX 1,200 FEET OF SHEET PILE DRIVEN TO A DEPTH OF 40 FEET. CONSTRUCT EROSION PROTECTION ALONG THE ADJACENT EMBANKMENTS. CONSTRUCT A CONCRETE CONTROL STRUCTURE OF APPROX DIMENSIONS 40 FEET LONG BY 7 FEET DIAMETER. IMPROVE EXISTING ACCESS TRAIL VEHICLE ROADWAY.
R-006 CUT OFF SHEET PILING |
Amount:
$178,871
Award Description: TAS::96 3134::TAS ARRA::YES::ARRA RECOVERYPROJECT#::153882::RP#
LOCK AND DAM 3 UPPER EMBANKMENTS SPOT DIKES PROJECT LOCATED ON THE MISSISSIPPI RIVER NEAR REDWING MN. PROJECT INCLUDES RECONSTRUCTING OF NINE CHANNEL CLOSURES, ALONG APPROX 2.25 MILES OF THE WI EMBANKMENT UPSTREAM OF L/D 3 ON THE MISSISSIPPI RIVER. THE CLOSURE STRUCTURES CONSIST OF APPROX 1,200 FEET OF SHEET PILE DRIVEN TO A DEPTH OF 40 FEET. CONSTRUCT EROSION PROTECTION ALONG THE ADJACENT EMBANKMENTS. CONSTRUCT A CONCRETE CONTROL STRUCTURE OF APPROX DIMENSIONS 40 FEET LONG BY 7 FEET DIAMETER. IMPROVE EXISTING ACCESS TRAIL VEHICLE ROADWAY.
R-007 QUANTITY VARIATIONS |
Amount:
-$18,068
Award Description: TAS::96 3134::TAS ARRA::YES::ARRA RECOVERYPROJECT#::153882::RP#
LOCK AND DAM 3 UPPER EMBANKMENTS PROJECT INCLUDES RECONSTRUCTING OF NINE CHANNEL CLOSURES, ALONG APPROXIMATELY 2.25 MILES OF THE WISCONSIN EMBANKMENT UPSTREAM OF LOCK & DAM 3 ON THE MISSISSIPPI RIVER. THE CLOSURE STRUCTURES CONSIST OF APPROXIMATELY 1,200 FEET OF SHEET PILE DRIVEN TO A DEPTH OF 40 FEET. CONSTRUCT RIPRAP EROSION PROTECTION ALONG THE ADJACENT EMBANKMENTS. CONSTRUCT A CONCRETE CONTROL STRUCTURE OF APPROXIMATE DIMENSIONS 40 FEET LONG BY 7 FEET DIAMETER. IMPROVE THE EXISTING ACCESS TRAIL VEHICLE ROADWAY.
MOD R-002 SHEET PILE, STRUCTURE D REVISIONS |
Amount:
$13,391
Award Description: TAS::96 3135::TAS ARRA::YES::ARRA RECOVERYPROJECT# 107452 CONCRETE CONTAINMENT CURB, ADDITIONAL BOLLARDS AND FENCING |
Amount:
$5,310
Award Description: TAS::96 3135:TAS ARRA::YES::ARRA
FURNISH AND INSTALL TO DIFFERING SITE CONDITIONS. |
Amount:
$27,788
Award Description: TAS::96 3135::TAS ARRA::YES::ARRA RECOVERYPROJECT#::12329::RP# UNDERGROUND STORAGE TANK REMOVAL AND REPLACEMENT WITH NEW FUELING SYSTEM |
Amount:
$35,512
Award Description: TAS::96 3134::TAS ARRA::YES::ARRA RECOVERYPROJECT#::153882::RP# LOCK&DAM SPOT DIKES PROJECT LOCATED ON MISSISSIPPI RIVER MILE 796.9 NEAR REDWING MN. THE PROJECT INCLUDES RECONSTRUCTING OF NINE CHANNEL CLOSURES, ALONG APPROXIMATELY 2.25 MILES OF THE WISCONSIN EMBANKMENT UPSTREAM OF LOCK AND DAM 3 ON THE MISSISSIPPI RIVER. THE CLOSURE STRUCTURES CONSIST OF APPROXIMATELY 1,200 FEET OF SHEET PILE DRIVEN TO A DEPTH OF 40 FEET. CONSTRUCT RIP RAP EROSION PROTECTION ALONG THE ADJACENT EMBANKMENTS. CONSTRUCT A CONCRETE CONTROL STRUCTURE OF APPROXIMATE DIMENSIONS 40 FEET LONG BY 7 FEET DIAMETER. IMPROVE THE EXISTING ACCESS TRAIL VEHICLE ROADWAY.
R-009 FINAL VARIATION IN QUANTITY MODIFICATION FOR CONTRACT CLINS 0005 AND 0007, SUBDIVIDED ITEMS. |
Amount:
-$20,245
Award Description: TAS::96 3134::TAS ARRA::YES::ARRA RECOVERYPROJECT#::153882::RP# LOCK&DAM SPOT DIKES PROJECT, LOCATED ON MISSISSIPPI RIVER MILE 796.9 NEAR REDWING MINNESOTA. THE PROJECT INCLUDES RECONSTRUCTING OF NINE CHANNEL CLOSURES, ALONG APPROXIMATELY 2.25 MILES OF THE WISCONSIN EMBANKMENT UPSTREAM OF LOCK&DAM 3 ON THE MISSISSIPPI RIVER. THE CLOSURE STRUCTURES CONSIST OF APPROXIMATELY 1,200 FEET OF SHEET PILE DRIVEN TO A DEPTH OF 40 FEET. CONSTRUCT RIPRAP EROSION PROTECTION ALONG THE ADJACENT EMBANKMENTS. CONSTRUCT A CONCRETE CONTROL STRUCTURE OF APPROXIMATE DIMENSIONS 40 FEET LONG BY 7 FEET DIAMETER. IMPROVE THE EXISTING ACCESS TRAIL VEHICLE ROADWAY.
R-010 VEQ FOR UNDERRUNS. |
Amount:
-$16,575
Award Description: TAS::96 3135::TAS ARRA::YES::ARRA RECOVERYPROJECT#::12329::RP# UNDERGROUND STORAGE TANK REMOVAL AND REPLACEMENT WITH NEW FUELING SYSTEM |