| Other Awards |
Amount:
$48,136
Award Description: RECOVERY- MOJA PMIS #129933. ENVIRONMENTAL ASSESSMENT TO ASSESS CLOSURE OPTIONS AND ENVIRONMENTAL IMPACTS TO MITIGATE SAFETY AND ENVIRONMENTAL HAZARDS AT ABANDONED MINE LANDS IN MOJAVE NATIONAL PRESERVE. PM |
Amount:
$90,242
Award Description: RECOVERY- DEVA PMIS #S 148432, 139752, 148500, 150024. ENVIRONMENTAL & BIOLOGICAL ASSESSMENT TO ASSESS CLOSURE OPTIONS AND ENVIRONMENTAL IMPACTS TO MITIGATE SAFETY AND ENVIRONMENTAL HAZARDS AT ABANDONED MINE LANDS IN DEATH VALLEY NATIONAL PARK. |
Amount:
$0
Award Description: TAS::14 1041::TAS RECOVERY. ENVIRONMENTAL AND BIOLOGICAL ASSESSEMENTS FOR ABANDONED MINE LANDS IN DEATH VALLEY NATIONAL PARK, MOJAVE NATIONAL PRESERVE, WHISKEYTOWN NATIONAL RECREATION AREA AND MOUNT RAINER NATIONAL PARK. |
Amount:
$62,435
Award Description: TAS::14 1041::TAS RECOVERY ENVIRONMENTAL ASSESSMENT TO ASSESS CLOSURE OPTIONS AN DENVIRONMENTAL IMPACTS TO INSTIGATE SAFETY AND ENVIRONMENTAL HAZARDS AT ABANDONED MINE LANDS IN WHISKEYTOWN NATIONAL PRESERVE. |
Amount:
$0
Award Description: RECOVERY - ENVIRONMENTAL SERVICES OF THE ARROYO COLORADO FLOODWAY
TAS::19 1079 000::TAS |
Amount:
$0
Award Description: RECOVERY - ENVIRONMENTAL SERVICES OF THE ARROYO COLORADO FLOODWAY
TAS::19 1079 000::TAS |
Amount:
$242,725
Award Description: RECOVERY - ENVIRONMENTAL SERVICES OF THE ARROYO COLORADO FLOODWAY TAS::19 1079 000::TAS |
Amount:
$290,221
Award Description: TAS::47 4543::TAS RECOVERY ENVIRONMENTAL IMPACT STATEMENT - OTAY MESA LAND PORT OF ENTRY |
Amount:
$0
Award Description: TAS::47 4543::TAS(RECOVERY)
CORRECT ACCOUNTING AND APPROPRIATION DATA AND INCORPORATE ARRA CLAUSES. |
Amount:
$758,847
Award Description: TAS::47 4543::TAS *RECOVERY* CONSTRUCTION MANAGEMENT (CM) SERVICES FOR THE MODERNIZATION & EXPANSION OF THE OTAY MESA LAND PORT OF ENTRY (LPOE) IN SAN DIEGO, CALIFORNIA. |
Amount:
$4,245,000
Award Description: RECOVERY ACT - REMOVE AND REPLACE HVAC FOR VARIOUS GS, LOC, |
Amount:
$0
Award Description: RECOVERY- DEVA PMIS #S 148432, 139752, 148500, 150024. NO COST MODIFICATION TO EXTEND PERIOD OF PERFORMANCE |
Amount:
$0
Award Description: TAS::14 1041::TAS RECOVERY-DEATH VALLEY NATIONAL PARK PMIS 148432 ENVIRONMENTAL & BIOLOGICAL ASSESSMENT TO ASSESS CLOSURE OPTIONS AND ENVIRONMENTAL IMPACTS TO MITIGATE SAFETY AND ENVIRONMENTAL HAZARDS AT ABANDONED MINE LANDS IN DEATH VALLEY NATIONAL PARK PMIS 148432, 139752, 148500, 150024. MODIFICATION 0001 IS ISSUED TO CORRECT THE ACCOUNTING AND APPROPRIATION DATA. |
Amount:
$0
Award Description: RECOVERY- MOJA PMIS #129933. NO COST MODIFICATION TO EXTEND THE PERIOD OF PERFORMANCE |
Amount:
$28,131
Award Description: RECOVERY WHIS 150392-MOD 2 ADD SERVICES TO INCLUDE A TOPOGRAPHICAL SURVEY AT THE CRYSTAL CREEK QUARRY SITE TO SUPPORT THE EA. |
Amount:
$0
Award Description: RECOVERY WHIS 150392 MOD 3 TO WHISKYTOWN NATIONAL RECREATION AREA - TOPO SURVEY - CRYSTAL CREEK QUARRY SITE- SHASTA COUNTY. POP EXTENSION, CHANGE TO SCOPE OF WORK. NO COST MODIFICATION |
Amount:
$122,125
Award Description: THE PURPOSE OF THIS MODIFICATION IS TO PROVIDE CONSTRUCTION MANAGEMENT SERVICES FOR REMOVING THE EXISTING ROOF AND FOR INSTALLING A NEW COOL ROOF ON THE WEST BUILDING AT THE JAMES V. FORRESTAL, DEPARTMENT OF ENERGY HEADQUARTERS (DC0093ZZ) LOCATED IN WASHINGTON, DC.
|
Amount:
$0
Award Description: CM SERVICES |
Amount:
$313,222
Award Description: ARRA -CONSTRUCTION MANAGEMENT FOR ENERGY IMPROVEMENT PROJECTS (HVAC, CONTROLS, PLUMBING, LIGHTING):
COYLE USCH, 2500 TULARE STREET, FRESNO, CA |
Amount:
$3,593,200
Award Description: THE PURPOSE OF THIS AWARD TO PROVIDE CONSTRUCTION MANAGEMENT SERVICES TO MANAGE ARRA PROJECTS |
Amount:
$23,183
Award Description: ADDING FUNDING TO PROVIDE CONSTRUCTION MANAGEMENT CONSTRUCTION COST ESTIMATE SERVICES. RECOVERY TAS::47-4543-001::TAS |
Amount:
$52,889
Award Description: CM SERVICES REMOVING EXISTING ROOF AND FOR INSTALLING A NEW COOL ROOF ON THE WEST BUILDING AT HTE JAMES V. FORRESTAL, DEPARTMENT OF ENERGY. |
Amount:
$53,213
Award Description: IN ACCORDANCE WITH THE STATEMENT OF WORK, THE PURPOSE OF THIS MODIFICATION IS TO PROVIDE CONSTRUCTION MANAGEMENT SERVICES FOR THE SOLAR SITE LIGHTING PROJECT AND PARKING LOT LIGHTING UPGRADE AT THE SUITLAND FEDERAL CENTER, MD0778AG, LOCATED IN SUITLAND, MARYLAND. |
Amount:
$0
Award Description: TAS::47 4543::TAS SUPPLY & SERVICES FOR ARRA USING RECOVERY |
Amount:
$2,681,339
Award Description: OTHER PROFESSINAL SERVICES |
Amount:
$0
Award Description: TAS::70 0535::TAS PMO PROGRAM MANAGEMENT SUPPORT SERVICES ARRA::YES::ARRA |
Amount:
$3,748,908
Award Description: TAS::70 0535::TAS PMO PROGRAM MANAGEMENT SUPPORT SERVICES ARRA::YES::ARRA |
Amount:
$0
Award Description: PMO PROGRAM MANAGEMENT SUPPORT SERVICES |
Amount:
$0
Award Description: PMO TECHNICAL SUPPORT SERVICES |
Amount:
$499,821
Award Description: TAS::70 0535::TAS PMO TECHNICAL SUPPORT SERVICES ARRA::YES::ARRA |
Amount:
-$372,375
Award Description: PMO TECHNICAL SUPPORT SERVICES |
Amount:
$0
Award Description: TAS::70 0535::TAS PMO TECHNICAL SUPPORT SERVICES ARRA::YES::ARRA |
Amount:
$2,149,887
Award Description: TAS::70 0535::TAS PMO ENVIRONMENTAL & ENGINEERING SUPPORT SERVICES ARRA::YES::ARRA |
Amount:
$0
Award Description: PMO ENVIRONMENTAL AND ENGINEERING SUPPORT SERVICES |
Amount:
-$206,162
Award Description: PMO ENVIRONMENTAL & ENGINEERING SUPPORT SERVICES |
Amount:
$0
Award Description: TAS::70 0535::TAS PMO ENVIRONMENTAL & ENGINEERING SUPPORT SERVICES ARRA::YES::ARRA |
Amount:
$0
Award Description: PMO ENVIRONMENTAL AND ENGINEERING SPT SVC |
Amount:
$121,832
Award Description: TAS::97 0150::TAS ARRA::YES::ARRA RECOVERPROJECT#::322400, 325893, 325984, XDAT108101::RP# PROJECT MANAGEMENT SERVICES: (322400, 325893, 325984)MILITARY PROGRAM, DEFENSE HEALTH PROGRAM AT BEALE AIR FORCE BASE, CALIFORNIA. AND (XDAT108101)MEDICAL CENTER-REPAIR HEATING, VENTILATION AND AIR CONDITIONING SYSTEM AT TRAVIS AIR FORCE BASE, CALIFORNIA. |
Amount:
-$709
Award Description: TAS::97 0150::TAS ARRA::YES::ARRA RECOVERPROJECT#::322400, 325893, 325984, XDAT108101::RP# PROJECT MANAGEMENT SERVICES: (322400, 325893, 325984)MILITARY PROGRAM, DEFENSE HEALTH PROGRAM AT BEALE AIR FORCE BASE, CALIFORNIA. AND (XDAT108101)MEDICAL CENTER-REPAIR HEATING, VENTILATION AND AIR CONDITIONING SYSTEM AT TRAVIS AIR FORCE BASE, CALIFORNIA. |
Amount:
$132,418
Award Description: RECOVERYPROJECT#::P1653::RP# NAVY HOSPITAL CAMP PENDLETON REPLACEMENT, CAPITAL IMPROVEMENTS-PROGRAM AND ENGINEERING SUPPORT. THIS MODIFICATION INCREASES THREE POSITIONS FOR CONSTRUCTION MANAGER CONSULTING SERVICES IN SUPPORT OF THE NAVY MARINE HOSPITAL ROICC CAMP PENDLETON. |
Amount:
$0
Award Description: PERIOD OF PERFORMANCE EXTENDED UNTIL AUGUST 31, 2013 WITHOUT COST OR LIABILITY TO EITHER PARTY. |
Amount:
-$250,000
Award Description: MODIFICATION TO DE-OBLIGATE FUNDS IN THE CONTRACT. |
Amount:
$0
Award Description: 1. CORRECT MODIFICATION PS7 DESCRIPTION TO STATE: THE PURPOSE TO THIS MODIFICATION IS TO PROVIDE CONSTRUCTION MANAGEMENT SERVICES FOR REMOVING THE EXISTING ROOF AND FOR INSTALLING A NEW COOL ROOF ON THE SOUTH BUILDING AT THE JAMES V. FORRESTAL, DEPARTMENT OF ENERGY HEADQUARTERS (DC0093ZZ) LOCATED IN WASHINGTON, DC. IN ACCORDANCE WITH THE STATEMENT OF WORK.
2. TO CORRECT THE CONTRACT AND MODIFICATION TOTALS IN MODIFICATIONSPS03 THRU PS08
THE CORRECT TOTALS ARE AS THE FOLLOWING:
ORIGINAL CONTRACT AMOUNT: $3,593,200.00
MODIFICATIONS 1-8: $202,526.80
NEW CONTRACT AMOUNT: $3,848,615.80
|
Amount:
$235,347
Award Description: TO PROVIDE HVAC CONSTRUCTION MANAGEMENT SERVICES TO THE THEODORE BUILDING |
Amount:
-$2,102
Award Description: TO DEOBLIGATE $2102.15 FROM THE COHEN BUILDING AMOUNT . |
Amount:
$4,520
Award Description: MODIFICATION TO CORRECT MOD 11 |
Amount:
$38,451
Award Description: CHANGE ORDER TO PROVIDE ADDITIONAL CM SERVICES TO LBJ BUILDING |
Amount:
$56,996
Award Description: PARSONS CM CONTRACT IS MODIFIED TO ADD ADDITIONAL HOURS FOR INCREASED CONSTRUCTION MANAGEMENT SERVICES DUE TO EXTEND REVIEWS DURING DESIGN PHASE OF LIMITED SCOPE ARRA PROJECTS |
Amount:
-$25,298
Award Description: MODIFICATION TO CANCEL ONE LINE ITEM AND INCLUDE ANOTHER FOR PARTIAL RENOVATION ON THE 4TH AND 7TH FLOOR OF THE REGIONAL BUILDING AT THE NATIONAL CAPITAL REGION. |
Amount:
$339,463
Award Description: PARSON CM CONTRACT IS MODIFIED TO ADD ADDITIONAL CONSTRUCTION MANAGEMENT MAN HOURS TO ALL LOCATIONS FOR THE GSA ARRA LIMITED SCOPE CONTRACTS DUE TO EXTEND DESIGN PHASES |
Amount:
$0
Award Description: MODIFICATION TO CORRECT CONTRACT AMOUNT ON MOD PS11 FROM $3,857,656.80 TO $3,853,135.80 |
Amount:
$0
Award Description: THIS MODIFICATION IS TO CHANGE THE CONTRACTONG OFFICER FROM ELAINA WALKER TO MIKE VROBEL AN DALSO TO ADD THEODORE ROOSEVELT BUILDING TO THE CONSTRUCTION MANAGEMENT SERVICES FOR 4520.00 FOR HOT WATER PIPE ANALYSIS. |
Amount:
$91,119
Award Description: PROJECT: ARRA CONSTRUCTION MANAGEMENT SUPPORT FOR ENERGY IMPROVEMENT PROJECTS, COYLE USCH, FRESNO, CA
THE PURPOSE OF THIS MODIFICATION IS TO ADD 96 WORKING DAYS OF CONSTRUCTION MANAGEMENT SUPPORT TO THE TASK ORDER AWARD. THESE ADDITIONAL DAYS ARE TO BE ON AS NEEDED BASICS AT THE CURRENT CONTRACT PRICE OF $949.16 PER DAY, TOTAL OF $91,119.36. IN ADIDTION, THE PERIOD OF PERFORMANCE IS EXTENDED UNTIL FEBRUARY 29, 2012.
THIS CHANGE WILL INCREASE THE TASK ORDER TOTAL PRICE FROM $313,222.80 TO $404,342.16.
ARRA FUNDED: $404,342.16
ALL OTHER TERMS AND CONDITIONS REMAIN UNCHANGED. |
Amount:
$0
Award Description: PROJECT: ARRA CONSTRUCTION MANAGEMENT SUPPORT FOR ENERGY IMPROVEMENT
COYLE USCH, FRESNO, CA
THE PURPOSE OF THIS MODIFICATION IS TO EXTEND THE CONTRACT DELIVERY DATE FROM MAY 1, 2011 TO SEPTEMBER 30, 2011.
THIS IS A NO COST CHANGE, ALL OTHER TERMS AND CONDITIONS REMAIN UNCHANGED. |
Amount:
$0
Award Description: PROJECT: ARRA CONSTRUCTION MANAGEMENT SERVICES
SCHWARTZ FEDERAL BUILDING, SAN DIEGO, CA
THIS IS A UNILATERAL MODIFICATION TO EXTEND THE TERM OF THE CONTRACT TO 4/30/2012 SOLELY FOR GSA INTERNAL ACCOUNTING PURPOSES. THIS MODIFICATION IN NO WAY CHANGES PRICE, TERMS OR CONDITIONS TO INCLUDE EXISTING REQUIRED COMPLETION DATES. |
Amount:
$0
Award Description: PROJECT: ARRA CONSTRUCTION MANAGEMENT SERVICES
SCHWARTZ FEDERAL BUILDING, SAN DIEGO, CA
THIS IS A UNILATERAL MODIFICATION TO EXTEND THE TERM OF THE CONTRACT TO 05/31/2012 SOLELY FOR GSA INTERNAL ACCOUNTING PURPOSES. THIS MODIFICATION IN NO WAY CHANGES PRICE, TERMS OR CONDITIONS TO INCLUDE EXISTING REQUIRED COMPLETION DATES.
ARRA FUNDED: $389,861.76 |
Amount:
-$5,092
Award Description: PROJECT: ARRA CONSTRUCTION MANAGEMENT SERVICES
SCHWARTZ FEDERAL BUILDING, SAN DIEGO, CA
THE CONSTRUCTION MANAGEMENT TASK ORDER IS COMPLETE. ALL WORK HAS BEEN RECEIVED, AND CONTRACTOR HAS RECEIVED THE FINAL PAYMENT.
THE PURPOSE OF THIS MODIFICATION IS TO DEOBLIGATE $5,092.00 FROM THE REMAINING BALANCE OF TASK ORDER. THIS AMOUNT TO BE APPLIED TO THE ARRA HVAC PROJECT AT THE FEDERAL BUILDING AND COURTHOUSE, FOR THE ENGINEERING, LABOR, AND MATERIALS TO CORRECT UNDOCUMENTED BOILER FLUE OFFSETS.
THERE WILL BE A REMAINING BALANCE OF $9,727.44 TO BE APPLIED TO THE ARRA BAY AREA CM/CX. ANOTHER MODIFICATION WILL BE ISSUED FOR THIS CHANGE.
THIS CHANGE WILL DECREASE THE TASK ORDER TOTAL PRICE FROM $389,861.76 TO $384,769.76
ARRA FUNDED: $384,769.76 |
Amount:
$0
Award Description: CAMPUS COORDINATOR SUPPORT SERVICES, ST ELIZABETHS CONSOLIDATION PROGRAM, SE, WASH., DC |
Amount:
-$164,956
Award Description: CLOSE-OUT AND DEOBLIGATE EXCESS FUNDS DUE TO COMPLETION IN ACCORDANCE WITH TERMS OF THE CONTRACT. |
Amount:
$0
Award Description: CHANGE OF NAME AGREEMENT |
Amount:
$0
Award Description: ADMIN MOD TO CORRECT COMPLETION DATE OF CONTRACT TO READ 04/30/2013 |
Amount:
-$17,518
Award Description: DEDUCTIVE MOD FOR CM SERVICES PARSONS |
Amount:
$0
Award Description: ADMIN MOD TO CORRECT OBLIGATIONS IN C SUITES TO MATCH PEGASYS |
Amount:
$0
Award Description: ADMINISTRATIVE MOD TO CORRECT OBLIGATIONS IN C SUITES TO MATCH PEGASYS |
Amount:
$132,418
Award Description: PROVIDE ARCHITECTURAL / ENGINEERING TECHNICAL SERVICES AND PROJECT MANAGEMENT.
CORRECT THE LINES OF ACCOUNTING FUNDED BY ARRA |
Amount:
-$10,537
Award Description: PROJECT: ARRA CONSTRUCTION MANAGEMENT SUPPORT
SCHWARTZ USCH AND FB, SAN DIEGO, CA
THE PURPOSE OF THIS MODIFICATION IS TO DEOBLIGATE THE REMAINING BALANCE OF $10,537.44 FROM THE TASK ORDER. THE FINAL PAYMENT HAS BEEN PAID OUT TO THE CONTRACTOR AND THE RELEASE OF CLAIMS HAS BEEN RECEIVED.
AN AMOUNT OF $374,232.32 HAS BEEN PAID OUT TO GENLYTE.
REMAINING OF THE TASK ORDER BALANCE IS ARRA FUNDED OF $10,537.44, AND WILL BE DEOBLIGATED. THIS AMOUNT IS FROM THE ORIGINAL AWARD OF TASK ORDER.
THIS MODIFICATION SHALL BE EFFECTIVE WITHOUT THE CONTRACTOR'S SIGNATURE.
FINAL ARRA FUNDED: $374,232.32 |
Amount:
$0
Award Description: THIS IS A UNILATERAL MODIFICATION TO EXTEND THE TERM OF THE CONTRACT TO 12/31/2012 FOR GSA INTERNAL ACCOUNTING PURPOSES. THIS MODIFICATION IN NO WAY CHANGES PRICE, TERMS OR CONDITIONS TO INCLUDE EXISTING REQUIRED COMPLETION DATES.
SEE PA05 FOR PENDING DEOBS. |
Amount:
$0
Award Description: CAMPUS COORDINATOR, CONSOLIDATION OF DHS AT THE ST. ELIZABETHS CAMPUS, SE, WASH., DC |