| Other Awards |
Amount:
$852,100
Award Description: TAS::21 0721::TAS RECOVERYPROJECT#::74520::RP# FAMILY HOUSING IMPROVEMENT (NEW WATER MAIN). REPLACE NEW OR LINE MAIN POTABLE WATER SUPPLY LINES IN THE DEPOT FAMILY HOUSING AREA TO PROVIDE QUALITY AND DRINKABLE WATER THAT MEETS FEDERAL, STATE AND LOCAL REGULATORY REQUIREMENTS AT HAWTHORNE ARMY DEPOT, NV. |
Amount:
$594,922
Award Description: TAS::21 2022::TAS ARRA::YES::ARRA RECOVERYPROJECT#::38541::RP# REPAIR FIRE SUPPRESSION BLDG 128; REPAIR AND REPLACE AS NEEDED 9 FIRE SUPPRESSION SYSTEMS, HANGER ASSEMBLIES, BRACING ASSEMBLIES, PIPE FITTINGS, SPRINKLER HEADS AND ASSOCIATED PIPES, WATER FLOW SYSTEMS, AND PAINT AS NEEDED. ARRA::YES::ARRA |
Amount:
$876,181
Award Description: TAS::21 2022::TAS RECOVERYPROJECT#::38964::RP# REPLACE MAIN POTABLE WATER LINE. REPLACE NEW OR LINE MAIN POTABLE WATER SUPPLY LINES IN THE INDUSTRIAL AREA TO PROVIDE QUALITY AND DRINKABLE WATER THAT MEETS FEDERAL, STATE AND LOCAL REGULATORY REQUIREMENTS. |
Amount:
$823,248
Award Description: TAS::57 3404::TAS RECOVERYPROJECT#::BAEY080080P4::RP# REPAIR PERIMETER FENCE PH 4 (FENCE NEAR WHTLD. GATE, WEST);
PHASE 4 FENCE, S. BEALE SECURITY GATE, N.HUTCHISON CREEK DOUBLE SWING GATE, VERNAL POOL RESTORATION WORK PLAN, VERNAL POOL CONSTRUCTION, OPTIONS - PHASE 5 FENCE COMPLETION, PHASE 5 VERNAL POOL CONSTRUCTION, PHASE 4 CATTLE SYSTEM, AND PHASE 5 CATTLE SYSTEM |
Amount:
$0
Award Description: RECOVERY, TAS::69 0504::TAS. ROADWAY CONSTRUCTION CONTRACT |
Amount:
$4,779,888
Award Description: RECOVERY, TAS::69 0504::TAS. ROADWAY CONSTRUCTION CONTRACT ARRA::YES::ARRA |
Amount:
$5,040
Award Description: RECOVERY, TAS::69 0504::TAS. ROADWAY CONSTRUCTION CONTRACT |
Amount:
$0
Award Description: RECOVERY, TAS::69 0504::TAS. ROADWAY CONSTRUCTION CONTRACT |
Amount:
$0
Award Description: RECOVERY, TAS::69 0504::TAS. ROADWAY CONSTRUCTION CONTRACT |
Amount:
$36,996
Award Description: TAS::96 3135::TAS
RECOVERY: WARM SPRINGS DAM CONSTRUCTION OF DECKS FOR HOUSING UNIT #1 |
Amount:
$1,638,878
Award Description: TAS::12 1402::TAS RECOVERY- ARRA- REPAIR EXTERIOR FINISHES WAB & SERVICE BLDG. |
Amount:
$721,934
Award Description: RECOVERY ARRA PROJECT NO: 90.000 TAS::14 0681::TAS
REHABILITATION OF THE FOLSOM FIXED WHEEL GATES |
Amount:
$0
Award Description: TAS::14 0681::TAS ARRA PROJECT NO: 90.000
REHABILITATION OF THE FIXED WHEEL GATES AT FOLSOM DAM |
Amount:
$7,787,953
Award Description: TAS::14 0681::TAS
ARRA PROJECT NUMBER: 90.000
REFURBISHMENT OF THREE FIXED WHEEL GATES AT THE FOLSOM DAM |
Amount:
$71,500
Award Description: RECOVERY YOSE PMIS #109576
MODIFICATION 0001 TO PROVIDE ALL LABOR, EQUIPMENT, AND MATERIALS FOR THE REMEDIATION OF HAZARDOUS MATERIALS IDENTIFIED IN THE MAY 27, 2010 PRE-DEMOLITION HAZARDOUS MATERIALS SURVEY. |
Amount:
$654,170
Award Description: RECOVERY YOSE PMIS # 109576
DEMOLITION OF 14 OBSOLETE STRUCTURES WITHIN THE WAWONA DISTRICT OF YOSEMITE NATIONAL PARK. |
Amount:
$7,190
Award Description: TAS::14 1035::TAS RECOVERY EUON PMIS # 154807
MISCELLANEOUS REMODELING PROJECTS WITHIN EUGENE O'NEILL NHS.
MODIFICATION 0002 IS FOR THE INSTALLATION OF A NEW CONCRETE PORCH SUBFOUNDATION AT THE ENTRANCE TO THE PARK HEADQUARTERS BUILDING. |
Amount:
$2,990
Award Description: TAS::14 1035::TAS RECOVERY EUON PMIS # 154807
MISCELLANEOUS REMODELING PROJECTS WITHIN EUGENE O'NEILL NHS. MODIFICATION 0001 CREATES A 5-FOOT TURN RADIUS FOR WHEELCHAIR ACCESS INTO THE NEW ADA ACCESSIBLE RESTROOM. |
Amount:
$29,984
Award Description: TAS::14 1035::TAS RECOVERY EUON PMIS # 154807
MISCELLANEOUS REMODELING PROJECTS WITHIN EUGENE O'NEILL NHS. |
Amount:
$2,903,108
Award Description: TAS::14 1041::TAS RECOVERY GOGA 65433 REPLACE OBSOLETE RADIO SYSTEM FOR SAFE EMERGENCY COMMUNICATION;BUILD OF FOUR NEW TOWERS, ICE BRIDGES, AND FOUNDATIONS AT FOUR DIFFERENT PROJECT SITES.
2. REHABILITATION OF BUILDING 314 WITH ASSOCIATED SITE IMPROVEMENTS AT THE PRESIDIO OF SAN FRANCISCO IN GOLDEN GATE NATIONAL RECREATION AREA. THE WORK AT THIS LOCATION INCLUDES:
A. NEW DRIVEWAY, PARKING, AND FLATWORK, WITH ASSOCIATED GRADING AT THE SITE.
B. NEW SECURITY GATE AT THE SITE.
C. CONNECTION TO EXISTING UTILITIES AT THE SITE
D. NEW SEWER LINE AT THE SITE.
E. NEW CAST-IN-PLACE CONCRETE SHEARWALLS, SUPPLEMENTAL SPANDREL ELEMENTS, AND FOUNDATION.
F. ABATEMENT OF HAZARDOUS MATERIALS.
G. REPAIR OF EXISTING REINFORCED CONCRETE STRUCTURAL SLABS AND WALLS.
H. NEW ROOFING
I. REPAIRS OF EXISTING WINDOWS AND DOORS
J. DEMOLITION OF INTERIOR WALLS.
K. DEMOLITION OF WALL FINISHES.
L. NEW ACCESSIBLE PATHWAYS.
M. NEW WHEELCHAIR LIFT.
N. BUILT UP FLOOR WITH RAMPS.
O. NEW DOOR HARDWARE, MODIFICATION OF DOOR OPENINGS, AND NEW DOORS.
P. NEW PARTITION WALLS AROUND LIFT.
Q. NEW BATHROOM FIXTURES TO PROVIDE ACCESSIBILITY.
R. NEW FIRE ALARM AND SECURITY SYSTEMS.
S. NEW HVAC SYSTEM.
T. NEW ELECTRICAL SYSTEM
U. MODIFICATION OF PLUMBING SYSTEM TO PROVIDE FOR ACCESSIBILITY UPGRADES.
A. THE TOWERS ARE LOCATED AT THE FOLLOWING FOUR SITES:
1. WEST PEAK OF MOUNT TAMALPAIS, MARIN COUNTY.
2. PRESIDIO HILL, SAN FRANCISCO COUNTY.
3. NORTH PEAK OF MONTARA MOUNTAIN, SAN MATEO COUNTY.
4. BLACK MOUNTAIN, SANTA CLARA COUNTY.
B. BUILDING 314 OF THE PRESIDIO |
Amount:
$72,764
Award Description: MOD. 1 - EXERCISE OPTIONS C & D, ADD EXECUTIVE ORDER PROHIBITING TEXT MESSAGING AND REVISE ARRA CLAUSE WITH DOI DEVIATION. |
Amount:
$86,219
Award Description: TAS::21 2022::TAS ARRA::YES::ARRA RECOVERYPROJECT#::38541::RP# PIER 2 SUPPRESSION SYSTEM AT MOTCO, CONCORD NWS, CA. REPAIR FIRE SUPPRESSION BLDG 128; REPAIR AND REPLACE AS NEEDED 9 FIRE SUPPRESSION SYSTEMS, HANGER ASSEMBLIES, BRACING ASSEMBLIES, PIPE FITTINGS, SPRINKLER HEADS AND ASSOCIATED PIPES, WATER FLOW SYSTEMS, AND PAINT AS NEEDED.
THE PURPOSE OF THIS MODIFICATION IS TO:
1) REMOVE/REPLACE CHECK VALVES. REMOVE AND REPLACE (1) 4" SHOTGUN CHECK VALVE AND (5) SHOTGUN VALVES. INSTALL ADDITIONAL SPRINKLER PIPE HANGERS. INSTALL ADDITIONAL LONGITUDINAL AND LATERAL SEISMIC BRACING AT FIRE SPRINKLER MAIN PIPING.
2) REPAIR DAMAGE. REPLACE 2, 12'-0" SECTIONS OF 1" STEEL FIRE SPRINKLER PIPE, AND 3 SPRINKLER HEADS-FIRE SPRINKLER SYSTEM 7 AT PIER 2. ALSO, PRESSURE TEST SYSTEM WHEN REPAIRS ARE COMPLETE.
3) PERIOD OF PERFORMANCE IS EXTENDED TO 31 JULY 2010. |
Amount:
$0
Award Description: RECOVERY, TAS::69 0504::TAS. ROADWAY CONSTRUCTION CONTRACT |
Amount:
$0
Award Description: RECOVERY, TAS::69 0504::TAS. ROADWAY CONSTRUCTION CONTRACT |
Amount:
$0
Award Description: RECOVERY, TAS::69 0504::TAS. ROADWAY CONSTRUCTION CONTRACT |
Amount:
$0
Award Description: RECOVERY, TAS::69 0504::TAS. ROADWAY CONSTRUCTION CONTRACT |
Amount:
-$123
Award Description: RECOVERY, TAS::69 0504::TAS. ROADWAY CONSTRUCTION CONTRACT |
Amount:
$116,143
Award Description: TAS::12 1402::TAS RECOVERY- ARRA- REPAIR EXTERIOR FINISHES WAB & SERVICE BLDG. |
Amount:
$23,684
Award Description: TAS::12 1402::TAS RECOVERY- ARRA- REPAIR EXTERIOR FINISHES WAB&SERVICE BLDG. |
Amount:
-$332,217
Award Description: RECOVERY ARRA PROJECT NO: 90.000 TAS::14 0681::TAS
REHABILITATION OF THE FOLSOM FIXED WHEEL GATES
MODIFICATION 0003 - RE-INSTATE PARTIALLY TERMINATED WORK. |
Amount:
$24,633
Award Description: MODIFICATION NO.4 - EXTEND AND CONNECT GROUND CABLES FROM TOWER TO GROUND RING, PRESIDIO HILL; DEMOLISH CLAY TILE PARTIION WALLS AND REPLACE WITH TYPE A1 TILE, PRESIDIO HILL; LEAD BASED PAIN REMEDIATION AND PAINT WALLS, MT. TAMALPAIS. |
Amount:
$299,734
Award Description: MODIFICATION NO. 2, PRESIDIO HILL SITE WORK, CONCRETE, FENCING DEMOLITION, EROSION CONTROL, SITE REGRADING AND FILL, RELOCATION OF GENERATOR PAD WITH ASSOCIATED TRENCHING, VAULTS, PIPING, WIRING, PUMPS AND CONTROLS, NEW FIRE SPRINKLER SYSTE PIPING, VALVES, WIRING AND CONTROLS, REVISIONS TO WHEELCHAIR LIFT REQUIREMENTS; MT. TAMALPAIS MODIFICATIONS TO EXISTING HVAC SYSTEM. TIME EXTENSION OF 55 DAYS FOR THE ADDITIONAL WORK AND DELAYS CAUSED DUE TO NESTING BIRDS. |
Amount:
$86,675
Award Description: MODIFICIATION 3-ADD 52.209-09 ALT 1, RFPS 2-7, 81, 9 & 10. VARIOUS SITE ADJUSTMENTS: PRESIDIO HILL: SITE WORK, STEEL BOLLARDS AND LEAD REMEDIATION IN SOIL.
PRESIDIO HILL: EXTERIOR DOOR HARDWARE AND CARD READER REVISIONS.
MT. TAMALPAIS: REKEY BUILDING LOCK AND REPLACE CYLINDER; EPOXY COATED REBAR AND HEAVIER GAUGE STEEL SLEEVE AT WALL PENETRATION; SCRAPE, PRIME, PAINT INTERIOR WALLS; NEW CABLE LADDER TRAY WITH ASSOCIATED WIRING AND EQUIPMENT.
MONTARA: RELOCATE HIGH VOLTAGE ELECTRICAL LINE; NEW STRIP LIGHTING IN EXISTING BUILDING.
|
Amount:
$0
Award Description: RECOVERY ARRA PROJECT NO: 90.000 TAS::14 0681::TAS REHABILITATION OF THE FOLSOM FIXED WHEEL GATES
MODIFICATION 0004 - PROVIDING THE CONTRACTOR EXTRA TIME TO COMPLETE TWO OF THE TASK IN SECTION F. |
Amount:
$50,126
Award Description: MODIFICATION 10. SETTLEMENT OF REQUESTS FOR EQUITABLE ADJUSTMENT NOS. 7, 8,&9. |
Amount:
$103,327
Award Description: GOGA 65433 GLODEN GATE NATIONAL RECREATION AREA - REPLACE OBSOLETE RADIO SYSTEM TO PROVIDE SAFE EMERGENCY COMMUNICATION |