Skip to content Skip to footer site map
Navigate Up

Recovery.gov - Track the Money

Recovery.gov is the U.S. government's official website that provides easy access to data
related to Recovery Act spending and allows for the reporting of potential fraud, waste, and abuse.

contract- RECIPIENT AWARD SUMMARY

NIKING CORPORATION

Clarification of Codes


AWARD OVERVIEW

AWARD OVERVIEW
Agency Name: Department of Defense--Military Project Location: HONOLULU
Award Number: 0003 Project Location - State: HI
Funding Amount: $15,237,555 Project Location - Zip Code: 968605101
Ending Date: 2011-07-30 Congressional District: 02

RECIPIENT INFORMATION (AWARD)

RECIPIENT INFORMATION (AWARD)
Recipient Name: NIKING CORPORATION
Recipient Address: 235 KELLOG ST
Recipient City: WAHIAWA
Recipient State: HI
Recipient Zip Code: 967862210
Congressional District: HI-02

DESCRIPTION OF WORK/SERVICE PERFORMED

TAS::17 1805::TAS RECOVERYPROJECT#::RM09-1363::RP# INSTALL PHOTOVOLTAIC SYSTEMS, OAHU, HI THIS PROJECT WILL CONSIST OF DESIGN-BUILD OF GRID-TIED PHOTOVOLTAIC POWER SYSTEMS ON THE ROOF TOP OF BUILDINGS 150, 1684, 654, 631 AND 617. THE DESIGN LIFE OF THE SYSTEM SHALL BE AT LEAST 20 YEARS IN CORROSIVE ENVIRONMENT. THE PV POWER SYSTEMS SHALL PRODUCE A MINIMUM AGGREGATED ENERGY OUTPUT OF 3.4 GWH DURING THE FIRST FULL YEAR OF OPERATION AND SHALL PRODUCE AGGREGATED ANNUAL OUTPUT EQUAL TO AND AT LEAST 80% OF THE FIRST YEAR TARGET FOR THE REMAINDER OF ITS TWENTY-YEAR LIFE. IT IS ANTICIPATED THAT THE AGGREGATED SYSTEM WILL CONTAIN PV PANELS/MODULES WITH OUTPUT CAPACITY OF AT LEAST 2.47 MWP DC BASED ON STANDARD TEST CONDITION (STC) AND WILL PROVIDE AT LEAST 1.85 MW AC OF CONTINUOUS POWER DURING PEAK DAYLIGHTS HOURS PECULIAR TO THE CRNH LOCATIONS. THE OUTPUT FROM EACH OF THE PV POWER SYSTEMS SHALL BE DESIGNED TO BE THE SAME AC VOLTAGE, WAVEFORM, AND FREQUENCY AS, AND WILL BE DISTRIBUTED VIA ISOLATION TRANSFORMER TO, THE NEAREST FACILITY GRID POWER PANEL. THE PV POWER SYSTEMS SHALL MEET ALL CURRENT NEC AND UL REQUIREMENTS, AND DESIGNED IN ACCORDANCE WITH THE CURRENT NAVAL FACILITIES ENGINEERING COMMAND HAWAII (NAVFAC-HI) PUBLIC WORKS UTILITIES CRITERIA. COMPLETE THE ENTIRE WORK READY FOR USE 545 CALENDAR DAYS AFTER THE NOTICE TO PROCEED.






TRANSACTIONS

TRANSACTIONS

Other Awards

Other Awards
Amount: $815,300
Award Description: TAS::57 3404::TAS RECOVERY--KNMD021123-2 - REPAIR HANGAR DOORS AND RAILS, B-2030, HICKAM AFB, HAWAII ARRA::YES::ARRA
Amount: $662,831
Award Description: TAS::57 3404::TAS RECOVERYPROJECT#KNMD091015::RP# ENTITLED REPAIR SEWER LIFT STATIONS #1/1A AT HICKAM AFB, HAWAII ARRA::YES::ARRA
Amount: $15,237,555
Award Description: TAS::17 1805::TAS RECOVERYPROJECT#::RM09-1363::RP# INSTALL PHOTOVOLTAIC SYSTEMS, OAHU, HI THIS PROJECT WILL CONSIST OF DESIGN-BUILD OF GRID-TIED PHOTOVOLTAIC POWER SYSTEMS ON THE ROOF TOP OF BUILDINGS 150, 1684, 654, 631 AND 617. THE DESIGN LIFE OF THE SYSTEM SHALL BE AT LEAST 20 YEARS IN CORROSIVE ENVIRONMENT. THE PV POWER SYSTEMS SHALL PRODUCE A MINIMUM AGGREGATED ENERGY OUTPUT OF 3.4 GWH DURING THE FIRST FULL YEAR OF OPERATION AND SHALL PRODUCE AGGREGATED ANNUAL OUTPUT EQUAL TO AND AT LEAST 80% OF THE FIRST YEAR TARGET FOR THE REMAINDER OF ITS TWENTY-YEAR LIFE. IT IS ANTICIPATED THAT THE AGGREGATED SYSTEM WILL CONTAIN PV PANELS/MODULES WITH OUTPUT CAPACITY OF AT LEAST 2.47 MWP DC BASED ON STANDARD TEST CONDITION (STC) AND WILL PROVIDE AT LEAST 1.85 MW AC OF CONTINUOUS POWER DURING PEAK DAYLIGHTS HOURS PECULIAR TO THE CRNH LOCATIONS. THE OUTPUT FROM EACH OF THE PV POWER SYSTEMS SHALL BE DESIGNED TO BE THE SAME AC VOLTAGE, WAVEFORM, AND FREQUENCY AS, AND WILL BE DISTRIBUTED VIA ISOLATION TRANSFORMER TO, THE NEAREST FACILITY GRID POWER PANEL. THE PV POWER SYSTEMS SHALL MEET ALL CURRENT NEC AND UL REQUIREMENTS, AND DESIGNED IN ACCORDANCE WITH THE CURRENT NAVAL FACILITIES ENGINEERING COMMAND HAWAII (NAVFAC-HI) PUBLIC WORKS UTILITIES CRITERIA. COMPLETE THE ENTIRE WORK READY FOR USE 545 CALENDAR DAYS AFTER THE NOTICE TO PROCEED.
Amount: $0
Award Description: TAS::17 1805::TAS RECOVERYPROJECT#::RM09-1363::RP# INSTALL PHOTOVOLTAIC SYSTEMS, OAHU, HI, TO CORRECT CONTRACT LINE ITEM NUMBER AND ADD WIDE AREA WORKFLOW CLAUSE
Amount: $2,726,540
Award Description: TAS::21 2022::TAS RECOVERYPROJECT::RP#REPLACE WATER TREATMENT PLANT GENERATOR LOAD INTERRUPTION, BUILDING 1580, SCHOFIELD BARRACKS, OAHU, HAWAII
Amount: $0
Award Description: TAS::21 2022::TAS RECOVERY PROJECT NUMBER 38201 REPLACE EXISTING STANDBY GENERATOR SET AND ASSOCIATED SWITCHGEAR AND EQUIPMENT AT SCHOFIELD BARRACKS WATER TREATMENT PLANT ARRA::YES::ARRA
Amount: $1,419,217
Award Description: TAS::21 2022::TAS RECOVERY PROJECT::38423::RP#COMBAT AVIATION BRIGADE, HANGAR WINDOW REPAIRS - REMOVE AND REPLACE EXISTING ROLLING HANGAR DOORS, OPERABLE STEEL FRAMED WINDOWS, PERSONNEL DOORS
Amount: $879,140
Award Description: REPAIR OF WATER SYSTEM
Amount: $12,382
Award Description: TAS::57 3404::TAS RECOVERYPROJECT#KNMD091015::RP# ENTITLED REPAIR SEWER LIFT STATIONS #1/1A AT HICKAM AFB, HAWAII ARRA::YES::ARRA A. THIS MODIFICATION TO TASK ORDER W912J6-08-D-0012-TN02, PROJECT NO. KNMD 09-1915, REPAIR SEWER LIFT STATIONS #1/1A, HICKAM AFB, HI, IS TO REPAIR DETERIORATED PIPE FROM NEW PUMP TO THE WET WELL AT SLS 1 (BLDG 2014) AND REPLACE A NON-FUNCTIONAL 12-INCH VALVE IN SLS 1A (BLDG 2015). THE GOVERNMENT ACCEPTS THE CONTRACTOR¿S PROPOSED EQUITABLE ADJUSTMENT DATED 20 AUG 2010; IN THE ADDITIONAL AMOUNT OF $12,382.00, AND EXTENSION OF PERFORMANCE PERIOD FOR AN ADDITIONAL 20 CALENDAR DAYS. B. AS A RESULT OF THIS MODIFICATION, THE TASK ORDER AMOUNT INCREASED BY $12,382.00 FROM $692,216.00 TO $704,598.00. THE PERFORMANCE PERIOD INCREASED BY 20 CALENDAR DAYS FROM 349 TO 369 CALENDAR DAYS, COMPLETION DATE WILL BE 20 OCTOBER 2010.
Amount: $0
Award Description: TAS::57 3404::TAS RECOVERYPROJECT#KNMD091015::RP# ENTITLED REPAIR SEWER LIFT STATIONS #1/1A AT HICKAM AFB, HAWAII ARRA::YES::ARRA
Amount: $29,385
Award Description: TAS::57 3404::TAS RECOVERYPROJECT#KNMD091015::RP# ENTITLED REPAIR SEWER LIFT STATIONS #1/1A AT HICKAM AFB, HAWAII ARRA::YES::ARRA
Amount: $0
Award Description: TAS::57 3404::TAS RECOVERYPROJECT#KNMD091015::RP# ENTITLED REPAIR SEWER LIFT STATIONS #1/1A AT HICKAM AFB, HAWAII ARRA::YES::ARRA
Amount: $30,000
Award Description: MOD, TAS::57 3404::TAS RECOVERY--KNMD021123-2-REPAIR HANGAR DOORS AND RAILS, B-2030, HICKAM AFB, HAWAII
Amount: $900,000
Award Description: TAS::17 1805::TAS RECOVERY PROJECT#::RP# INSTALL PHOTOVOLTAIC SYSTEMS, OAHU, HI, PC000004, FOR NEX BUILDING 631: INSTALL SAFETY NET COMPLETELY THROUGHOUT ABOVE THE 2ND FLOOR DROP CEILING TO CAPTURE ANY FALLING SPRAYED ON FIRE RETARDANT; AND PLACE PLYWOOD SHEET PLANKING THROUGHOUT THE ROOFTOP TO ADEQUATELY DISTRIBUTE THE LOAD ALONG THE RUNWAYS TO PREVENT VIBRATION AND FURTHER DISTURB THE CEILING RETARDANT FROM DELAMINATING.
Amount: $0
Award Description: TAS::17 1805::TAS RECOVERY PROJECT#::RP# INSTALL PHOTOVOLTAIC SYSTEMS, OAHU, HI, PC000003, SUSPENSION OF WORK DUE TO FALLING DEBRIS AT NEX, BLDG 631
Amount: $2,792
Award Description: CONSTRUCT POTABLE WATER SYSTEM
Amount: -$62,473
Award Description: REPAIR OF WATER SYSTEM

Project Location Detail

Location Information
Latitude, Longitude 0º 0' 0", 0º 0' 0"
Congressional District 02
City HONOLULU
County HONOLULU
State HI
Zip 96860