contract- RECIPIENT AWARD SUMMARY
| AWARD OVERVIEW |
|
Agency Name: Department of Defense--Military |
Project Location:
HONOLULU |
|
Award Number: 0003 |
Project Location - State: HI |
|
Funding Amount:
$15,237,555 |
Project Location - Zip Code: 968605101 |
|
Ending Date:
2011-07-30 |
Congressional District: 02 |
RECIPIENT INFORMATION (AWARD)
| RECIPIENT INFORMATION (AWARD) |
|
Recipient Name:
|
NIKING CORPORATION |
|
Recipient Address:
|
235 KELLOG ST |
|
Recipient City:
|
WAHIAWA |
|
Recipient State:
|
HI |
|
Recipient Zip Code:
|
967862210 |
|
Congressional District:
|
HI-02 |
DESCRIPTION OF WORK/SERVICE PERFORMED
TAS::17 1805::TAS RECOVERYPROJECT#::RM09-1363::RP# INSTALL PHOTOVOLTAIC SYSTEMS, OAHU, HI
THIS PROJECT WILL CONSIST OF DESIGN-BUILD OF GRID-TIED PHOTOVOLTAIC POWER SYSTEMS ON THE ROOF TOP OF BUILDINGS 150, 1684, 654, 631 AND 617. THE DESIGN LIFE OF THE SYSTEM SHALL BE AT LEAST 20 YEARS IN CORROSIVE ENVIRONMENT. THE PV POWER SYSTEMS SHALL PRODUCE A MINIMUM AGGREGATED ENERGY OUTPUT OF 3.4 GWH DURING THE FIRST FULL YEAR OF OPERATION AND SHALL PRODUCE AGGREGATED ANNUAL OUTPUT EQUAL TO AND AT LEAST 80% OF THE FIRST YEAR TARGET FOR THE REMAINDER OF ITS TWENTY-YEAR LIFE. IT IS ANTICIPATED THAT THE AGGREGATED SYSTEM WILL CONTAIN PV PANELS/MODULES WITH OUTPUT CAPACITY OF AT LEAST 2.47 MWP DC BASED ON STANDARD TEST CONDITION (STC) AND WILL PROVIDE AT LEAST 1.85 MW AC OF CONTINUOUS POWER DURING PEAK DAYLIGHTS HOURS PECULIAR TO THE CRNH LOCATIONS. THE OUTPUT FROM EACH OF THE PV POWER SYSTEMS SHALL BE DESIGNED TO BE THE SAME AC VOLTAGE, WAVEFORM, AND FREQUENCY AS, AND WILL BE DISTRIBUTED VIA ISOLATION TRANSFORMER TO, THE NEAREST FACILITY GRID POWER PANEL. THE PV POWER SYSTEMS SHALL MEET ALL CURRENT NEC AND UL REQUIREMENTS, AND DESIGNED IN ACCORDANCE WITH THE CURRENT NAVAL FACILITIES ENGINEERING COMMAND HAWAII (NAVFAC-HI) PUBLIC WORKS UTILITIES CRITERIA. COMPLETE THE ENTIRE WORK READY FOR USE 545 CALENDAR DAYS AFTER THE NOTICE TO PROCEED.
| Other Awards |
Amount:
$815,300
Award Description: TAS::57 3404::TAS RECOVERY--KNMD021123-2 - REPAIR HANGAR DOORS AND RAILS, B-2030, HICKAM AFB, HAWAII ARRA::YES::ARRA |
Amount:
$662,831
Award Description: TAS::57 3404::TAS RECOVERYPROJECT#KNMD091015::RP# ENTITLED REPAIR SEWER LIFT STATIONS #1/1A AT HICKAM AFB, HAWAII ARRA::YES::ARRA |
Amount:
$15,237,555
Award Description: TAS::17 1805::TAS RECOVERYPROJECT#::RM09-1363::RP# INSTALL PHOTOVOLTAIC SYSTEMS, OAHU, HI
THIS PROJECT WILL CONSIST OF DESIGN-BUILD OF GRID-TIED PHOTOVOLTAIC POWER SYSTEMS ON THE ROOF TOP OF BUILDINGS 150, 1684, 654, 631 AND 617. THE DESIGN LIFE OF THE SYSTEM SHALL BE AT LEAST 20 YEARS IN CORROSIVE ENVIRONMENT. THE PV POWER SYSTEMS SHALL PRODUCE A MINIMUM AGGREGATED ENERGY OUTPUT OF 3.4 GWH DURING THE FIRST FULL YEAR OF OPERATION AND SHALL PRODUCE AGGREGATED ANNUAL OUTPUT EQUAL TO AND AT LEAST 80% OF THE FIRST YEAR TARGET FOR THE REMAINDER OF ITS TWENTY-YEAR LIFE. IT IS ANTICIPATED THAT THE AGGREGATED SYSTEM WILL CONTAIN PV PANELS/MODULES WITH OUTPUT CAPACITY OF AT LEAST 2.47 MWP DC BASED ON STANDARD TEST CONDITION (STC) AND WILL PROVIDE AT LEAST 1.85 MW AC OF CONTINUOUS POWER DURING PEAK DAYLIGHTS HOURS PECULIAR TO THE CRNH LOCATIONS. THE OUTPUT FROM EACH OF THE PV POWER SYSTEMS SHALL BE DESIGNED TO BE THE SAME AC VOLTAGE, WAVEFORM, AND FREQUENCY AS, AND WILL BE DISTRIBUTED VIA ISOLATION TRANSFORMER TO, THE NEAREST FACILITY GRID POWER PANEL. THE PV POWER SYSTEMS SHALL MEET ALL CURRENT NEC AND UL REQUIREMENTS, AND DESIGNED IN ACCORDANCE WITH THE CURRENT NAVAL FACILITIES ENGINEERING COMMAND HAWAII (NAVFAC-HI) PUBLIC WORKS UTILITIES CRITERIA. COMPLETE THE ENTIRE WORK READY FOR USE 545 CALENDAR DAYS AFTER THE NOTICE TO PROCEED. |
Amount:
$0
Award Description: TAS::17 1805::TAS RECOVERYPROJECT#::RM09-1363::RP# INSTALL PHOTOVOLTAIC SYSTEMS, OAHU, HI, TO CORRECT CONTRACT LINE ITEM NUMBER AND ADD WIDE AREA WORKFLOW CLAUSE |
Amount:
$2,726,540
Award Description: TAS::21 2022::TAS RECOVERYPROJECT::RP#REPLACE WATER TREATMENT PLANT GENERATOR LOAD INTERRUPTION, BUILDING 1580, SCHOFIELD BARRACKS, OAHU, HAWAII |
Amount:
$0
Award Description: TAS::21 2022::TAS RECOVERY PROJECT NUMBER 38201 REPLACE EXISTING STANDBY GENERATOR SET AND ASSOCIATED SWITCHGEAR AND EQUIPMENT AT SCHOFIELD BARRACKS WATER TREATMENT PLANT ARRA::YES::ARRA |
Amount:
$1,419,217
Award Description: TAS::21 2022::TAS RECOVERY PROJECT::38423::RP#COMBAT AVIATION BRIGADE, HANGAR WINDOW REPAIRS - REMOVE AND REPLACE EXISTING ROLLING HANGAR DOORS, OPERABLE STEEL FRAMED WINDOWS, PERSONNEL DOORS |
Amount:
$879,140
Award Description: REPAIR OF WATER SYSTEM |
Amount:
$12,382
Award Description: TAS::57 3404::TAS RECOVERYPROJECT#KNMD091015::RP# ENTITLED REPAIR SEWER LIFT STATIONS #1/1A AT HICKAM AFB, HAWAII ARRA::YES::ARRA
A. THIS MODIFICATION TO TASK ORDER W912J6-08-D-0012-TN02, PROJECT NO. KNMD 09-1915, REPAIR SEWER LIFT STATIONS #1/1A, HICKAM AFB, HI, IS TO REPAIR DETERIORATED PIPE FROM NEW PUMP TO THE WET WELL AT SLS 1 (BLDG 2014) AND REPLACE A NON-FUNCTIONAL 12-INCH VALVE IN SLS 1A (BLDG 2015). THE GOVERNMENT ACCEPTS THE CONTRACTOR¿S PROPOSED EQUITABLE ADJUSTMENT DATED 20 AUG 2010; IN THE ADDITIONAL AMOUNT OF $12,382.00, AND EXTENSION OF PERFORMANCE PERIOD FOR AN ADDITIONAL 20 CALENDAR DAYS.
B. AS A RESULT OF THIS MODIFICATION, THE TASK ORDER AMOUNT INCREASED BY $12,382.00 FROM $692,216.00 TO $704,598.00. THE PERFORMANCE PERIOD INCREASED BY 20 CALENDAR DAYS FROM 349 TO 369 CALENDAR DAYS, COMPLETION DATE WILL BE 20 OCTOBER 2010. |
Amount:
$0
Award Description: TAS::57 3404::TAS RECOVERYPROJECT#KNMD091015::RP# ENTITLED REPAIR SEWER LIFT STATIONS #1/1A AT HICKAM AFB, HAWAII ARRA::YES::ARRA |
Amount:
$29,385
Award Description: TAS::57 3404::TAS RECOVERYPROJECT#KNMD091015::RP# ENTITLED REPAIR SEWER LIFT STATIONS #1/1A AT HICKAM AFB, HAWAII ARRA::YES::ARRA |
Amount:
$0
Award Description: TAS::57 3404::TAS RECOVERYPROJECT#KNMD091015::RP# ENTITLED REPAIR SEWER LIFT STATIONS #1/1A AT HICKAM AFB, HAWAII ARRA::YES::ARRA |
Amount:
$30,000
Award Description: MOD, TAS::57 3404::TAS RECOVERY--KNMD021123-2-REPAIR HANGAR DOORS AND RAILS, B-2030, HICKAM AFB, HAWAII |
Amount:
$900,000
Award Description: TAS::17 1805::TAS RECOVERY PROJECT#::RP# INSTALL PHOTOVOLTAIC SYSTEMS, OAHU, HI, PC000004, FOR NEX BUILDING 631: INSTALL SAFETY NET COMPLETELY THROUGHOUT ABOVE THE 2ND FLOOR DROP CEILING TO CAPTURE ANY FALLING SPRAYED ON FIRE RETARDANT; AND PLACE PLYWOOD SHEET PLANKING THROUGHOUT THE ROOFTOP TO ADEQUATELY DISTRIBUTE THE LOAD ALONG THE RUNWAYS TO PREVENT VIBRATION AND FURTHER DISTURB THE CEILING RETARDANT FROM DELAMINATING. |
Amount:
$0
Award Description: TAS::17 1805::TAS RECOVERY PROJECT#::RP# INSTALL PHOTOVOLTAIC SYSTEMS, OAHU, HI, PC000003, SUSPENSION OF WORK DUE TO FALLING DEBRIS AT NEX, BLDG 631 |
Amount:
$2,792
Award Description: CONSTRUCT POTABLE WATER SYSTEM |
Amount:
-$62,473
Award Description: REPAIR OF WATER SYSTEM |
| Location Information |
| Latitude, Longitude |
0º 0' 0",
0º 0' 0" |
| Congressional District |
02 |
| City |
HONOLULU |
| County |
HONOLULU |
| State |
HI |
| Zip |
96860 |
|