contract- RECIPIENT AWARD SUMMARY

HOF CONSTRUCTION INCORPORATED

Clarification of Codes


AWARD OVERVIEW

AWARD OVERVIEW
Agency Name: General Services Administration Project Location: SAINT LOUIS CITY
Award Number: GSP0609GZ5058 Project Location - State: MO
Funding Amount: $9,040,856 Project Location - Zip Code: 631032818
Ending Date: 2012-07-31 Congressional District: 01

RECIPIENT INFORMATION (AWARD)

RECIPIENT INFORMATION (AWARD)
Recipient Name: HOF CONSTRUCTION INCORPORATED
Recipient Address: 3137 JAMIESON AVE
Recipient City: SAINT LOUIS
Recipient State: MO
Recipient Zip Code: 631392519
Congressional District: MO-03

DESCRIPTION OF WORK/SERVICE PERFORMED

RECOVERY: TAS::47 4543::TAS: THE WORK TO BE DELIVERED UNDER THIS TASK ORDER INCLUDES, BUT IS NOT LIMITED TO : 1. PRE-CONSTRUCTION PHASE SERVICES INCLUDING DESIGN DEVELOPMENT FOR MASONRY REPAIRS, REPLACEMENT OF WINDOWS AND CONTINUED ACCESS TO SWING STAGES, WINDOW REMOVAL AND BRICK REMOVAL.






TRANSACTIONS

TRANSACTIONS

Other Awards

Other Awards
Amount: $7,008,200
Award Description: RECOVERY TAS::47 4543::TAS RECOVERY: THE WORK TO BE DELIVERED UNDER THIS CONTRACT INCLUDES, BUT IS NOT LIMITED TO: (1) PRE-CONSTRUCTION PHASE SERVICES INCLUDING DESIGN DEVELOPMENT FOR THE RAY ENVELOPE PROJECT LOCATED AT 1222 SPRUCE ST., ST. LOUIS, MO. ALSO, CONSTRUCTION SERVICES AT 1222 SPRUCE ST., ST. LOUIS, MO.
Amount: $190,463
Award Description: RECOVERY: TAS::47 4543::TAS THIS TASK ORDER IS TO BE AWARDED AS A PDL. THE PDL IS FOR FACADE ACCESS FOR FACADE STUDY FOR RAY ARRA ENVELOPE IMPROVEMENTS.
Amount: $5,184,000
Award Description: RECOVERY: TAS::47 4543::TAS THIS PROJECT WILL BE FUNDED THROUGH THE AMERICAN RECOVERY AND REINVESTMENT ACT 2009. THE PROPOSED PROCUREMENT IS BEING MADE UNDER THE CMC IDIQ MULTIPLE AWARD TASK ORDER CONSTRUCTION CONTRACT FOR THE GEOGRAPHIC AREA OF ST. LOUIS METRO AREA INCLUDING THE CITIES OF CAPE GIRARDEAU AND HANNIBAL, MISSOURI. THE SUBJECT PROJECT AT THE FEDERAL CENTER, BLDG 104,AT 4300 GOODFELLOW BLVD IN ST. LOUIS, MO WAS AWARDED TO HOF CONSTRUCTION IN THE AMOUNT OF $5,184,000.00 ON SEPTEMBER 4, 2009. THE FEDERAL SERVICE CODE IS Z111. THE NORTH AMERICAN INDUSTRIAL CLASSIFICATION CODE IS 236220 AND THE SIZE STANDARD IS $33.5 MILLION. THE ESTIMATED RANGE OF THIS PROJECT WILL BE BETWEEN $5,000,000 AND $10,000,000. THE WORK TO BE DELIVERED UNDER THIS TASK ORDER INCLUDES, BUT IS NOT LIMITED TO: THE INSTALLATION NEW HIGH EFFICIENCY CHILLERS, NEW HIGH EFFICIENCY CHILLED WATER, CONDENSER WATER AND HOT WATER PUMPS, NEW HIGH EFFICIENCY COOLING TOWER(S), NEW HIGH EFFICIENCY AIR-HANDLING UNITS AND DISTRIBUTION DUCTWORK, CHILLED & HEATING HOT WATER PIPE AND A HUMIDIFICATION SYSTEM FOR APPROXIMATELY 130,000 S.F. OF FILE STORAGE. THIS PROJECT WILL INCLUDE THE INSTALLATION OF A NEW HVAC AND HUMIDIFICATION SYSTEM TO MEET THE NARA 2009 REQUIREMENTS FOR FILE STORAGE. THIS WILL BRING THE FACILITY UP TO STANDARD IN PROVIDING A WARM LIT SHELL AND ENABLE THE TENANT TO MEET REQUIREMENTS ENFORCED BY NARA 2009 STANDARDS. THE RECOMMENDED PROJECT WILL COMPLY WITH SITE REGULATIONS AND MAINTAIN SURFACE PARKING AND IS WITHIN THE BUILDING TUNE-UP, LIGHTING REPLACEMENT, BUILDING HVAC SYSTEMS AND ENERGY SAVING CATEGORIES AS DEFINED IN THE ARRA DESCRIPTIONS OF HIGH PERFORMANCE BUILDING IMPROVEMENTS.
Amount: $1,909,000
Award Description: RECOVERY TAS::47 4543::TAS RAY ARRA CAFETERIA UPGRADE - THE CMC WILL PROVIDE PRECONSTRUCTION SERVICES AND CONSTRUCTION SERVICES TO INCLUDE, A NEW DISH ROOM WILL BE CONSTRUCTED WITH AN ACCUMULATING CONVEYOR AND THE OLD DISH ROOM DEMOLISHED. THE SERVERY WILL BE RECONFIGURED WITH NEW FOOD SERVICE EQUIPMENT AND ALL ASSOCIATED ROUGH-INS. THE SERVERY WILL ALSO BE COMPLETELY RENOVATED WITH ALL NEW FINISHES ON THE WALLS, FLOORS AND CEILINGS WITH DOWN LIGHTING AND ACCENT LIGHTING. THE KITCHEN WILL HAVE THE EXISTING HOODS AND THE MAJORITY OF THE EXISTING EQUIPMENT REPLACED WITH NEW HIGHER EFFICIENCY EQUIPMENT. THE DINING ROOM WILL HAVE TWO CONFERENCE ROOMS CONSTRUCTED AT THE NORTH END. THE REMAINDER OF THE DINING ROOM WILL HAVE NEW PENDANT LIGHTING, NEW DIFFUSERS AND NEW FINISHES THROUGHOUT INCLUDING CEILING, WALL AND FLOOR FINISHES. EXTENSIVE COORDINATION AND PHASING IS REQUIRED TO MINIMIZE DISRUPTIONS TO CAFETERIA SERVICE, BUILDING OPERATIONS, AND TENANTS.
Amount: $8,317,000
Award Description: RECOVERY: TAS::47 4543::TAS RECOVERY: THE WORK TO BE DELIVERED UNDER THIS TASK ORDER INCLUDES, BUT IS NOT LIMITED TO: (1) PRE-CONSTRUCTION PHASE SERVICES INCLUDING DESIGN DEVELOPMENT FOR THE SEWER REPLACEMENT PROJECT LOCATED AT THE FEDERAL CENTER AT 4300 GOODFELLOW, ST. LOUIS, MO. ALSO, CONSTRUCTION PHASE SERVICES FOR THE SEWER REPLACEMENT PROJECT LOCATED AT THE SAME FEDERAL CENTER AT 4300 GOODFELLOW, ST. LOUIS, MO.
Amount: $10,266,403
Award Description: RAY ARRA ENVELOPE IMPROVEMENTS PROJECT #: IMO00090 MODIFICATION PS05 ROBERT A. YOUNG FEDERAL BUILDING (MO0106ZZ) 1222 SPRUCE ST. LOUIS, MO MODIFICATION PS05 IS FOR ADDITIONAL FUNDS TO ALLOW FURTHER INVESTIGATION OF THE ENTIRE BUILDING ENVELOPE, INCLUDING THE WINDOWS, TUCK POINTING, AND PROBLEMS ASSOCIATED WITH THE SPALLING OF THE CONCRETE SPANDRELS ABOVE THE WINDOWS ON THE UPPER PORTIONS OF THE BUILDING WHICH WILL POSSIBLY REQUIRE EXTENSIVE MODIFICATION AND/OR REPLACEMENT OF WINDOW ASSEMBLIES, EXTERIOR MORTAR JOINT WORK. THE POSSIBLE MORTAR JOINT WORK COULD REQUIRE TUCK POINTING AND CONCRETE SPANDREL REPAIRS. THERE MAY ALSO BE SOME CORRECTIONS MADE TO THE BUILDINGS WATER AND AIR INFILTRATION PROBLEMS, AND EXTENSIVE SCAFFOLDING SYSTEMS WILL BE SET UP. INCREASING THE GMP WILL AID IN THE STUDY AND POSSIBLE SUBSEQUENT MODIFICATION OF ALL OF THE ABOVE MENTIONED ACTIONS
Amount: -$58,717
Award Description: RECOVERY: TAS::47 4543::TAS: THIS TASK ORDER IS TO BE AWARDED IN ORDER TO FIRM FIX PRICE PDL PC01 FOR CMC FACADE ACCESS FOR FACADE STUDY FOR RAY ARRA ENVELOPE IMPROVEMENTS.
Amount: $3,000
Award Description: RECOVERY: TAS::47 4543::TAS: BUILDING #MO0106ZZ. RAY ARRA ENVELOPE IMPROVEMENTS. RAY BUILDING 1222 SPRUCE. ST. LOUIS, MO. THE WORK IN THIS WORK ORDER INVOLVES THE CONTRACTOR ASSISTING THE AE IN EVALUATING THE STRUCTURE IN AND AROUND 3 WINDOW UNITS. THE CONTRACTOR IS REQUIRED TO REMOVE DRYWALL AND FRAME SEAL AROUND THE WINDOWS IN ORDER FOR THE ENGINEER TO EVALUATE THE WINDOW SUPPORT SYSTEM. DRYWALL REMOVAL AROUND THE WINDOW SHALL BE NO MORE THAN 1 TO 2 SQUARE FEET. THE CONTRACTOR WILL BE REQUIRED TO INITATE WALL REPAIRS AFTER HOURS (NO EARLIER THAN 6:00 PM), THE SAME DAY THE INSPECTION IS COMPLETED, AND ALL SUBSEQUENT WORK WILL BE AFTER HOURS. THE WALLS AND WINDOW SILLS SHALL BE RETURNED TO THEIR ORIGINAL CONDITION.
Amount: $0
Award Description: RECOVERY: MODIFICATION PS10 (P-8 REV. 1) RAY ARRA ENVELOPE IMPROVEMENTS (IMO00090)1222 SPRUCE ST. LOUIS, MO THIS MODIFICATION IS TO PROVIDE FOR INSTALLATION OF HEILICAL ANCHORS ON THE WEST ELEVATION OF THE BUILDING. THIS IS A NO COST MODIFICATION. ($0.00) THIS MODIFICATION PS10 IS A DRAW DOWN AGAINST THE GMP IN THE AMOUNT OF $165,511.00
Amount: $0
Award Description: P-10, MODIFICATION PC11 (PDL) THIS MODIFICATION (PDL)IS A DRAW DOWN AGAINST THE PREVIOUSLY ESTABLISHED TOTAL GMP. THIS PDL IS A ZERO DOLLAR MODIFICATION. WHEN GSA FIRM FIXES THE PRICE ON THIS PDL, THE FFP WILL BE A DRAWDOWN AGAINST THE GMP FOR THE DIFFERENCE BETWEEN THE PDL AND THE FFP. RAY ARRA ENVELOPE (IMO00090) 1222 SPRUCE ST. ST. LOUIS, MO THIS PDL IS SPECIFICALLY FOR 100 FEET OF HELEOBAR (HELIBEAM SYSTEM) JOINT REINFORCEMENT.
Amount: $9,040,856
Award Description: RECOVERY: TAS::47 4543::TAS: THE WORK TO BE DELIVERED UNDER THIS TASK ORDER INCLUDES, BUT IS NOT LIMITED TO : 1. PRE-CONSTRUCTION PHASE SERVICES INCLUDING DESIGN DEVELOPMENT FOR MASONRY REPAIRS, REPLACEMENT OF WINDOWS AND CONTINUED ACCESS TO SWING STAGES, WINDOW REMOVAL AND BRICK REMOVAL.
Amount: $0
Award Description: RECOVERY: MODIFICATION PS09 RAY ARRA ENVELOPE IMPROVEMENTS (IMO00090) 1222 SPRUCE ST. LOUIS, MO THIS MODIFICATION IS FOR PRELIMINARY CONSTRUCTION DRAWINGS FOR WINDOW SHOPS AND MOCKUPS. THE MODIFICATION WILL ALSO INCLUDE AIR AND WATER INFILTRATION TESTING ON SOME OF THE MOCKUPS, AND PRIVIDING DIES FOR NEW PANNING AND INTERIOR TRIM. THIS IS A NO COST MODIFICATION. THIS MODIFICATION PS09 IS A DRAW DOWN AGAINST THE GMP.
Amount: -$1,093
Award Description: MODIFICATION PS08 (FIRM FIX PRICE PC04 / P-4) IMO00090 (RAY ARRA ENVELOPE) CONTRACTOR WORK WITH THE AE IN EVALUATING THE STRUCTURE AROUND 3 WINDOW UNITS. THE CONTRACTOR WILL REMOVE DRY WALL AND FRAME SEAL AROUND 3 WINDOW UNITS.
Amount: $0
Award Description: MODIFICATION ISSUED TO THE FIRM FIXED PRICE SETTLEMENT OF THE GMP FOR SPECIFIC WORK INCLUDED IN CONSTRUCTION PHASE SERVICES. MHIS MODIFICATION ALSO PROVIDES THE CONTRACTOR NOTICE TO PROCEED ON THIS WORK UPON SIGNATURE OF THE CONTRACTING OFFICER. THE SPECIFIC WORK IS AS FOLLOWS: CONTRACTOR SHALL PERFORM THE WORK DESCRIBED IN THE ROBERT A. YOUNG FEDERAL BUILDING - RAY ARRA ENVELOPE IMPROVEMENT (100% MASONRY DESIGN PACKAGE, 31 DRAWINGS WITH ASSOCIATED TECHNICAL SPECIFICATIONS, DATED FEBRUARY 22, 2010. CLARIFICATION NO. 1 TO 100% MASONRY DESIGN PACKAGE, DATED MARCH 23, 2010. DIVISION 1 GENERAL CONDITIONS SPECIFICATIONS, ISSUED MARCH 26, 2010. LIQUIDATED DAMAGES ARE $3,200.00 PER CALENDAR DAY. SUBSTANTIAL COMPLETION DATE IS SEPTEMBER 20, 2011.
Amount: $14,399
Award Description: RECOVERY. ROBERT A. YOUNG FEDERAL BUILDING 1222 SPRUCE STREET ST. LOUIS, MO 63103 WORK TO BE COMPLETED UNDER THIS MODIFICATION INCLUDES BUT IS NOT LIMITED TO: RELOCATION OF SODA LINE HANGERS, RELOCATION OF BLAST CHILLERS, REPLACEMENT OF WHITE TEST SWITCH PLATES AND TROUBLESHOOTING OF FIRE ALARM SYSTEM.
Amount: $13,183
Award Description: RECOVERY. TAS::47 4543::TAS ROBERT A. YOUNG FEDERAL BUILDING 1222 SPRUCE STREET ST. LOUIS, MO 63103 WORK TO BE COMPLETED UNDER THIS MODIFICATION INCLUDE BUT IS NOT LIMITED TO: PROVIDING AIR DIFFUSERS, RAISE EXISTING ELECTRICAL DISCONNECTS, PROVIDE FOR ADDITIONAL CORK FLOORING, RELOCATION OF HOSE CONTROL BOX AND PROVIDE TRANSFER DUCTS IN THE CONFERENCE ROOM.
Amount: $5,232
Award Description: RECOVERY. ROBERT A. YOUNG FEDERAL BUILDING 1222 SPRUCE STREET ST. LOUIS, MO 63103 WORK TO BE COMPLETED UNDER THIS MODIFICATION INCLUDES BUT IS NOT LIMITED TO: PROVIDING ADDITIONAL DUCTWORK AT THE SOUTH END OF THE DINING ROOM, PROVIDE NEW TOE KICKS FOR SERVERY COUNTERS, AND TO PROVIDE A PIZZA OVEN EXHAUST SWITCH COVER.
Amount: $9,423
Award Description: RECOVERY. ROBERT A. YOUNG FEDERAL BUILDING 1222 SPRUCE STREET ST. LOUIS, MO 63103 WORK TO BE COMPLETED UNDER THIS MODIFICATION INCLUDES BUT IS NOT LIMITED TO: PROVIDE FOR ADDING, RELOCATING AND ADJUSTING SPRINKLER HEADS. THIS MODIFICATION IS ALSO THE FIRM PRICE SETTLEMENT OF A PREVIOUS MODIFICATION PC14.
Amount: $45,219
Award Description: RECOVERY TAS::47 4543::TAS ROBERT A YOUNG FEDERAL BUILDING (MO0106ZZ) 1222 SPRUCE ST. LOUIS, MO 63103 THE WORK TO BE DELIVERED UNDER THIS TASK ORDER INCLUDES, BUT IS NOT LIMITED TO: THE RELOCATION OF A 3" CONDUIT, SETUP OF TEMPORARY AIR COOLING AND AIR EXHAUST OVER THE COAST GUARD COMPUTER ROOM.
Amount: $13,194
Award Description: RECOVERY. TAS::47 4543::TAS ROBERT A. YOUNG FEDERAL BUILDING 1222 SPRUCE ST. ST. LOUIS, MO 63103-2818 THE MODIFICATION OF THIS TASK ORDER INCLUDES, BUT IS NOT LIMITED TO THE FOLLOWING: INSTALLATION OF VENT PIPING FOR FLOOR DRAINS. IT ALSO IS FOR DRAINING OF THE FLOOR SINKS AT THE NORTH, SOUTH AND EAST SIDES OF THE NEW DISH ROOM. IN CONJUNCTION WITH THE WORK LISTED ABOVE, REMOVAL AND PATCHING OF DRYWALL MUST BE COMPLETED WHERE THE PIPES ARE TO BE INSTALLED.
Amount: $122,147
Award Description: RECOVERY: TAS::47 4543::TAS PROJECT# IMO00090/BUILDING# MO0106ZZ THE WORK TO BE DELIVERED UNDER THIS MODIFICATION, FOR THE CAFETERIA PROJECT LOCATED AT ROBERT A YOUNG FEDERAL BUILDING, 1222 SPRUCE, ST. LOUIS, MO, INCLUDES BUT IS NOT LIMITED TO: MODIFICATIONS TO THE DRAWINGS TO ATTAIN LEED CREDITS, UPGRADED DISHWASHER AS IT IS MORE ENERGY EFFICIENT AND AN ADDITIONAL FIRE ALARM MODULE WAS ADDED TO THE KITCHEN.
Amount: $14,042
Award Description: RECOVERY. ROBERT A. YOUNG FEDERAL BUILDING 1222 SPRUCE STREET ST. LOUIS, MO 63103 WORK TO BE COMPLETED UNDER THIS MODIFICATION INCLUDE BUT IS NOT LIMITED TO: REVISION OF SERVERY GRILL AREA. THIS INLCUDES DELETION OF WINDOW AREA, MODIFICATION OF WALL FRAMING, COUNTER MODIFICATIONS, HOOD REPLACEMENT WALL TILE REVISIONS AND INCLUSION OF A SNEEZE GUARD.
Amount: $4,161
Award Description: RECOVERY. ROBERT A. YOUNG FEDERAL BUILDING 1222 SPRUCE STREET ST. LOUIS, MO 63103 WORK TO BE COMPLETED UNDER THIS MODIFICATION INCLUDE BUT IS NOT LIMITED TO: REPLACE PVC WATER AND DRAIN LINES WITH COPPER AND CAST IRON THAT ARE LOCATED BETWEEN COLUMNS J3, J4, K3 AND K4 THAT PENETRATES THE FLOOR ABOVE THE DINING ROOM.
Amount: $21,904
Award Description: IMO00090 - ARRA RAY CAFETERIA - PS17 - P-17 - MO0106ZZ - 122 SPRUCE - ST. LOUIS MO - 63103 MODIFICATION FOR MULTIPLE MISC ITEMS CODED TO ADIS VMO00095 WORK ITEM 1242. WORK TO INCLUDE: PROVIDE FIRE EXTINGUISHERS, PAINT AIR DIFFUSERS, RELOCATE CONDUIT, SKIM COAT AND PAINT BEEM HANGING BELOW THE CEILING, RELOCATE SWITCH FROM BEHIND ROLL-IN REFIGERATOR.
Amount: $36,920
Award Description: RECOVERY. TAS:47 4543::TAS RAY ARRA CAFETERIA UPGRADE 1222 SPRUCE ST. LOUIS, MO WORK TO BE DELIVERED UNDER THIS MODIFICATION INCLUDES, BUT IS NOT LIMITED TO: IMPROVED FIRE SPRINKLERS, INCLUSION OF A 50 AMP CIRCUIT BREAKER ,REVISION OF WALL BASE IN THE SERVERY AND RELOCATION OF OUTLETS.
Amount: $7,892
Award Description: ROBERT A. YOUNG FEDERAL BUILDING 1222 SPRUCE STREET ST. LOUIS, MO 63103 WORK TO BE COMPLETED UNDER THIS MODIFICATION INCLUDE BUT IS NOT LIMITED TO: REPLACE PVC WATER AND DRAIN LINES WITH COPPER AND CAST IRON THAT ARE LOCATED BETWEEN COLUMNS J3, J4, K3 AND K4 THAT PENETRATE THE FLOOR ABOVE THE DINING ROOM.
Amount: $13,296
Award Description: RECOVERY: MODIFICATION PS18 RAY ARRA CAFETERIA UPGRADES. 1222 SPRUCE ST. LOUIS, MO THIS MODIFICATION IS FOR TIME EXTENTION FOR THIS PROJECT: 28 CALENDAR DAYS. FROM 05/25/2010 TO 06/22/2010 THIS TIME EXTENSION IS TO COVER DISRUPTIONS TO THE CONTRACT SCHEDULED CRITICAL PATH TASK. THESE DISRUPTIONS OR DELAYS WERE GOVERNMENT DEVIATIONS TO DESIGN, OR WORK FLOW.
Amount: $2,957
Award Description: RECOVERY. ROBERT A. YOUNG FEDERAL BUILDING 1222 SPRUCE STREET ST. LOUIS, MO 63103 WORK TO BE COMPLETED UNDER THIS MODIFICATION INCLUDES BUT IS NOT LIMITED TO: COMPLETE FLOORING OVER WEEKEND HOURS, ADD TWO DRAIN VALVES TO SOUP WELLS AND TO INVESTIGATE AHU ISSUES.
Amount: $3,008
Award Description: RECOVERY. ROBERT A. YOUNG FEDERAL BUILDING 1222 SPRUCE STREET ST. LOUIS, MO 63103 WORK TO BE COMPLETED UNDER THIS MODIFICATION INCLUDE BUT IS NOT LIMITED TO: THIS CHANGE PROVIDES FOR THE REFURBISHING OF THE WEST ENGRANCE TO THE CAFETERIA FLOORING. WORK WILL INCLUDE REMOVING THE EXISTING VCT FLOORING, MINOR FLOOR PREP, INSTALLING NEW VCT FLOORING, REMOVING OLD AND INSTALLING NEW WALL BASE. ALL MATERIALS SHOULD MATCH THE CAFETERIA.
Amount: $14,059
Award Description: ROBERT A. YOUNG FEDERAL BUILDING 1222 SPRUCE STREET ST. LOUIS, MO 63103 WORK TO BE COMPLETED UNDER THIS MODIFICATION INCLUDE BUT IS NOT LIMITED TO: RELOCATION OF THE GREASE PIT, PROVIDE A STAND FOR THE GREASE PIT, RELOCATION OF THE KITCHEN EXHAUST AND REVISION OF THE ENTRY LIGHT SYSTEM.
Amount: $14,100
Award Description: ROBERT A. YOUNG FEDERAL BUILDING 1222 SPRUCE STREET ST. LOUIS, MO 63103 WORK TO BE COMPLETED UNDER THIS MODIFICATION INCLUDE BUT IS NOT LIMITED TO: REPLACING THE SERVERY CORK FLOORING WITH PORCELAIN FLOOR TILE. THIS IS A PRICE TO BE DETERMINTED LATER MODIFICATION WHICH WILL BE SETTLED IN A FUTURE MODIFICATION.
Amount: $23,721
Award Description: RECOVERY. ROBERT A. YOUNG FEDERAL BUILDING 1222 SPRUCE STREET ST. LOUIS, MO 63103 WORK TO BE COMPLETED UNDER THIS MODIFICATION INCLUDE BUT IS NOT LIMITED TO: REPAIR LEAKING FLOOR DRAINS AND TO PROVIDE COMBINATION PROOFING/HOLDING CABINET. MODIFICATION ALSO DEOBLIGATES FUNDS FOR LIGHTS AT ENTRY SIGN WHICH WERE REPLACED IN A DIFFERENT MODIFICATION.
Amount: $59,420
Award Description: RECOVERY. TAS::47 4543::TAS ROBERT A YOUNG FEDERAL BUILDING 1222 SPRUCE ST ST. LOUIS, MO 63103 WORK TO BE COMPLETED UNDER THIS MODIFICATION INCLUDE BUT IS NOT LIMITED TO: REPLACEMENT OF NON-FUNCTIONING WATER TEMPERATURE BOOSTER, RELOCATION OF SPRINKLER PIPING AND FOR REPLACEMENT OF FIVE WATER SHUT-OFF VALVES AT NEW ICE MAKERS.
Amount: $67,773
Award Description: RECOVERY. TAS::47 4543::TAS ROBERT A. YOUNG FEDERAL BUILDING 1222 SPRUCE STREET ST. LOUIS, MO 63103 WORK TO BE COMPLETED UNDER THIS MODIFICATION INCLUDE BUT IS NOT LIMITED TO: REPLACEMENT OF THE EXISTING AIR CONDITIONING UNIT AT THE CONVENIENCE FOOD SHOP.
Amount: $12,344
Award Description: RECOVERY. ROBERT A. YOUNG FEDERAL BUILDING 1222 SPRUCE STREET ST. LOUIS, MO 63103 WORK TO BE COMPLETED UNDER THIS MODIFICATION INCLUDE BUT IS NOT LIMITED TO: REVISION OF CEILINGS, BULKHEADS AND THE REINSTALLATION OF FIREMAN'S JACK. THE MODIFICATION ALSO INCLUDES WORK FOR CORE DRILLING AND FOR THE INSTALLATION OF CERAMIC TILE.
Amount: $3,000
Award Description: RECOVERY. ROBERT A. YOUNG FEDERAL BUILDING 1222 SPRUCE STREET ST. LOUIS, MO 63103 WORK TO BE COMPLETED UNDER THIS MODIFICATION INCLUDE BUT IS NOT LIMITED TO: REVISE SPRINKLERS IN SERVERY PER FRI-86 AND PER DRAWINGS FP X 02 AND FP X 03. WORK TO BE VERIFIED WITH AHERN'S TIME TICKET DATED 4/12/2010 AND RFI-86 WORK.
Amount: $0
Award Description: RECOVERY: ARRA SEWER REPLACEMENT (IMO00096) 4300 GOODFELLOW ST. LOUIS, MO MODIFICATION PS02 THIS MODIFICATION IS FOR INSTALLATION OF TEMPORARY SECURITY FENCING AND GATES OF THE SAME TYPE AND STYLE AS THE EXISTING CAMPUS PERIMETER FENCING. ALSO TEMPORARY SECURITY FENCING NEAR DETENTION POND AREA BETWEEN BUILDINGS 102 AND 103. THIS FENCING AND GATES WILL BASICALLY AROUND THE PERIMETER OF THE ENTIRE PROJECT AREA. THE CONTRACTOR WILL SUBMIT A DRAWING DETAILING FENCE AND GATE MATERIAL AND PLACEMENT LOCATION. THIS MODIFICATION PS02 IS TO DRAW DOWN AGAINST THE GMP.
Amount: $6,000,000
Award Description: ARRA SEWER REPLACEMENT (IMO00096) THE FEDERAL CENTER 4300 GOODFELLOW ST. LOUIS, MO MODIFICATION PS01 TO ADD FUNDS TO INCREASE GMP. THIS INCREASE WILL ALLOW THIS PROJECT TO BE COMPLETED USING ENVIROMENTALLY FRIENDLY MATERIALS AND PROVIDE A SUSTAINABLE DESIGN.
Amount: -$5,663
Award Description: RECOVERY. ROBERT A. YOUNG FEDERAL BUILDING 1222 SPRUCE STREET ST. LOUIS, MO 63103 THIS MODIFICATION IS A DEFINITIZATION OF CHANGE ORDER, FOR PRICE TO BE DETERMINED LATER MODIFICATION SIGNED EARLER (PC19). ACTION PC19 WAS SIGNED FOR $14,100 BUT THIS THE AGREED UPON WORK PRICE OF THIS ACTION $8,437. THE DIFFERENCE IS THIS MODIFICATION.
Amount: -$303,966
Award Description: RECOVERY. GOODFELLOW FEDERAL CENTER 4300 GOODFELLOW BLVD ST. LOUIS, MO 63120 MODIFICATION IS TO DEOBLIGATE FUNDS IN THE AMOUNT OF $303,966.00. THE SAME DOLLAR AMOUNT WILL BE AWARDED TO THE A/E FIRM TO PROPERLY COMPLETE DESIGN DOCUMENTS.
Amount: $0
Award Description: MODIFICATION PS05 (P-5) ARRA VA 104 HVAC (IMO00097) FEDERAL CENTER BUILDING 104 4300 GOODFELLOW ST. LOUIS, MO THIS MODIFICATION PS05 IS HEREBY ISSUED TO PROVIDE THE FOLLOWING: PROVIDE CHANGES TO ELECTRICAL POWER REQUIREMENTS AS INDICATED ON RESPONSES TO RFI #41 (120 VOLT ELECTRICAL CIRCUITS) AND RFI #46 (HEAT RECOVERY WHEEL POWER) AND ELECTRICAL POWER FOR UVC EMITTERS LOCATED IN EACH OF THE AHU'S AND VAU'S (8 TOTAL UNITS). PROVIDE FIRE DAMPERS AS INDICATED IN THE RESPONSE TO RFI #52 (B15 FIRE DAMPERS). THIS IS A $0 DOLLAR MODIFICATION THAT IS A DRAW DOWN FROM THE PREVIOUSLY ESTABLISHED GMP. THE DRAW DOWN AMOUNT IS $32,130.00.
Amount: $0
Award Description: MODIFICATION PS43 (P-35) ARRA ENVELOPE IMPROVEMENTS (IMO00090 - ENVELOPE) ROBERT A. YOUNG FEDERAL BUILDING 1222 SPRUCE ST. LOUIS, MO THIS MODIFICATION PS43 IS A ZERO DOLLAR ($0) MODIFICATION DUE TO THE FACT THAT IT IS FUNDED VIA A DRAW DOWN FROM THE PREVIOUSLY ESTABLISHED GMP FOR THIS PROJECT. THE TOTAL AMOUNT OF THIS DRAW DOWN FROM THE PREVIOUSLY ESTABLISHED GMP WITH THIS MODIFICATION PS43 IS $434,903.00. THIS MODIFICATION PS43 PROVIDES FOR THE CONSTRUCTION OF THE SOUTHEAST ENTRY BASED ON 100% CONTRACT DRAWINGS AND SPECIFICATION. ALSO, WITH THIS MODIFICATION PS43, THERE IS A 39 CALENDAR DAY TIME EXTENSION TO BE ADDED.
Amount: -$153,565
Award Description: MODIFICATION PS44 (P-38) ARRA ENVELOPE IMPROVEMENTS (IMO00090) ROBERT A. YOUNG FEDERAL BUILDING 1222 SPRUCE ST. LOUIS, MO REDUCE GMP ON THIS CONTRACT BY $153,565.00 CURRENT GMP = $27,157,259.00 PS44 GMP DEDUCT = $153,565.00 NEW GMP = $27,003,694.00
Amount: $0
Award Description: MODIFICATION PS 36 (P-31) ARRA ENVELOPE IMPROVEMENTS (IMO00090) ROBERT A. YOUNG FEDERAL BUILDING 1222 SPRUCE ST. LOUIS, MO THIS MODIFICATION PS36 IS HEREBY ISSUED TO PROVIDE FOR ADDITIONAL OVERHEAD PROTECTION OVER THE CHILDCARE PLAY DECK. ADDITIONAL FRAMING, DECKING, HOISTING, LABOR AND INCIDENTALS ARE ALL INCLUDED FOR A COMPLETE SYSTEM. THIS MODIFICATION PS36 IS A ZERO DOLLAR MODIFICATION BASED ON THE FACT THAT IT IS FUNDED VIA A DRAW DOWN FROM THE PREVIOUSLY ESTABLISHED GMP. THE TOTAL AMOUNT OF THE DRAW DOWN FROM THE PREVIOUSLY ESTABLISHED GMP WITH THIS MODIFICATION PS36 IS $17,395.00.
Amount: $0
Award Description: MODIFICATION PS41 (P-34) ARRA ENVELOPE IMPROVEMENTS (IMO00090) ROBERT A. YOUNG FEDERAL BUILDING 1222 SPRUCE ST. LOUIS, MO THIS MODIFICATION PS41 IS A ZERO DOLLAR MODIFICATION BASED ON THE FACT THAT IT IS FUNDED VIA A DRAW DOWN FROM THE PREVIOUSLY ESTABLISHED GMP FOR THIS PROJECT. THE TOTAL AMOUNT OF THE DRAW DOWN FROM THE PREVIOUSLY ESTABLISHED GMP WITH THIS MODIFICATION PS41 IS $4,969.00. THIS MODIFICATION PS41 PROVIDES FOR THREE (3) NEW SASHES FOR WINDOW TYPE B2B. NO FRAME IS REQUIRED. LABOR FOR INSTALLATION IS ALREADY IN CONTRACT. GLAZING SHALL MATCH WHAT IS CURRENTLY BEING INSTALLED. NO EXTENSION OF TIME IS PROPOSED FOR THIS MODIFICATION PS41.
Amount: $0
Award Description: MODIFICATION PS38 (FIRM FIX PRICE PC34 PDL - P30) ARRA ENVELOPE IMPROVEMENTS (IMO00090) ROBERT A. YOUNG FEDERAL BUILDING 1222 SPRUCE ST. LOUIS, MO THIS MODIFICATION PS38 IS HEREBY ISSUED TO: - REPLACE IGU'S FOR 68 WINDOWS ON EAST AND NORTH. - PROVIDE ADDITIONAL EQUIPMENT AND TRAINING REQUIRED TO ADD ADDITIONAL CREWS FOR INSTALLATION OF WINDOWS. - COSTS TO KOCH AND GRAHAM ASSOCIATED WITH MANUFACTURING AND PRODUCTION IN EXPENSES AND DOWNTIME. - 45 CALENDAR DAY EXTENSION OF THE WINDOWS FROM 10/22/11 TO 12/06/11. THIS IS A ZERO DOLLAR ($0) MODIFICATION AND IS AN "ADD" BACK TO THE PREVIOUSLY ESTABLISHED GMP BASED ON THE FACT THAT THE PDL AMOUNT WAS GREATER THAN THE ACTUAL AMOUNT ALLOWED FOR THIS MODIFICATION. FFP SETTLEMENT OF MOD PC34 W/THIS MOD PS38 = $387,234.00 PC34 PDL AMOUNT PREVIOUSLY DRAWN DOWN = $400,000.00 NET CHANGE AMOUNT WITH THIS MOD PS38 = -$12,766.00
Amount: $850,000
Award Description: MODIFICATION PS32 (P-28) ARRA ENVELOPE IMPROVEMENTS (IMO00090) ROBERT A. YOUNG FEDERAL BUILDING 1222 SPRUCE STREET ST. LOUIS, MO THIS MODIFICATION PS32 IS HEREBY ISSUED TO PROVIDE FOR THE INSTALLATION OF HELICAL ANCHORS, INCREASE QUANTITIES OF BRICK SALVAGE AND COMPLETION OF THE SOUTHEAST ENTRY WAY. THIS MODIFICATION PS32 IS ADDING ADDITIONAL NEW MONEY TO THE GMP FOR THIS PROJECT. THE CURRENT CONTRACT GMP = $26,307,259.00 ADDITIONAL PER MOD PS32 = $850,000.00 NEW GMP AMOUNT AFTER MOD PS32 = $27,257,259.00 NO ADDITIONAL TIME EXTENSION.
Amount: $0
Award Description: MODIFICATION PS45 (P-39) ARRA ENVELOPE IMPROVEMENTS (IMO00090-ENVELOPE) ROBERT A. YOUNG FEDERAL BUILDING 1222 SPRUCE ST. LOUIS, MO THIS MODIFICATION PS45 (P-39) IS HEREBY EXECUTED FOR THE FOLLOWING: REVISION OF THE CURRENT CONTRACT COMPLETION DATE BY ADDITION OF 50 CALENDAR DAYS. THE CONTRACT COMPLETION DATE WILL GO FROM 09/30/2011 TO 11/19/2011. THIS TIME EXTENSION IS DUE TO THE STRIKE THAT SHUT DOWN THE MASONRY PORTION OF THE PROJECT FOR 50 CALENDAR DAYS. THIS MODIFICATION ONLY EXTENDS THE SUBSTANTIAL COMPLETION DATE FOR THE MASONRY PORTION OF THE PROJECT (NOT THE WINDOW PORTION OF THE PROJECT). THIS IS A NON-COMPENSABLE MODIFICATION.
Amount: $0
Award Description: MODIFICATION PS42 (P-33) ARRA ENVELOPE IMPROVEMENTS (IMO00090 - ENVELOPE) ROBERT A. YOUNG FEDERAL BUILDING 1222 SPRUCE ST. LOUIS, MO THIS MODIFICATION PS42 IS A ZERO DOLLAR MODIFICATION DUE TO THE FACT THAT IT IS FUNDED VIA A DRAW DOWN FROM THE PREVIOUSLY ESTABLISHED GMP FOR THIS PROJECT. THE TOTAL AMOUNT OF THIS DRAW DOWN FROM THE PREVIOUSLY ESTABLISHED GMP WITH THIS MODIFICATION PS42 IS $17,493.00. THIS MODIFICATION PS42 PROVIDES FOR WEEKEND WORK ABOVE THE CHILD CARE PLAY DECK. THIS IS MEANT TO EXPEDITE WORK OVER THE PLAY DECK IN AN EFFORT TO MINIMIZE THE IMPACT TO THE CHILD CARE OPERATIONS. WORK SHALL INCLUDE 2 SHIFTS OF 20 MINE ON SATURDAYS AND 2 SHIFTS OF 20 MEN ON SUNDAYS. NO EXTENSION OF TIME IS PROPOSED FOR THIS MODIFICATION PS42.
Amount: $0
Award Description: MODIFICATION PS40 (P-37) ARRA ENVELOPE IMPROVEMENTS (IMO00090) ROBERT A. YOUNG FEDERAL BUILDING 1222 SPRUCE ST. LOUIS, MO THIS MODIFICATION PS40 IS A ZERO DOLLAR MODIFICATION BASED ON THE FACT THAT IT IS FUNDED VIA A DRAW DOWN FROM THE PREVIOUSLY ESTABLISHED GMP. THE TOTAL AMOUNT OF THE DRAW DOWN FROM THE PREVIOUSLY ESTABLISHED GMP WITH THIS MODIFICATION PS40 IS $2,111.00. THIS MODIFICATION PS40 PROVIDES FOR EXTENDING VERTICAL CALUK JOINTS FROM 6 INCHES TO FULL HIEGHT AT JAMBS AND MULLIONS OF WINDOW TYPES B, C, AND D. THIS MODIFICATION PS40 ALSO PROVIDES FOR NOT INSTALLING FINISH CAULK BEAD AT THE BOTTOM OF THE SILL TO DRYWALL ON THE INTERIOR SIDE OF THE WALL FOR WINDOW TYPES B, C, AND D. NO EXTENTION OF TIME IS PROPOSED FOR THIS MODIFICATION PS40.
Amount: $0
Award Description: THIS ADMINISTRATIVE MODIFICATION PA39 IS HEREBY ISSUED TO: ADD NEW WAGE RATES EFFECTIVE 05/06/2011.
Amount: $0
Award Description: MODIFICATION PS37 (P-29). THIS MODIFICATION PS37 FIRM FIX PRICE SETTLES PDL PC33 ARRA ENVELOPE IMPROVEMENTS (IMO00090) ROBERT A. YOUNG FEDERAL BUILDING 1222 SPRUCE ST. LOUIS, MO THIS MODIFICATION PS37 IS HEREBY ISSUED TO REMOVE FLOOR TILE FROM FLOORS 11 THRU 18 IN THE TOWER AND PROVIDE INDEPENDENT MONITORING/TESTING PER THE ATTACHED SPECIFICATIONS. THIS MODIFICATION PS37 IS A ZERO DOLLAR MODIFICATION BASED ON THE FACT THAT IT IS FUNDED VIA A DRAWDOWN FROM THE PREVIOUSLY ESTABLISHED GMP. ACTUAL FIRM PRICE SETTELEMENT W/THIS MOD PS37=$81,230.00 ORIGINAL PDL PC33 AMOUNT (PREVIOUS DRAWDOWN)=$44,000.00 NET CHANGE (ADDITIONAL DRAWDOWN W/THIS MOD PS37)=$37,230.00
Amount: $0
Award Description: MODIFICATION PS06 (P-7) ARRA VA 104 HVAC (IMO00097) FEDERAL CENTER BUILDING 104 4300 GOODFELLOW ST. LOUIS, MO THIS MODIFICATION PS06 IS HEREBY ISSUED TO PROVIDE THE FOLLOWING: PROVIDE STRUCTURAL BEAMS AND CHANGES TO DRAWINGS AND INDICATED ON RESPONSES TO RFI 45, RFI 64, RFI 65. RELOCATE CONTROLS JUNCTION BOX AND ASSOCIATED CONTROLS AS INDICATED IN THE RESPONSE TO RFI 48. REMOVE REQUIREMENT TO RELOCATE LADDER IN PENTHOUSE E AS INDICATED IN RESPONSE TO RFI 51. PROVID INSULATION ON THE RETURN AIR DUCTWORK IN THE PENTHOUSES AS INDICATD ON RESPONSE TO RFI 58. THIS IS A $0 DOLLAR MODIFICATION THAT IS A DRAW DOWN FROM THE PREVIOUSLY ESTABLISHED GMP. THE TOTAL AMOUNT OF THIS DRAWDOWN FOR MODIFICATION PS06 IS $12,664.00.
Amount: $34
Award Description: PA13. (SEE PS12 FOR EXPLAINATION)
Amount: $4,054
Award Description: MODIFICATION PS09 ARRA VA104 (IMO00097) FEDERAL CENTER 4300 GOODFELLOW ST. LOUIS, MO BUILDING 104 OPTION 1 - OFFICE/MAILROOM RENOVATION: PROVIDE THE FOLLOWING ITEMS AS PART OF THIS PROJECT: -CARPET -COVEBASE -VCT -PAINTING THIS MODIFICATION PS09 IS IN CONJUNCTION WITH MODIFICATION PS10 (ARRA FUNDING STRING AND NON-ARRA FUNDING STRING REQUIRED 2 SEPERATE MODIFICATIONS TO BE ENTERED IN COMPRIZON.)
Amount: -$27,098
Award Description: MODIFICATION PA24 (P-23) ARRA SEWER REPLACEMENT (IMO00096) FEDERAL CENTER 4300 GOODFELLOW ST. LOUIS, MO THIS UNILATERAL MODIFICATION IS HEREBY ISSUED TO DE-OBLIGATE FUNDS FROM THIS CONTRACT TO AWARD TO DHS FOR GUARD SERVICES FOR: 03/28/2011 THRU 06/03/2011. OBLIGATE TO DHS: SWA# R0611FNP4M11 THIS REDUCES THE OVERALL GMP BY $-27,098.27
Amount: $0
Award Description: MODIFICATION PS27 (P-26) ARRA SEWER REPLACEMENT (IMO00096) 4300 GOODFELLOW ST. LOUIS, MO THIS MODIFICATION PS27 IS HEREBY ISSUED FOR THE FOLLOWING: - PROVIDE FOR THE MODIFICATION OF MH 25, CHANGE NEW SANITARY TO 8" PVC, AND RAISE THE 4TH STREET SANITARY BETWEEN MH 25 AND MH 26 PER REVISED DRAWING CU 3 04, REVISION 5, DATED 03/29/2011. THE NEW INVERT TO BE POURED IN MH 26 AFTER ABANDONMENT OF THE EXISTING 24" SANITARY IS INCLUDED IN THIS SCOPE OF WORK AND WILL BE INSTALLED AT A LATER DATE. THIS IS A $0 (ZERO DOLLAR) MODIFICATION. THIS MODIFICATION PS27 IS FUNDED VIA A PREVIOUSLY ESTABLISHED GMP. THIS IS A CREDIT TO THE PREVIOUSLY ESTABLISHED GMP IN THE AMOUNT OF (-$11,349.00).
Amount: $0
Award Description: MODIFICATION PS26 (P-22) ARRA SEWER REPLACEMENT (IMO00096) 4300 GOODFELLOW ST. LOUIS, MO THIS MODIFICATION PS26 IS HEREBY ISSUED FOR THE FOLLOWING: -PROVIDE CHANGES TO THE WORK AS DIRECTED IN RESPONSE TO RFI12,14,19 AND 20. - PROVIDE FOR THE REMOVAL OF THE CONCRETE ENCASEMENT ON THE EXISTING 24" SANITARY SEWER UNDER 5TH ST. TO ALLOW CONSTRUCTION OF NEW SANITARY MH 9. THIS IS A $0 (ZERO DOLLAR) MODIFICATION. THIS MODIFICATION PS26 IS FUNDED VIA A PREVIOUSLY ESTABLISHED GMP. THIS IS A CREDIT TO THE PREVIOUSLY ESTABLISHED GMP IN THE AMOUNT OF (-$34,772.00).
Amount: $0
Award Description: MODIFICATION PS38 (FIRM FIX PRICE PC35 PDL - P33) ARRA SEWER REPLACEMENT (IMO00096) FEDERAL CENTER 4300 GOODFELLOW ST. LOUIS, MO THIS MODIFICATION PS38 IS HEREBY ISSUED TO: -PROVIDE FOR VIDEO INSPECTION OF THE EXISTING 15" VCP SEWER CONNECTING FROM THE WEST INTO EXISTING STRUCTURE 328 LOCATED IN 3RD STREET AT THE SE CORNER OF BUILDING 103F DOCK. THIS IS A ZERO DOLLAR ($0) MODIFICATION AND IS A DRAWDOWN FROM THE PREVIOIUSLY ESTABLISHED GMP FOR THIS PROJECT. HOWEVER, BECAUSE THIS FIRM PRICE SETTELEMENT AMOUNT IS LOWER THAN THE PDL AMOUNT, THE NET AMOUNT WILL BE ADDED BACK INTO THE GMP NOT FFP AND SUBTRACTED FROM THE TOTAL GMP FFP. FP SETTELEMENT OF MOD PC35 PDL W/THIS MOD PS38 = $1,429 PC35 PDL AMOUNT PREVIOUSLY DRAWN DOWN = $1,446 NET CHANGE AMOUNT WITH THIS MOD PS38 = -$17
Amount: $0
Award Description: MODIFICATION PS37 (FIRM FIX PRICE PC34 PDL) ARRA SEWER REPLACEMENT (IMO00096) FEDERAL CENTER 4300 GOODFELLOW ST. LOUIS, MO THIS MODIFICATION PS37 IS HEREBY ISSUED TO: - PROVIDE FOR REVISIONS TO THE 3RD STREET STORM AND SANITARY SEWERS PER REVISED DRAWING CU 3 02, REVISION 9 DATED 5/20/2011. THIS IS A ZERO DOLLAR ($0) MODIFICATION AND IS A DRAWDOWN FROM THE PREVIOUSLY ESTABLISHED GMP FOR THIS PROJECT. THE TOTAL DRAWDOWN AMOUNT FOR THIE MODIFICATION PS37 IS AS FOLLOWS: FIRM PRICE SETTELEMENT OF MOD PC34 PDL = $15,456 PC34 PDL AMOUNT PREVIOUSLY DRAWNDOWN = $14,438 NET AMOUNT ADDITIONALLY DRAWNDOWN W/THIS MOD PS37 = $1,018
Amount: $0
Award Description: MODIFICATION PS40 (P-34) ARRA SEWER REPLACEMENT (IMO00096) FEDERAL CENTER 4300 GOODFELLOW ST. LOUIS, MO THIS MODIFICATION PS40 IS HEREBY ISSUED FOR THE COMPLETION OF THE FOLLOWING: - ADDITIONAL INLET IN E LOT PER RFI #41. - CORRECTION FOR PRICING ERRORS MADE BY THE CONTRACTOR ON MODIFICATION PS32 FOR CONCRETE FLATWORK FOR PHASE 2B AND PHASE 2C. - CREDIT FOR DE-SCOPE OF WORK SPECIFIED. THIS IS A ZERO DOLLAR ($0) MODIFICATION AND IS A DRAWDOWN FROM THE PREVIOUSLY ESTABLISHED GMP FOR THIS PROJECT. THE TOTAL DRAWDOWN AMOUNT FOR THIS MODIFICATION PS40 IS $21,832.00. NO TIME EXTENSION IS GRANTED WITH THIS MODIFICATION PS40.
Amount: $0
Award Description: MODIFICATION PS28 (P-27) ARRA SEWER REPLACEMENT (IMO00096) FEDERAL CENTER 4300 GOODFELLOW ST. LOUIS, MO THIS MODIFICATION PS28 IS HEREBY ISSUED TO EXTEND THE PHASE 1 COMPLETION DATE BY AN ADDITIONAL 42 CALENDAR DAYS. THE CURRENT PHASE 1 SUBSTANTIAL COMPLETION WAS ESTABLISHED BY MODIFICATION PS23 AS 04/15/2011. THIS MODIFICATION PS28 WILL EXTEND THIS BY AN ADDITIONAL 42 DAYS TO 05/27/2011. THIS IS A ZERO DOLLAR MODIFICATION AND THERE IS NO AFFECT ON THE GMP WITH THIS MODIFICATION PS28.
Amount: -$6,723
Award Description: MODIFICATION PA22 (P-21) SEWER REPLACEMENT (IMO00096) FEDERAL CENTER 4300 GOODFELLOW ST. LOUIS, MO THIS UNILATERAL MODIFICATION PA22 IS HEREBY ISSUED TO DE-OBLIGATE FUNDS FROM THE CONTRACT. THIS MODIFICATION PA22 IS TO CORRECT AN INTERNAL SYSTEM PROBLEM AND TO REPLACE THE INTERNAL COMPRIZON ACTIONS TAKEN WITH MODIFICATIONS PA20 AND PA21.
Amount: $0
Award Description: MODIFICATION PS29 (P-25) ARRA SEWER REPLACEMENT (IMO00096) FEDERAL CENTER 4300 GOODFELLOW ST. LOUIS, MO THIS MODIFICATION PS29 IS HEREBY ISSUED TO: -REMOVE AND REPLACE ONE EXISTING CURB INLET -PROVIDE PARKING LOT STRIPING -DELETE REMOVAL OF EXISTING ISLAND CURBS AND BACKFILL -REMOVE 4 TREES AND GRIND STUMPS -REMOVE EXISTING PERIMETER FENCE -PROVIDE CHANGES TO WORK AS DIRECTED IN RESPONSE TO RFI 26 THIS IS A ZERO DOLLAR MODIFICATION. THIS IS A DRAWDOWN OF $14,986.00 FROM THE PREVIOUSLY ESTABLISHED GMP.
Amount: $0
Award Description: MODIFICATION PS33 (FIRM FIX PRICE PC30 PDL) ARRA SEWER REPLACEMENT (IMO00096) FEDERAL CENTER 4300 GOODFELLOW ST. LOUIS, MO THIS MODIFICATION PS33 IS HEREBY ISSUED TO: -PERFORM ADDITIONAL PAVEMENT MILLING, ASPHALT OVERLAY, CURB/GUTTER REVISIONS, AND ANY INCIDENTAL WORK AS INDICATED ON PLAN SHEET CG 1 10, DATED APRIL 29, 2011, BY TENG&ASSOCIATES (AE FIRM). THIS IS A $0 DOLLAR MODIFICATION AND IS A DRAWDOWN FROM THE PREVIOUSLY ESTABLISHED GMP FOR THIS PROJECT. THE TOTAL DRAWDOWN AMOUNT FOR THIS MODIFICATION PS33 IS AS FOLLOWS: FPS OF MOD PC30 PDL = $28,983.00 PDL AMOUNT (PC30) = $18,000.00(PREVIOUSLY DRAWN DOWN) NET CHANGE = $10,983.00(DRAW DOWN W/THIS MOD PS30)
Amount: $0
Award Description: MODIFICATION PC34 PDL ARRA SEWER REPLACEMENT (IMO00096) FEDERAL CENTER 4300 GOODFELLOW ST. LOUIS, MO THIS MODIFICATION PC34 IS HEREBY ISSUED TO: - PROVIDE FOR REVISIONS TO THE 3RD STREET STORM AND SANITARY SEWERS PER THE REVISED DRAWING CU 3 02, REVISION 9, DATED 05/20/2011. THIS PDL PC34 REPRESENTS A $0 DOLLAR MODIFICATION AND IS A DRAWDOWN IN THE AMOUNT OF 14,438.00 FROM THE ORIGINAL GMP FOR THIS PROJECT.
Amount: $0
Award Description: MODIFICATION PS32 (P-28) ARRA SEWER REPLACEMENT (IMO00096) FEDERAL CENTER 4300 GOODFELLOW ST. LOUIS, MO THIS MODIFICATION PS32 IS HEREBY ISSUED FOR THE COMPLETION OF THE FOLLOWING WORK: - PHASE 2B, 2C, AND 3A CONTRACTED WORK TO INCLUDE PROJECT AND SPECIFICATIONS FROM TENG&ASSOCIATES (AE). - ALL TESTING, ADDENDUMS, AND AMENDMENTS. - PHASE 3A OPTION 1 TO INCLUDE REMOVALS, SEWER WORK, AND RESTORATION WORK AFTER REMOVAL OF THE "CALIFORNIA ROOM" AT SOUTH END OF BUILDING 107. - OVERALL CONTRACT COMPLETION DATE REVISED BY THIS MODIFICATION PS32 TO CONTRACT COMPLETION BY SEPTEMBER 30, 2011. THIS IS A $0 DOLLAR MODIFICATION AND IS A DRAWDOWN FROM THE PREVIOUSLY ESTABLISHE GMP FOR THIS PROJECT. THE TOTAL DRAWDOWN AMOUNT FOR THIS MODIFICATION PS32 IS $4,306,832.00.
Amount: $0
Award Description: MODIFICATION PS42 (P-37) ARRA SEWER REPLACEMENT (IMO00096) FEDERAL CENTER 4300 GOODFELLOW ST. LOUIS, MO THIS MODIFICATION PS42 IS HEREBY ISSUED FOR THE COMPLETION OF THE FOLLOWING: - REMOVAL OF 5 TREES AND TRIMMING OF 3 TREES - REMOVAL OF UNSUITABLE SUBGRADE - REMOVAL OF EXISTING RAILROAD TRACKS - DELETE REMOVAL AND DISPOSAL OF UNSUITABLE MATERIAL - DELETE RAILROAD TRACK REMOVAL - ADJUSTMENT OF ASPHALT MATERIAL PRICING PLACED IN PHASE 2A. THIS IS A ZERO DOLLAR ($0) MODIFICATION AND IS A DRAWDOWN FROM THE PREVIOUSLY ESTABLISHED GMP IN THE AMOUNT OF $13,805.00. THERE IS NO TIME EXTENSION ASSOCIATED WITH THIS MODIFICATION PS42.
Amount: $0
Award Description: P-29, MODIFICATION PC30 (PDL) ARRA SEWER REPLACEMENT (IMO00096) 4300 GOODFELLOW ST. LOUIS, MO THIS PDL PC30 IS HEREBY EXECUTED TO PROVIDE FOR ADDITIONAL PAVEMENT MILLING, ASPHALT OVERLAY, CURB/GUTTER REVISIONS, AND ANY INCIDENTAL WORK AS INDICATED ON PLAN SHEET CG 1 10, DATED APRIL 29, 2011 BY TENG&ASSOCIATES, INC. (AE FIRM). THIS IS A ZERO DOLLAR MODIFICATION WHICH WILL BE A DRAWDOWN AGAINST THE PREVIOUSLY DECIDED ON GMP IN THE AMOUNT OF $18,000.00.
Amount: $0
Award Description: MODIFICATION PC35 PDL ARRA SEWER REPLACEMENT (IMO00096) FEDERAL CENTER 4300 GOODFELLOW ST. LOUIS, MO THIS MODIFICATION PC35 IS HEREBY ISSUED TO: PROVIDE VIDEO INSPECTION OF EXISTING 15" VCP SEWER CONNECTING FROM WEST INTO THE EXISTING STRUCTURE 328 LOCATED IN 3RD STREET AT SE CORNER OF BUILDING 103F DOCK. THIS WILL PROVIDE FOR AN INVESTIGATION OF THE UPSTREAM CONNECTIONS TO DETERMINE APPROPRIATE CONNECTION TO THE NEW SANITARY OR STORM SEWER. THIS MODIFICATION PC34 IS A PDL AND ALSO REPRESENTS A $0 DOLLAR MODIFICATION. IT IS ALSO A DRAWDOWN IN THE AMOUNT OF $1,446.00 FROM THE ORIGINAL GMP FOR THIS PROJECT.
Amount: $0
Award Description: MODIFICATION PS31 (P-24) ARRA SEWER REPLACEMENT (IMO00096) FEDERAL CENTER 4300 GOODFELLOW ST. LOUIS, MO THIS MODIFICATION PS31 IS HEREBY ISSUED FOR REIMBURSEMENT TO USDA/NITC FOR THE POWER FAILURE TO THEIR SYSTEMS DUE TO AN INCIDENT IN OCTOBER 2010 CONCERNING THE UTILITIES TO BUILDINGS 103, 104, AND 105. THIS IS A $0 DOLLAR MODIFICATION AND IS A DRAWDOWN FROM THE PREVIOUSLY ESTABLISHED GMP FOR THIS PROJECT.
Amount: $0
Award Description: MODIFICATION PS39 (P-35) ARRA SEWER REPLACEMENT (IMO00096) 4300 GOODFELLOW ST. LOUIS, MO THIS MODIFICATION PS39 IS HEREBY ISSUED TO EXTEND THE PHASE 2A COMPLETION DATE FROM 07/02/11 TO 07/15/11 (ADDITIONAL 13 CALENDAR DAYS). THIS IS A ZERO DOLLAR ($0.00) MODIFICATION AND THERE IS NO AFFECT ON THE GMP WITH THIS MODIFICATION PS39.
Amount: $0
Award Description: MODIFICATION PS36 (P-31) ARRA SEWER REPLACEMENT (IMO00096) FEDERAL CENTER 4300 GOODFELLOW ST. LOUIS, MO THIS MODIFICATION PS36 IS HEREBY ISSUED FOR THE COMPLETION OF THE FOLLOWING WORK: - PROVIDE ADDITIONAL DRAIN NEAR SOUTH END OF BUILDING 105 ON 5TH STREET UNDER THE USDA DUMPSTER. - PROVIDE REVISIONS TO CURB INSTALLED EAST OF THE NITC GENERATOR PADS ON 4TH STREET. - PROVIDE ADJUSTMENT TO GRADE OF SANITARY MH 3 AT THE DRY POND. THIS IS A ZERO DOLLAR ($0) MODIFICATION AND IS A DRAWDOWN FROM A PREVIOUSLY ESTABLISHED GMP FOR THIS PROJECT. THE TOTAL DRAWDOWN AMOUNT FOR THIS MODIFICATION PS36 IS $5,251.00. NO TIME EXTENSION IS GRANTED WITH THIS MODIFICATION PS36.
Amount: $0
Award Description: MODIFICATION PS41 (P-30) ARRA SEWER REPLACEMENT (IMO00096) FEDERAL CENTER 4300 GOODFELLOW ST. LOUIS, MO THIS MODIFICATION PS41 IS HEREBY ISSUED FOR THE COMPLETION OF THE FOLLOWING: PROVIDE FOR INSTALLATION OF THE STORM AND SANITARY SEWERS ON PLAN SHEET CU 3 10 AND PHASE 2D ON PLAN SHEETS CS 1 02 AND CU 1 02. THIS IS A ZERO DOLLAR ($0) MODIFICATION AND IS A DRAWDOWN FROM THE PREVIOUS ESTABLISHED GMP IN THE AMOUNT OF $652,790.00. THERE IS ALSO A TIME EXTENSION OF 56 CALENDAR DAYS ATTACHED AND HEREBY EXECUTED AS A PART OF THIS MODIFICATION PS41.
Amount: $0
Award Description: MODIFICATION PS56 (P-49) ARRA ENVELOPE IMPROVEMENTS (IMO00090) ROBERT A. YOUNG FEDERAL BUILDING 1222 SPRUCE ST. LOUIS, MO 63103-2818 THIS MODIFICATION PS56 IS HEREBY ISSUED TO PROVIDE FOR THE FOLLOWING: - REPAIRS TO BUCKLING GRANITE ON RAMPS LEADING TO THE NORTH ENTRANCE SLIDING DOORS PER WJE DRAWINGS AND IN RESPONSE TO RFI 199. NO TIME EXTENSION. THIS IS A ZERO DOLLAR ($0) MODIFICATION AND WILL BE FUNDED VIA A DRAW DOWN FROM THE PREVIOUSLY ESTABLISHED GMP IN THE AMOUNT OF $12,506.00.
Amount: $0
Award Description: MODIFICATION PS55 (P-47) ARRA ENVELOPE IMPROVEMENTS (IMO00090) ROBERT A. YOUNG FEDERAL BUILDING 1222 SPRUCE ST. LOUIS, MO 63103-2818 THIS MODIFICATION PS55 IS HEREBY ISSUED TO PROVIDE FOR THE FOLLOWING: -PROVIDE REMOTE PUSH BUTTON AND WIRING FOR DOOR RELEASE AT THE SE ENTRY. - RE-INSTALL SECURITY CAMERA THAT WAS REMOVED FROM WALL DURING THE CONSTRUCTION OF THE SE ENTRY. NO TIME EXTENSION. THIS IS A ZERO DOLLAR ($0) MODIFICATION AND WILL BE FUNDED VIA A DRAW DOWN FROM THE PREVIOUSLY ESTABLISHED GMP IN THE AMOUNT OF $874.00.
Amount: $0
Award Description: MODIFICATION PS59 (P-48) ARRA ENVELOPE IMPROVEMENTS (IMO00090) ROBERT A. YOUNG FEDERAL BUILDING 1222 SPRUCE ST. LOUIS, MO 63103-2818 THIS MODIFICATION PS59 IS HEREBY ISSUED TO PROVIDE FOR THE FOLLOWING: - FINALIZING QUANTITIES AND ASSOCIATED COSTS FOR ALLOWANCES IDENTIFIED IN THE CONTRACT DOCUMENTS, P-15 AND P-17. - NO TIME EXTENSION. THIS IS A ZERO DOLLAR ($0) MODIFICATION AND IS A CREDIT OF $417,037.00. THIS MEANS THIS MONEY IS ADDED BACK INTO THE PREVIOUSLY AGREED UPON GMP FOR THIS PROJECT.
Amount: $0
Award Description: MODIFICATION PS61 (P-52) ARRA ENVELOPE IMPROVEMENTS (IMO00090) ROBERT A. YOUNG FEDERAL BUILDING 1222 SPRUCE ST. LOUIS, MO 63103-2818 THIS MODIFICATION PS61 IS HEREBY ISSUED TO PROVIDE FOR THE FOLLOWING: - CAULK - BRICK IN THE LOUVER OPENING LOCATED ON NORTH ELEVATION - REVISE DOOR OPERATION AT SE ENTRY - RELOCATE PVC GAS VENT PIPES NO TIME EXTENSION THIS IS A ZERO DOLLAR ($0) MOD AND IS FUNDED VIA A DRAWDOWN IN THE AMOUNT OF $18,383.00 FROM THE PREVIOUSLY ESTABLISHED GMP.
Amount: $0
Award Description: MODIFICATION PC47 (P-42) ARRA ENVELOPE IMPROVEMENTS (IMO00090) ROBERT A. YOUNG FEDERAL BUILDING 1222 SPRUCE ST. LOUIS, MO 63103-2818 THIS MODIFICATION PC47 IS A PDL AND IS HEREBY ISSUED TO PROVIDE FOR: - 10 HOUR SHIFTS, 1ST AND 2ND SHIFTS ONLY, MONDAY THROUGH FRIDAY. THIS CHANGE IS MEANT TO EXPEDITE WORK. THIS IS A $0 (ZERO) DOLLAR MODIFICATION BASED ON THE FACT THAT IT WILL BE FUNDED VIA A DRAWDOWN FROM THE PREVIOUSLY ESTABLISHED GMP IN THE AMOUNT OF $104,100.00. THIS AMOUNT WILL BE FIRM FIXED PRICED ON A PRICE TO BE DETERMINED LATER BASIS. THIS IS A PDL, SO AS NOT TO DELAY WORK. NO TIME EXTENSION HAS BEEN GRANTED IN ASSOCIATION WITH THIS MODIFICATION PC47.
Amount: $0
Award Description: MODIFICATION PC48 (P-43) ARRA ENVELOPE IMPROVEMENTS (IMO00090) ROBERT A. YOUNG FEDERAL BUILDING 1222 SPRUCE ST. LOUIS, MO 63103-2818 THIS MODIFICATION PC48 IS A PDL AND IS HEREBY ISSUED TO PROVIDE FOR THE FOLLOWING: - WINDOW OPENINGS REQUIRING ADDITIONAL WOOD FRAMING AND ANCHORAGE WILL BE COMPLETED. THIS IS A $0 (ZERO DOLLAR) MODIFICATION AND WILL BE FUNDED VIA A DRAWDOWN FROM THE PREVIOUSLY ESTABLISHED GMP IN THE AMOUNT OF $20,000.00. THIS AMOUNT WILL BE FIRM FIXED PRICED ON A PRICE TO BE DETERMINED LATER BASIS. THIS PDL IS SO THAT WORK WILL NOT BE DELAYED. NO TIME EXTENSION HAS BEEN GRANTED IN ASSOCIATION WITH THIS MODIFICATION PC48.
Amount: $0
Award Description: MODIFICATION PS52 (P-45) ARRA ENVELOPE IMPROVEMENTS (IMO00090) ROBERT A. YOUNG FEDERAL BUILDING 1222 SPRUCE ST. LOUIS, MO 63103-2818 THIS MODIFICATION PS52 IS HEREBY ISSUED TO PROVIDE FOR THE FOLLOWING: - PROVIDE A PRICE FOR CLAIMED OMISSION BY THE CONTRACTOR OF COST IN P-35 (NEW SE ENTRANCE). THESE COSTS SHALL BE ASSOCIATED WITH THE SPECIFIED INSTALLATION OF DDC CONTROLS. - NO EXTENSION OF TIME IS GRANTED WITH THIS MODIFICATION PS52. - GSA AGREED TO PROVIDE PAYMENT OF HALF OF THE COST ONLY. THIS IS A ZERO DOLLAR ($0) MODIFICATION AND WILL BE FUNDED VIA A DRAW DOWN FROMTHE PREVIOUSLY ESTABLISHED GMP IN THE AMOUNT OF $1,829.00.
Amount: $0
Award Description: MODIFICATION PS57 (P-50) ARRA ENVELOPE IMPROVEMENTS (IMO00090) ROBERT A. YOUNG FEDERAL BUILDING 1222 SPRUCE ST. LOUIS, MO 63103-2818 THIS MODIFICATION PS57 IS HEREBY ISSUED TO PROVIDE FOR THE FOLLOWING CONSTRUCTION SERVICES: - INSTALL MODIFIED BRACING FOR CURTAIN WALL TYPE H1 - INSTALL MODIFIED HEAD BRACING FOR CURTAIN WALL TYPE K1 - INSTALL MODIFIED HEAD BRACING FOR CURTAIN WALL TYPE K2 - PROVIDE RELOCATING 3 E1 CURTAIN WALL UNITS AND ONE E2 CURTAIN WALL UNIT INWARD. TRIM PIECES SHALL BE INCLUDED TO COVER THE NEW GAP WHERE THE WINDOW UNITS WERE ORIGINALLY SUPPOSED TO SIT. (CHILD CARE AREA) - NO TIME EXTENSION THIS IS A ZERO DOLLAR ($0) MODIFICATION AND WILL BE FUNDED VIA A DRAW DOWN FROM THE PREVIOUSLY ESTABLISHED GMP IN THE AMOUNT OF $14,558.00.
Amount: $0
Award Description: MODIFICATION PS62 (P-53) ARRA ENVELOPE IMPROVEMENTS (IMO00090) ROBERT A. YOUND FEDERAL BUILDING 1222 SPRUCE ST. LOUIS, MO 63103-2818 THIS MODIFICATION PS62 IS HEREBY ISSUED TO PROVIDE FOR THE FOLLOWING: - REPAIR / REPLACE BROKEN GRANITE PAVERS, STAIR TREADS AND RISERS AND WALL PANELS. - REPLACE DAMAGED GRANITE SOFFIT AND SURROUNDING DAMAGED GRANITE WALL PIECES. - GRIND OUT AND CALUK JOINTS IN BLACK GRANITE. - CUT OUT AND RE-CAULK PERIMETER OF BUILDING AT GRANITE TO SIDEWALK ON NORTH AND EAST ELEVATIONS. NO TIME EXTENSION. THIS IS A ZERO DOLLAR ($0) MOD AND IS FUNDED VIA A DRAWDOWN IN THE AMOUNT OF $43,911.00 FROM THE PREVIOUSLY ESTABLISHED GMP.
Amount: $0
Award Description: MODIFICATION PS63 (P-55) ARRA ENVELOPE IMPROVEMENTS (IMO00090) ROBERT A. YOUNG FEDERAL BUILDING 1222 SPRUCE ST. LOUIS, MO 63103-2818 THIS MODIFICATION PS63 IS HEREBY ISSUED TO PROVIDE FOR THE FOLLOWING: - REPLACE DOOR FRAMES, DOORS, HARDWARE, THRESHOLDS, WEATHER STRIP, SWEEPS, DOOR BOTTOM DRIP CAPS AND CLOSERS. - PROVIDE CREDIT FOR DAMAGES CAUSED TO DOORS, FRAMES AND HARDWARE THAT OCCURRED DURING CONSTRUCTION. NO TIME EXTENSION. THIS IS A ZERO DOLLAR ($0) MOD AND IS FUNDED VIA A DRAWDOWN IN THE AMOUNT OF $30,500.00 FROM THE PREVIOUSLY ESTABLISHED GMP.
Amount: $0
Award Description: MODIFICATION PS50 (P-41) ARRA ENVELOPE IMPROVEMENTS (IMO00090) ROBERT A. YOUNG FEDERAL BUILDING 1222 SPRUCE ST. LOUIS, MO 63103-2818 THIS MODIFICATION PS50 IS HEREBY ISSUED TO PROVIDE FOR THE FOLLOWING: - PROVIDE FOR WEEKEND WORK (SATURDAY WORK) FOR 1 OR 2 SHIFTS. THIS CHANGE IS TO EXPEDITE WORK. THIS MODIFICATION PS50 IS FOR 5 SATURDAYS OF WORK OR OTHERWISE CHANGED BY THE CO. THERE IS NO TIME EXTENSION ASSOCIATED WITH THIS MOD. THIS IS A ZERO DOLLAR ($0) MODIFICATION AND WILL BE FUNDED VIA A DRAW DOWN FROM THE PREVIOUSLY ESTABLISHED GMP IN THE AMOUNT OF $39,371.00.
Amount: $0
Award Description: MODIFICATION PS54 (FIRM FIX PRICE PC47 PDL - P42) ARRA ENVELOPE IMPROVEMENTS (IMO00090) ROBERT A. YOUNG FEDERAL BUILDING 1222 SPRUCE ST. LOUIS, MO 63102-1705 THIS MODIFICATION PS54 IS HEREBY ISSUED FOR THE FOLLOWING: - PROVIDE FOR WORKING 10 HOUR SHIFTS, 1ST AND 2ND SHIFTS, MONDAY THROUGH FRIDAY. THIS CHANGE IS NECESSARY TO EXPEDITE WORK. ONLY THE PREMIUM PORTION OF THE LABOR RATE SHALL BE INCLUDED IN THE PROPOSAL SINCE THIS WORK IS ALREADY PART OF THE CONTRACT. - NO TIME EXTENSION. THIS IS A ZERO DOLLAR ($0) MODIFICATION AND IS A REDUCTION OR DRAW DOWN TO THE OVERALL AVAILABLE GMP FOR THIS PROJECT. FFP SETTLEMENT OF MOD PC47 W/THIS MOD PS54 = $60,257 PC47 PDL AMOUNT PREVIOUSLY DRAWN DOWN FROM GMP = $104,100 NET CHANGE AMOUNT WITH THIS MOD PS54 = -$43,843
Amount: $0
Award Description: MODIFICATION PS49 (P-44) ARRA ENVELOPE IMPROVEMENTS (IMO00090) ROBERT A. YOUNG FEDERAL BUILDING 1222 SPRUCE ST. LOUIS, MO 63103-2818 THIS MODIFICATION PS49 IS HEREBY ISSUED TO PROVIDE FOR THE FOLLOWING: - TIME EXTENSION FOR THE MASONRY PORTION OF THE WORK ASSOCIATED WITH THIS PROJECT. THIS TIME EXTENSION IS 42 CALENDAR DAYS TO 12/31/2011. - DEFINITION OF WHAT CONSTITUTES SUBSTANTIAL COMPLETION. - UPDATED PROJECT SCHEDULE. - PUNCH LIST ITEMS BREAKDOWN. - VARIOUS CONDITIONS FOR THE CONTRACTOR AND GSA THAT ARE SPELLED OUT IN DETAIL ON THE SIGNED SF30. THIS IS A ZERO DOLLAR ($0) MODIFICATION AND WILL BE FUNDED VIA A DRAW DOWN FROM THE PREVIOUSLY ESTABLISHED GMP IN THE AMOUNT OF $62,872.00.
Amount: $0
Award Description: ARRA ENVELOPE IMPROVEMENTS (IMO00090) ROBERT A. YOUNG FEDERAL BUILDING 1222 SPRUCE ST. LOUIS, MO 63103-2818 THIS MODIFICATION PS64 IS HEREBY ISSUED TO PROVIDE FOR THE FOLLOWING: - REPAIRS TO TOWER PARAPET WALLS LOCATED ON LEVELS 12, 17, AND 21 (ROOF) DEPICTED ON MARKED-UP DRAWINGS. NO TIME EXTENSION THIS IS A ZERO DOLLAR ($0) MODIFICATION AND IS FUNDED VIA A DRAWDOWN IN THE AMOUNT OF $3,541.00 FROM THE PREVIOUSLY ESTABLISHED GMP.
Amount: -$500,000
Award Description: MODIFICATION PS60 (P-54) ARRA ENVELOPE IMPROVEMENTS (IMO00090) ROBERT A. YOUNG FEDERAL BUILDING 1222 SPRUCE ST. LOUIS, MO 63103-2818 THIS MODIFICATION PS60 IS HEREBY ISSUED TO PROVIDE FOR THE FOLLOWING: - REDUCE GMP (DEDUCT MOD). REDUCTION OF THE REMAINING GMP THAT IS HAD NOT YET BEEN FFP'D. NO CHANGE TO THE GMP THAT HAS ALREADY BEEN FFP'D. NO TIME EXTENSION.
Amount: $0
Award Description: MODIFICATION PS46 (P-40) ARRA ENVELOPE IMPROVEMENTS (IMO00090-ENVELOPE) ROBERT A. YOUNG FEDERAL BUILDING 1222 SPRUCE ST. LOUIS, MO 63102-1708 THIS MODIFICATION PS46 IS A ZERO DOLLAR MODIFICATION AND IS FUNDED VIA A DRAWDOWN FROM THE PREVIOUSLY ESTABLISHED GMP FOR THIS PROJECT. THE TOTAL AMOUNT OF THIS DRAWDOWN FROM THE PREVIOUSLY ESTABLISHED GMP WITH THIS MODIFICATION PS46 OF $8,331.00. THIS MODIFICATION PS46 PROVIDES FOR THE FOLLOWING: - CREDIT FOR FOR DELETING INTERIOR SOLID SURFACE MATERIAL SILLS - WIRELESS BUZZER AT SE ENTRY - COMPENSATE CONTRACTOR FOR COMPLETING DEMO AT SE ENTRY - NEW CUT SAND STONE TO REPLACE CRACKED MATERIAL ON SOUTH HALF OF EAST ELEVATION - PROVIDE LABOR AND MATERIAL TO INSTALL CONCRETE BOLLARDS AT SE ENTRY - NO TIME EXTENSION
Amount: $0
Award Description: MODIFICATION PS53 (P-46) ARRA ENVELOPE IMPROVEMENTS (IMO00090) ROBERT A. YOUNG FEDERAL BUILDING 1222 SPRUCE ST. LOUIS, MO 63103-2818 THIS MODIFICATION PS50 IS HEREBY ISSUED TO PROVIDE FOR THE FOLLOWING: - PERFORM CORE DRILLING AT SE ENTRY AFTER NORMAL HOURS. ONLY THE PREMIUM PORTION OF THE LABOR COST WILL BE PAID. THIS MODIFICATION PS53 COVERS SPRINKLER, ELECTRICAL AND DUCTWORK CORING. THIS IS A ZERO DOLLAR ($0) MODIFICATION AND WILL BE FUNDED VIA A DRAW DOWN FROM THE PREVIOUSLY ESTABLISHED GMP IN THE AMOUNT OF $1,500.00. THERE IS NO TIME EXTENSION ASSOCIATED WITH THIS MOD.
Amount: $0
Award Description: MODIFICATION PS51 (FIRM FIX PRICE PC48 PDL - P43) ARRA ENVELOPE IMPROVEMENTS (IMO00090) ROBERT A. YOUNG FEDERAL BUILDING 1222 SPRUCE ST. LOUIS, MO 63102-1705 THIS MODIFICATION PS51 IS HEREBY ISSUED FOR THE FOLLOWING: - ADDITIONAL WOOD FRAMING AND ANCHORAGE DUE TO PARTIALLY MISSING OR ENTIRELY MISSING STEEL FRAMING. - TIME EXTENSION. SUBSTANTIAL COMPLETION CHANGED FROM 12/06/11 TO 01/31/12 FOR AN ADD OF 56 CALENDAR DAYS. THIS IS A ZERO DOLLAR ($0) MODIFICATION AND IS A REDUCTION OR DRAW DOWN TO THE OVERALL AVAILABLE GMP FOR THIS PROJECT. FFP SETTELEMENT OF MOD PC48 W/THIS MOD PS51 = $325,303. PC48 PDL AMOUNT PREVIOUSLY DRAWN DOWN FROM GMP = $20,000. NET CHANGE AMOUNT WITH THIS MOD PS51 (DRAW DOWN AMOUNT) = $305,303.
Amount: $0
Award Description: MODIFICATION PS19 (P-17) ARRA VA 104 (IMO00097) FEDERAL CENTER 4300 GOODFELLOW ST. LOUIS, MO 63120-1703 THIS MODIFICATION PS19 IS HEREBY ISSUED FOR THE FOLLOWING: - SKIM COAT TOPPING ON UNSUITABLE CONCRETE FLOOR IN ROOM/AREAS TO RECEIVE VINYL COMPOSITE TILE. - PROVIDE FIRE DAMPER. - RELOCATE EXISTING FIRE ALARM PULL STATION TO CLEAR DOOR. - PROVIDE EXPANSION TANK FOR DOMESTIC HOT WATER HEATER. THIS IS ZERO DOLLAR ($0) MODIFICATION AND IS A DRAW DOWN IN THE AMOUNT OF $219.00 FROM THE GMP CREATED WITH PS15 IN THE AMOUNT OF $1,265.00. REMAINING GMP AVAILABLE FOR USE WITH THIS PROJECT IS $1,046.00. NO TIME EXTENSION IS ASSOCIATED WITH THIS MOD.
Amount: $0
Award Description: MODIFICATION PS21 (P-19) ARRA VA 104 (IMO00097) FEDERAL CENTER 4300 GOODFELLOW BLVD. ST. LOUIS, MO THIS MODIFICATION PS21 IS HEREBY ISSUED FOR THE FOLLOWING: - RELOCATE HVAC THERMOSTATS, RELOCATE LIGHT SWITCHES, RELOCATE ELECTRICAL OUTLET, AND RELOCATE 3 LIGHTS IN MAILROOM 119.01B. - INCREASE SUBSTANTIAL COMPLETION DATE BY 21 CALENDAR DAYS FROM 01/04/2012 TO THE NEW SUBSTANTIAL COMPLETION DATE 01/25/2012. THIS PROJECT WAS INITIALLY ARRA FUNDED AND ALL INITIAL ARRA FUNDS HAD BEEN DRAWN DOWN. HOWEVER, MOD PS15 ADDED $1,265.00 BACK TO THE GMP. MOD PS19 REDUCED THE GMP BY $219.00. THIS LEFT A GMP BALANCE OF $1,046.00. THIS MOD PS21 WILL BE A $0 (ZERO DOLLAR) MOD AND WILL BE A DRAW DOWN FROM THE PREVIOUS GMP IN THE AMOUNT OF THE BALANCE OF $1,046.00. THE REMAINING $438.00 TO COVER WORK DESCRIBED ABOVE WILL BE PROCESSED ON MODIFICATION PS22 AND WILL BE FUNDED USING BA80 FUNDS. (SEE MOD PS22).
Amount: $0
Award Description: MODIFICATION PS15 (P-14) ARRA VA 104 (IMO00097) FEDERAL CENTER 4300 GOODFELLOW BLVD. ST. LOUIS, MO THIS MODIFICATION PS15 IS HEREBY ISSUED FOR THE FOLLOWING: - REMOVE AND DISPOSE OF DRYWALL AND ASSOCIATED INSULATION. - PROVIDE CREDIT FOR UNUSED PORTION OF ALLOCATED BONDS UNDER MOD PS02. - PROVIDE ITEM AS PART OF THIS PROJECT AS DESCRIBED AND SHOWN ON BID DOCS DRAWING AND SPECS DATED FEBRUARY 24, 2011. THIS PROJECT WAS INITIALLY ARRA FUNDED. THE GMP HAD BEEN COMPLETELY DRAWNDOWN AGAINST. HOWEVER, THIS MODIFICATION PS15 IS A ZERO DOLLAR MODIFICATION THAT WILL CREDIT GSA ($1,265.00)AND THESE FUNDS WILL BE PLACED BACK INTO THE GMP POOL FOR DRAWDOWN AT A FUTURE TIME.
Amount: $0
Award Description: MODIFICATION PS44 (P-38) ARRA SEWER REPLACEMENT (IMO00096) FEDERAL CENTER 4300 GOODFELLOW ST. LOUIS, MO THIS MODIFICATION PS44 IS HEREBY ISSUED FOR THE COMPLETION OF THE FOLLOWING: - PROVIDE FOR G LOT LANDSCAPING - ADDITIONAL COSTS DUE TO UNFORESEEN UNDERGROUND ELECTRICAL DUCTBANKS - STAIR CONNECTION - DELETE REMOVAL OF 2" ASPHALT PAVEMENT - DELETE REMOVAL OF 10" ASPHALT PAVEMENT - PROVIDE FOR ADJUSTING TO GRADE OF SANITARY MANHOLE - REMOVAL OF UNSUITABLE SUBGRADE. THIS IS A ZERO DOLLAR ($0) MODIFICATION AND IS A DRAWDOWN FROM THE PREVIOUSLY ESTABLISED GMP IN THE AMOUNT OF $15,701.00. THERE IS NO TIME EXTENSION ASSOCIATED WITH THIS MODIFICIATION PS44.
Amount: $0
Award Description: MODIFICATION PS43 (P-36) ARRA SEWER REPLACEMENT (IMO00096) FEDERAL CENTER 4300 GOODFELLOW ST. LOUIS, MO THIS MODIFICATION PS43 IS HEREBY ISSUED FOR THE COMPLETION OF THE FOLLOWING: -PROVIDE FOR SCOPE OF WORK PER RFI43, EXCEPT DO NOT INSTALL REVETMENT AROUND NE MOST LATERAL OUTFALL INTO DRY POND. -CREDIT FOR LEAVING EXISTING MANHOLES. THIS IS A ZERO DOLLAR ($0) MODIFICATION AND IS A DRAWDOWN FROM THE PREVIOUSLY ESTABLISHED GMP IN THE AMOUNT OF 3,408.00. THERE IS NO TIME EXTENSION ASSOCIATED WITH THIS MODIFICATION PS43.
Amount: $0
Award Description: MODIFICATION PS49 (P-45) ARRA SEWER REPLACEMENT (IMO00096) FEDERAL CENTER 4300 GOODFELLOW ST. LOUIS, MO 63102-1703 THIS MODIFICATION PS49 IS HEREBY ISSUED FOR THE COMPLETION OF THE FOLLOWING WORK: - PROVIDE PARKING STALL STENCILING PER THE ATTACHED DRAWINGS. THIS IS A ZERO DOLLAR ($0) MODIFICATION AND IS A DRAW DOWN FROM THE PREVIOUSLY ESTABLISHED GMP IN THE AMOUNT OF $2,533.00. THERE IS NO TIME EXTENSION OF TIME ASSOCIATED WITH THIS MODIFICATION PS49.
Amount: $0
Award Description: MODIFICATION PC45 PDL (P-44) ARRA SEWER REPLACEMENT (IMO00096) FEDERAL CENTER 4300 GOODFELLOW ST. LOUIS, MO 63102-1705 THIS MODIFICATION PC45 IS HEREBY ISSUED TO: - PROVIDE FOR FUTURE CONNECTION OF ROOF DRAIN LATERALS ON WEST SIDE OF BUILDING 107. - INSTALL 6 INCH PVC FROM NEW STORM SEWER TO WITHIN 3 INCHES OF WEST FACE OF THE BUILDING. THIS MODIFICATION PC45 IS A PDL AND ALSO REPRESENTS A $0 (ZERO) DOLLAR MODIFICATION. IT IS A DRAWDOWN IN THE AMOUNT OF $23,005.00 FROM THE ORIGINAL GMP FOR THIS PROJECT. WHEN THIS PDL IS FINALIZED AND FFP'D, THE AMOUNT OF THE DRAWDOWN WILL BE ADJUSTED ACCORDINGLY. THERE IS NO TIME EXTENSION ASSOCIATED WITH THIS MODIFICATION PC45 (P-44).
Amount: $0
Award Description: ARRA SEWER REPLACEMENT (IMO00096) FEDERAL CENTER 4300 GOODFELLOW ST. LOUIS, MO 63102-1703 THIS MODIFICATION PS48 IS HEREBY ISSUED FOR THE COMPLETION OF THE FOLLOWING WORK: - ADD CRUSH GRANITE - INSTALLATION OF 18 INCH PVC - ADJUST STORM MH521 TO GRADE - CONNECTIO NOF STORM LATERALS - LOCATE 2 STORM LATERALS - CONNECTION OF SUMP PUMP - CREDIT TO ELIMINATE WEED BARRIER - CREDIT PER RFI 80 - ADJUSTMENT TO GRADE STORM MH H7-4 - REVISIONS TO DRY POND TEMPORARY OUTFALL. THIS IS A ZERO DOLLAR ($0) MODIFICATION AND IS A DRAW DOWN FROM THE PREVIOIUSLY ESTABLISHED GMP IN THE AMOUNT OF $2,170.00. THERE IS NO TIME EXTENSION ASSOCIATED WITH THE MODIFICATION PS48.
Amount: $0
Award Description: MODIFICATION PS52 (P-46) ARRA SEWER REPLACEMENT (IMO00096) FEDERAL CENTER 4300 GOODFELLOW ST. LOUIS, MO 63102-1703 THIS MODIFICATION PS52 IS HEREBY ISSUED FOR THE COMPLETION OF THE FOLLOWING WORK: - FURNISH ALL LABOR, MATERIALS AND EQUIPMENTS AS NECESSARY TO PROVIDE FOR THE PLUMBING REVISIONS AS SHOWN ON THE BUILDING 107 PLUMBING EXHIBIT DATED 12/13/2011 AND THE PROJECT SPECIFICATIONS. - ADD ADDITIONAL 67 CALENDAR DAYS TO SUBSTANTIAL COMPLETION FROM 11/25/11 TO 01/31/12. - THIS IS A $0 (ZERO DOLLAR) MODIFICATION AND IS A DRAW DOWN AGAINST A PREVIOUSLY ESTABLISHED GMP.
Amount: -$21,309
Award Description: IMO00096 ARRA GOODFELLOW SEWER PROJECT ST. LOUIS, MO FEDERAL COMPLEX GOODFELLOW DEDUCT UNUSED FUNDS
Amount: $0
Award Description: MODIFICATION PS53 (P-48) ARRA SEWER REPLACEMENT (IMO00096) FEDERAL CENTER 4300 GOODFELLOW ST. LOUIS, MO 63102-1703 THIS MODIFICATION PS53 IS HEREBY ISSUED FOR THE COMPLETION OF THE FOLLOWING: - CONSTRUCTION OF PERMANENT OUTFALL FOR THE DRY POND DETENTION BASIN ON WEST SIDE OF BUILDING 103. - PROVIDE FOR ADJUSTEMENT OF THE ASPHALT MATERIAL PRICING FOR ASPHALT INSTALLED BETWEEN OCTOBER 1, 2011 AND DECEMBER 31, 2011 (PS32). - PROVIDE FOR ADJUSTMENT OF BOND COSTS PER EMAIL FROM CO TO CONTRACTOR. THIS PROJECT WAS SC 01/31/2012. THIS MODIFICATION PS53 IS SET TO BE COMPLETED BY 04/05/2012, WHICH IS AFTER SC BUT PRIOR TO FINAL COMPLETION. THIS IS A $0 (ZERO DOLLAR) MODIFICATION AND IS A DRAW DOWN AGAINST THE PREVIOUSLY ESTABLISHED GMP IN THE AMOUNT OF $28,118.00.
Amount: $0
Award Description: MODIFICATION PS54 (P-49) ARRA SEWER REPLACEMENT (IMO00096) FEDERAL CENTER 4300 GOODFELLOW ST. LOUIS, MO 63102-1703 THIS MODIFICATION PS54 IS HEREBY ISSUED FOR THE COMPLETION OF THE FOLLOWING WORK: - REPAIR OF EXISTING SANITARY MANHOLE #4 AT NE CORNER OF RETENTION POND WEST BUILDING 103 AND RE-BRICK AS REQUIRED AND RE-USE THE EXISTING CONCRETE TOP AND FRAME. - PROVIDE FOR ABANDONMENT OF THE EXISTING CURB INLET #5239 AND THE ASSOCIATED OUTFALL SEWER LINE. ABANDON THE EXISTING PIPE AND STRUCTURE WITH FLOWABLE FILL, REMOVE TOP 2' OF EXISTING STRUCTURE, BACKFILL WITH TOPSOIL, "NO-MOW" GRASS, AND OVERLAY THE SUMP AREA TO MAKE FLUSH WITH THE EXISTING SURROUNDING PAVEMENT AND TO ALLOW FOR DRAINAGE. THIS IS A $0 (ZERO DOLLAR) MODIFICATION AND IS A DRAW DOWN AGAINST THE PREVIOUSLY ESTABLISHED GMP IN THE AMOUNT OF $2,931.00.
Amount: $0
Award Description: MODIFICATION PS51 (FIRM FIX PRICE PC45 PDL - P-44) ARRA SEWER REPLACEMENT (IMO00096) FEDERAL CENTER 4300 GOODFELLOW ST. LOUIS, MO THIS MODIFICATION PS51 IS HEREBY ISSUED TO: -PROVIDE FOR FUTURE CONNECTIONOF ROOF DRAIN LATERALS ON WEST SIDE OF BLDNG 107. -THIS IS A ZERO DOLLAR ($0) MODIFICATION AND IS A DRAWDOWN FROM THE PREVIOIUSLY ESTABLISHED GMP FOR THIS PROJECT. FIRM PRICE SETTELEMENT AMOUNT IS $3 HIGHER THAN THE ORIGINAL PDL AMOUNT. FP SETTELEMENT OF MOD PC45 PDL = $23,008.00 PC45 PDL AMOUNT PREVIOUSLY DRAWN DOWN = $23,005.00 NET CHANGE AMOUNT WITH THIS MOD PS51 = $3.00
Amount: $0
Award Description: MODIFICATION PS47 (P-39) ARRA SEWER REPLACEMENT (IMO00096) FEDERAL CENTER 4300 GOODFELLOW ST. LOUIS, MO 63102-1703 THIS MODIFICATION PS47 IS HEREBY ISSUED FOR THE COMPLETION OF THE FOLLOWING WORK: - UNFORSEEN UNDERGROUND CONCRETE FOOTINGS - RELOCATE 2" WATER LINE - PAVING GRADE REVISIONS - ADJUSTING STORM INLET F10 TO GRADE - CREDIT TO LEAVE EXISTING SIDEWALK IN PLACE - CREDIT TO DELETE NEW SIDEWALK AND LANDSCAPING - ADDITION OF CONCRETE SIDEWALK AT THE ELECTRIC VAULT ENTRANCE - CHANGES AS REQUIRED IN CONSTRUCTION MEMO 4 - CREDIT TO DELETE GEOTEXTILE FABRICS - CREDIT TO DELETE REMOVAL OF LANDING - ADDITION TO LANDSCAPING AT SOUTH END OF BLDNG 104E - CONNECTION OF ELECTRIC VAULT SUMP PUMP - COST OF UNFORESEEN DOWNSPOUT DRAIN - COST FOR INLET MODS DU TO INCORRECT FLOWLINE ELEVATION THIS IS A ZERO DOLLAR ($0) MODIFICATION AND IS A DRAWDOWN FROM THE PREVIOUSLY ESTABLISHED GMP IN THE AMOUNT OF $26,556.00. THERE IS NO TIME EXTENSION ASSOCIATED WITH THIS MODIFICATION PS47.
Amount: $0
Award Description: MODIFICATION PS46 (P-41) ARRA SEWER REPLACEMENT (IMO00096) FEDERAL CENTER 4300 GOODFELLOW ST. LOUIS, MO 63102-1703 THIS MODIFICATION PS46 IS HEREBY ISSUED FOR THE COMPLETION OF THE FOLLOWING WORK: - PROVIDE VIDEO INSPECTION OF EXISTING SEWER FROM MANHOLE 5279 TO MANHOLE 5253. - DELETE RR TRACK REMOVAL - DELETE 90 CY OF REMOVAL AND DISPOSAL OF UNSUITABLE MATERIAL. THIS IS A ZERO DOLLAR ($0) MODIFICATION. IT IS A CREDIT THAT IS PLACED BACK INTO THE GMP POOL IN THE AMOUNT OF $14,843.00. THERE IS NO TIME EXTENSION ASSOCIATED WITH THIS MODIFICATION PS46.
Amount: $0
Award Description: MODIFICATION PS50 (P-43) ARRA SEWER REPLACEMENT (IMO00096) FEDERAL CENTER 4300 GOODFELLOW ST. LOUIS, MO 63102-1703 THIS MODIFICATION PS50 IS HEREBY ISSUED FOR THE COMPLETION OF THE FOLLOWING WORK: - REMOVAL OF REINFORCED CONCRETE WALL - REMOLVAL OF 100 SF OF SIDEWALK - REPLACEMENT OF 30 LINEAR FEET OF VERTICAL CURB - REMOVAL OF TOP 1 INCH OF EXISTING FOUNDATION - ADJUSTMENT OF ASPHALT MATERIAL PRICING - REMOVAL OF CURB AND DOWELING A NEW CURB - PLACEMENT OF FLOWABLE FILL UNDER BLDNG 104. - PROVIDE 8 INCH WIDE CROSSWALK - PROVIDE ADDITIONAL COSTS INCURRED DUE TO UNFORESEEN CONDITIONS DURING CONNECTION OF BLDNG 105L SANITARY LATERAL ON 09/15/11. - NO TIME EXTENSION WITH THIS MOD PS50. THIS IS A ZERO DOLLAR ($0) MODIFICATION AND IS A DRAW DOWN FROM THE PREVIOUSLY ESTABLISHED GMP IN THE AMOUNT OF $4,425.00.
Amount: -$406,732
Award Description: ARRA ENVELOPE IMPROVEMENTS (IMO00090) ROBERT A. YOUNG FEDERAL BUILDING 1222 SPRUCE ST. LOUIS, MO 63103-2818 THIS MODIFICATION PS65 IS HEREBY ISSUED FOR THE FOLLOWING: - GMP RECONCILIATION - CREDITS ALL REMAINING GMP FUNDS NOT UTILIZED ON THE PROJECT. - BOND RECONCILIATION - CREDITS THE FINAL BOND AMOUNT FROM BOND OVERAGE FROM NEGOTIATED MODS. THIS REDUCES THE BOND COST FROM $179,613.40 TO THE BOND PAYMENT OF $161,546 FOR A FINAL BOND CREDIT OF $18,067.40. - CONTINGENCY RECONCILIATION - RECONCILES UNFORESEEN CONDITIONS COSTS OF $103,191, AS IDENTIFIED IN P-17 AND P-21. RESULTS IN A NO COST CHANGE. - NOT TIME EXTENSION. THIS MODIFICATION PS65 IS A RESULT OF THE FOLLOWING: CURRENT GMP NOT FFP $388,665 BOND RECONCILIATION CREDIT $18,067.40 TOTAL AMOUNT OF GMP NOT FFP'D TO BE CREDITED - $406,732.40