Skip to content Skip to footer site map
Navigate Up

Recovery.gov - Track the Money

Recovery.gov is the U.S. government's official website that provides easy access to data
related to Recovery Act spending and allows for the reporting of potential fraud, waste, and abuse.

contract- RECIPIENT AWARD SUMMARY

FEDERAL CONTRACTING, INC

Clarification of Codes


AWARD OVERVIEW

AWARD OVERVIEW
Agency Name: Department of Defense--Military Project Location: EL PASO
Award Number: 0004 Project Location - State: CO
Funding Amount: $5,987 Project Location - Zip Code: 809141294
Ending Date: 2010-11-24 Congressional District: 05

RECIPIENT INFORMATION (AWARD)

RECIPIENT INFORMATION (AWARD)
Recipient Name: FEDERAL CONTRACTING, INC
Recipient Address: 7025 CAMPUS DRIVE
Recipient City: COLORADO SPRINGS
Recipient State: CO
Recipient Zip Code: 809203164
Congressional District: CO-05

DESCRIPTION OF WORK/SERVICE PERFORMED

TAS:: 57 3404:: TAS, CD-M CONSTRUCTION DIVISION, CONSTRUCTION CONTRACT MODIFICATION R00007, $5,987.92 TAS0001 - K578CB






TRANSACTIONS

TRANSACTIONS

Other Awards

Other Awards
Amount: $1,977,793
Award Description: TAS::57 3404::TAS M-REPAIR FIRE SUPPRESSION & A/C SYSTEM
Amount: $1,698,678
Award Description: TAS::21 2022::TAS RECOVERY - SRM UTILITY PROJECT BOILER BLDG 1860 REPLACEMENT OF BOILER #1 - PHASE 3 OF 3, (AMERICAN REINVESTMENT AND RECOVERY ACT (ARRA) MILITARY
Amount: -$451,689
Award Description: TAS::21 2022::TAS CD-M CONSTRUCTION DIVISION, CONSTRUCTION CONTRACT MODIFICATION R00002, -$451,689.00SRM UTILITY PROJECT FT CARSON, CO ARRA::YES::ARRA
Amount: $8,856
Award Description: TAS::21 2022::TAS ARRA::YES::ARRA RECOVERYPROJECT#FT325P, FT345P::RP# SRM UTILITY PROJECT - SANITARY AT FT CARSON, CO BUILDING 2061, 4" SERVICE LINE CONNECTING INTO THE NEW SANITARY LINE WAS IN POOR CONDITION AND NEEDED TO BE REPAIRED. ORIGINALLY THE SERVICE LINE WAS BEING CONNECTED BY A CLEANOUT BUT A SLIP LINE IS NECESSARY TO KEEP THE SERVICE INTACT. CD-M CONSTRUCTION DIVISION, CONSTRUCTION CONTRACT MODIFICATION R00014, $8,856.80
Amount: $5,031
Award Description: TAS::21 2050::TAS ARRA::YES::ARRA RECOVERYPROJECT# FT32/5P AND FT34/5P::RP# SRM UTILITY PROJECT - SANITARY AT FT CARSON, CO AN EXISTING STORM LINE WAS LOCATED BETWEEN MANHOLE 2738 AND 2738A. THIS LINE WAS NOT INDICATED IN THE AS BUILDS AND WAS IN THE WAY OF THE NEW 21+ SEWER LINE. CD-M CONSTRUCTION DIVISION, CONSTRUCTION CONTRACT MODIFICATION R00012, $5,031.71
Amount: $1,187,788
Award Description: TAS:: 21 2022 ::TAS CD-M CONSTRUCTION DIVISION, CONSTRUCTION CONTRACT MODIFICATION R00003, $1,187,788.00 SRM UTILITY PROJECT FT CARSON, CO
Amount: $3,190
Award Description: TAS::21 2050::TAS ARRA::YES::ARRA RECOVERYPROJECT#::FT3250, FT345P::RP# SRM UTILITY PROJECT - SANITARY AT FT CARSON, CO THE EXISTING WATERLINE THE NEW SEWER LINE WAS CROSSING UNDER HAD AN ABANDONED TEE THAT WAS CAPPED. THE CAP WAS HELD IN PLACE BY CONCRETE AND THE CONCRETE WAS BEING HELD IN PLACE BY THE COMPACTED SOIL AROUND THE WATERLINE. THE WATERLINE HAD APPROXIMATELY 100-200 PSI OF BUILT UP PRESSURE. THE TEE WAS TO BE REMOVED AND REPLACED WITH A STRAIGHT SECTION OF PIPE AS THE CONCRETE WOULD NO LONGER HOLD THE CAP UNDER THAT PRESSURE ONCE THE SOIL WAS EXCAVATED AROUND THE WATERLINE. CD-M CONSTRUCTION DIVISION, CONSTRUCTION CONTRACT MODIFICATION R00017, $3,190.24
Amount: $21,344
Award Description: TAS::21 2022::TAS CD-M CONSTRUCTION DIVISION, CONSTRUCTION CONTRACT MODIFICATION R00004, $21,344.52 NTE SRM UTILITY PROJECT FT CARSON, CO ARRA::YES::ARRA
Amount: $8,190
Award Description: TAS::21 2022::TAS ARRA::YES::ARRA RECOVERYPROJECT#::FT325P SRM UTILITY PROJECT AT FT CARSON, CO THE EXISTING LINE THE NEW SEWER WAS TYING INTO WAS ENCASED IN CONCRETE WHERE THE CONTRACTOR HAD PROPOSED TO PUT THE NEW MANHOLE AT THE END OF LINE 1, CLIN #2. THE CONTRACTOR HAD TO CHIP AWAY THE CONCRETE AROUND THE EXISTING LINE TO ALLOW FOR THE PLACEMENT OF THE NEW MANHOLE. THE DIG PERMIT INDICATED AN UNLOCATABLE WATERLINE IN THE AREA AS WELL. THE CONTRACTOR SPENT FOUR (4) DAYS LOOKING FOR THE WATERLINE. THIS WAS CONSIDERED ABOVE AND BEYOND THE AMOUNT OF WORK IT SHOULD TAKE TO POTHOLE. TWO (2) DAYS OF LABOR, EQUIPMENT AND MATERIAL TO FIND THE WATERLINE WAS ACCEPTABLE. CD-M CONSTRUCTION DIVISION, CONSTRUCTION CONTRACT MODIFICATION R00013, $8,190.20
Amount: $76,962
Award Description: TAS::21 2050::TAS ARRA::YES::ARRARECOVERYPROJECT#::FT34/5P::RP# PROJECT TITLE:SRM UTILITY PROJECT-SEWER AT FORT CARSON, CO FUTURE BCTC SITE-DIFFERING SITE CONDITION: THROUGH DPW AND USACE COORDINATION IT WAS DETERMINED THAT THE FUTURE BATTALION COMMAND TRAINING CENTER SITE WAS LOCATED DIRECTLY ON THE NEW 21" SEWER LINE GOING THROUGH THAT AREA. THE SEWER LINE NEEDED TO BE REROUTED TO THE EAST SIDE OF THE BUILDING TO ACCOMMODATE THE FUTURE SITE. THE AREA TO THE WEST WAS AN EXPANSION AREA FOR THE BCTC AND WOULD BE A LESS IDEAL ROUTE FOR THE LINE.
Amount: $4,421,878
Award Description: TAS::21 2022::TAS RECOVERYPROJECT#::OSD1591::RP# RECOVERYPROJECT#::OSD1589 REF B&V RPT SANITARY SEWERS DSGN & RPR-REPL PH 3; REF B&V RPT SANITARY SEWERS DSGN SRM UTILITY PROJECT FT CARSON, CO.
Amount: $12,865
Award Description: TAS::21 2022::TAS ARRA:: YES::ARRA RECOVERYPROJECT#::FT345P::RP# PROJECT TITLE: SRM UTILITY PROJECT - SANITARY AT FT CARSON, CO ANOTHER SEWER PROJECT FINISHED AT ABOUT THE SAME TIME THIS PROJECT WAS STARTED. THE FINAL RUN OF THE SEWER ON THE OTHER PROJECT HAD TO BE ADJUSTED TO COMPENSATE FOR THE NEGATIVE SLOPE OF THE EXISTING PIPE. THE SOLUTION WAS AN ADDITIONAL MANHOLE WITH A 90 DEGREE BEND AND A CONNECTION TO THE EXISTING PIPE FURTHER DOWN. THE LOCATION OF THE OTHER PROJECT+S NEW MANHOLE WAS THE PLACE OF OUR FIRST MANHOLE OF THE RUN DOWN BARKLEY. DPW REQUESTED WE NOT ADD ANOTHER MANHOLE AT THAT LOCATION. IT WAS DETERMINED THAT THE MANHOLE WOULD BE REMOVED FROM THE OTHER PROJECT AND WE WOULD PLACE OUR DESIGNED MANHOLE. BY PASS PUMPING WOULD BE NECESSARY. CD-M CONSTRUCTION DIVISION, CONSTRUCTION CONTRACT MODIFICATION R00005, $12,865.53
Amount: $10,764
Award Description: TAS::21 2050::TAS ARRA::YES::ARRA RECOVERYPROJECT#::FT325P, FT345P::RP# SRM UTILITY PROJECT - SANITARY AT FT CARSON, CO THE EXISTING ELECTRICAL LINE WAS LOCATED AT APPROXIMATELY 9' IN DEPTH WHICH WAS IN THE WAY OF THE NEW SEWER LINE. THE 9' DEPTH OF THE ELECTRICAL LINE WAS CONSIDERED GREATLY OUTSIDE INDUSTRY STANDARDS OF 4' TO 5'. THE ELECTRICAL LINE COULD BE RAISED APPROXIMATELY 6" TO AVOID THIS CONFLICT. CD-M CONSTRUCTION DIVISION, CONSTRUCTION CONTRACT MODIFICATION R00018, $10,764.00
Amount: $208,695
Award Description: TAS::21 2022::TAS ARRA::YES::ARRA RECOVERYPROJECT#::FT325P,FT345P::RP# SRM UTILITY PROJECT SANITARY AT FT CARSON, CO CHANGES ARE NEEDED FOR THE SEWER LINE AND A WATERLINE TO AVOID CONFLICTS. MANHOLE LINERS HAVE BEEN ADDED TO 25 OF THE 6+ DIAMETER MANHOLES THAT RECEIVED THE MOST USE TO INCREASE THE LONGEVITY OF THE MANHOLES TO REDUCE MAINTENANCE AND ALSO PREVENT GROUND WATER INFILTRATION. CD-M CONSTRUCTION DIVISION, CONSTRUCTION CONTRACT MODIFICATION R00019, $208,695.00
Amount: $37,141
Award Description: TAS::57 3404::TAS CD-M CONSTRUCTION DIVISON, CONSTRUCTION CONTRACT MODIFICATION R00006, $6,555.07 0001 - K578CB
Amount: $159,338
Award Description: TAS::57 3404::TAS, CD-M CONSTRUCTION DIVISION, CONSTRUCTION CONTRACT MODIFICATION R00008, ADDN FIRE ALARM DEVICES, $159,338.46 70 CALENDAR DAYS, 0001 - K578CB
Amount: $9,950
Award Description: TAS::57 3404::TAS CD-M CONSTRUCTION DIVISION, CONSTRUCTION CONTRACT MODIFICATION R00009 $9,950.00 0001 - K578CB
Amount: $194,224
Award Description: TAS::57 3404::TAS, CD-M CONSTRUCTION DIVISION, CONSTRUCTION CONTRACT MODIFICATION R00005, $194,224.21 0001 - K578CB
Amount: $28,000
Award Description: TAS::57 3404::TAS CD-M, CONSTRUCTION DIVISION, CONSTRUCTION CONTRACT MODIFICATION R00003, $28,000.00 0001 - K578CB
Amount: $0
Award Description: CD-M CONSTRUCTION DIVISION, CONSTRUCTION CONTRACT MODIFICATION R10001, $0.00 0001 - K578CB
Amount: $2,494
Award Description: TAS::57 3404::TAS 0001 - K578CB,CD-M CONSTRUCTION DIVISION, CONSTRUCTION CONTRACT MODIFICATION, R00004, FIRE ALARM DEVICE COLOR, $2,494.97 0 DAYS.
Amount: $79,932
Award Description: TAS::57 3404::TAS CD-M CONSTRUCTION DIVISION CONSTRUCTION MODIFICATION R00001, $79,932.72 0001 - K578CB
Amount: $5,987
Award Description: TAS:: 57 3404:: TAS, CD-M CONSTRUCTION DIVISION, CONSTRUCTION CONTRACT MODIFICATION R00007, $5,987.92 TAS0001 - K578CB
Amount: $17,001
Award Description: TAS::57 3404::TAS CD-M, CONSTRUCTION DIVISION, CONSTRUCTION CONTRACT MODIFICATION R00002, $47,587.34 0001 - K578CB
Amount: $51,460
Award Description: TAS::57 3404::TAS CD-M CONSTRUCTION DIVISION, CONSTRUCTION CONTRACT MODIFICATION R00006, $51,460.00 RECOVERY - TDKA971010(325647)
Amount: $18,715
Award Description: TAS::57 3404::TAS CD-M CONSTRUCTION DIVISION, CONSTRUCTION CONTRACT MODIFICATION R00004, ADDITIONAL LIGHT FOR JOGGING TRAIL PART 1, NTE $18,715.50 RECOVERY - TDKA971010(325647)
Amount: $8,827
Award Description: TAS:: 57 3404 ::TAS CD-M CONSTRUCTION DIVISION, CONSTRUCTION CONTRACT MODIFCATION R00001, $8,827.00 RECOVERY - TDKA971010(325647)
Amount: -$39
Award Description: TAS::57 3404::TAS CD-M CONSTRUCTION DIVISION, CONSTRUCTION CONTRACT MODIFICATION R10006 -$39.74 RECOVERY - TDKA971010(325647)
Amount: $10,000
Award Description: TAS::57 3404::TAS CD-M CONSTRUCTION DIVISION, CONSTRUCTION CONTRACT MODIFICATION R00005, $10,000.00 NTE RECOVERY - TDKA971010(325647) ARRA::YES::ARRA
Amount: $24,028
Award Description: TAS::57 3404::TAS CD-M, CONSTRUCTION DIVISION, CONSTRUCTION CONTRACT MODIFICATION R10005, $24,028.00 ADD'L TOTAL $34,028.00 RECOVERY - TDKA971010(325647)
Amount: $4,140,788
Award Description: TAS::57 3404::TAS RECOVERYPROJECT#::TDKA031012C TDKA031024B TDKA051200 TDKA051211 TDKA061212 TDKA081001B TDKA081001D TDKA081241 TDKA091041 TDKA081014 TDKA971010 TDKA052505 TDKA081001A::RP#, AS PART OF MAINTENANCE AND REPAIR ON THE TDKA PROJECTS IDENTIFIED, THIS RECOVERY AWARD IS TO PROVIDE REPAIR AND MAINTENANCE ON VARIOUS PROJECTS LOCATED AT PETERSON AIR FORCE BSAE, COLORADO; M- ARRA PETERSON AFB, CO RECOVERY
Amount: $15,928,835
Award Description: TAS::97 0501::TAS ARRA::YES::ARRA RECOVERYPROJECT#::328513::RP# MILITARY-PN 70350 RECOVERY HOSPITAL ALTERATION, FT CARSON CO
Amount: $0
Award Description: TAS::21 2050::TAS ARRA::YES::ARRA RECOVERYPROJECT#::325869::RP# SRM UTILITY PROJECT AT FT CARSON, CO ITEM1: WATER LINE WAS UNLOCATABLE ON THE DIG PERMIT. CAVING SOILS WERE ENCOUNTERED EAST OF BUILDING 900 IN THE PARKING AREA. THE CAVING SOILS WERE UNDERMINING THE PAVEMENT. ADDITIONAL CONCRETE NEEDED TO BE REMOVED TO STABILIZE THE SOIL IN THE AREA. ITEM 2: MULTIPLE UNFORESEEN CONDITIONS IN THE FIELD NEEDED TO BE EXECUTED QUICKLY TO ALLOW THE CONTRACT TO PROCEED, SO THE SCOPE OF MODIFICATION 00019 WITH NOTICE TO PROCEED DATE SEPTEMBER 28, 2010 WAS REDUCED. ITEM 3: DUE TO UNFORESEEN CONDITIONS IN THE FIELD, WORK ASSOCIATED WITH THE COLLAPSED SERVICE LINE NEEDED COULD NOT BE COMPLETED CD-M CONSTRUCTION DIVISION, CONSTRUCTION CONTRACT MODIFICATION R00027, $0.00
Amount: $0
Award Description: TAS::21 2022::TAS ARRA::YES::ARRA RECOVERYPROJECT#::325824::RP# REPLACEMENT OF BOILER #1 FORT CARSON, CO PROVIDE THE TEMPORARY HOT SHOWERS FOR THE FACILITIES WHICH BE IMPACTED BY THE DOMESTIC HOT WATER SUPPLY INTERRUPTIONS DURING THE HEAT PLANT OUTAGE PERIOD FROM 04 AUGUST 2011 TO 08 AUGUST 2011. CD-M CONSTRUCTION DIVISION, CONSTRUCTION CONTRACT MODIFICATION R00003, $0.00
Amount: $104,650
Award Description: TAS::21 2022::TAS ARRA::YES::ARRA RECOVERYPROJECT#::325824::RP# BUILDING 1860 REPLACE BOILER NO 1 PHASE 3 OF 3 AT FORT CARSON CO THE EXISTING DISCONNECT SWITCH AND ELECTRICAL PANELS AT BUILDING 1860 IS OLD. UPGRADE THE ELECTRICAL PANELS AND MAIN SWITCH WILL IMPROVE SAFETY AND MAINTENANCE. SCHEDULE FOR POWER OUTAGE SHOULD BE DURING THE HEAT PLANT OUTAGE FOR VALVES REPLACEMENT TO AVOID ANOTHER HEAT PLANT OUTAGE REQUIREMENT. CD-M CONSTRUCTION DIVISION, CONSTRUCTION CONTRACT MODIFICATION R00004, $104,650.00
Amount: $0
Award Description: TAS::21 2022::TAS ARRA::YES::ARRA RECOVERYPROJECT#::325824::RP# BUILDING 1860 REPLACE BOILER #1, PHASE 3 OF 3 AT FORT CARSON, CO DUE TO THE NEW REPLACEMENT OF ENGLISH BOILER # 2 IN THE SAME BUILDING FROM OTHER PROJECT HAS NOT BEEN PROPER FUNCTION, THE BASE OPERATION AND MAINTENANCE DIVISION REQUESTED THE BOILER # 1 WILL NOT BE REPLACED. THEREFORE THE GOVERNMENT CHANGES THE PROJECT SCOPE OF WORK FROM BOILER REPLACEMENT TO IMPROVEMENT WITHOUT REPLACEMENT OF EXISTING BOILER # 1. CD-M CONSTRUCTION DIVISION, CONSTRUCTION CONTRACT MODIFICATION R20001, $0.00 TE 119 DAYS
Amount: $0
Award Description: TAS::21 2050::TAS ARRA::YES::ARRA RECOVERYPROJECT#::325869::RP# SRM UTILITY PROJECT AT FT CARSON, CO ITEM1: ADDITIONAL CLEANOUTS WERE ADDED FOR EASE OF MAINTENANCE AFTER DESIGN WAS COMPLETED. IT WAS REQUESTED THAT ALL CLEANOUTS IN THE LANDSCAPED AREAS HAD CONCRETE COLLARS ADDED. THE CLEANOUTS THAT WERE ADDED AFTER DESIGN WAS COMPLETED WERE NOT PART OF THE ORIGINAL WORK SO ADDITIONAL COSTS WERE REQUIRED FOR THOSE CLEANOUTS. ITEM 2: THE RUNNING TRAIL HAD BEEN DEGRADED DURING CONSTRUCTION IN THAT AREA FROM SOLDIERS DRIVING OVER THE TRAIL TO PARK THEIR VEHICLES. ITEM 3: THE EXISTING MANHOLES WERE IN POOR SHAPE AND NEEDED TO BE REFURBISHED. ITEM 4: MULTIPLE UNFORESEEN CONDITIONS IN THE FIELD NEEDED TO BE EXECUTED QUICKLY TO ALLOW THE CONTRACT TO PROCEED, SO THE SCOPE OF MODIFICATION 00019 WITH NOTICE TO PROCEED DATE SEPTEMBER 28, 2010 WAS REDUCED. CD-M CONSTRUCTION DIVISION, CONSTRUCTION CONTRACT MODIFICATION R00028, $0.00
Amount: $0
Award Description: TAS::21 2022::TAS ARRA::YES::ARRA RECOVERYPROJECT#::325896&325871 SRM UTILITY PROJECT AT FT CARSON, CO ITEM1: 3RD BRIGADE RETURNS IN MARCH AND THE SANITARY LINE NEEDS TO BE COMPLETED IN THAT AREA BEFORE THEIR RETURN. ITEM 2: MULTIPLE UNFORESEEN CONDITIONS IN THE FIELD NEEDED TO BE EXECUTED QUICKLY TO ALLOW THE CONTRACT TO PROCEED, SO THE SCOPE OF MODIFICATION R00019 WITH NOTICE TO PROCEED DATE SEPTEMBER 28, 2010 WAS REDUCED. CD-M CONSTRUCTION DIVISION, CONSTRUCTION CONTRACT MODIFICATION R00023, $0.00
Amount: $0
Award Description: TAS:21 2050::TAS ARRA::YES::ARRA RECOVERYPROJECT#::325869::RP# SRM UTILITY PROJECT AT FT CARSON, CO R10020 THERE WAS A TYPO IN THE DOCUMENTS. THE ACTUAL CREDIT AMOUNT WAS TO BE IN THE AMOUNT OF $57,993 INSTEAD OF $57,933 AND THE AMOUNT SPECIFIED IN R00019 WAS SUPPOSED TO BE $208,695 INSTEAD OF $208,965. THIS CHANGE CORRECTS THE ERROR FOR A $60 CREDIT BUT DOES NOT CHANGE THE OVERALL REDUCTION OF SCOPE WHICH REMAINS THE SAME AT $150,702 AND IS A $0.00 COST CHANGE. CD-M CONSTRUCTION DIVISION, CONSTRUCTION CONTRACT MODIFICATION R10020, $0.00
Amount: $0
Award Description: TAS:21 2022::TAS ARRA::YES::ARRA RECOVERYPROJECT#::325869::RP# SRM UTILITY PROJECT FT CARSON, CO ITEM1: WATERLINE WAS UNLOCATEABLE ON DIG PERMIT. ITEM 2: THE RUNNING TRACK WAS UPGRADED WITH NEW LIGHT POLES AND A RUBBER BASE AFTER THE ISSUE FOR CONSTRUCTION DESIGN PACKAGE WAS ACCEPTED. ITEM 3: THE COMMUNICATION LINE WAS CONSTRUCTED AFTER ISSUE FOR CONSTRUCTION DESIGN DOCUMENTS WERE ACCEPTED. ITEM 4: PORTIONS OF 3RD BRIGADE WILL RETURN ON 01 MAR 2011 AND THE PARKING LOTS IN THE 3/4 AREA NEED TO BE CLEANED UP AND ASPHALT PATCHED OR FILLED WITH ROAD BASE TO ALLOW FOR EASE OF ACCESS THROUGH THE AREA FOR THE RETURNING SOLDIERS. ITEM 5: BUILDING 2040 WAS GOING TO BE DEMOLISHED TO MAKE ROOM FOR THE NEW BATTALION COMMAND TRAINING CENTER (BCTC), SO THE NEW SERVICE CONNECTION WAS NOT NEEDED, JUST A TEMPORARY CONNECTION. IT WAS NOT ORIGINALLY KNOWN WHEN THE BCTC WOULD BE AWARDED SO A NEW SERVICE WAS THOUGHT TO BE NECESSARY AS A TEMPORARY CONNECTION COULD ONLY LAST FOR A SHORT DURATION. ONCE IT WAS DETERMINED THAT THE AWARD WOULD BE MADE WITHIN A REASONABLE AMOUNT OF TIME A TEMPORARY CONNECTION WAS ALL THAT WAS NEEDED. ITEM 6: MULTIPLE UNFORESEEN CONDITIONS IN THE FIELD NEEDED TO BE EXECUTED QUICKLY TO ALLOW THE CONTRACT TO PROCEED, SO THE SCOPE OF MODIFICATION 00019 WITH NOTICE TO PROCEED DATE SEPTEMBER 28, 2010 WAS REDUCED. CD-M CONSTRUCTION DIVISION, CONSTRUCTION CONTRACT MODIFICATION R00025 $0.00
Amount: $0
Award Description: TAS::21 2022::TAS ARRA::YES::ARRA RECOVERYPROJECT#::325869 325871 SRM UTILITY PROJECT FT CARSON, CO ITEM1: CONTAMINATED SOIL WAS FOUND DURING CONSTRUCTION AND NEEDED TO BE DISPOSED OF PROPERLY. ITEM 2: LIME TREATED BASE COURSE WAS DISCOVERED IN THE PARKING LOT EAST OF BUILDING 2074 AND MULTIPLE OTHER PARKING AREAS. THIS WAS AN UNFORESEEN CONDITION IN THIS ENTIRE AREA, IT WAS ASSUMED TO BE A GRAVEL BASE COURSE. ITEM 3: MULTIPLE UNFORESEEN CONDITIONS IN THE FIELD NEEDED TO BE EXECUTED QUICKLY TO ALLOW THE CONTRACT TO PROCEED, SO THE SCOPE OF MODIFICATION 00019 WITH NOTICE TO PROCEED DATE SEPTEMBER 28, 2010 WAS REDUCED. CD-M CONSTRUCTION DIVISION, CONSTRUCTION CONTRACT MODIFICATION R00024, $0.00
Amount: $0
Award Description: TAS::21 2022::TAS ARRA::YES::ARRA RECOVERYPROJECT#::325869::RP# SRM UTILITY PROJECT - SANITARY AT FT CARSON, CO : ITEM 1: A STORM LINE WAS ENCOUNTERED WHILE BORING UNDER KHE SAHN ST. WHICH WAS IN THE DIRECT LINE OF PATH FOR THE NEW SEVER MAIN LINE. THE SLOPE OF THE PIPE WOULD BE TOO SHALLOW AND TOO STEEP TO TRY AND GO UNDER OR OVER THE EXISTING STORM LINE SO THE ONLY OPTION WAS TO IN-SITU FORM THE EXISTING SEWER MAIN TO GET UNDER THE ROAD. ITEM 2: THE 9' DEEP WATER LINE CROSSING THE NEW SEWER NEEDED TO BE RAISED TO ALLOW THE SEWER TO BE PLACED AT THE DESIGNED SLOPE. ITEM 3: THE 8.5' WATER LINE CROSSING THE NEW SEWER LINE NEEDED TO BE LOWERED WITH AN 18" SEPARATION TO ALLOW THE SEWER LINE TO BE PLACED ACCORDING TO DESIGN. THE WATER LINE NEEDED TO BE LOWERED INSTEAD OF ROSE BECAUSE THE WATER LINE WOULD NOT HAVE THE NECESSARY 5' OF COVER CD-M CONSTRUCTION DIVISION, CONSTRUCTION CONTRACT MODIFICATION R00020, $0.00
Amount: $0
Award Description: TAS::21 2022::TAS ARRA::YES::ARRA RECOVERYPROJECT#325869 SRM UTILITY PROJECT - SANITARY AT FT CARSON, CO ITEM1: THE COMMUNICATION LINE NEAR STATION 216+00 WAS IN THE BORE PATH OF THE NEW SEWER LINE. THE COMMUNICATION LINE WAS NOT LOCATED IN THE FIELD OR ON THE DIG PERMIT. ITEM 2: THE EXISTING WATERLINE THAT THE NEW SEWER LINE WAS CROSSING UNDER HAD AN ABANDONED TEE THAT WAS CAPPED. THE CAP WAS HELD IN PLACE BY CONCRETE AND THE CONCRETE WAS BEING HELD IN PLACE BY THE COMPACTED SOIL AROUND THE WATERLINE. THE WATERLINE HAD APPROXIMATELY 100-200 PSI OF BUILT UP PRESSURE. THE TEE WAS TO BE REMOVED AND REPLACED WITH A STRAIGHT SECTION OF PIPE AS THE CONCRETE WOULD NO LONGER HOLD THE CAP UNDER THAT PRESSURE ONCE THE SOIL WAS EXCAVATED AROUND THE WATERLINE. ITEM 3: MULTIPLE UNFORESEEN CONDITIONS IN THE FIELD NEEDED TO BE EXECUTED QUICKLY TO ALLOW THE CONTRACT TO PROCEED, SO THE SCOPE OF MODIFICATION 00019 WITH NOTICE TO PROCEED DATE SEPTEMBER 28, 2010 WAS REDUCED. CD-M CONSTRUCTION DIVISION, CONSTRUCTION CONTRACT MODIFICATION R00021, $0.00
Amount: $0
Award Description: TAS::57 3404::TAS ARRA::YES::ARRA RECOVERYPROJECT#::325481::RP# LIGHTING, GAS & PAVEMENT REPAIRS AT PETERSON AFB, CO RECOVERY - TDKA971010(325647) REPAIR BURIED FIRE ALARM CABLE AND LOCATES - ON 15 JUNE 2010, WHILE BORING FOR THE GAS LINE (PHASE 1) ALONG MALSTROM STREET AND JUST EAST OF ENT AVENUE THE CONTRACTOR ENCOUNTERED/CUT AN UNMARKED COMMUNICATION CABLE. THIS CABLE PROVIDES COMMUNICATION FOR THE PETERSON AFB AUTOMATIC FIRE ALARM NOTIFICATION SYSTEM FOR OVER 80% OF THE BUILDINGS AT PETERSON AFB. AFTER ISSUANCE OF THE ORIGINAL NTE MODIFICATION IT WAS DETERMINED THE CONTRACTOR WHICH HAS BEEN ENCOUNTERING NUMEROUS UNMARK UTILITIES NEED TO CONTINUE WITHOUT BEING INTERRUPTED FOR THE REMAINING 2/3S GAS LINE. THIS MODIFICATION DEFINITIZED PREVIOUS MODIFICATION R00005 AND R10005. CD-M CONSTRUCTION DIVISION, CONSTRUCTION CONTRACT MODIFICATION R20005, $0.00
Amount: $18,190
Award Description: TAS::57 3404::TAS ARRA::YES::ARRA RECOVERYPROJECT#::325481::RP# LIGHTING, GAS & PAVEMENT REPAIRS AT PETERSON AFB, CO RECOVERY - TDKA971010(325647) JOGGING TRAIL LIGHTING - ON 12 AUG 10, THE USING AGENCY REQUESTED THE GOVERNMENT ACQUIRE ADDITIONAL LIGHTING ALONG THE JOGGING TRAIL AT EASTSIDE OF PETERSON AFB WHERE THE EXISTING ROADWAY LIGHTING UPGRADE PROJECT WAS ONGOING. THE USING AGENCY STATED THAT AS DESIGN THE PETERSON EASTSIDE PROJECT WOULD NOT PROVIDE THE REQUIRED LIGHTING AT THE JOGGING TRAIL THUS CAUSING A LIFE SAFETY DURING TIMES OF HEAVY USAGE AFTER DAYLIGHT HOURS. THIS IS A LIFE SAFETY REPAIR THAT REQUIRES IMMEDIATE ATTENTION FOR A LIFE SAFETY ISSUE. THIS MODIFICATION WILL DEFINITIZE MODIFICATION R00001. THIS IS A MISCELLANEOUS CHANGE. CARD READER ¿ THE USING AGENCY HAS REQUESTED THAT THE NEW GATES INSTALLED AT BUILDINGS 1840 & 1844 BE EQUIPPED WITH CARD READERS. THIS IS A USING AGENCY REQUEST. CE-M CONSTRUCTION DIVISION CONSTRUCTION CONTRACT MODIFICATION R10004, $18,190.86
Amount: $0
Award Description: TAS::57 3404::TAS ARRA::YES::ARRA RECOVERYPROJECT#::325481::RP# LIGHTING, GAS AND PAVEMENT REPAIRS AT PETERSON AFB, CO TDKA971010(325647) BUILDING 1840/1844 CAMERAS¿ AFTER THE CAMERAS WERE REPLACE UNDER THE ORIGINAL CONTRACT IT WAS DETERMINED WHILE THE CAMERAS INSTALL WHILE ADHERING THE ORIGINAL CONTRACT DOCUMENTS THE CAMERAS DID NOT PERFORM IN THE MANNER AND AS REQUIRED BY BUILDING 1840/1844 SECURITY STANDARDS. THIS IS A CONSTRUCTION CHANGE. EQUITABLE ADJUSTMENTS¿ UNDER CONTRACTOR SERIAL LETTER NUMBER 105 DATED 22 FEB 11, THE CONTRACTOR REQUESTED AN EQUITABLE ADJUSTMENT FOR ADDITIONAL WORK ASSOCIATED WITH ADDITIONAL BOLLARDS AND ADDITIONAL ROCK. THIS IS A CONSTRUCTION CHANGE. CD-M CONSTRUCTION DIVISION, CONSTRUCTION CONTRACT MODIFICATION R00007, $0.00
Amount: $0
Award Description: TAS::21 2022::TAS ARRA::YES::ARRA RECOVERYPROJECTA#::325824::RPA# REPLACEMENT OF BOILER #1 FORT CARSON, CO PURCHASE AND DELIVER SPARE PARTS FOR THE HIGH TEMPERATURE HOT WATER GENERATORS ARE NECESSARY FOR FUTURE MAINTENANCE AND REPAIR. CD-M CONSTRUCTION DIVISION, CONSTRUCTION CONTRACT MODIFICATION R00008, $0.00
Amount: $0
Award Description: TAS::21 2022::TAS ARRA::YES::ARRA RECOVERYPROJECT#::325824::RP# REPLACEMENT OF BOILER #1 AT FORT CARSON, CO DUE TO THE NEW REPLACEMENT OF ENGLISH BOILER # 2 IN THE SAME BUILDING FROM OTHER PROJECT HAS NOT BEEN PROPER FUNCTION, THE BASE OPERATION AND MAINTENANCE DIVISION REQUESTED THE BOILER # 1 WILL NOT BE REPLACED. THEREFORE THE GOVERNMENT CHANGES THE PROJECT SCOPE OF WORK FROM BOILER REPLACEMENT TO IMPROVEMENT WITHOUT REPLACEMENT OF EXISTING BOILER # 1. CD-M CONSTRUCTION DIVISION, CONSTRUCTION CONTRACT MODIFICATION R00007, $0.00 TE 38 DAYS
Amount: $0
Award Description: TAS::21 2022::TAS ARRA::YES::ARRA RECOVERYPROJECT#::325824::RP# REPLACEMENT OF BOILER #1 FORT CARSON, CO CHANGES ARE NECESSARY FOR IMPROVEMENT OF THE GENERATORS' PERFORMANCE CD-M CONSTRUCTION DIVISION, CONSTRUCTION CONTRACT MODIFICATION R00006, $0.00 TE 24 DAYS
Amount: $0
Award Description: TAS::21 2022::TAS ARRA::YES::ARRA RECOVERYPROJECT#::325924::RP# BUILDING 1860 REPLACE BOILER #1, PHASE 3 OF 3 AT FORT CARSON, CO REPLACE THE EXISTING MAXON GAS VALVES FOR BOILER # 1 DUE TO ITS DETERIORATE CONDITION AND ADDITIONAL WORKS DUE TO DIFFERING SITE CONDITION OF THE HTHW (HIGH TEMPERATURE HOT WATER) SUPPLY VALVE. CD-M CONSTRUCTION DIVISION, CONSTRUCTION CONTRACT MODIFICATION R00005 $0.00
Amount: $21,860
Award Description: TAS::97 0501::TAS ARRA::YES::ARRA RECOVERYPROJECT#::328516::RP# EVANS ARMY COMMUNITY HOPSITAL ALTERATION AT FORT CARSON, CO RFP W9128F-06-R-0015/25, SECTION 2.1.1.1 STATES THAT NEW CONSTRUCTION WITHIN THE AREAS OF RENOVATION SHALL COMPLY FULLY WITH UFC 4-510-01 AND OTHER REFERENCED CRITERIA. UFC 4-510-01 IS THE CENTRAL CRITERIA FOR THIS PROJECT, AND SERVES AS THE FOUNDATION OF DESIGN AND CONSTRUCTION DECISIONS. IN THE EVENT THAT NEW CONSTRUCTION SUB-SYSTEMS CONNECT TO PRE-EXISTING BUILDING SYSTEMS WHICH ARE INCONSISTENT WITH THESE CRITERIA, THE D-B CONTRACTOR SHALL ADVISE THE COR IMMEDIATELY FOR RESOLUTION. CD-M CONSTRUCTION DIVISION, CONSTRUCTION CONTRACT MODIFICATION R00008, $21,860.00 RECOVERY - HOSPITAL ALTERATION
Amount: $38,133
Award Description: CD-M CONSTRUCTION DIVISION, CONSTRUCTION CONTRACT MODIFICATION R00004, $38,133.00 RECOVERY - HOSPITAL ALTERATION
Amount: $10,564
Award Description: TAS::97 0501::TAS ARRA::YES::ARRA RECOVERYPROJECT#::328513::RP# EVANS ARMY COMMUNITY HOSPITAL ALTERATION AT FORT CARSON, CO CD-M CONSTRUCTION DIVISION, CONSTRUCTION CONTRACT MODIFICATION R00005, $10,564.00
Amount: $262,620
Award Description: TAS::97 0501::TAS ARRA::YES::ARRA RECOVERYPROJECT#::328513::RP# EVANS ARMY COMMUNITY HOSPITAL ALTERATION AT FORT CARSON, CO THE REQUIREMENT FOR PATIENT LIFT CAPABILITY BETWEEN PATIENT BATHROOMS AND PATIENT BEDS IS A RECENT CLINICAL REQUIREMENT ENDORSED BY HFPA AND ARMY INSTITUTE OF PUBLIC HEALTH IN SUPPORT OF EVIDENCE BASED DESIGN. THE NEED IS PARTICULARLY EVIDENT WHEN TRYING TO ASSIST A FALLEN PATIENT WITHIN THE CONFINES OF A PATIENT BATHROOM. THE SMALL AREA OF A PATIENT BATHROOM DOES NOT ALLOW ENOUGH ROOM FOR PATIENT CARE SPECIALISTS TO ASSIST THE INJURED PATIENT EFFECTIVELY OR EFFICIENTLY. CD-M CONSTRUCTION DIVISION, CONSTRUCTION CONTRACT MODIFICATION R00003, $262,620.00
Amount: $4,628
Award Description: TAS::97 0501::TAS ARRA::YES::ARRA RECOVERYPROJECT#::328513::RP# EVANS ARMY COMMUITY HOSPITAL ALTERATION AT FORT CARSON, CO THE PRELIMINARY SOUND ISOLATION REPORT DATED NOVEMBER 29, 2011 INDICATE THAT THE SOUND ISOLATION REQUIREMENTS OF THE UNITED FACILITIES CRITERIA (UFC) 4-510-01 FOR DESIGN OF MEDICAL FACILITIES ARE AT LOWER LEVELS THAT WHAT WOULD BE RECOMMENDED FOR THE DESIRED MITIGATING EFFECTS. THE UFC REQUIREMENTS ARE ALSO LOWER THAN THE RECOMMENDATIONS OF THE AIA 2010 GUIDELINES FOR DESIGN AND CONSTRUCTION OF HEALTH CARE FACILITIES. THE TYPICAL REQUIRED SOUND TRANSMISSION CLASS (STC) FOR WALL ASSEMBLIES AS IDENTIFIED IN THE UFC IS AN STC 40. THE ACOUSTICAL CONSULTANT'S REPORT IS RECOMMENDING RATINGS OF AROUND STC 50. OUR TEAM IS CURRENTLY PROCEEDING WITH A DESIGN OF A TYPICAL WALL ASSEMBLY THAT INCLUDES SOUND ATTENUATION BLANKETS INSTALLED WITHIN THE STUD CAVITY THAT WILL PROVIDE A STANDARD RATING OF STC 45. THIS LEVEL OF SOUND ISOLATION HAS BEEN VERBALLY ACCEPTED BY THE ACOUSTICAL CONSULTANT. IN ORDER TO ACHIEVE THE SOUND ISOLATION PERFORMANCE OF STC 50 AS BEING RECOMMENDED, AN ADDITIONAL LAYER OF GYPSUM BOARD WOULD NEED TO BE ADDED TO THE WALL ASSEMBLY. THIS IS SIGNIFICANTLY ABOVE THE REQUIREMENTS OF THE UFC AND RFP. THE RECOMMENDATIONS ARE FOR THE WALL ASSEMBLY ONLY AND THE ACOUSTICAL CONSULTANT IS NOT RECOMMENDING ADDITIONAL SOUND MITIGATING MEASURES FOR DOORS OR OTHER OPENINGS AND PENETRATIONS. THE COST IMPACT TO THE PROJECT WOULD BE THE COST OF AN ADDITIONAL LAYER OF GYPSUM BOARD TO ALL APPLICABLE WALL ASSEMBLIES. IN THE CASE OF FIRE SEPARATIONS BETWEEN FLOORS, THE ELEVATOR BANK, ETC., THE HOSPITAL AND HFPA ASKED THAT ALL EXISTING TO REMAIN WALLS DEEMED TO BE FIRE SEPARATIONS BE UPGRADED TO COMPLY WITH CURRENT CODES. CD-M CONSTRUCTION DIVISION, CONSTRUCTION CONTRACT MODIFICATION R00009, $4,628.00
Amount: $15,401
Award Description: TAS::97 0501::TAS ARRA::YES::ARRA RECOVERYPROJECT#::328513::RP# EVANS ARMY COMMUNITY HOSPITAL ALTERATION AT FORT CARSON, CO THE HOSPITAL DOES NOT HAVE THE DOCUMENTATION AND TEST DATA TO SUPPORT THE RFP STATEMENT THAT THE BUILDING HAS AN ACTIVE AND CODE COMPLIANT SMOKE CONTROL SYSTEM. THEREFORE AN ACCURATE ANALYSIS OF THE EXISTING SYSTEM CANNOT BE PERFORMED AND THE CURRENT SYSTEM CANNOT BE MAINTAINED TO CODE. DURING NUMEROUS RECENT MEETINGS AND CONFERENCE CALLS INFORMATION HAS BEEN PROVIDED, AND DISCUSSION HAS TAKEN PLACE, REGARDING THE EXISTING SMOKE CONTROL SYSTEM AND THE SCOPE OF FUTURE RENOVATIONS TO THE SYSTEM THAT WILL PROVIDE THE MAXIMUM BENEFIT TO BUILDING OCCUPANTS, BUILDING OWNERS, AND MAINTENANCE PERSONNEL. FIRST AND FOREMOST IS THE SAFETY OF BUILDING OCCUPANTS. WE KNOW THAT THE ORIGINAL SMOKE CONTROL SYSTEM WAS DESIGNED AND CONSTRUCTED IN 1986 WITH THE CONSTRUCTION OF THE EVANS ARMY COMMUNITY HOSPITAL (EACH) BUILDING. AT THAT TIME THERE WERE NO APPLICABLE CODES THAT WERE WRITTEN SPECIFICALLY FOR SMOKE CONTROL SYSTEMS; THE FIRST EDITION OF NPFA 92A, "RECOMMENDED PRACTICE FOR SMOKE CONTROL SYSTEMS", WAS PUBLISHED IN 1988. OUR UNDERSTANDING IS THAT THE INTENT OF THE ORIGINAL DESIGN WAS TO EXHAUST (100%) THE SMOKE ZONE WHERE SMOKE HAD BEEN DETECTED (ALSO KNOWN AS THE ACTIVE ZONE), AND TO PRESSURIZE (100% SUPPLY) THE ADJACENT ZONES ON ALL SIDES. THIS METHOD WOULD CREATE SOME SORT OF PRESSURE DIFFERENTIAL AND AID IN CONTAINING SMOKE TO THE ZONE OF ORIGIN. CD-M CONSTRUCTION DIVISION, CONSTRUCTION CONTRACT MODIFICATION R00016, $15,401.00
Amount: $3,202
Award Description: TAS::97 0501::TAS ARRA::YES:: RECOVERYPROJECT#::328513::RP# EVANS ARMY COMMUNITY HOSPITAL AT FORT CARSON, CO RFP W9128F-06-R-0015/25, SECTION 01 10 00-6.13.6 AND APPENDIX D REQUIRE GOVERNMENT ACTION TO OBTAIN THE REQUIRED GREEN ENERGY LEED CREDITS. THE FT. CARSON DPW SUSTAINABILITY MANAGER CANNOT PROVIDE THE DOCUMENTATION NEEDED TO ACQUIRE THE CREDITS. CD-M CONSTRUCTION DIVISION, CONSTRUCTION CONTRACT MODIFICATION R00014, $3,202.00 RECOVERY - HOSPITAL ALTERATION
Amount: $9,324
Award Description: TAS::97 0501::TAS ARRA::YES::ARRA RECOVERYPROJECT#::328513::RP# EVANS ARMY COMMUNITY HOSPITAL ALTERATION AT FORT CARSON, CO THE PROJECT ROOM CONTENTS REPORT (PRCR) JOINT SCHEDULE NUMBER (JSN) ITEMS CONTAINED ON APPENDIX E AND CONCEPT OF OPERATIONS IN THE RFP WAS DEVELOPED WITH THE INTENTION TO HAVE FLEXIBILITY FOR CHANGES DURING DESIGN TO INCORPORATE RECENT CLINICAL REQUIREMENTS ENDORSED BY HFPA AND ARMY INSTITUTE OF PUBLIC HEALTH IN SUPPORT OF EVIDENCE BASED DESIGN. CD-M CONSTRUCTION DIVISION, CONSTRUCTION CONTRACT MODIFICATION R00010, $9,324.00
Amount: $80,157
Award Description: TAS::97 0501::TAS ARRA::YES::ARRA RECOVERYPROJECT#::328513::RP# EVANS ARMY COMMUNITY HOSPITAL ALTERATION AT FORT CARSON, CO 2. NECESSITY FOR CHANGE: 2.1. THE GENERAL CONTRACTOR PLANNED FOR A FLOORING PRODUCT, JOHNSONITE MELODIA, IN THEIR ORIGINAL BID THAT MET THE RFP REQUIREMENT. HOWEVER, THE DESIGN TEAM RECOMMENDS A TEKNOFLOR PRODUCT THAT OFFERS MORE RETURN ON INVESTMENT FOR THE INPATIENT BEHAVIORAL HEALTH (IPBH) FLOOR. 2.1.1. THE TEKNOFLOR PRODUCT SUPPORTS EVIDENCE BASED DESIGN FEATURES. IT OFFERS A WOOD TONE THAT IS HIGHLY RECOMMENDED BY THE VA MENTAL HEALTH FACILITIES DESIGN GUIDE TO CREATE A RESIDENTIAL VERSUS INSTITUTIONAL ENVIRONMENT WHILE THE JOHNSONITE MELODIA DOES NOT. FURTHERMORE, THE JOHNSONITE PRODUCT RAISES CONCERNS FROM THE PDT ABOUT LIGATURE RISKS, THE HIDING OF CONTRABAND, AND INGESTION. THESE CONCERNS ARE ADDRESSED WITH THE TEKNOFLOR PRODUCT, THUS INCREASING STAFF AND PATIENT SAFETY ON A HIGH RISK IPBH FLOOR. 2.1.2. ADDITIONALLY, TEKNOFLOR COMES WITH A 15 YEAR WARRANTY VERSUS A 5 YEAR WARRANTY FOR JOHNSONITE AND DOES NOT REQUIRE WAXING. THE EXPECTATION IS THAT THIS PRODUCT WILL PAY FOR ITSELF DURING ITS LIFETIME SOLELY DUE TO WAXING COSTS. 2.2. THE JOHNSONITE OPTIMA PRODUCT SUPPORTS EVIDENCE BASED DESIGN FEATURES. IT COMES WITH A 12 YEAR WARRANTY VERSUS A 5 YEAR WARRANTY FOR SPECIFIED PRODUCT AND DOES NOT REQUIRE WAXING. THE EXPECTATION IS THAT THIS PRODUCT WILL PAY FOR ITSELF DURING ITS LIFETIME SOLELY DUE TO WAXING COSTS. CD-M CONSTRUCTION DIVISION, CONSTRUCTION CONTRACT MODIFICATION R00006 $80,157.00
Amount: -$65,527
Award Description: TAS::97 0501::TAS ARRA::YES::ARRA RECOVERYPROJECT#328513::RP# EVANS ARMY COMMUNITY HOSPITAL ADDITION AT FORT CARSON, CO THE EACH COMMANDER AND HFPA ASKED TO REVISE THE CONTRACT TO UTILIZE AN EXISTING TEMPORARY BUILDING LOCATED ON THE HOSPITAL CAMPUS IN LIEU OF BUILDING A NEW TEMPORARY OFFICE FACILITY FOR THE HFPA. THIS CHANGE RESULTS IN SIGNIFICANT COST SAVINGS AND PROVIDES CONVENIENCE FOR THE GOVERNMENT. CD-M CONSTRUCTION DIVISION, CONSTRUCTION CONTRACT MODIFICATION R00001, -$65,527.00
Amount: $255,229
Award Description: TAS::97 0501::TAS ARRA::YES::ARRA RECOVERYPROJECT#::328513::RP# EVANS ARMY COMMUNITY HOSPITAL ALTERATION AT FORT CARSON, CO 2.1. THE GOVERNMENT DOES NOT HAVE THE COMMUNICATIONS EQUIPMENT AVAILABLE TO SUPPORT THE PROJECT. THIS EQUIPMENT WAS AVAILABLE AT THE TIME OF RFP DEVELOPMENT BUT HAS SINCE BEEN USED IN AN EMERGENCY SITUATION AND IS NO LONGER AVAILABLE. THESE GFGI ITEMS WILL HAVE TO BE ADDED AS A MOD TO THE CONTRACT SINCE THE FUNDING IS NOW CLASSIFIED AS CONSTRUCTION $ RATHER THAN ISEC $. 2.2. T HE GOVERNMENT WAS NOT ABLE TO OBTAIN COPIES OF THE CONTRACT DOCUMENTS FOR USE DURING THE PERFORMANCE OF THE CONTRACT. 2.3. THIS PROJECT HAS INTERESTED PARTIES, SUBJECT MATTER EXPERTS, AND DESIGN ENGINEERS THAT NEED TO REVIEW THE PROJECT SUBMITTALS AND ARE REMOTELY LOCATED FROM THE PROJECT LOCATION. AN ELECTRONIC WEB-BASED SUBMITTAL PROGRAM WILL ALLOW THE PDT TO DISTRIBUTE SUBMITTAL PACKAGES TO REVIEWERS WITHOUT DELAY OF SHIPPING. IT WILL ALSO ALLOW REVIEWS TO COMMUNICATE CONCERNS AND COMMENTS TO THE PDT IN A TIMELY MANNER. ADDITIONALLY, THERE IS SIGNIFICANT SAVINGS DUE TO REDUCED REPRODUCTION COSTS AND SHIPPING COSTS. THE ELECTRONIC SYSTEM WILL ALSO CREATE A CENTRAL DATA BASE OF EVERY SUBMITTAL CONTEND AND AT THE END OF THE PROJECT PRODUCE AN INDEXED ELECTRONIC FILE OF EVERY SUBMITTAL AND PRODUCT DATA SHEET SUBMITTED ON THE PROJECT. 2.4. DURING THE DESIGN PROCESS AND THE EVALUATION BY THE CONTRACTOR AND HOSPITAL, IT WAS DETERMINED THAT USING THE TEMPORARY ELEVATOR TO REMOVE DEBRIS VIA COVERED CARTS WAS MORE AND SAFER. THE HOSPITAL'S MAIN CONCERNS WITH THE TRASH CHUTE ARE THE ABILITY TO CONTROL DUST AT THE ER/ED ENTRANCE AND NOISE/VIBRATION DISTURBANCE TO OCCUPIED FLOORS. CD-M CONSTRUCTION DIVISION, CONSTRUCTION CONTRACT MODIFICATION R00002, $255,229.00
Amount: $27,714
Award Description: TAS::97 0501::TAS ARRA::YES::ARRA RECOVERYPROJECT#::328513::RP#:: EVANS ARMY COMMUNITY HOSPITAL ALTERATION AT FORT CARSON, CO THE RFP DID NOT ADDRESS THE DOMESTIC HOT WATER RECIRCULATION SYSTEM ON THE THIRD FLOOR. THE THIRD FLOOR DOMESTIC HOT WATER MAIN APPEARS TO BE RECIRCULATED ON THE THIRD FLOOR AND THE VERTICAL HOT WATER FEEDS OFF THE SAME MAINS ARE ALSO RECIRCULATED. WHEN THE 4TH AND 5TH FLOOR WORK IS COMPLETED, THE VERTICAL RECIRCULATION WILL NO LONGER EXIST. THIS WILL RESULT WITH LONG RUNS OF NON RECIRCULATED HOT WATER BRANCHES AT THE END OF EACH WING. PRESENTLY THERE ARE EXISTING DEAD-END RUNS OF DOMESTIC HOT WATER WHICH IS NOT BEING TOUCHED BY THE 4TH AND 5TH FLOOR WORK THAT HAS LONGER DEAD ENDS THAT WHAT WOULD BE CREATED BY THE REMOVAL OF VERTICAL MAINS IN THE 4TH AND 5TH FLOOR WORK. CD-M CONSTRUCTION DIVISION, CONSTRUCTION CONTRACT MODIFICATION R00007 $27,714.00 RECOVERY - HOSPITAL ALTERATION
Amount: $1,350
Award Description: TAS::97 0501::TAS ARRA::YES::ARRA ARECOVERYPROJECT#::328513::RPA# EVANS ARMY COMMUNITY HOSPITAL ALTERATION AT FORT CARSON, CO THE FIRE ZONE/FIRE STROBE/FIRE DOOR LABELING IS REQUIRED TO MAINTAIN THE HOSPITAL STANDARD THROUGHOUT THE FACILITY. THIS REQUIREMENT IS IN EXCESS OF THE CODE BUT REQUIRED TO REMAIN CONSISTENT IN THE FACILITY AND MAINTAIN CURRENT SOPS. THIS HAS BEEN DISCUSSED WITH HFPA(M.SIMON) AND CONCURRED. THE FIRE ALARM (FA) PULL STATION IN THIS AREA IS REQUIRED TO BE TAMPER PROOF AND ANTI-LIGATURE DUE TO THE NATURE OF THE IPBH CLINIC. THIS IS FOR PATIENT SAFETY. CD-M CONSTRUCTION DIVISION, CONSTRUCTION CONTRACT MODIFICATION R00015, $1,350.00
Amount: $21,578
Award Description: TAS::97 0501::TAS ARRA::YES::ARRA RECOVERYPROJECT#::328513::RP#:: EVANS ARMY COMMUNITY HOSPITAL ALETERATION AT FORT CARSON, CO RECOVERY - HOSPITAL ALTERATION
Amount: $199,579
Award Description: TAS::97 0501::TAS ARRA::YES::ARRA RECOVERYPROJECT#::328513::RP# EVANS ARMY COMMUNITY HOSPITAL ALTERATION AT FORT CARSON, CO THE EXISTING HYDRONIC SYSTEM ISOLATION VALVES ARE NOT OPERABLE. THIS WILL CAUSE SEVERAL WHOLE-HOSPITAL OUTAGES IN ORDER TO PERFORM CONTRACT WORK ON THE 4TH AND 5TH FLOORS. INSTALLATION OF NEW ISOLATION VALVES WILL ALLOW THE AFFECTED AREAS OF A PLANNED OUTAGE TO BE MINIMIZED THUS REDUCING IMPACT TO PATIENT CARE. CD-M CONSTRUCTION DIVISION, CONSTRUCTION CONTRACT MODIFICATION R00025, $199,579.00
Amount: $1,942
Award Description: TAS::97 0501::TAS ARRA::YES::ARRA RECOVERYPROJECT#::328513::RP# EVANS ARMY COMMUNITY HOSPITAL ALTERATION AT FORT CARSON, CO EXISTING CONDUIT AND CIRCUIT IS NOT SHOWN ON THE BUILDING AS-BUILTS AND IS LOCATED WHERE A NEW SANITARY PIPING MUST BE INSTALLED. CD-M CONSTRUCTION DIVISION, CONSTRUCTION CONTRACT MODIFICATION R00021, $1,942.76
Amount: $3,708
Award Description: TAS::97 0501::TAS ARRA::YES::ARRA RECOVERYPROJECT#::328513::RP#:: EVANS ARMY COMMUNITY HOSPITAL ALTERATION AT FORT CARSON, CO . THE RFP PROVIDED WHITE BOARDS (THROUGH THE FF&E) FOR PATIENT TRACKING AT THE NURSES¿ STATION BUT THAT IS NOT HOW THE HOSPITAL CURRENTLY TRACKS PATIENTS. THE HOSPITAL IS NOW USING AN ELECTRONIC PATIENT TRACKING SYSTEM WITH A DIGITAL DASHBOARD. THIS SYSTEM REQUIRES A POWER AND COMMUNICATIONS OUTLET AT EACH NURSE STATION ON THE 4TH FLOOR. CD-M CONSTRUCTION DIVISION, CONSTRUCTION CONTRACT MODIFICATION R00022, $3,708.00
Amount: $49,564
Award Description: TAS::97 0501::TAS ARRA::YES::ARRA RECOVERYPROJECT#::328513::RP#:: EVANS ARMY COMMUNITY HOSPITAL ALTERATION AT FORT CARSON, CO THE NFPA CODES REQUIRE THAT ANY BUILDING SYSTEMS ADJACENT OR WITHIN THE CONTRACT AREA BE EVALUATED FOR CODE COMPLIANCE AND TO DETERMINE THAT ANY ALTERATIONS DONE AS PART OF THE PROJECT DO NOT ADVERSELY AFFECT THAT CURRENT SYSTEM. THE EXISTING ELEVATORS HAVE A FIREMAN'S HAT INDICATOR BUT IT IS 10-12 YEARS OLD AND DOES NOT HAVE THE CAPABILITY TO DIFFERENTIATE ALARMS FROM DIFFERENT FA DEVICES. THIS DOES NOT MEET THE CURRENT CODE REQUIREMENTS SINCE ONCE THE ELEVATOR MACHINE ROOM IS SPRINKLERED AND INSTALLED WITH A SMOKE ALARM, THE INDICATOR SHOULD FLASH FOR AN INCIDENT IN THE MACHINE ROOM AND LIGHT-UP SOLID FOR ANY OTHER INCIDENT. CD-M CONSTRUCTION DIVISION, CONSTRUCTION CONTRACT MODIFICATION R00020, FIREMAN'S HAT INDICATOR IN ELEVATOR CAR, $49,564.00
Amount: $76,836
Award Description: TAS::97 0501::TAS ARRA::YES::ARRA RECOVERYPROJECT#::328513::RP# EVANS ARMY COMMUNITY HOSPITAL ALTERATION AT FORT CARSON, CO THE EXISTING CONTROLLER IS AT MAXIMUM CAPACITY AND CANNOT BE EXPANDED BECAUSE IT IS ON OLD TECHNOLOGY AND SOFTWARE THAT IS NO LONGER AVAILABLE. ADDITIONALLY, THE EXISTING WAP DENSITY WILL NOT SUPPORT OTHER EQUIPMENT REQUIRED AS PART OF THE CONTRACT. CD-M CONSTRUCTION DIVISION, CONSTRUCTION CONTRACT MODIFICATION R00012, $76,836.00 TE 10 DAYS
Amount: $91,762
Award Description: TAS::97 0501::TAS ARRA::YES::ARRA RECOVERYPROJECT#::328513::RP# EVANS ARMY COMMUNITY HOSPITAL ALTERATION AT FORT CARSON, CO THE EXISTING HEATING AND CHILLED WATER IS VERY DIRTY. THE CURRENT STATE OF THE WATER IS NOT CLEAN ENOUGH TO MEET THE REQUIREMENTS OF THE NEW CHILLERS REQUIRED UNDER THE CONTRACT. IF THE WATER REMAINS UNTREATED THE CHILLER MANUFACTURER WILL NOT WARRANTY THE CHILLER. CD-M CONSTRUCTION DIVISION, CONSTRUCTION CONTRACT MODIFICATION R00011 $91,762.00
Amount: $24,396
Award Description: TAS::97 0501::TAS ARRA::YES::ARRA RECOVERYPROJECT#::328513::RP# EVANS ARMY COMMUNITY HOSPITAL ALTERATION AT FORT CARSON, CO THE SMOKE CONTROL RELAYS ASSOCIATED WITH AHU#6 AND AHU#4 ARE CROSS-WIRED AND NOT FUNCTIONING CORRECTLY. THIS MEANS THAT THE WRONG SMOKE ZONES GO INTO ALARM FROM WHAT ZONE SHOULD GO INTO ALARM. THE SMOKE CONTROL RELAY(SCR) MUST BE TROUBLESHOOT/RECONFIGURED IN SMOKE CONTROL ZONE 9. CURRENTLY SCR'S TIED INTO AHU6 SHOULD BE TIED INTO AHU4. ADDITIONALLY, ZONE 7 ON THE 3RD FLOOR EAST IS FED FROM 2 AHU (4,15). SUGGEST SEPARATING THIS THROUGH DAMPERS OR SEPARATE ZONES. GLOBAL RENEW WOMEN¿S HEALTH, UNIT PHASE B INDICATES THIS (DWGS M2.N1, M2.N2, M2.S1, M2.S2). TO GIVE AN EXAMPLE OF A POTENTIAL ISSUE, SEE THE ATTACHED DRAWING. IF ZONE 7 GOES INTO EVACUATION, THEN AHU4/15 EVACUATE. AT THAT POINT ZONE 9 RIGHT NEXT DOOR WILL EVACUATE AS WELL DUE TO THE FACT IT IS ON AHU 4. IN THIS SITUATION, IT SHOULD ACTUALLY BE PRESSURIZING. ANOTHER QUESTION IS THE IMPACT THE 4TH FLR PRESSURIZATION WOULD HAVE ON THE AREA BELOW THAT IS TIED INTO MULTIPLE AHUS. WE MAY BE IMPACTING OTHER AREAS THAT WE WERE NOT EVEN PLANNING ON LOOKING AT. CD-M CONSTRUCTION DIVISION, CONSTRUCTION CONTRACT MODIFICATION R00031, $24,396.00
Amount: $14,327
Award Description: TAS::97 0501::TAS ARRA::YES::ARRA RECOVERYPROJECT#::3288513::RP# EVANS ARMY COMMUNITY HOSPITAL ALTERATION AT FORT CARSON, CO CONNECTIVITY IS NEED TO THE WALL MOUNTED PRESENTATION MONITOR IN ORDER TO ELIMINATE THE NEED FOR OPEN WIRE RUNNING ACROSS THE FLOOR. OPEN WIRES RUNNING ACROSS THE FLOOR CREATE A TRIPPING HAZARD. CD-M CONSTRUCTION DIVISION, CONSTRUCTION CONTRACT MODIFICATION R00027, $14,327.00
Amount: $1,301
Award Description: TAS::97 0501::TAS ARRA::YES::ARRA RECOVERYPROJECT#::328513::RP#:: EVANS ARMY COMMUNITY HOSPITAL ALTERATION AT FORT CARSON, CO RECOVERY - HOSPITAL ALTERATION
Amount: $83,506
Award Description: TAS::97 0501::TAS ARRA::YES::ARRA RECOVERYPROJECT#::328513::RP# EVANS ARMY COMMUNITY HOSPITAL ALTERATION AT FORT CARSON, CO EVANS ARMY COMMUNITY HOSPITAL (EACH) AT FT. CARSON, CO REQUIRES THAT THE IO&T EFFORT FOR FURNITURE AND MEDICAL EQUIPMENT SYSTEMS, FOR THE EVANS ARMY COMMUNITY HOSPITAL, MEDICAL SURGE AND IN PATIENT BEHAVIOR HEALTH 4TH AND 5TH FLOOR RENOVATION PROJECT (MED SURGE/IPBH) BE PROVIDED UNDER THE RENOVATION DESIGN/BUILD CONTRACT IN ORDER TO MEET OPERATIONAL REQUIREMENTS OF THE EACH. THE GOVERNMENT IS NOT ABLE TO PROVIDE TRANSITION AND MOVE SERVICES TO MEET THE OPERATIONAL REQUIREMENTS OF EACH. CD-M CONSTRUCTION DIVISION, CONSTRUCTION CONTRACT MODIFICATION R00019, $83,506.00 RECOVERY - HOSPITAL ALTERATION
Amount: $192,111
Award Description: TAS::97 0501::TAS ARRA::YES::ARRA RECOVERYPROJECT#::328513::RP# EVANS ARMY COMMUNITY HOSPITAL ALTERATION AT FORT CARSON, CO THE EXISTING HYDRONIC SYSTEM ISOLATION VALVES ARE NOT OPERABLE. THIS WILL CAUSE SEVERAL WHOLE-HOSPITAL OUTAGES IN ORDER TO PERFORM CONTRACT WORK ON THE 4TH AND 5TH FLOORS. INSTALLATION OF NEW ISOLATION VALVES WILL ALLOW THE AFFECTED AREAS OF A PLANNED OUTAGE TO BE MINIMIZED THUS REDUCING IMPACT TO PATIENT CARE. CD-M CONSTRUCTION DIVISION, CONSTRUCTION CONTRACT MODIFICATION R00026, $192,111.00
Amount: $50,000
Award Description: TAS::97 0501::TAS ARRA::YES::ARRA RECOVERYPROJECT#::328513::RP# EVANS ARMY COMMUNITY HOSPITAL ALTERATION AT FORT CARSON, CO THIS ALLOWANCE IS INTENDED TO ENSURE THE ARTWORK INSTALLED IN THE COMPLETED RENOVATION MEETS THE EVOLVING MEDCOM STANDARD OF A WORLD CLASS FACILITY AND IS COMPLIANT WITH CURRENT PSYCHOLOGY AND WELLBEING. CD-M CONSTRUCTION DIVISION, CONSTRUCTION CONTRACT MODIFICATION R00024, $50,000.00
Amount: $8,122
Award Description: TAS::97 0501::TAS ARRA::YES::ARRA RECOVERYPROJECT#::328513::RP# EVANS ARMY COMMUNITY HOSPITAL ALTERATION AT FORT CARSON, CO THE PROJECT ROOM CONTENTS REPORT (PRCR) JOINT SCHEDULE NUMBER (JSN) ITEMS CONTAINED ON APPENDIX E OF THE RFP WAS DEVELOPED WITH THE INTENTION TO HAVE FLEXIBILITY FOR CHANGES DURING DESIGN TO INCORPORATE RECENT CLINICAL REQUIREMENTS ENDORSED BY HFPA AND ARMY INSTITUTE OF PUBLIC HEALTH IN SUPPORT OF EVIDENCE BASED DESIGN. ADDITIONALLY, THE PRCR WAS NOT PRESCRIPTIVE BECAUSE EACH WAS EVALUATING ITS SUPPLY SERVICES CONTRACTS AT THE TIME THE RFP WAS COMPLETED. SOME OF THE ITEMS LISTED IN THE PRCR AS CONTRACTOR FURNISHED/CONTRACTOR INSTALLED ARE NOT NECESSARY AS THEY CAN BE INSTALLED UNDER THE EACH SUPPLY SERVICES CONTRACT. CD-M CONSTRUCTION DIVISION, CONSTRUCTION CONTRACT MODIFICATION R00023, $8,122.56

Project Location Detail

Location Information
Latitude, Longitude 0º 0' 0", 0º 0' 0"
Congressional District 05
City EL PASO
County EL PASO
State CO
Zip 80914