contract- RECIPIENT AWARD SUMMARY
FUSSELL COMPANY CONTRACTORS
| AWARD OVERVIEW |
|
Agency Name: Department of Defense--Military |
Project Location:
BOSSIER |
|
Award Number: 5101 |
Project Location - State: LA |
|
Funding Amount:
$0 |
Project Location - Zip Code: 711102270 |
|
Ending Date:
2010-10-03 |
Congressional District: 04 |
RECIPIENT INFORMATION (AWARD)
| RECIPIENT INFORMATION (AWARD) |
|
Recipient Name:
|
FUSSELL COMPANY CONTRACTORS |
|
Recipient Address:
|
310 HWY 610 |
|
Recipient City:
|
WINNSBORO |
|
Recipient State:
|
LA |
|
Recipient Zip Code:
|
71295 |
|
Congressional District:
|
LA-05 |
DESCRIPTION OF WORK/SERVICE PERFORMED
TAS::57 3404::TAS - RECOVERY - AWUB 08-0099, CONTRACTOR SHALL PROVIDE ALL MATERIALS, EQUIPMENT, LABOR, TRANSPORTATION, AND SUPERVISION TO ACCOMPLISH ALL WORK DONE IN ACCORDANCE WITH THE REQUIREMENTS CONTAINED IN THE ORIGINAL CONTRACT SPECIFICATIONS AND THE ATTACHED STATEMENT OF WORK. WO: A89150 ARRA::YES::ARRA
| Other Awards |
Amount:
$1,999,992
Award Description: TAS::57 3404::TAS RECOVERY - AWUB 09-0041P1, RPR AIRFIELD PAVEMENTS, THE CONTRACTOR WILL BE REQUIRED TO REMOVE AND REPLACE APPROXIMATELY 37,465 SY-IN (APPROX 83 SLABS 12.5 FT X 12.5 FT X 26 IN) OF CONCRETE ON THE PARALLEL TAXIWAY CENTERLINE IN FRONT OF PARKING SITES 15 THRU 19 BY PERFORMING RANDOM SLAB REPLACEMENT WITH COMPLETED SLABS TO BE APPROXIMATELY 12.5 FT BY 12.5 FT BY 26 INCHES THICK. ARRA::YES::ARRA |
Amount:
$999,989
Award Description: TAS::57 3404::TAS RECOVERY - AWUB070152P2 - REPAIR AIRFIELD PAVEMENT, PH 2. THE CONTRACTOR WILL BE REQUIRED TO REMOVE AND REPLACE APPROXIMATELY 36,112 SQUARE YARDS-INCHES (APPROX 80 SLABS 12.5 FT X 12.5 FT X 26 IN) OF CONCRETE ON THE PARALLEL TAXIWAY CENTERLINE IN FRONT OF PARKING SITES 12 THRU 15 BY PERFORMING RANDOM SLAB REPLACEMENT WITH COMPLETED SLABS TO BE APPROXIMATELY 12.5 FT BY 12.5 FT BY 26 INCHES THICK. ARRA::YES::ARRA |
Amount:
$599,988
Award Description: TAS::57 3404::TAS RECOVERY - AWUB080099 - REPAIR AIRFIELD JOINT SEALS. CONTRACTOR SHALL BE RESPONSIBLE FOR KEEPING CONSTRUCTION AREA CLEAN TO REDUCE OVERALL FOREIGN OBJECT DAMAGE. WORK TO BE INSPECTED BY THE 2ND CIVIL ENGINEERING SQUADRON. CONTRACTOR TO COORDINATE SCHEDULE FOR JOINT SEAL REPAIRS WITH THE 2ND CIVIL ENGINEERING SQUADRON AND BASE OPERATIONS. DUE TO THE UNCERTAINTY OF SCHEDULED RUNWAY CLOSURES THE ESTIMATED DURATION FOR COMPLETION OF PROJECT IS 8 MONTHS. ANY WORK NOT MEETING SPECIFICATIONS WILL BE PERFORMED AGAIN BY CONTRACTOR. ARRA::YES::ARRA |
Amount:
$0
Award Description: TAS::57 3404::TAS - RECOVERY - AWUB 08-0099, CONTRACTOR SHALL PROVIDE ALL MATERIALS, EQUIPMENT, LABOR, TRANSPORTATION, AND SUPERVISION TO ACCOMPLISH ALL WORK DONE IN ACCORDANCE WITH THE REQUIREMENTS CONTAINED IN THE ORIGINAL CONTRACT SPECIFICATIONS AND THE ATTACHED STATEMENT OF WORK. WO: A89150 ARRA::YES::ARRA |
Amount:
$0
Award Description: TAS::57 3404::TAS RECOVERY - AWUB080099 - REPAIR AIRFIELD JOINT SEALS. CONTRACTOR SHALL BE RESPONSIBLE FOR KEEPING CONSTRUCTION AREA CLEAN TO REDUCE OVERALL FOREIGN OBJECT DAMAGE. WORK TO BE INSPECTED BY THE 2ND CIVIL ENGINEERING SQUADRON. CONTRACTOR TO COORDINATE SCHEDULE FOR JOINT SEAL REPAIRS WITH THE 2ND CIVIL ENGINEERING SQUADRON AND BASE OPERATIONS. DUE TO THE UNCERTAINTY OF SCHEDULED RUNWAY CLOSURES THE ESTIMATED DURATION FOR COMPLETION OF PROJECT IS 8 MONTHS. ANY WORK NOT MEETING SPECIFICATIONS WILL BE PERFORMED AGAIN BY CONTRACTOR. |
Amount:
$0
Award Description: TAS::57 3404::TAS AWUB 09-0041P1, CONTRACTOR SHALL PROVIDE ALL MATERIALS, EQUIPMENT, LABOR, TRANSPORTATION, AND SUPERVISION TO ACCOMPLISH ALL WORK DONE IN ACCORDANCE WITH THE REQUIREMENTS CONTAINED IN THE ORIGINAL CONTRACT SPECIFICATIONS AND THE ATTACHED STATEMENT OF WORK. WO: A89130 ARRA::YES::ARRA |
Amount:
$0
Award Description: TAS::57 3404::TAS -RECOVERY- AWUB 07-0152P2, CONTRACTOR SHALL PROVIDE ALL MATERIALS, EQUIPMENT, LABOR, TRANSPORTATION, AND SUPERVISION TO ACCOMPLISH ALL WORK DONE IN ACCORDANCE WITH THE REQUIREMENTS CONTAINED IN THE ORIGINAL CONTRACT SPECIFICATIONS AND THE ATTACHED STATEMENT OF WORK. WO: A89151 ARRA::YES::ARRA |
Amount:
$0
Award Description: TAS::57 3404::TAS RECOVERY - AWUB070152P2 - REPAIR AIRFIELD PAVEMENT, PH 2. THE CONTRACTOR WILL BE REQUIRED TO REMOVE AND REPLACE APPROXIMATELY 36,112 SQUARE YARDS-INCHES (APPROX 80 SLABS 12.5 FT X 12.5 FT X 26 IN) OF CONCRETE ON THE PARALLEL TAXIWAY CENTERLINE IN FRONT OF PARKING SITES 12 THRU 15 BY PERFORMING RANDOM SLAB REPLACEMENT WITH COMPLETED SLABS TO BE APPROXIMATELY 12.5 FT BY 12.5 FT BY 26 INCHES THICK. |
| Location Information |
| Latitude, Longitude |
0º 0' 0",
0º 0' 0" |
| Congressional District |
04 |
| City |
BOSSIER |
| County |
BOSSIER |
| State |
LA |
| Zip |
71110 |
|