Skip to content Skip to footer site map
Navigate Up

Recovery.gov - Track the Money

Recovery.gov is the U.S. government's official website that provides easy access to data
related to Recovery Act spending and allows for the reporting of potential fraud, waste, and abuse.

contract- RECIPIENT AWARD SUMMARY

TOCCI/DRISCOLL

Clarification of Codes


AWARD OVERVIEW

AWARD OVERVIEW
Agency Name: General Services Administration Project Location: ESSEX
Award Number: GS02P09DTC0018 Project Location - State: NJ
Funding Amount: $189,955 Project Location - Zip Code: 071024554
Ending Date: 2015-02-24 Congressional District: 10

RECIPIENT INFORMATION (AWARD)

RECIPIENT INFORMATION (AWARD)
Recipient Name: TOCCI/DRISCOLL
Recipient Address: 660 MAIN STREET
Recipient City: WOBURN
Recipient State: MA
Recipient Zip Code: 018018407
Congressional District: MA-07

DESCRIPTION OF WORK/SERVICE PERFORMED

THIS MODIFICATION IS FOR THE PERIMETER COLUMN ABATEMENT AT THE RODINO FEDERAL BUILDING ON FLOORS 4 AND 13.






TRANSACTIONS

TRANSACTIONS

Other Awards

Other Awards
Amount: $107,739,834
Award Description: TAS::47 4543::TAS RECOVERY ACT: THIS IS A DESIGN/BUILD CONTRACT AWARDED FOR THE RENOVATION OF THE PETER W. RODINO FEDERAL BUILDING IN NEWARK, NJ.
Amount: $380,091
Award Description: TAS:: 47 4543::TAS RECOVERY ACT. SEVEN (7) TENANT WORK OPTIONS FOR CIS, EIOR AND USAO HAVE BEEN REINSTATED IN ACCORDANCE WITH THE CONTRACT.
Amount: $113,676
Award Description: RECOVERY ACT: CONTRACT GS02P09DTC0018 HAS BEEN MODIFIED TO MODIFY THE EXISTING PLAZA RAMP TO MEET ADA CODE. THE CURRENT RAMP DOES NOT MEET CODE.
Amount: $910,353
Award Description: RECOVERY ACT: AN UNDEFINITIZED CHANGE ORDER HAS BEEN ISSUED TO CONTRACT GS02P09DTC0018 FOR OPERATIONS AND MAINTENANCE (O&M) SUPPORT SERVICES THROUGHOUT THIS PROJECT ON AN INTERMITTENT BASIS.
Amount: $414,000
Award Description: RECOVERY ACT: THIS IS A MODIFICATION TO THE CURRENT CONTRACT FOR THE USE OF BIM FOR FACILITIES MANAGEMENT. THIS IS A PDL AND WILL BE DEFINITIZED WITHIN 30 DAYS.
Amount: $199,703
Award Description: RECOVERY ACT: THE CURRENT CONTRACT HAS BEEN MODIFIED TO INCLUDE OPERATIONS AND MAINTENANCE SERVICES FOR SCHEDULED SHUTDOWNS OF THE BUILDING RELATED TO THE PROJECT.
Amount: $58,136
Award Description: RECOVERY ACT: THE WORK INCLUDES ABATEMENT OF BASEMENT AND MAILROOM AND A BUILD OUT OF TEMPORARY STORAGE AREAS IN THE BASEMENT.
Amount: $36,485
Award Description: THIS MODIFICATION IS FOR ADDITIONAL GALVANIZED DUCTWORK THROUGHOUT THE BUILDING.
Amount: $83,310
Award Description: THIS MODIFICATION IS FOR ADDITIONAL TELE/DATA JACKS AND DOOR CONTACTS TO BE INSTALLED THROUGHOUT THE BUILDING.
Amount: $20,021
Award Description: THIS MODIFICATION IS FOR FOUR (4) PROBES AND MOCK UP COLUMN ATTACHMENTS TO LOOK FOR ASBESTOS ISSUES.
Amount: $510,405
Award Description: THIS MODIFICATION HAS BEEN ISSUED TO REPLENTICH ASBESTOS ABATEMENT ALLOWANCES FOR UNFORESEEN CONDITIONS.
Amount: $392,895
Award Description: ADDITIONAL ABATEMENT AREA AND DEMOLITION PER THE FOLLOWING (9TH, 4TH, AND 13TH FLOORS ONLY.)
Amount: $65,012
Award Description: THIS MODIFICATION IS FOR FLOOR MITIGATION AND CLEANING (ASBESTOS) ON THE 9TH AND 12TH FLOORS. THIS MODIFICATION IS ALSO FOR WINDOW POCKET REMOVAL ON THE 12TH AND 14TH FLOORS.
Amount: $86,005
Award Description: THIS MODIFICATION IS FOR THE FLOOR MITIGATION AND CLEANING OF THE 9TH AND 14TH FLOORS.
Amount: $293,792
Award Description: PROVIDE ABATEMENT WORK ON FLOORS 12 AND 14 OF THE RODINO FEDERAL BUILDING.
Amount: $228,476
Award Description: THIS MODIFICATION IS FOR WINDOW WASHING EQUIPMENT TO BE INSTALLED ON THE BUILDING.
Amount: $9,093
Award Description: THIS MODIFICATION IS FOR THE REPAIR OF GARAGE ACCESS FLOOR PANELS AT THE RODINO FEDERAL BUIDLING.
Amount: $540,967
Award Description: THIS MODIFICATION IS FOR PREMIUNIM OVER TIME HOURS TO BE ESTABLISHED FOR NOISE RELATED WORK TO TAKE PLACE OFF HOURS.
Amount: $155,960
Award Description: THIS MODIFICATION IS FOR GSA TELE/DATA ON THE 2ND AND 13TH FLOORS OF THE RODINO FEDERAL BUILDING.
Amount: $199,558
Award Description: THIS MODIFICATION IS TO PROVIDE CIS WITH TELE/DATA IN THEIR RENOVATED SPACE AT THE PETER RODINO FEDERAL BUILDING.
Amount: $328,160
Award Description: THIS MODIFICATION IS FOR PERIMETER COLUMN ABATEMENT AT THE RODINO FEDERAL BUILDING ON FLOORS 9, 12 AND 14.
Amount: $406,239
Award Description: THIS MODIFICATION IS FOR LEAD ABATEMENT OF ADDITIONAL STRUCTURAL STEEL REINFORCEMENTS.
Amount: $283,405
Award Description: THIS MODIFICATION IS FOR THE ABATEMENT OF PERIMETER COLUMNS ON FLOORS 2, 5 AND 11.
Amount: $155,301
Award Description: MODIFICATION TO PROVIDE ADDITIONAL ABATEMENT, FLOOR TILES AND RELOCATION SERVICES WITHIN THE RODINO FEDERAL BUILDING.
Amount: $654,826
Award Description: ADDITIONAL ABATEMENT OF FLOORS 2, 5, 11, AND 6.
Amount: $72,595
Award Description: THIS MODIFICATION IS FOR ADDITIONAL PAINTING THROUGHOUT THE BUILDING. THERE ARE A NUMBER OF CHANGES TO TENANT SPACE WHICH IS THE REASON FOR THIS ADDITIONAL PAINTING ALLOWANCE.
Amount: $451,746
Award Description: THIS MODIFICATION IS FOR EXTERIOR SOFFIT SPRAY FIREPROOFING ABATEMENT AT 3RD FLOOR OF THE RODINO FEDERAL BUILDING.
Amount: $39,294
Award Description: MECHNICAL PIPE FLUSHING AND MAINTENANCE
Amount: $281,690
Award Description: THIS MODIFICATION IS FOR LEAD PAINT ABATEMENT AT THE STRUCTURAL STEEL CONNECTIONS. THIS WAS AN UNFORESEEN CONDITION
Amount: $24,755
Award Description: THIS MODIFICATION IS FOR A ARRA/LEED EDUCATIONAL DISPLAY FOR THE BUILDING TENANTS TO KEEP THEM INFORMED OF THE PROJECT.
Amount: $408,585
Award Description: THIS MODIFICATION IS FOR EXTERIOR PRECAST FACADE REPAIRS. THIS ALLOWS THE CONTRACTOR TO SET A UNIT PRICE FOR FACADE REPAIRS PRIOR TO PUTTING ON THE OVER-CLAD. THERE ARE A NUMBER OF CRACKS IN THE FACADE THAT WERE UNFORESEEN WHEN THE WORK STARTED WHICH LED TO THIS MOD.
Amount: $103,973
Award Description: THIS MODIFICATION IS FOR ASBESTOS ABATEMENT IN THE BATHROOM TILE ON ALL FLOORS UNDER RENOVATION. THIS WAS AN UNFORESEEN CONDITION.
Amount: $82,508
Award Description: THIS MODIFICATION IS FOR ADDITIONAL ATTIC STOCK. IE: CEILING FINISH, FLOOR FINISH, FLOOR BASE AND WALL COVERING.
Amount: $104,023
Award Description: THIS MODIFICATION IS FOR REHEAT COILS FOR THE EOIR TENANT IN THEIR CONFERENCE ROOMS.
Amount: $54,249
Award Description: THIS MODIFICATION IS FOR ADDITIONAL FIRE ALARM DEVICES THROUGHOUT THE BUILDING.
Amount: $189,955
Award Description: THIS MODIFICATION IS FOR THE PERIMETER COLUMN ABATEMENT AT THE RODINO FEDERAL BUILDING ON FLOORS 4 AND 13.
Amount: $49,261
Award Description: THIS MODIFICATION IS FOR AN ALLOWANCE FOR SPRAY-ON FIREPROOFING.
Amount: $21,807
Award Description: THIS MODIFICATION IS FOR THE TENANT (CIS) ON THE 14TH SECURITY EQUIPMENT. THE DEVICES CONSISTS OF TWELVE (12) CARD READERS AND FOUR (4) PANIS BUTTONS.
Amount: $100,913
Award Description: THIS MODIFICATION IS FOR ADDITIONAL PARTITIONS TO BE PROVIDED THROUGHOUT THE BUILDING. THERE HAVE BEEN A NUMBER OF CHANGES TO FLOOR LAYOUTS MAKING IT NECESSARY TO ADD PARTITIONS.
Amount: $38,670
Award Description: THIS MODIFICATION WAS EXECUTED FOR VARIOUS ITEMS FOR A BUILD OUT AT THE RODINO FEDERAL BUILDING. THESE ITEMS INCLUDE DRYWALL, PAINTING, STORAGE ROOM BUILD OUT.
Amount: $643,350
Award Description: THIS MODIFICATION IS FOR ADDITIONAL STRUCTURAL REINFORCEMENT IN THE INTERIOR OF THE BUILDING.
Amount: $63,559
Award Description: THIS MODIFICATION IS FOR AN ADDITIONAL 300 AV JACKS TO BE INSTALLED THROUGHOUT THE BUILDING ON RENOVATED FLOORS.
Amount: $524,560
Award Description: ABATEMENT OF NORTH CORRIDOR WALL ON FLOORS 2, 4, 5, 6, 9, 11, 12, 13.
Amount: $52,143
Award Description: ABATEMENT OF NORTH CORRIDOR WALL AT THE RODINO FEDERAL BUILDING. ALSO CONSTRUCTION AND DESIGN OF A NEW NORTH CORRIDOR WALL AT THE RODINO FEDERAL BUILDING.
Amount: $74,103
Award Description: THIS MODIFICATION IS FOR ADDITIONAL DOORS, FRAMES AND HARDWARE THROUGHOUT THE BUILDING THAT WILL BE AN ALLOWANCE FOR ANY TENATNT CHANGES. THERE HAVE BEEN A SIGNIFICANT NUMBER OF CHANGES TO TENANT SPACE TO DATE AND THIS WILL HELP WITH THE CHANGE ORDER PROCESS.
Amount: $96,233
Award Description: THIS MODIFICATION IS FOR THE TEMPORARY ELECTRIC RELOCATION AND ELECTRICAL CLOSET CLEANING. THE RELOCATION OF ELECTRIC WILL TAKE PLACE ON FLOORS 9, 12 AND 14 AND THE CLEANING OF ELECTRICAL CLOSETS WILL TAKE PLACE ON ALL 16 FLOORS.
Amount: -$32,348
Award Description: DEFINITIZE PC05 FOR AS-BUILT BIM DELIVERABLES.
Amount: $14,096
Award Description: SUB BASEMENT WWORK: PAINTING, NEW WALL, ELECTRICAL EQUIPMENT AND REMOVAL OF ELECTRIC AND DIVING WALL.
Amount: $96,505
Award Description: THIS MODIFICATION IS FOR THE PERIMETER COLUMN ABATEMENT ON FLOOR 5 OF THE PETER RODINO FEDERAL BUILDING.
Amount: $17,200
Award Description: REINSTATE OPTION OPLA2 (COFFEE BAR)
Amount: $34,494
Award Description: RECOVERY ACT: THIS MODIFICATION IS FOR MULTIPLE ITEMS RELATING TO THE BUILD OUT OF SWING SPACE AT THE RODINO FEDERAL BUILDING.
Amount: $636,710
Award Description: THIS MODIFICATION IS FOR ADDITIONAL EXTERIOR STRUCTURAL SUPPORT FOR LATERAL MOVEMENT.
Amount: $224,958
Award Description: THIS MODIFICATION IS FOR THE ADVANCED METERING REQUIREMENT TO BE IMPLEMENTED INTO THE CONTRACT.
Amount: $28,343
Award Description: THIS MODIFICATION IS TO DEFINITIZE PC56 FOR THE TEMP ELECTRIC RELOCATION AND ELECTRICAL CLOSET CLEANING.
Amount: -$358,583
Award Description: THIS MODIFICATION IS FOR MASONRY ABATEMENT DURING PHASE 3 AND 4 AT THE RODINO FEDERAL BUILDING. THIS MOD DEFINITIZED MOD PC16
Amount: -$426
Award Description: THIS MODIFICATION IS FOR VARIOUS CHANGES TO THE 9TH FLOOR TENANT SPACE.
Amount: $153,290
Award Description: THIS MODIFICATION IS FOR THE LATERAL BRACING SYSTEM CONSTRUCTION ON THE RODINO FEDERAL BUILDING.
Amount: -$167,374
Award Description: THIS MODIFICATION IS FOR THE MASONRY ABATEMENT IN PHASE 1 AND 2 OF THE PROJECT AT THE RODINO FEDERAL BUILDING. THIS MODIFICATION DEFINITIZES MOD PC15.
Amount: $4,456
Award Description: THIS MODIFICATION IS THE ARRA FUNDED PORTION OF THE PISTOL LOCKER INSTALLATION FOR CIS ON THE 14TH FLOOR OF THE RODINO FEDERAL BUILDING.
Amount: $44,189
Award Description: THIS MODIFICATION IS FOR THE CITIZEN AND IMMIGRATION SERVICES TENANT TELEPHONE UPGRADES AT THE RODINO FEDERAL BUILDING.
Amount: -$971,343
Award Description: THIS MODIFICATION DEFINITIZES MOD PC04 AND PC06. O&M SERVICES INCLUDED IN PC04 WILL NOW BE DEALT WITH DIRECTLY FROM THE NJ SERVICE CENTER OFFICE. MOD PC06 HAS BEEN DEFINITIZED FOR ELEVATOR REPAIR SERVICES.
Amount: -$23,065
Award Description: THIS MODIFICATION DEFINITIZES MOD PC19. THE WORK INVOLVED IS THE NORTH CORRIDOR WALL ABATEMENT ON FLOORS 2, 4, 5, 6, 9, 11, 12, 13 AT THE RODINO FEDERAL BUILDING.
Amount: $9,844
Award Description: THIS MODIFICATION IS FOR THE ABATEMENT OF THE 14TH FLOOR NORTH CORRIDOR WALL AT THE RODINO FEDERAL BUILDING.
Amount: $2,701
Award Description: THIS MODIFICATION IS FOR THE USAO 9TH FLOOR MAILROOM VCT REPLACEMENT AT THE RODINO FEDERAL BUILDING.
Amount: $76,627
Award Description: THIS MODIFICATION WAS EXECUTED FOR THE TENANT ERO MOVE, ELECTRIC TURNOVER FOR THE ERO TENANT AND CABLE REQUIREMENTS FOR HTE GSA COOP ROOM.
Amount: $47,667
Award Description: MISC ITEMS INCLUDING: SUPPORT HANGERS FOR SPRINKER MAIN AND BRANCH>LINES, CABLE RISERS, ELECTRICAL AND ARCHITECTURAL REVISIONS, ABATEMENT ON>13TH FLOOR, ABATEMENT OF GLASS TILES IN 3 BATHROOMS AND RELOCATE SPINKLER>LINE AT GARAGE HATCH.>
Amount: $85,573
Award Description: THIS MODIFICATION IS TO DEFINITIZE MOD PC36 FOR THE TENANT EOIR REHEAT COILS TO BE INSTALLED IN 8 COURTROOMS LOCATED IN THE RODINO FEDERAL BUILDING.
Amount: $0
Award Description: H CODE TRANFERS DUE TO REALIGNMENT OF WORK.
Amount: -$26,657
Award Description: THIS MODIFICATION IS FOR MISC ABATEMENT IN THE RODINO BUILDING AND FOR FURNITURE INSTALLATION/FLOORING.
Amount: $218,155
Award Description: THIS MODIFICATION IS FOR WORK WITHIN SCOPE. THIS IS TO DEFINITIZE MOD PC15 FOR THE MASONRY ABATEMENT IN PHASE 1 AND 2 OF CONSTRUCTION AT THE RODINO FEDERAL BUILDING. THIS INCLUDES WORK ON FLOORS 9, 4 AND 13.
Amount: $31,000
Award Description: THIS MODIFICATION IS FOR THE USAO 9TH FLOOR TENANT REVISIONS TO THEIR RENOVATED OFFICE SPACE.
Amount: $244,304
Award Description: EOIR (TENANT) TELEDATA SYSTEM ON THE 12TH FLOOR OF THE RODINO FEDERAL BUILDING.
Amount: $1,726
Award Description: THIS MODIFICATION HAS BEEN EXECUTED TO ADD ADDITIONAL ELECTRICAL OUTLETS FOR THE EORI TENANT LOCATED ON THE 12TH FLOOR OF THE RODINO FEDERAL BUILDING.
Amount: $200,000
Award Description: 2ND FLOOR ACM CLEANUP, 16TH FLOOR ACM CLEANUP/7TH FLOOR DUAL TEMP PIPING ACM CLEANUP.
Amount: $746,358
Award Description: THIS MODIFICATION DEFINITIZES MODS PC35, 38, 46, 47, 48. THE MODIFICATIONS ARE FOR CIS SECURITY, LEAD PAINT ABATEMENT, ADDITIONAL PAINTING AND GSA TELEDATA SYSTEM.
Amount: $239,489
Award Description: THIS MODIFICATION IS FOR EXTERIOR SPRAY ON FIREPROOFING REMOVAL. THIS WAS AN UNFORESEEN CONDITION FOUND WHEN THE EXTERIOR OF THE BUILDING WAS BEING WORKED ON.
Amount: $1,504,479
Award Description: THIS MODIFICATION IS FOR A GLOBAL SETTLEMENT OF A NUMBER OF CORS, AND DISPUTED P100 ISSUES AND OPEN RFP'S.
Amount: $54,183
Award Description: THIS MODIFICATION IS FOR ABATEMENT, REPAIR OF ANTENNA, RELOCATION OF TV'S.
Amount: $99,579
Award Description: THIS MODIFICATION IS FOR DRO HOLDING CELLS, IT AND SECURITY. THIS IS COUPLED WITH MOD PS99 WHICH IS THE RWA AND BA55 PORTION OF THE MODIFICATION. THIS IS THE ARRA FUNDED PORTION WHICH NEEDS TO BE ON A SEPARATE MODIFICATION.
Amount: -$1,982,133
Award Description: CORRECTIVE ACTION MODIFICATION. THIS MODIFICATION CANCELS MODIFICATIONS PC13, PC27, PC29, PC31, PC33, PC37, PC39, PC41, PC42, PC43, PC44, PC45, PC60.
Amount: $26,231
Award Description: THIS MODIFICATION IS FOR ABATEMENT AND DEMOLITION ON THE 12TH AND 14TH FLOORS OF THE RODINO FEDERAL BUILDING.
Amount: $72,092
Award Description: PROBE AND MOCK UP AT COLUMN ATTACHMENTS ON 2ND FLOOR FOR OUT OF SEQUENCE ABATEMENT AND LEAD ABATEMENT OF 16TH FLOOR STEEL.
Amount: $2,400,000
Award Description: THIS MODIFICATION IS FOR AN UNFORESEEN CONDITION FOUND ON THE OUTSIDE OF THE RODINO BUILDING. PCB'S WERE FOUND IN THE CAULKING AND NEED TO BE ABATED. ALSO, THE FACADE NEEDS TO BE HAULED AWAY AND PUT IN A TSCA LANDFILL. THIS MODIFICATION EMCOMPASSES ALL WORK TO BE COMPELTED.
Amount: $22,097
Award Description: RFP 85 SETTLEMENT. ELECTRICAL CHANGES AND MISC CHANGE ORDER REQUESET SETTLEMENT
Amount: -$408,585
Award Description: THIS MODIFICATION CANCELS AND DEOBLIGATES MODIFICATION PS32 IN ITS ENTIRETY.

Project Location Detail

Location Information
Latitude, Longitude 0º 0' 0", 0º 0' 0"
Congressional District 10
City ESSEX
County ESSEX
State NJ
Zip 07102