contract- RECIPIENT AWARD SUMMARY

MESSER CONSTRUCTION CO

Clarification of Codes


AWARD OVERVIEW

AWARD OVERVIEW
Agency Name: General Services Administration Project Location: MARION
Award Number: GS05P08GBC0005 Project Location - State: IN
Funding Amount: -$42 Project Location - Zip Code: 462041519
Ending Date: 2012-09-09 Congressional District: 07

RECIPIENT INFORMATION (AWARD)

RECIPIENT INFORMATION (AWARD)
Recipient Name: MESSER CONSTRUCTION CO
Recipient Address: 5158 FISHWICK DR
Recipient City: CINCINNATI
Recipient State: OH
Recipient Zip Code: 452162216
Congressional District: OH-01

DESCRIPTION OF WORK/SERVICE PERFORMED

THIS MODIFICATION IS BEING ISSUED TO DEOBLIGATE MONEY FROM THE CMC'S CONTRACT FOR AN INTEREST PAYMENT.






TRANSACTIONS

TRANSACTIONS

Other Awards

Other Awards
Amount: $0
Award Description: TAS::47 4543::TAS THIS MODIFICATION WAS ISSUED TO CORRECT FUCTION CODES AND WORK ITEM NUMBERS FOR AN ARRA RELATED AWARD. THIS DOES NOT CHANGE THE CONTRACT AMOUNT AND IS AN ADMINISTRATIVE MODIFICATION ONLY.
Amount: $50,000
Award Description: TAS::47 4543::TAS EXERCISE CONSTRUCTION DOCUMENT OPTION OF THE CONTRACT AND ADD CLAUSES AS REQUIRED FOR THE AMERICAN RECOVERY AND REINVESTMENT ACT FOR THE MINTON CAPEHART FEDERAL BUILDING IN INDIANAPOLIS, INDIANA.
Amount: $43,110,252
Award Description: TAS::47 4543::TAS RECOVERY - THE PURPOSE OF THIS MODIFICATION IS TO EXERCISE OPTION 3 - CONSTRUCTION PHASE SERVICES FOR THE FIRE/LIFE SAFETY & HVAC MODERNIZATION PROJECT AT THE MINTON CAPEHART FEDERAL BUILDING IN INDIANAPOLIS, IN. THESE SERVICES INCLUDE UPGRADES TO THE HVAC SYSTEM, INSTALLATION OF A FIRE SPRINKLER SYSTEM, REPLACEMENT OF EXISTING FIRE ALARM SYSTEM AND REPLACEMENT OF THE EXISTING EMERGENCY GENERATOR.
Amount: $0
Award Description: MODIFICATION PS14, IS BEING ISSUED TO HAVE THE CMC REMOVE THE CARPET THEY PULLED UP RATHER THAN REPLACE IT AS SPECIFIED IN THE CONTRACT.
Amount: $0
Award Description: THIS MODIFICATION ALLOWS THE CMC TO STORE PRE-PURCHASED MATERIALS OFFSITE AND BILL FOR THEM.
Amount: $0
Award Description: THIS MODIFICATION ALLOWS THE CONSTRUCTION MANAGER AS CONSTRUCTOR TO PRE PURCHASE MATERIALS AND STORE THEM OFF SITE IN A SECURE WAREHOUSE.
Amount: $0
Award Description: THIS MODIFICATION IS BEING ISSUED TO REDUCE GSA'S PAYMENT PERIOD FROM 23 TO 14 DAYS.
Amount: $152,793
Award Description: RECOVERY - THIS MODIFICATION IS BEING ISSUED FOR ASBESTOS ABATEMENT FOR VCT TILE UNDERNEATH THE CARPET.
Amount: $125,849
Award Description: RECOVERY : THIS MODIFICATION IS BEING ISSUED TO ABATE ALL ASBESTOS ITEMS AND MATERIALS IN AIR HANDLER UNITS 1, 2,&3.
Amount: $0
Award Description: THIS MODIFICATION IS BEING ISSUED TO ADD VAV AND MODIFY THE EXISTING DUCTWORK.
Amount: $0
Award Description: THIS MODIFICATION IS BEING ISSUED TO INSTALL A NEW DRAIN AT THE BACK FLOW PREVENTER IN THE MEZZANINE.
Amount: $0
Award Description: THIS MODIFICATION IS BEING ISSUED TO ADD A METER AND DISCONNECT TO THE FIRE PUMP FEEDER, PROVIDING GROUNDING FOR THE BASEMENT AND PENTHOUSE, REPLACE GEN DP, AND PROVIDE CHANGES TO THE BASEMENT MCCS.
Amount: $0
Award Description: MODIFICATION REQUIRED TO INCORPORATE BAS CONTROLS CHANGE AS WELL AS TRANSFORMER REPLACEMENT THROUGH OUT THE BUILDING.
Amount: $76,692
Award Description: RECOVERY : THIS MODIFICATION IS BEING ISSUED INCORPORATE THIRD FLOOR PERIMETER CONSTRUCTION DOCUMENTS CHANGES, INSTALL TWO RECEPTACLES FOR EMERGENCY POWER FOR THE BUILDING AUTOMATION SYSTEM, AND INSTALL TWO SPEAKER STROBE DECEIVES.
Amount: -$325
Award Description: THIS MODIFICATION IS BEING ISSUED TO DE-OBLIGATE MONEY FROM THE CMC'S CONTRACT FOR AN INTEREST PAYMENT.
Amount: $0
Award Description: THIS MODIFICATION IS BEING ISSUED TO REROUTE EXISTING BASEMENT SPRINKLERS.
Amount: $0
Award Description: MODIFICATION REQUIRED TO INCORPORATE RESTROOM RENOVATIONS AND BAS CONTROLS CHANGES.
Amount: $136,170
Award Description: RECOVERY : THIS MODIFICATION IS BEING ISSUED TO ADD AN ADDITIONAL PROJECT ENGINEER TO THE PROJECT TO ASSIST WITH BUILDING GROUNDING, COOLING TOWER AND CHILLER UPGRADES, KITCHEN EXHAUST AND LIGHTING CHANGES.
Amount: $8,954
Award Description: RECOVERY - THIS MODIFICATION IS BEING ISSUED TO INCREASE THE BOND FOR THE CONTRACT WHICH WAS NOT INCLUDED FOR MODIFICATION PS47.
Amount: $71,730
Award Description: RECOVERY : THIS MODIFICATION IS BEING ISSUED TO RESTORE THE FIRE RATING AND PERFORM SHAFT REPAIRS IN ALL FOUR STAIR SHAFTS.
Amount: $0
Award Description: THIS MODIFICATION IS BEING ISSUED TO REMOVE A ABANDONED WOOD AND METAL PARTITION.
Amount: $27,247
Award Description: RECOVERY : THIS MODIFICATION IS BEING ISSUED TO INSTALL A PLASTER COATING ON EXISTING WALLS IN THE SOUTH RESTROOM.
Amount: $0
Award Description: THIS MODIFICATION IS BEING ISSUED TO RECONFIGURE BASEMENT PIPING AND CONNECT IT TO THE LOADING DOCK DRAIN.
Amount: $29,451
Award Description: RECOVERY : THIS MODIFICATION IS BEING ISSUED TO ADD SMOKE DETECTORS AND TRANSFER DUCT IN THE SOUTH RESTROOMS.
Amount: $161,869
Award Description: RECOVERY : THIS MODIFICATION IS BEING ISSUED TO REMOVE EXISTING CONDENSER LINE AND INCREASE THE BREAKER SIZE FROM 60 AMP TO 100 AMP.
Amount: $0
Award Description: THIS MODIFICATION IS BEING ISSUED TO INSTALL AN ADDITIONAL EXIT SIGN.
Amount: $0
Award Description: THIS MODIFICATION IS BEING ISSUED TO ADJUST LIGHTING, HVAC AND SPRINKLER LOCATIONS FOR THE IRS WALL LAYOUT.
Amount: -$1,192
Award Description: THIS MODIFICATION IS BEING ISSUED TO DE-OBLIGATE MONEY FROM THE CONTRACT TO PAY INTEREST PENALTIES.
Amount: $0
Award Description: CHANGES TO INCLUDE NEW LIGHT FIXTURES, RELOCATION OF CONDUIT AND ADDING SPRINKLERS.
Amount: $0
Award Description: THIS MODIFICATION IS BEING ISSUED TO INCORPORATE ADDITIONAL EXHAUST, MURAL RESTORATION AND CHANGES TO THE FBI AND USSS SPACES.
Amount: $748,574
Award Description: RECOVERY : THIS MODIFICATION IS BEING ISSUED TO ADJUST MECHANICAL SYSTEMS AND REMOVE HVAC FROM THE FIRST FLOOR.
Amount: $0
Award Description: ACTION REQUIRED TO ADD ITEMS WITHIN SCOPE TO BE BILLED AGAINST CONTINGENCY. WORK INCLUDES RELOCATIONS OF CONDUIT, COPPER PIPES AND CONDENSATE LINES TO ALLOW FOR ABOVE CEILING WORK.
Amount: -$220,321
Award Description: RECOVERY - THIS MODIFICATION IS BEING ISSUED TO REMOVE ($75,000) FROM THE PERMANENT SUPPORT CABLING ALLOWANCE AND REMOVE ($145,321.83) FROM THE FLOOR TILE ABATEMENT ALLOWANCE.
Amount: $0
Award Description: THIS MODIFICATION IS BEING ISSUED TO PROVIDE CHANGES TO THE NORTH CONFERENCE CENTER ON THE FIRST FLOOR PER THE REVISED CONSTRUCTION DOCUMENTS.
Amount: $0
Award Description: THIS MODIFICATION IS BEING ISSUED TO INSTALL A DAY TANK OIL VENT AND ONE LIGHT FIXTURE.
Amount: $0
Award Description: THIS MODIFICATION IS BEING ISSUED TO PROVIDE AND INSTALL A NEW HIGH DENSITY SPRINKLER SYSTEM, PROVIDE DIMMING BALLAST, REPLACE CHILLER PUMPS, REMOVE ALL ITEMS WITHIN FBI SPACE, AND REPLACE EXISTING CARPETING AND BASE WITHIN PUBLIC CORRIDORS.
Amount: $0
Award Description: THIS MODIFICATION IS BEING ISSUED TO RELOCATE THE EXISTING EMERGENCY GENERATOR, CORRECT MULTIPLE OUTLETS ON THE SIXTH FLOOR, REPLACE PVC, MOVE THERMOSTATS AND SWITCHES, ADD A NEW GLYCOL BYPASS VALVE, AND PROVIDE A BASEMENT STORAGE AREA.
Amount: $0
Award Description: THIS MODIFICATION IS BEING ISSUED TO PROVIDE AND INSTALL ALL ITEMS SHOWN ON THE BASEMENT AND MEZZANINE RESTROOM RENOVATION DOCUMENTS.
Amount: -$61,040
Award Description: RECOVERY - THIS MODIFICATION IS BEING ISSUED TO DEOBLIGATE THE SAVINGS THAT RESULTED FROM DE-SCOPING THE REPLACEMENT OF THE WINDOW GASKETS.
Amount: $0
Award Description: THIS MODIFICATION IS BEING ISSUED TO REFINISH THE PAINTED INTERIOR OF THE NORTH ELEVATOR WITH A POWDER COAT AND ALL PAINTED INTERIOR SOUTH ELEVATOR FINISHES WITH POWDER COAT. THIS CHANGE INCLUDES ALL ASSOCIATED LABOR INCLUDING REMOVAL AND REINSTALLATION OF PREVIOUSLY INSTALLED NORTH ELEVATOR PARTS.
Amount: $0
Award Description: THIS MODIFICATION IS BEING ISSUED TO INSTALL NEW TRAVELER CABLES AND PHONE JACKS, RELOCATE EXISTING RESTROOM EXAHUST DUCT WORK, AND ADD BIRD SCREENS.
Amount: $0
Award Description: ADMINISTRATIVE CHANGE TO CORRECT THE AUTHORITY FOR MODIFICATION PCB5.
Amount: $0
Award Description: THIS MODIFICATION IS BEING ISSUED TO PROVIDE AND INSTALL PROCEDURE LIGHT, PROVIDE DRYWALL BOX OUT, DEMOLISH AND REINSTALL THE PROJECTING CMU ABOVE THE THREE SOUTH ELEVATORS TO RECEIVE THE NEW STONE, PAINT THE TRIM REVEALS IN THE SECURITY LOBBY DARK BRONZE, UPGRADE LOBBY AND ELEVATOR CARPET, REMOVE ABANDONED FIRE ALARM DEVICES AND REPLACE STONE AT SAME LOCATIONS, REPLACE THE THIRD FLOOR THERMOSTATS TO MATCH THERMOSTATS INSTALLED ON OTHER FLOORS, PROVIDE ADDITIONAL DUCTWORK FOR THE GENERATOR EXHAUST, DEMOLISH PANEL ELBFA WITH MAIN FIRE ALARM CONTROL PANELS, PROVIDE A QUAD RECEPTACLE IN SECURITY OFFICE 191, AND RE-FEED OTHER NON-FIRE ALARM LOADS FED FROM PANEL ELBFA, AND CLEAN THE SECONDARY CHILLED WATER PUMP STRAINERS AS PART OF THE LOW PUMP FLOW INVESTIGATION.
Amount: -$42
Award Description: THIS MODIFICATION IS BEING ISSUED TO DEOBLIGATE MONEY FROM THE CMC'S CONTRACT FOR AN INTEREST PAYMENT.
Amount: $0
Award Description: THIS MODIFICATION IS BEING ISSUED TO RELOCATE CCTV WIRING AND CONDUIT, LIGHTS, HOT WATER LINES, DRAIN PIPES, AND HVAC AND PROVIDE CHANGES TO EXISTING PLUMBING SYSTEMS.
Amount: $0
Award Description: THIS MODIFICATION IS BEING ISSUED TO MOVE A THERMOSTAT, REMOVE SWITCHES AND PROGRAM THE ROOM, PROVIDE CHANGE TO THE CONFERENCE ROOM, AND ISSUE A CREDIT FOR THE INSTALLATION OF AN ACOUSTICAL CEILING.
Amount: $0
Award Description: THIS MODIFICATION IS BEING ISSUED TO RELOCATE TWO OCCUPANCY SENSORS AWAY FROM ENTRY DOORS, RELOCATE THE EXISTING DEA EXHAUST FAN DUCTWORK, PROVIDE A CHILLED WATER BYPASS VALVE, MODIFY THE BASEMENT MOTOR CONTROL CENTER TO UTILIZE THE SPARE MOTOR STARTERS FOR THE AIR COMPRESSORS AND CONDENSATE PUMPS, AND SHIP THE TEMPORARY ELECTRICAL GEAR TO GSA IN CHICAGO FOR REUSE.
Amount: $0
Award Description: THIS MODIFICATION IS BEING ISSUED TO INSTALL RUBBER BUMPERS IN THE FEMALE RESTROOM, REMOVE SECURITY LIGHTING, PANELS AND ASSOCIATED WIRING, INSTALL WIRE GUARDS, AND DEMOLISH AND INSTALL A NEW SPRINKLER SYSTEM.
Amount: $0
Award Description: THIS MODIFICATION IS BEING ISSUED TO PROVIDE LOBBY AND SECURITY UPGRADES, LIGHTING UPGRADES, DOOR AND HARDWARE CHANGES, AND INTERACTIVE TOUCH SCREENS.
Amount: $0
Award Description: THIS MODIFICATION IS BEING ISSUED TO RELOCATE POWER AND PLUMBING ON THE 6TH FLOOR AND MODIFY THE DUCTWORK, AND PROVIDE A NEW HVAC SYSTEM FOR THE FIRST FLOOR RESTROOMS.
Amount: $0
Award Description: THIS MODIFICATION IS BEING ISSUED TO INSPECT AND DOCUMENT EXISTING FIRE DAMPERS, INSTALL A VAV BOX, ADD FOUR ABOVE CEILING RETURN OPENINGS WITH SECURITY GRILLES, ACCOUNT FOR A PRICING CHANGE IN TRANSFORMERS, AND EXTEND THE EXISTING VAV DUCT.
Amount: $0
Award Description: THIS MODIFICATION IS BEING ISSUED TO REMOVE AND REPLACE EXISTING ELECTRICAL, RELOCATE PLUMBING, RELOCATE LIGHT SWITCHES, RELOCATE CONDUIT LINES, AND REPROGRAM LIGHTING.
Amount: $0
Award Description: THIS MODIFICATION IS BEING ISSUED TO PROVIDE A CREDIT FOR A CHANGE IN CEILING HEIGHT FROM 9' TO 8'.
Amount: $0
Award Description: THIS MODIFICATION IS BEING ISSUED TO MAKE MULTIPLE THERMOSTAT CHANGES, PROVIDE SIGNAGE INSERTS FOR NEW BRONZE FRAMES IN COORDINATION WITH THE PUBLIC CORRIDOR DESIGN PACKAGE, AND PROVIDE THREE FULL SETS OF PROTECTIVE ELEVATOR BLANKETS TO PROTECT ALL INTERIOR WALLS OF THE PASSENGER ELEVATORS.
Amount: $0
Award Description: THIS MODIFICATION IS BEING ISSUED TO PROVIDE PRICING FOR THE BUILD-OUT OF THE SIXTH FLOOR VENDING MACHINE AREA, INSTALL THE AIR FLOW MEASURING STATION (AFMS) FOR THE AHU#1, INSTALL THE NEW ELEVATOR DOOR PANELS IN LIEU OF CLADDING THE EXISTING DOORS, CHANGE THE SYSTEM TESTING AND PROGRAMMING FOR AHU #1, AHU#2, AND THE HEAT EXCHANGER, AND PROVIDE A CREDIT FOR HOSTING A LESSONS LEARNED MEETING IN LIEU OF THE FINAL PARTNERING SESSION.
Amount: $0
Award Description: THIS MODIFICATION IS BEING ISSUED TO RELOCATE HOT AND COLD WATER LINES, RELOCATE EXISTING EXHAUST FAN DUCTWORK, ADD EXTRA CONTROLS TO THE DAY TANK, REMOVE OLD HANGERS AND UNUSED CEILING MOUNTED ITEMS, AND REPLACE THE SECOND FLOOR NORTH WALL IN THE DEA SPACE.
Amount: $0
Award Description: THIS MODIFICATION IS BEING ISSUED TO PROVIDE AND INSTALL ALL ITEMS FOR THE LOBBY RENOVATION.
Amount: $0
Award Description: THIS MODIFICATION IS BEING ISSUED TO ADD 12 LIGHTING CONTROLS, ADD A DRYWALL REVEAL IN THE HIGH LOBBY, INSTALL A VFD FOR THE CHILLER WATER PUMP, DEMOLISH THE INSULATION AND STEEL TRACK ON THE SIXTH FLOOR, DEMOLISH EXISTING EXHAUST DUCT, AND PROVIDE POWER TO THE BASEMENT DOMESTIC WATER BOOSTER PUMP.
Amount: $0
Award Description: THIS MODIFICATION IS BEING ISSUED TO REPLACE THE EXISTING ATS AND DP AT THE EXISTING BASEMENT GENERATOR.
Amount: $0
Award Description: ACCEPTANCE OF MAIN SWTICHGEAR PRICING AT THE MINTON CAPEHART FEDERAL BUILDING
Amount: $0
Award Description: THIS MODIFICATION IS BEING ISSUED TO RELOCATE THE INSPECTOR+S TEST DRAIN IN THE CHILLER ROOM FIRE PROTECTION SYSTEM TO THE FLOOR DRAIN, FLUSH MOUNT THE EXISTING HVAC GRILLE IN THE UPPER NORTHWEST CORNER OF THE LOBBY TO ALIGN WITH THE SURFACE OF THE STONE, PROVIDE ADDITIONAL F4 FIXTURES IN NORTH RESTROOMS, PROVIDE LIFE SAFETY SIGNAGE AND STAIRWELL PAINTING, AND REPROGRAM THE HVAC CONTROLS FOR OUTSIDE AIR.
Amount: $0
Award Description: THIS MODIFICATION IS BEING ISSUED TO CHANGE THE PARTNERING LANGUAGE IN THE CONTRACT.
Amount: $0
Award Description: THIS MODIFICATION IS BEING ISSUED TO PROVIDE A REPORT FOR ALL FINDINGS OF READINGS TAKEN FROM THE GPM FLOW ON ALL EXISTING BALANCE VALVES FOR THE GLYCOL OVERHANG LOOP, PROVIDE SLOT DIFFUSERS AND OTHER EXHAUST AND LIGHTING MODIFICATIONS TO THE NORTH RESTROOMS, PROVIDE FITNESS ROOM BUILD-OUT AND BASEMENT RESTROOM AND LOCKER ROOM RENOVATION, PROVIDE AN ADDITIONAL BULKHEAD AT THE CONFERENCE ROOM MOVABLE PARTITION, AND TO REMOVE THE ELECTRICAL FLOOR BOXES AND ASSOCIATED CABLING IN THE EXECUTIVE CONFERENCE CENTER SPACE AND REPAIR THE FLOOR AND FLOOR FINISHES IN THESE LOCATIONS.
Amount: $0
Award Description: THIS MODIFICATION IS BEING ISSUED TO CHANGE THE WALL LAYOUT, REVISE THE SPRINKLER LAYOUT, PROVIDE ADDITIONAL CLEANING SERVICES, AND RELOCATE AN EXISTING DUCT.
Amount: $0
Award Description: THIS MODIFICATION IS BEING ISSUED TO RECONFIGURE CANNED LIGHTS, REMOVE AND REPLACE ACT, DEMOLISH CONDENSING UNITS, AND PROVIDE TEMPORARY DUCTWORK AND DIFFUSERS.
Amount: $0
Award Description: THIS MODIFICATION IS BEING ISSUED TO PROVIDE AND INSTALL NEW SECURITY GRILLS AND REMOVE AN EXISTING SPRINKLER SYSTEM.
Amount: $0
Award Description: THIS MODIFICATION IS BEING ISSUED TO TEST AN ADDITIONAL DAMPER, ADD LIGHT FIXTURES, RELOCATE POWER CONDITIONERS, AND FURNISH 6 FIRE FIGHTER PHONES.
Amount: $0
Award Description: THIS MODIFICATION IS BEING ISSUED TO REPLACE A PORTION OF THE RESTROOM VENT PIPING, DEMOLISH THE EXHAUST FAN AND POWER, REIMBURSEMENT OF ADT SERVICE CALLS, RELOCATE EXISTING EXHAUST DUCT AND ELECTRICAL CONDUIT, REMOVE OLD HANGERS AND UNUSED CEILING ITEMS ON THE SIXTH FLOOR, AND A CREDIT FOR THE PLACEMENT OF A TRANSFORMER.
Amount: $0
Award Description: THIS MODIFICATION IS BEING ISSUED TO PROVIDE TWO (2) COATS OF FINISH FOR THE NEW TRAVERTINE SECURITY TABLES TO MATCH EXISTING FLOORS, PROVIDE THE TOILET EXHAUST FAN REPLACEMENT, REPLACE THE EXISTING FIRE ALARM JUNCTION BOXES WITH WEATHERPROOF JUNCTION BOXES IN THE GARAGE, PROVIDE FLEXCO RUBBER BASE FOR THE CORRIDOR PACKAGE WORK IN LIEU OF THE SPECIFIED BASED, PROVIDE AA GRADE PLAIN SLICED VENEER ON ALL WOOD CORRIDOR PACKAGE DOORS IN LIEU OF THE SPECIFIED A GRADE QUARTER SLICED VENEER, AND PROVIDE LOBBY SECURITY CHANGES.
Amount: $0
Award Description: THIS MODIFICATION IS BEING ISSUED TO REPLACE THE MAIN ELECTRICAL GEAR PER TENG'S DESIGN PACKAGE, ADDENDUM 1, ALTERNATIVE 1, AND MESSER QUALIFICATIONS.
Amount: $0
Award Description: THIS MODIFICATION IS BEING ISSUED TO INCORPORATE MULTIPLE CHANGES INTO THE CONTRACT.
Amount: $0
Award Description: THIS MODIFICATION IS BEING ISSUED TO RELOCATE LIGHT SWITCHES, PROVIDE DOOR BUMPERS, AND PAINT DOORS AND FRAMES.
Amount: $0
Award Description: THIS MODIFICATION IS BEING ISSUED TO CORRECTLY ACCOUNT FOR PCO'S THAT WERE INCORRECTLY ISSUED AGAINST GENERAL CONTINGENCY AND ALLOCATE THEM TO FIRM FIXED PRICE.
Amount: $0
Award Description: THIS MODIFICATION IS BEING ISSUED TO RELOCATE ELECTRICAL, DEMOLISH ELECTRICAL FEEDERS, RELOCATE FIRE ALARM, DEMOLISH CMU WALL, STRIP AND WAX THE FLOOR, PROVIDE AND INSTALL CARPET, AND PROVIDE AND INSTALL CEILING INSULATION.
Amount: $0
Award Description: THIS MODIFICATION IS BEING ISSUED TO ANALYZE AND VERIFY LOADS, PAINT THE EXTERIOR SOFFIT, AND REMOVE EXISTING DATA CONDUIT.
Amount: $0
Award Description: THIS MODIFICATION IS BEING ISSUED TO REPLACE ELEVATOR SILLS, PAINT, REMOVE DUCT WORK, PROVIDE ADDITIONAL PLENUM FIXTURES, AND REMOVE WALLPAPER.
Amount: $0
Award Description: THIS MODIFICATION IS BEING ISSUED TO PROVIDE CORRIDOR IMPROVEMENTS AND EXTEND THE FINAL COMPLETION DATE OF THE CONTRACT BY 56 CALENDAR DAYS.
Amount: $0
Award Description: OTHER FUNCTION: THIS MODIFICATION IS BEING ISSUED TO PROVIDE REPLACEMENT OF THE PNEUMATIC CONTROLS AND ASSOCIATED EQUIPMENT, REMOVAL OF THE EXTERIOR FACING HANDLES AND LOCKS FROM THE OUTSIDE SET OF EXIT DOORS AT THE WEST VESTIBULE AND REPLACE WITH A RETAINER PLATE, DEMOLISH THE EXISTING RESTROOM DOORS ON FLOORS 2-6, REMOVE THE HARDWARE AND INSTALL NEW DOORS, FURNISH FOUR RUBBER COATED ALUMINUM 'CUSTOM+ SECURITY CRASH BARS FOR THE FIRST FLOOR VESTIBULE EXIT DOORS, ADD A HOLD OPEN ARM AND ARMOR PLACT TO DOOR 516, AND REPLACE THE SHUT-OFF VALVES ON THE FOUR (4) CABINET HEATERS.
Amount: $0
Award Description: OTHER FUNCTION: THIS MODIFICATION IS BEING ISSUED TO ADD PRESSURE SENSORS TO AHU 1 AND 2 TO CONTROL HIGH STATIC TRIPPING; FOR PREMIUM TIME FOR ATS WORK TO BE PERFORMED ON A SUNDAY; INSTALL NEW ELECTRICAL BREAKERS AND PROVIDE A LABOR CREDIT FOR DOOR T303 AND HARDWARE TO REMAIN IN PLACE; ADD AN OCCUPANCY SENSOR TO ROOM 238-31 AND REPROGRAM THE LIGHTING CONTROLS FOR ROOM 555-1 AND ROOM 467; INSTALL A BASEMENT EXHAUST VOLUME DAMPER AT THE EXHAUST DUCT IN THE FITNESS ROOM AND DUCT SERVING B37 STORAGE AREA ACROSS FROM THE LOANDING DOCK+S DOUBLE DOORS; REPLACE THE DUTCH DOOR, RELOCATE THE PEG BOARD, AND REAPINT TWO WALLS IN THE DAYCARE CENTER; AND FURNISH 23 SINGLE BUTTON LEVITON LIGHT SWITCHES AND 8 DOUBLE BUTTON LEVITON LIGHT SWITCHES.
Amount: $0
Award Description: OTHER FUNCTION: THIS MODIFICATION IS BEING ISSUED TO REPLACE THE PANIC DEVISE AT STAIR #1 WITH HARDWARE THAT CAN BE UNLOCKED, PAINT THE DAMAGED DOOR FRAMES, PROVIDE SIX (6) ADDITIONAL FREESTANDING SIGN PEDESTALS FOR THE EXTERIOR OF THE BUILDING, AND FURNISH AND INSTALL NEW PHOTO LUMINESCENT S18 SIGNS IN THE STAIRWELLS.
Amount: $0
Award Description: OTHER FUNCTION: THIS MODIFICATION IS BEING ISSUED TO REPAIR THE POWER TO UNIT HEATER UH-12, TO REMOVE UNIT HEATER UH-36 AND CAP THE PIPING AT THE NORTH MEZZANINE, REPAIR THE POWER TO THE UNIT HEATERS IN BASEMENT ROOMS B16 AND B18, REPLACE THE LOCKSET AT DOOR 504 AND REPLACE THE WALL BUMP AT DOOR 558.
Amount: $0
Award Description: OTHER FUNCTION: THIS MODIFICATION IS BEING ISSUED TO PROVIDE BRONZE FINISH, +BRONZE+ CORIAN TOP, AND COMBINATION HID/PIV COMBINATION CARD READER; PROVIDE TWO PUSH EXIT SWITCHES FOR DOOR 100J (THE CHILDCARE ENTRANCE DOOR FROM THE LOBBY) AND INSTALL THE SWITCHES ON THE WALL ON THE DAYCARE SIDE OF THE DOOR; EITHER SWITCH MUST BE CAPABLE OF INDEPENDENTLY RELEASING THE DOOR AND CONNECT THE DRY CONTACT AT THE POWER SUPPLY FOR THE MAGNETIC LOCK TO THE FIRE ALARM SO THAT IT OPENS WHEN THE ALARM IS ACTIVATED; PROVIDE WALL REPAIRS AND PAINT WALLS TO MATCH THE EXISTING; AND REPLACE THE LOCKSET FOR DOOR 527.
Amount: $0
Award Description: OTHER FUNCTION: THIS MODIFICATION IS BEING ISSUED TO TO REPAIR THE SCRATCHED STONE FLOOR, PROVIDE MISCELLANEOUS LIFE SAFETY CHANGES, PROVIDE NUMBER PLATES WITH BRAILLE AT ALL ELEVATOR JAMBS ON FLOORS 2-6, TO REPAIR AND REPAINT THE HEADER AT THE FIRST FLOOR FREIGHT ELEVATOR, MODIFY THE CONTROLS TO ADDRESS ADDITIONAL OUTSIDE AIR REQUIRED FOR BUILDING PRESSURIZATION, PROVIDE SHEET RUBBER FLOORING IN LIEU OF RUBBER FLOORING SQUARES IN THE FITNESS CENTER ROOM, AND PURCHASE AND INSTALL BLINDS AS SPECIFIED.
Amount: $0
Award Description: THIS MODIFICATION IS BEING ISSUED TO REVISE THE REMAINING GSA CONTINGNECY VALUES FOR PSE9 AND PSF1.
Amount: $0
Award Description: OTHER FUNCTION: THIS MODIFICATION IS BEING ISSUED TO REPAIR SCRATCHES, HOLES AND GOUGES IN THE STONE FLOORING IN THE FIRST FLOOR LOBBY, ADD VFD+S FOR STAIR PRESSURIZATION FANS, FURNISH AND INSTALL VINYL LETTERING AT THE ENTERANCE DOORS, FURNISH AND INSTALL 8 ADDITIONAL VOLUME DAMPERS FOR TEF-2 AND REBALANCE, FURNISH AND INSTALL NEW CARD READERS FOR TURNSTILES AND EXTERIOR POSTS, AND A CREDIT TO REFLECT A PUNCHLIST DEDUCT FOR ELEVATOR NUMBER 6 AS IT RELATES TO THE SCRATCHES ON THE INTERIOR FINISH OF THE CAB.
Amount: $0
Award Description: THIS MODIFICATION IS BEING ISSUED TO INVESTIGATE AND TRACK DUCTWORK CONNECTING GRILLES FOR TEF 1, TEF 2 AND EF 1, AND REBALANCE PER CX MEETINGS, ADD 24 DOTS (12 ON EACH SIDE OF THE GLASS) TO THE WEST VESTIBULE GLASS DIVIDER, REPLACE THE PNEUMATIC DAMPER OPERATORS FOR THE EXISTING GENERATOR, TO INSTALL SIX (6) TRANSFER GRILLES IN THE BASEMENT FITNESS ROOM, AND REPLACE SIGNAGE INSERTS PER PROPERTY MANAGEMENT ROOM NUMBERING (12 INSERTS TOTAL).
Amount: $0
Award Description: OTHER FUNCTION: THIS MODIFICATION IS BEING ISSUED TO PAINT ALL WALLS +CHINA WHITE+ IN THE CORRIDOR LEADING INTO THE CONFERENCE CENTER ON THE FIRST FLOOR, THE CONFERENCE CENTER, AND THE CONFERENCE CENTER CLOSET TO MATCH THE EXISTING PUBLIC CORRIDORS; TO ADD THREE (3) AMPLIFIERS TO THE FIRE ALARM SYSTEM; TO FURNISH AND INSTALL REPLACEMENT LOCKSETS FOR DOORS 428 AND 495; TO INSTALL THREE (3) NEW DOORS (DOOR NUMBERS 505, 543, AND 553) AND TENANT REQUIRED LOCKSETS ON DOORS 543 AND 553; AND TO PROVIDE ADDITIONAL STEEL FOR THE WEST VESTIBULE DUE TO THE CUT IN THE CONCRETE PER DETAIL 8/A512.

Project Location Detail

Location Information
Latitude, Longitude 0º 0' 0", 0º 0' 0"
Congressional District 07
City MARION
County MARION
State IN
Zip 46204