| Other Awards |
Amount:
$25,082
Award Description: TAS::14 1041::TAS RECOVERY VAFO PMIS # 152410 THIS BPA CALL ORDER FOR CONSTRUCTION MANAGEMENT SERVICES SHALL CONSIST OF ON-SITE INSPECTION, ADMINISTRATION OF THE CONSTRUCTION CONTRACT, OFFICE SERVICES, AND SITE VISITS. ALL WORK SHALL BE PERFORMED UNDER A SINGLE CONTRACT.
THE CONSTRUCTION MANAGEMENT REPRESENTATIVE (CMR) IS RESPONSIBLE FOR COORDINATING THE CONTRACTORS CONSTRUCTION EFFORTS WITH THE PARK STAFF'S DAILY OPERATIONS. |
Amount:
$168,864
Award Description: TAS::14 1035::TAS - RECOVERY PMIS SAMO 139731 + CONSTRUCTION MANAGEMENT SERVICES FOR THE CONSTRUCTION OF THE STUDENT INTERN CENTER AT SANTA MONICA MOUNTAINS NATIONAL RECREATION AREA - |
Amount:
$169,224
Award Description: TAS::47 4543::TAS RECOVERY
PROJECT TITLE: CM/PM SERVICES FOR THE MANAGEMENT OF RETRO-CX STUDIES. PROVIDE CONSTRUCTION MANAGMENT / PROJECT MANAGEMENT SERVICES. |
Amount:
$812,952
Award Description: TAS::47 4543::TAS - RECOVERY - CONSTRUCTION MANAGEMENT SERVICES IN SUPPORT OF JACKSON FEDERAL BUILDING MODERNIZATION PROJECT. SERVICES INCLUDE PRE-DESIGN AND DESIGN PHASE. |
Amount:
$3,128,635
Award Description: RECOVERY. CONSTRUCTION MANAGEMENT SERVICES. TAS::47 4543::TAS |
Amount:
$0
Award Description: ARRA AWARD FOR CONSTRUCTION AT HOLLOMAN AFB, NM. ER - MODIFICATION TO CORRECT DAVIS-BACON WAGE DECISION |
Amount:
$1,355,772
Award Description: TAS::57 3404::TAS - ER - RECOVERY ACT FUNDED PROJECT - PRATHER WATERLINE REPAIR/REPLACEMENT, HOLLOMAN AFB, NM ARRA::YES::ARRA |
Amount:
$0
Award Description: RECOVERY, TAS::69 0504::TAS, NON-PERSONAL, PROFESSIONAL PROGRAM AND ENVIRONMENTAL SUPPORT SERVICES. ARRA::YES::ARRA |
Amount:
$79,635
Award Description: RECOVERY, TAS::69 0504::TAS
THE CONTRACTOR SHALL PROVIDE NON-PERSONAL, PROFESSIONAL ENGINEERING SUPPORT SERVICES FOR THE FEDERAL HIGHWAY ADMINISTRATION+S MISSISSIPPI DIVISION. ARRA::YES::ARRA |
Amount:
$0
Award Description: RECOVERY COLO PMIS 152684 CONSTRUCTION MANAGEMENT SERVICES FOR THE PROJECT RECONSTRUCT GLASSHOUSE PARKING LOT AND HIKE/BIKE TRAILS AT NECK OF LAND, JAMESTOWN ISLAND, VA |
Amount:
$66,017
Award Description: TAS::14 1041::TAS RECOVERY COLO PMIS # 152684 - CONSTRUCTION MANAGEMENT SERVICES CONSISTING OF ON-SITE INSPECTION, SPECIAL INSPECTIONS, ADMINISTRATION OF THE CONSTRUCTION CONTRACT, OFFICE SERVICES, AND SITE VISITS. |
Amount:
$26,147
Award Description: TAS::14 1041::TAS RECOVERY COLO-152684, CONSTRUCTION MANAGEMENT SERVICES FOR RECONSTRUCTION GLASS HOUSE PARKING LOT/NOL, COLONIAL NATIONAL HISTORICAL PARK, VIRGINIA23690-0210
MODIFICATION NO. 1 ADDS ADDTIONAL CMR HOURS, 35 HOURS/WEEK |
Amount:
$158,001
Award Description: TAS::14 1041::TAS RECOVERY ROCR PMIS # 148821 CM SERVICES TO INCLUDE ON-SITE INSPECTION, SUBMITTAL REVIEW, SITE VISITS AND OTHER OFFICE SERVICES |
Amount:
$0
Award Description: RECOVERY BISO 152731 AND 146276 CM SERVICES FOR CLOSURE OF HAZARDOUS ABANDONED OIL AND GAS WELLS AND RESTORATION OF NATURAL LANDSCAPE |
Amount:
$392,342
Award Description: RECOVERY BISO-152731
CONSTRUCTION MANAGEMENT SERVICES FOR CLOSURE OF HAZARDOUS ABANDONED OIL AND GAS WELLS AND RESTORATION OF NATURAL LANDSCAPE, BIG SOUTH FORT NATIONAL RIVER AND RECREATION AREA, ONEIDA, TENNESSEE. SERVICES INCLUDE FULL TIME ON-SITE INSPECTION, PREPARING INSPECTION REPORTS, WEEKLY PROGRESS MEETINGS, SUBMITTAL REVIEW, AND OFFICE SERVICES. |
Amount:
$0
Award Description: RECOVERY CUVA, PMIS 151629, A/E & CM SERVICES FOR SANITARY SEWER COLLECTION AND CONSTRUCTED WETLAND CONTRACT; CUYAHOGA VALLEY NATIONAL PARK, SUMMIT COUNTY, BOSTON TOWNSHIP, OHIO. ADMINSTRATIVE MODIFICATION TO CORRECT ERRONEOUS FUNDING DATA. |
Amount:
$454,884
Award Description: RECOVERY GOGA 65433 REPLACE OBSOLETE RADIO SYSTEM FOR SAFE EMERGENCY COMMUNICATIONS, GOLDEN GATE NATIONAL RECREATION AREA, CONSTRUCTION MANAGEMENT SERVICES |
Amount:
$148,237
Award Description: RECOVERY CUVA, PMIS 151629, A/E AND CM SERVICES FOR SANITARY SEWER COLLECTION AND CONSTRUCTED WETLAND CONTRACT; CUYAHOGA VALLEY NATIONAL PARK, SUMMIT COUNTY, BOSTON TOWNSHIP, OHIO. |
Amount:
$134,588
Award Description: DEER CREEK EE/CA & HERA TAS::14 1108::TAS |
Amount:
$796,906
Award Description: RECOVERY-PHYSICAL SAFETY/ENVIRONMENTAL HAZARD INVENTORIES-LXABH077000 TAS::14 1108::TAS |
Amount:
$524,310
Award Description: FIELD VALIDATION OF AML SITES TAS::14 1108::TAS |
Amount:
$146,725
Award Description: TAS::21 2022::TAS ARRA::YES::ARRA RECOVERYPROJECT#::E503::RP# -- PROJECT TITLE: REPAIRS TO STEAM LINES, VAULTS AND TUNNELS AT WEST POINT MILITARY RESERVATION, NY. ER - P2 NUMBER: 326129 (STEAM LINES ETC REPAIRS) STEAM DISTRIBUTION RENOVATION, WEST POINT |
Amount:
$9,586,051
Award Description: TAS::21 2022::TAS ER/MIL - STEAM DISTRIBUTION RENOVATIONPROGRAM, WEST POINT MILITARY ACADEMY, PROJECT NUMBERS: 326131 AND 326129 |
Amount:
$131,774
Award Description: FIRE LIFE AND SAFETY SERVICES-TASK ORDER NUMBER 0001. |
Amount:
$0
Award Description: ADMINISTRATIVE MODIFICATION TO CORRECT INFORMATION ON FIRST CLIN OF THE CONTRACT. |
Amount:
$0
Award Description: MODIFICATION TO CORRECT THE REFERENCED IDV ID NUMBER FROM GS-23F-0232L TO GS-10F-09-LP-A-0029 |
Amount:
$494,189
Award Description: CMA SERVICES FOR ARRA RECOMMISSIONING AND ROOF REPLACEMENT |
Amount:
$99,804
Award Description: PROVIDE CONSTRUCTION MANAGEMENT SERVICES |
Amount:
$1,323,756
Award Description: TAS::47 4543::TAS RECOVERY - CONSTRUCTION MANAGEMENT SERVICES IN SUPPORT OF JACKSON FEDERAL BUILDING MODERNIZATION PROJECT. MOD PO02 TO EXERCISE OPTIONS 1 - 3 FOR DESIGN AND CONSTRUCTION PHASE SERVICES. |
Amount:
$130,865
Award Description: TAS::47 4543::TAS RECOVERY - CONSTRUCTION MANAGEMENT SERVICES IN SUPPORT OF JACKSON FEDERAL BUILDING MODERNIZATION PROJECT. MOD PS01 TO ADD ADDITIONAL ENERGY CONSERVATION MEASURES (ECM) COSTS, CONVERSION FROM LEED NEW CONSTRUCTION (LEED NC) TO LEED EXISTING BUILDING (LEED EB). |
Amount:
$139,900
Award Description: RECOVERY - CONSTRUCTION MANAGEMENT ASSIST (CMA) SERVICES IN SUPPORT OF JACKSON FEDERAL BUILDING MODERNIZATION PROJECT, SEATTLE, WASHINGTON.
MODIFICATION PS04 ADDS ADDITIONAL SERVICES. |
Amount:
$0
Award Description: TAS::47 4543::TAS RECOVERY - CONSTRUCTION MANAGEMENT SERVICES IN SUPPORT OF JACKSON FEDERAL BUILDING MODERNIZATION PROJECT. MOD PA03 CORRECTS DELIVERY DATE FOR CLIN 0007. |
Amount:
$37,149
Award Description: TAS::47 4543::TAS
RECOVERY: TO PROVIDE ABATEMENT MONITORING, HAZARDOUS MATERIALS SURVEY AND INDOOR AIR QUALITY MANAGEMENT AT THE IRS SERVICE CENTER, ANDOVER, MA |
Amount:
$84,489
Award Description: PROVIDE CONSTRUCTION MANAGEMENT SERVICES IN SUPPORT OF ARRA PROJECT LOCATED IN SPOKANE US POST OFFICE AND FEDERAL COURTHOUSE. |
Amount:
$0
Award Description: CMA SERVICES |
Amount:
$0
Award Description: TAS::47 4543::TAS RECOVERY
COMPRIZON CORRECTION DELIVERY DATE TO AGREE WITH MOD PS01 ALREADY ISSUED. |
Amount:
$0
Award Description: TAS::47 4543::TAS RECOVERY
EXTENSION OF PERIOD OF PERFORMANCE TO 12/31/2009 |
Amount:
$0
Award Description: MODIFICATION WAS TO CHANGE THE REFERENCE IDV NUMBER FROM GS-23F-0232L TO GS-10F-09-LP-A-0029 |
Amount:
$292,993
Award Description: RECOVERY - CONSTRUCTION MANAGER (CM) SERVICES FOR PPV SYSTEMS,
DENVER FEDERAL CENTER, LAKEWOOD, COLORADO |
Amount:
$164,559
Award Description: MODIFICATION TO EXTEND THE ARRA CM SERVICES FOR THE PV PROJECTS LOCATED ON THE DENVER FEDERAL CENTER, LAKEWOOD, COLORADO. |
Amount:
-$19,788
Award Description: MODIFICATION TO EXTEND THE RECOVERY CM SERVICES FOR THE RECOVERY PV PROJECTS LOCATED ON THE DENVER FEDERAL CENTER, LAKEWOOD, COLORADO. |
Amount:
$808,936
Award Description: THIS IS TO EXTEND URS SERVICES IN ACCORDANCE WITH THE CONTRACT THROUGH AUGUST 31, 2012 FOR TASKS 1, 2, 4, 5 AND 6. |
Amount:
$29,984
Award Description: THIS MODIFICATION IS TO: CONDUCT CAULK AND WIPE TESTS ON CURTAIN WALL AREA, PERFORM UNDERSLAB STORM DRAIN SURVEY, DO ADDITIONAL PCB TESTING IN PHASE 1 OF BUILDING, AND ADDITIONAL PCB TESTING OF CAULKING AND BRICK IN ACCORDANCE WITH THE SCOPE OF WORK. |
Amount:
$44,180
Award Description: RECOVERY:
ABATEMENT MONITORING, ADDITIONAL TESTING ON ROOF AND ADDITIONAL HAZARDOUS MATERIALS SURVEY TESTING FOR THE CONSTRUCTION MANAGEMENT SERVICES, MODERNIZATION, IRS SERVICE CENTER, ANDOVER, MA |
Amount:
$75,597
Award Description: RECOVERY:
ADDITIONAL WORK TO PROVIDE ENVIRONMENTAL INSPECTIONS, PCB RESEARCH AND ESTIMATING, ABATEMENT/REMEDIATION AND PCB CLEANUP AT THE IRS BUILDING, ANDOVER, MA |
Amount:
$185,316
Award Description: TAS::57 3404::TAS::YES::ARRA RECOVERYPROJECT#::157240::RP#ER - PROJECT TITLE:RECOVERY ACT FUNDED PROJECT, WATERLINE, PRATHER |
Amount:
$178,716
Award Description: TAS::96 3134::TAS ARRA::YES::ARRA RECOVERYPROJECT#::323257::RP#
DATA ANLYST SUPPORT
TO PROVIDE DATA ANALYST SUPPORT FOR ECSO. |
Amount:
$113,959
Award Description: RECOVERYPROJECT#::11740::RP#
LINE ITEM 0001 PROJECT SCHEDULER
LINE ITEM 0002 TRAVEL |
Amount:
$52,525
Award Description: MOD 3 ADDS WORK TO THE CONTRACT SCOPE AND EXTENDS THE DELIVERY DATE. |
Amount:
$0
Award Description: MOD 0002 EXTENDS THE DELIVERY DATE. |
Amount:
$0
Award Description: RECOVERY BISO 152731 AND 146276 CM SERVICES FOR CLOSURE OF HAZARDOUS AMANDONED OIL AND GAS WELLS AND RESTORATION OF NATURAL LANDSCAPE AT BIG SOUTH FORK NATIONAL RIVER AND RECREATION AREA - NO COST MOD TO CORRECT VERBIAGE TO SCOPE OF SERVICES. |
Amount:
$0
Award Description: RECOVERY TAS 14-1041
PMIS 148821, ROCK CREEK PARK, CM SERVICES MERIDIAN HILL HIGH WALL STABILIZATION WASHINGTON, DC
NO COST TIME EXTENSION BY MUTUAL AGREEMENT OF THE PARTIES |
Amount:
$0
Award Description: RECOVERY TAS 14-1041 PMIS # 148821 ROCK CREEK PARK, WASHINGTON DC
TIME EXTENSION TO ALLOW FOR WINTER SHUT DOWN. |
Amount:
$0
Award Description: RECOVERY TAS 14-1041
PMIS 148821 ROCK CREEK PARK, CM SERVICES MERIDIAN HILL HIGH WALL STABILIZATION WASHINGTON DC
EXTEND POP DUE TO EXTENDED WINTER SHUT DOWN COLD&RAINY SPRING |
Amount:
$0
Award Description: INTERN CENTER, SANTA MONICA MOUNTAINS NATIONAL RECREATION AREA, CA SAMO 139731 EXTEND COMPLETION DATE FROM DECEMBER 30, 2010 TO MAY 30, 2011. |
Amount:
$0
Award Description: RECOVERY SAMO 139731, REPLACE STUDENT DORM, SANTA MOUNTAINS NATIONAL RECREATION AREA EXTEND COMPLETION DATE DUE TO CONSTRUCTION CONTRACT BEING EXTENDED |
Amount:
$0
Award Description: RECOVERY TAS 14-1041 COLO PMIS 152684
CONSTRUCTION MANAGEMENT SERVICES/CONTRACT CLOSE OUT ACTIVITIES FOR PROJECT RECONSTRUCT GLASS HOUSE PARKING LOT. MOD 0003 EXTENDS THE PERIOD OF PERFORMANCE TO APRIL 30, 2011 AS A RESULT IN THE EXTENSION OF THE CONSTRUCTION PERFORMANCE PERIOD. |
Amount:
$0
Award Description: MOD 2, NO COST TIME EXTENSION EXTENDING PERFORMANCE PERIOD TO OCTOBER 31, 2011. |
Amount:
$0
Award Description: RECOVERY-PHYSICAL SAFETY/ENVIRONMENTAL HAZARD INVENTORIES-LXABH077000 |
Amount:
$0
Award Description: CM SERVICES |
Amount:
$16,615
Award Description: PROVIDE CONSTRUCTION MANAGEMENT SERVICES FOR SPOKANE ROOF PROJECT. |
Amount:
$0
Award Description: CONSTRUCTION MANAGEMENT SERVICES |
Amount:
$5,862
Award Description: THIS WORK CONSISTS OF PROVIDING DRILLING SERVICES AND GEOTECHNICAL REPORT FOR THE MODERNIZATION, IRS SERVICE CENTER, ANDOVER, MA. |
Amount:
$268,785
Award Description: MODIFICATION PS08 INCLUDES THE EXTENSION OF CMA SERVICES TO PROVIDE ADDITIONAL STAFF AS REQUIRED TO COMPLETE THE IRS SERVICE CENTER PROJECT IN ANDOVER, MA. |
Amount:
$150,440
Award Description: THIS IS FOR ADDITIONAL COST ESTIMATING SERVICES FOR THE MODERNIZATION AT THE IRS SERVICE CENTER, ANDOVER, MA. |
Amount:
$499,000
Award Description: ADDITIONAL CONSTRUCTION MANAGEMENT SERVICES TO INCLUDE BASE SERVICES, INSPECTION SERVICES, AND PCB AIR MONITORING FOR THE MODERNIZATION AT THE IRS SERVICE CENTER, ANDOVER, MA. |
Amount:
$51,375
Award Description: THIS WORK CONSISTS OF PROVIDING A SCHEDULE ANALYSIS DUE TO PROJECT DELAYS FOR THE ANDOVER IRS MODERNIZATION PROJECT, ANDOVER, MA. |
Amount:
$101,438
Award Description: THIS PROVIDED ESTIMATING SERVICES FOR THE MODERNIZATION PROJECT, IRS SERVICE CENTER, ANDOVER, MA. |
Amount:
$157,080
Award Description: THIS WORK CONSISTS OF PROVIDING CLAIM ANALYSIS FOR COLUMBIA CONSTRUCTIONS CERTIFIED CLAIM FOR THE PROJECT ENTITLED MODERNIZATION AT THE IRS ANDOVER SERVICE CENTER, ANDOVER, MA. |
Amount:
$120,000
Award Description: PROVIDE ADDITIONAL CLAIMS REVIEW SERVICES FOR THE MODERNIZATION AT THE IRS SERVICE CENTER, ANDOVER, MA. |
Amount:
$117,644
Award Description: THIS WORK CONSISTS OF PCB AIR MONITORING ON OCCUPIED BUILDING, HVAC ESTIMATING FOR TEMP HEAT CHANGE AND NON-DESTRUCTIVE STRUCTURAL TESTING FOR THE CONSTRUCTION MANAGEMENT SERVICE, MODERNIZATION, IRS SERVICE CENTER, ANDOVER, MA. |
Amount:
$0
Award Description: RENEWAL PERIOD OF THE FIRE&LIFE SAFETY BPA CONTRACT. |
Amount:
$144,479
Award Description: FIRE PROTECTION AND ENGINEERING SERVICES. |
Amount:
$145,617
Award Description: MODIFICATION TO EXTEND THE CONTRACT COMPLETION DATE |
Amount:
$53,220
Award Description: ARRA- IRS RETROCOMMISSIONING CM(A) |
Amount:
$0
Award Description: CMA/CX SERVICES SPOKANE FEDERAL BUILDING/U.S. POST OFICE |
Amount:
$4,278
Award Description: PROVIDE CONSTRUCTION MANAGEMENT SERVICES IN SUPPORT OF ARRA PROJECT LOCATED IN SPOKANE US POST OFFICE AND FEDERAL COURT HOUSE. EXTENSION TO PERIOD OF PERFORMANCE. |
Amount:
$12,349
Award Description: CMA/CX SERVICES SPOKANE FEDERAL BUILDING/U.S. POST OFFICE |
Amount:
$0
Award Description: PROVIDE CONSTRUCTION MANAGEMENT SERVICES IN SUPPORT OF ARRA PROJECT LOCATED IN SPOKANE U.S. POST OFFICE AND FEDERAL COURT HOUSE. CHANGE IN FSC CODE. |
Amount:
-$678
Award Description: CMA/CX SERVICES SPOKANE FEDERAL BUILDING/U.S. POST OFICE |
Amount:
-$2,641
Award Description: RECOVERY: CONSTRUCTION MANAGEMENT ASSISTANT(CMA)/COMMISSINONING AUTHORITY SERVICES IN SUPPORT OF THE REPLACE BOILER, CHILLER, FAN-COILS, WINDOWS PROJECT AT THE US BORDER STATION IN PORTHILL IDAHO. THE PURPOSE OF THE MODIFICATION IS FEE REDUCTION FOR CMA SERVICES. |
Amount:
$64,444
Award Description: RECOVERY: CONSTRUCTION MANAGEMENT ASSISTAND AND COMMISSIONING AUTHORITY SERVICES IN SUPPORT OF REPLACE BOILER, CHILLER, FAN-COILS AND WINDWS DESIGN/BUILD CONSTRUCTION PROJECT AT THE US BORDER STATION LOCATED IN PORTHILL IDAHO. |
Amount:
-$4
Award Description: MOD 4 DEOBLIGATES THE REMAINING FUNDS. |
Amount:
-$3,068
Award Description: TAS::14 1041::TAS RECOVERY VAFO PMIS # 152410 MODIFICATION TO DEOBLIGATE REMAINING FUNDS AND CLOSE OUT THE CALL ORDER. |
Amount:
$0
Award Description: MODIFICATION 3, NO COST TIME EXTENSION TO COINCIDE WITH RADIO EQUIPMENT CONTRACT. |
Amount:
$18,571
Award Description: RECOVERY BISO 152731 AND 146276 CM SERVICES FOR CLOSURE OF HAZARDOUS AMANDONED OIL AND GAS WELLS AND RESTORATION OF NATURAL LANDSCAPE AT BIG SOUTH FORK NATIONAL RIVER AND RECREATION AREA - ADDITIONAL FUNDING FOR CM SERVICES. |
Amount:
-$5,999
Award Description: COLO 152684 ARRA
MOD TO CLOSE CALL ORDER&DEOBLIGATE FUNDS |
Amount:
$2,992,464
Award Description: FIXED PRICE CONSTRUCTION - GMAC |
Amount:
$0
Award Description: SINGLE AWARD BPA + CONSTRUCTION MANAGEMENT AS AGENT AND GENERAL SERVICES IN SUPPORT OF THE FOREIGN AFFAIRS SECURITY TRAINING CENTER (FASTC) PROJECT |
Amount:
$0
Award Description: CMA/CX SERVICES SPOKANE FEDERAL BUILDING/U.S. POST OFFICE |
Amount:
$0
Award Description: RECOVERY: CONSTRUCTION MANAGEMENT ASSISTANT AND COMMISSIONING AUTHORITY CMA/CX) SERVICES IN SUPPORT OF RECOVERY: REPLACE BOILER, CHILLER, FAN-COILS AND WINDOWS DESIGN-BUILD (D/B) CONSTRUCTION SERVICES. THE PURPOSE OF THIS SUPPLEMENTAL MODIFICATION IS TO EXTEND THE PERIOD OF PERFORMANCE OF THE CONTRACT DUE TO THE REPLACEMENT/INSTALLATION OF THE INSPECTION BOOTH WINDOW, COMMISSIONING OF BOILERS, CHILLERS AND TO ALLOW FOR CONTRACT CLOSEOUT PROCEDURES AT THE US BORDER STATION IN PORTHILL, ID. |
Amount:
$82,280
Award Description: ENHANCED CX |
Amount:
$0
Award Description: ADMIN CHANGE OF CO |
Amount:
$0
Award Description: PERIOD OF PERFORMANCE UPDATE |
Amount:
$0
Award Description: THIS MODIFICATION EXTENDS THE OPTION PERIOD FROM JULY 1, 2012 THROUGH AUGUST 31, 2012. ALLOTHER TERMS AND CONDITIONS REMAIN THE SAME. |
Amount:
$5,000
Award Description: THIS WORK CONSISTS OF ADDITIONAL SERVICES FOR URS TO PROVIDE 12 TEMPERATURE RECORDING SENSORS FOR PHASE 1 MBS SYSTEM FOR THE MODERNIZATION OF THE IRS SERVICE CENTER, ANDOVER, MA |
Amount:
$3,630
Award Description: THIS WORK CONSISTS OF UNDERSLAB STORM DRAINAGE AND SEWER PIPING SURVEY VIA FIBER OPTIC CAMERA FOR THE MODERNIZATION AT IRS SERVICE CENTER, ANDOVER, MA. |
Amount:
$0
Award Description: THIS MOD DEFINITIZES PC16 FOR SCHEDULE CLAIM ANALYSIS FOR THE MODERNIZATION OF THE IRS SERVICE CENTER, ANDOVER, MA |
Amount:
$0
Award Description: FIRE AND LIFE SAFETY SERVICES |
Amount:
$99,755
Award Description: FIRE AND LIFE SAFETY SERVICES |
Amount:
$0
Award Description: MODIFICATION TO CHANGE THE CONTRACTING OFFICER. PROJECT IS CM SERVICES FOR PV PROJECT, DENVER FEDERAL CENTER, LAKEWOOD, COLORADO. |
Amount:
$15,021
Award Description: ARRA CONSTRUCTION MANAGEMENT SERVICES - IRS RETROFIT ENERGY PROJECT LOCATED IN UTAH. |
Amount:
$0
Award Description: LIBI 163914 ALTERNATE TRANSPORTATION FEASIBILITY STUDY, LITTLE BIGHORN NATIONAL MONUMENT
MOD 5: EXTEND THE PERIOD OF PERFORMANCE FROM 12/14/2012 TO 2/15/2013. |
Amount:
$0
Award Description: SINGLE AWARD BLANKET PURCHASE AGREEMENT (BPA) + CONSTRUCTION MANAGEMENT AS AGENT AND GENERAL SERVICES IN SUPPORT OF THE FOREIGN AFFAIRS SECURITY TRAINING CENTER (FASTC) PROJECT
THIS MODIFICATION CHANGES IN THE CONTRACTOR'S DUNS NUMBER, MAILING ADDRESS, AND PAYMENT/REMITTANCE ADDRESS FOR BLANKET PURCHASE AGREEMENT #: GS-23F-0232L/GS-03P-12-DX-A-0052. |
Amount:
$0
Award Description: CMA SERVICES FOR DOS FASTC - INCORPORATE DD FORM 254. |
Amount:
-$105
Award Description: TAS::19 0112::TAS IGF::OT::IGF CONSTRUCTION MANAGER SERVICES (RFP #1 - SCOPE DEDUCTIONS AND ADDITIONS) FOR THE DEPT. OF STATE FOREIGN AFFAIRS SECURITY TRAINING CENTER (FASTC) IN BLACKSTONE, VA. |
Amount:
$222,747
Award Description: TAS::19 0112::TAS THIS IS NOT AN INHERENTLY GOVERNMENTAL FUNCTION. CONSTUCTION MANAGEMENT AS AGENT SERVICES FOR THE DEPT. OF STATE FOREIGN AFFAIRS SECURITY TRAINING CENTER (FASTC) IN BLACKSTONE, VA. THIS IS A BPA CALL FOR THE REVIEW OF THE MASTER PLAN AND GUIDELINES. |
Amount:
$22,924
Award Description: ENHANCED CX |
Amount:
$0
Award Description: THIS MODIFICATION DEFINITIZES PC14 IN FULL FOR THE CONSTRUCTION MANAGEMENT SERVICES AT THE IRS SERVICE, ANDOVER, MA. |
Amount:
$71,402
Award Description: THIS WORK WAS TO PROVIDE REA ANALYSIS FOR SUBCONTRACTORS AND PROVIDE ADDITIONAL MAN HOURS FOR CLAIMS REVIEW FOR THE MODERNIZATION AT THE IRS SERVICE CENTER, ANDOVER, MA. |
Amount:
$407,850
Award Description: THIS WORK CONSISTS OF EXTENDING CM CONSTRUCTION MANAGEMENT SERVICES UNTIL APRIL 30, 2013 AND TENANT OCCUPANCY AND CLOSE OUT PHASE UNTIL JULY 31, 2013 FOR THE MODERNIZATION AT THE IRS SERVICE CENTER, ANDOVER, MA. |
Amount:
$0
Award Description: THIS MODIFICATION DEFINITIZES THE ADDITIONAL CONSTRUCTION MANAGEMENT SERVICES FROM 7/1/12 - 10/31/12 FOR THE MODERNIZATION AT THE IRS SERVICE CENTER, ANDOVER, MA. |
Amount:
$0
Award Description: THIS MODIFICATION REVISED THE SOW SERVICES REQUIRED THROUGHOUT 2/28/2013 FOR THE MODERNIZATION AT THE IRS SERVICE CENTER, ANDOVER, MA. |