JUST BUCKET EXCAVATING, INC.

Clarification of Codes


AWARD OVERVIEW

AWARD OVERVIEW
Agency Name: Department of Agriculture Project Location: MARION
Award Number: AG04T0C090006 Project Location - State: OR
Funding Amount: $1,515,261 Project Location - Zip Code: 973420401
Ending Date: 2010-08-01 Congressional District: 05

RECIPIENT INFORMATION (AWARD)

RECIPIENT INFORMATION (AWARD)
Recipient Name: JUST BUCKET EXCAVATING, INC.
Recipient Address: 324 SW 29TH AVE
Recipient City: ALBANY
Recipient State: OR
Recipient Zip Code: 973223899
Congressional District: OR-04

DESCRIPTION OF WORK/SERVICE PERFORMED

TAS::12 1102::TAS FOR CAPITAL IMPROVEMENT & MAINTENANCE RECOVERY EXERCISE OPTIONAL ITEM TO PAVE FOREST SERVICE ROAD 46






TRANSACTIONS

TRANSACTIONS

Other Awards

Other Awards
Amount: $1,515,261
Award Description: TAS::12 1102::TAS FOR CAPITAL IMPROVEMENT & MAINTENANCE RECOVERY EXERCISE OPTIONAL ITEM TO PAVE FOREST SERVICE ROAD 46
Amount: $2,300,547
Award Description: TAS::96 3134::TAS THE PROJECT ENTAILS CONSTRUCTION OF 1, 3/4 ACRE FLOATING ISLAND IN SHEEPY LAKE, A PERMANENT BODY OF WATER LOCATED WITHIN WITHIN LOWER KLAMATH NATIONAL WILDLIFE REFUGE (NWR).
Amount: $959,577
Award Description: TAS::96 3134::TAS GOLD DIKE ISLAND FILL AND SLOPE PROTECTION; COARSE SAND/GRAVEL; TEMPORARY ISLAND HAUL ROAD; ACCESS ROADS; DUTCHY ISLAND AND MOB/DEMOB. ARRA::YES::ARRA
Amount: $1
Award Description: TAS::96 3135::TAS RECOVERYPROJECT#322633::GILES FRENCH PAVING
Amount: $69,894
Award Description: TAS::12 1102::TAS RECOVERY-ROAD 46 RECONSTRUCTION; ARRA CAPITAL IMPROVEMENT & MAINTENANCE. THIS MODIFICATION IS TO PROVIDE ADDITIONAL FUNDS RESULTING FROM AN INCREASE/DECREASE OF ESTIMATED QUANTITIES USED IN THIS CONTRACT.
Amount: $24,010
Award Description: TAS::12 1102::TAS RECOVERY-ROAD 46 RECONSTRUCTION; ARRA CAPITAL IMPROVEMENT & MAINTENANCE. THIS MODIFICATION IS TO PROVIDE FUNDS RESULTING FROM AN INCREASE/DECREASE OF ESTIMATED QUANTITIES USED IN THIS CONTRACT.
Amount: $1,279,175
Award Description: ARRA - PROJECT NUMBER 114785: RESTORATION PROJECT THAT INCLUDES REPLACEMENT OF THE DIVERSION CULVERTS AND SLUICE GATES TO GORRIE CREEK AND THE INSTALLATION OF FISH SCREENS; PLACING FILL MATERIAL TO REDUCE BANK SLOPE AND CHANNEL WIDTH BETWEEN F STREET BRIDGE AND THE MILL POND TO MATCH THE REST OF THE MILLRACE CHANNEL AND PROVIDE A BUFFER FROM THE LUMBER MILL; REMOVAL OF THE MILL DAM AND BRIDGE AND ASSOCIATED SHEET PILING, FILL, FISH LADDER, AND RETAINING WALLS; CUTTING BACK STORM DRAIN OUTFALLS NEAR THE MILL DAM AND ROUTING EXISTING SUBSURFACE VAULT OUTLETS INTO TWO STORM WATER DETENTION BASINS DESIGNED TO TREAT STORM WATER FROM THE BOOTH-KELLY SITE PRIOR TO DISCHARGE INTO THE MILL RACE; EXCAVATION AND GRADING OF A NEW MILL RACE CHANNEL THROUGH THE MILL POND AND CREATION OF WETLANDS AND BACKWATER SLOUGHS; CREATION OF AN OFF-LINE FIRE PROTECTION POND WITH INLET CULVERT, FISH SCREEN, AND BACKFLOW VALVE ADJACENT TO THE UPPER END OF THE MILL POND AREA; EXCAVATION AND GRADING TO FLATTEN THE LEFT BANK BETWEEN THE MILL DAM AND 7TH STREET BRIDGE; WETLAND AND RIPARIAN RE-VEGETATION/RESTORATION IN FORMER MILL POND AREA AND SURROUNDINGS ON PUBLIC LANDS; AND RECREATION FEATURES INCLUDING A PERVIOUS CONCRETE AND BOARDWALK LOOP TRAIL, AND EDUCATIONAL/INTERPRETIVE SIGNAGE KIOSKS AT THE MILL POND AREA.
Amount: $284,727
Award Description: TAS::96 3134::TAS RECOVERYPROJECT#::150373::RP# FLOATING ISLAND CONSTRUCTION AT SHEEPY LAKE TO PROVIDE NESTING HABITAT FOR CASPIAN TERNS ARRA::YES::ARRA
Amount: $77,371
Award Description: TAS::96 3134::TAS RECOVERYPROJECT#::150373::RP# FLOATING ISLAND CONSTRUCTION AT SHEEPY LAKE TO PROVIDE NESTING HABITAT FOR CASPAIN TERNS. ARRA::YES::ARRA
Amount: -$95,872
Award Description: TAS::96 3134::TAS RECOVERYPROJECT#::150373::RP# SHEEPY LAKE WATERFOWL HABITAT RESTORATION. MODIFICATION IS TO DELETE THE REQUIREMENT OF 1,500 CUBIC YARDS OF ROCK FOR TEMPORARY ACCESS ROAD 3; 1,533 SQUARE FEET OF ISLAND MODULES; 500 CUBIC YARDS OF STONE FOR COUNTY ACCESS ROAD; 30 SKILLED CRAFTSMEN HOURS; AND MISCELLANEOUS MATERIALS AND TRANPORTATION. IN ADDITION, THIS MODIFICATION ADDS 1.300 CUBIC YARDS OF ROAD REPAIR MATERIAL. ARRA::YES::ARRA
Amount: -$21,576
Award Description: TAS::96 3134::TAS RECOVERYPROJECT#::149708::RP# SUMMER LAKE WATERFOWL HABITAT ADJUSTMENT FOR FINAL QUANTITIES OF FILL USED FOR GOLD DIKE ISLAND INCLUDING SLOPE PROTECTION AND THE TEMPORARY ISLAND HAUL ROAD. ARRA::YES::ARRA
Amount: $53,687
Award Description: TAS::96 3135::TAS ARRA::YES::ARRA RECOVERYPROJECT#::330610::RP#TIMBERLINE LODGE WATER SYSTEM IMPROVMENTS. THE TIMBERLINE PUMP HOUSE HAS BEEN IN SERVICE FOR 50 YEARS HOUSING AND PROTECTING ALL PUMPING EQUIPMENT THAT SERVES THE LODGE AND SKI FACILITIES. DUE TO THE AGING THAT COMES FROM SURVIVING 50 MT. HOOD WINTERS THE STRUCTURAL FRAMING IS NOW IN NEED OF UPGRADES AND IMPROVEMENTS. REMEDIAL UPGRADES AND IMPROVEMENTS CAN EXTEND THE USEFUL SERVICE LIFE OF THIS FACILITY FOR MANY DECADES TO COME. PROPOSED ACTIONS ARE TO RE MOVE AND REPLACE ALL EXISTING CONCRETE FOUNDATIONS AND RECONNECT 4X12 FRAME TO NEW CONCRETE AND UPGRADE THE CONNECTION BETWEEN 4X12 FRAME MEMBERS AND 2X12 CROSSTIES WITH NEW HARDWARE, FASTENERS, AND RESORATION OF ALL 4X12S AND 2X12S TO ORIGINAL STRENGTH AND CONDITION.
Amount: $479,464
Award Description: TAS::96 3135::TAS ARRA::YES::ARRA RECOVERYPROJECT#::330610::RP#TIMBERLINE LODGE WATER SYSTEM IMPROVMENTS. THE TIMBERLINE PUMP HOUSE HAS BEEN IN SERVICE FOR 50 YEARS HOUSING AND PROTECTING ALL PUMPING EQUIPMENT THAT SERVES THE LODGE AND SKI FACILITIES. DUE TO THE AGING THAT COMES FROM SURVIVING 50 MT. HOOD WINTERS THE STRUCTURAL FRAMING IS NOW IN NEED OF UPGRADES AND IMPROVEMENTS. REMEDIAL UPGRADES AND IMPROVEMENTS CAN EXTEND THE USEFUL SERVICE LIFE OF THIS FACILITY FOR MANY DECADES TO COME. PROPOSED ACTIONS ARE TO RE MOVE AND REPLACE ALL EXISTING CONCRETE FOUNDATIONS AND RECONNECT 4X12 FRAME TO NEW CONCRETE AND UPGRADE THE CONNECTION BETWEEN 4X12 FRAME MEMBERS AND 2X12 CROSSTIES WITH NEW HARDWARE, FASTENERS, AND RESORATION OF ALL 4X12S AND 2X12S TO ORIGINAL STRENGTH AND CONDITION.
Amount: $2,200,812
Award Description: TAS::96 3135::TAS RECOVERYPROJECT#322633::GILES FRENCH PAVING
Amount: $0
Award Description: TAS::96 3135::TAS ARRA::YES::ARRA RECOVERYPROJECT#::330610::RP#TIMBERLINE LODGE WATER SYSTEM IMPROVMENTS. ADMINISTRATIVE MODIFICATION TO CORRECT AN ERROR IN THE COMPLETION DATE.
Amount: $0
Award Description: TAS::96 3134::TAS ARRA::YES::ARRA RECOVERYPROJECT#::114785::RP# SPRINGFIELD MILLRACE - NO COST MOD TO REVISE PLANTINGS
Amount: $1
Award Description: TAS::96 3134::TAS ARRA::YES::ARRA RECOVERYPROJECT#::114785::RP# SPRINGFIELD MILLRACE - PIPE EXTENSION, RIP RAP OUTFALL.
Amount: $0
Award Description: TAS::96 3135::TAS ARRA::YES::ARRA RECOVERYPROJECT#::330610::RP#TIMBERLINE LODGE WATER SYSTEM IMPROVMENTS
Amount: $0
Award Description: TAS::96 3135::TAS ARRA::YES::ARRA RECOVERYPROJECT#::330610::RP#TIMBERLINE LODGE WATER SYSTEM IMPROVMENTS
Amount: $0
Award Description: TAS::96 3135::TAS ARRA::YES::ARRA RECOVERYPROJECT#::330610::RP#TIMBERLINE LODGE WATER SYSTEM IMPROVMENTS.
Amount: $0
Award Description: TAS::96 3135::TAS ARRA::YES::ARRA RECOVERYPROJECT#::330610::RP#TIMBERLINE LODGE WATER SYSTEM IMPROVMENTS.
Amount: $0
Award Description: TAS::96 3135::TAS ARRA::YES::ARRA RECOVERYPROJECT#::330610::RP#TIMBERLINE LODGE WATER SYSTEM IMPROVMENTS

Project Location Detail

Location Information
Latitude, Longitude 0º 0' 0", 0º 0' 0"
Congressional District 05
City MARION
County MARION
State OR
Zip 97342