contract- RECIPIENT AWARD SUMMARY
SUBSTANCE LIMITED LIABILITY COMPANY
| AWARD OVERVIEW |
|
Agency Name: General Services Administration |
Project Location:
WOODBURY |
|
Award Number: GSP0609GZ5095 |
Project Location - State: IA |
|
Funding Amount:
$196,326 |
Project Location - Zip Code: 511031202 |
|
Ending Date:
2013-01-02 |
Congressional District: 05 |
RECIPIENT INFORMATION (AWARD)
| RECIPIENT INFORMATION (AWARD) |
|
Recipient Name:
|
SUBSTANCE LIMITED LIABILITY COMPANY |
|
Recipient Address:
|
1300 WALNUT ST STE 201 |
|
Recipient City:
|
DES MOINES |
|
Recipient State:
|
IA |
|
Recipient Zip Code:
|
503093401 |
|
Congressional District:
|
IA-03 |
DESCRIPTION OF WORK/SERVICE PERFORMED
RECOVERY TAS::47 4543::TAS - PER THE SCOPE OF WORK ATTACHED AND HEREBY INCORPORATED, SUBSTANCE, LLC WORK ORDER 34 IS HEREBY ISSUED TO PROVIDE NECESSARY PROFESSIONAL PRELIMINARY DESIGN SERVICES FOR THE FOLLOWING:
SIOUX CITY FB-CT, ARRA
SIOUX CITY FEDERAL BUILDING & COURTHOUSE
SIOUX CITY, IA
| Other Awards |
Amount:
$1,350
Award Description: RECOVERY. TAS::47 4543::TAS - SUBSTANCE, LLC WORK ORDER 28 IS HEREBY ISSUED TO PROVIDE NECESSARY PROFESSIONAL PRELIMINARY DESIGN SERVICES FOR THE FOLLOWING: PER THE SCOPE OF WORK ATTACHED AND HEREBY INCORPORATED.
ARRA - NEIL SMITH FEDERAL BUILDING (IIA00013)
210 WALNUT STREET
DES MOINES, IA 50309 |
Amount:
$82,149
Award Description: RECOVERY TAS::47 4543::TAS - THIS PROJECT (IIA00013) WILL TAKE PLACE AT THE NEIL SMITH FEDERAL BUILDING (IA0112ZZ) ON 210 WALNUT STREET IN DES MOINES, IA. THIS PROJECT WILL BE FUNDED THROUGH THE AMERICAN RECOVERY AND REINVESTMENT ACT OF 2009. THE PROPOSED PROCUREMENT IS BEING MADE UNDER THE A-E IDIQ MULTIPLE AWARD TASK ORDER FOR THE PRIMARY GEOGRAPHIC AREA OF THE STATE OF IOWA. ***ONLY THE CONTRACTOR LISTED IS PERMITTED TO SUBMIT PROPOSALS FOR THIS CONTRACT: SUBSTANCE, LLC., 1300 WALNUT STREET, STE. 201, DES MOINES, IA 50309 *** THE FEDERAL SERVICE CODE IS C211. THE NORTH AMERICAN INDUSTRIAL CLASSIFICATION CODE IS 541310 (ARCHITECTURAL SERVICES) AND THE SIZE STANDARD IS $4.5 MILLION. THE ESTIMATED RANGE OF THIS PROJECT WILL BE BETWEEN $25,000 AND $100,000. UNDER THE AMERICAN RECOVERY AND REINVESTMENT ACT (ARRA) OF 2009, FUNDING HAS BEEN RELEASED TO IMPROVE THE PERFORMANCE OF LIGHTING AND HVAC COMPONENTS IN EXISTING FEDERAL BUILDINGS. THE WORK TO BE DELIVERED UNDER THIS TASK ORDER INCLUDES, BUT IS NOT LIMITED TO: TESTING AND VALIDATING THE "GO" STRATEGIES IN TERMS OF COST AND ENERGY SAVINGS. THE A/E WILL BE REQUIRED FOR PROJECT PLANNING AND EXECUTION TO PERFORM THEIR CONTRACT DUTIES REGARDING DESIGN AND DESIGN RELATED SERVICES. MANAGEMENT INFORMATION WILL INCLUDE CONSTRUCTION DOCUMENT SUBMITTALS, SHOP DRAWING REVIEWS, CMC REQUESTS FOR INFORMATION (RFI'S) RESPONSES, AND PROVIDE AS-BUILT RECORD DOCUMENTS. PER THE SCOPE OF WORK ATTACHED AND HEREBY INCORPORATED, SUBSTANCE, LLC WORK ORDER 28, MODIFICATION PS01, IS HEREBY ISSUED TO PROVIDE NECESSARY PROFESSIONAL PRELIMINARY DESIGN SERVICES FOR THE FOLLOWING:
NEIL SMITH FB HVAC & ELECTRICAL UPGRADES
NEIL SMITH FEDERAL BUILDING
210 WALNUT STREET
DES MOINES, IA 50309
|
Amount:
$38,200
Award Description: RECOVERY TAS::47 4543::TAS ADDITIONAL SCOPE FOR HVAC MODIFICATIONS |
Amount:
$15,461
Award Description: RECOVERY TAS::47 4543::TAS - THIS IS AN APPROVED ARRA FUNDED STUDY. SUBSTANCE, LLC WORK ORDER 26, MODIFICATION PS01 IS HEREBY ISSUED TO PROVIDE NECESSARY PROFESSIONAL PRELIMINARY DESIGN SERVICES FOR THE FOLLOWING:
PER THE SCOPE OF WORK ATTACHED AND HEREBY INCORPORATED.
HVAC MODIFICATION + HEATING AND COOLING LOAD STUDY (RIA00066)
U.S. COURTHOUSE
131 EAST 4TH STREET
DAVENPORT, IA 52801 |
Amount:
$196,326
Award Description: RECOVERY TAS::47 4543::TAS - PER THE SCOPE OF WORK ATTACHED AND HEREBY INCORPORATED, SUBSTANCE, LLC WORK ORDER 34 IS HEREBY ISSUED TO PROVIDE NECESSARY PROFESSIONAL PRELIMINARY DESIGN SERVICES FOR THE FOLLOWING:
SIOUX CITY FB-CT, ARRA
SIOUX CITY FEDERAL BUILDING & COURTHOUSE
SIOUX CITY, IA
|
Amount:
$20,734
Award Description: RECOVERY TAS::47 4543::TAS PER THE SCOPE OF WORK ATTACHED AND HEREBY INCORPORATED, SUBSTANCE, LLC WORK ORDER 22 IS HEREBY ISSUED TO PROVIDE NECESSARY PROFESSIONAL PRELIMINARY DESIGN SERVICES FOR THE FOLLOWING:
CAFETERIA KITCHEN STUDY
ARRA PROJECT
NEAL SMITH FEDERAL BUILDING
WALNUT STREET
DES MOINES, IA |
Amount:
$146,283
Award Description: RECOVERY TAS::47 4543::TAS SUBSTANCE, LLC WORK ORDER 28, MODIFICATION PS05 IS ISSUED PER THE SCOPE OF WORK ATTACHED AND HEREBY INCORPORATED. THE MODIFICATION WILL PROVIDE NECESSARY PROFESSIONAL PRELIMINARY DESIGN SERVICES FOR HVAC & ELECTRICAL UPGRADES (IIA00013) AT THE NEAL SMITH FEDERAL BUILDING ON 210 WALNUT STREET IN DES MOINES, IA. |
Amount:
$84,932
Award Description: RECOVERY: MODIFICATION PS08 WILL PROVIDE NECESSARY PROFESSIONAL MANAGEMENT AND INSPECTION (M&I) SERVICES FOR BUILDING PERFORMANCE ENHANCEMENTS (IIA00013) AT BUILDING NUMBER IA0112ZZ (NEAL SMITH FEDERAL BUILDING ON 210 WALNUT STREET IN DES MOINES, IA). M&I SERVICES INCLUDE BUT ARE NOT LIMITED TO FINAL INSPECTIONS WITH ARCHITECTURAL, MECHANICAL, AND ELECTRICAL STAFF PRESENT. THESE SERVICES ARE TO BE PERFORMED IN ACCORDANCE WITH SPECIFIC SECTIONS OF THE SPECIFICATIONS. FOR FURTHER EXPLANATION, REFER TO THE ATTACHED SCOPE OF WORK. |
Amount:
$1,289,661
Award Description: RECOVERY TAS::47 4543::TAS - SUBSTANCE, LLC WORK ORDER 28, MODIFICATION PS04 IS ISSUED PER THE SCOPE OF WORK ATTACHED AND HEREBY INCORPORATED. THE MODIFICATION WILL PROVIDE NECESSARY PROFESSIONAL PRELIMINARY DESIGN SERVICES FOR BUILDING PERFORMANCE ENHANCEMENTS (IIA00013) AT THE NEAL SMITH FEDERAL BUILDING ON 210 WALNUT STREET IN DES MOINES, IA. PRELIMINARY DESIGN SERVICES INCLUDE BUT ARE NOT LIMITED TO: REMOVAL OF INDUCTION UNITS, INSTALLATION OF NEW TRANSFORMERS, EXECUTING DAY-LIGHTING IMPROVEMENTS, UPGRADING RESTROOMS ON FLOORS 2 THROUGH 10, REMODELING RESTROOMS ON FIRST FLOOR, CAFETERIA UPGRADES, MODIFICATIONS TO SERVICE ELEVATOR, AND REPLACING COOLING TOWER. |
Amount:
$38,187
Award Description: RECOVERY TAS::47 4543::TAS PER THE SCOPE OF THE WORK ATTACHED AND HEREBY INCORPORATED, SUBSTANCE, LLC WORK ORDER 28, MODIFICATION PS0-3, IS HEREBY ISSUED TO PROVIDE NECESSARY PROFESSIONAL DESIGN SERVICES FOR:
HVAC & ELECTRICAL UPGRADES
NEAL SMITH FEDERAL BUILDING (IA0112ZZ)
210 WALNUT STREET
DES MOINES, IA 50309
TOTAL COST OF THIS MODIFICATION IS: $38,187.61.
|
Amount:
$353,964
Award Description: RECOVERY TAS::47 4543::TAS SUBSTANCE, LLC WORK ORDER 28, MODIFICATION PS06 IS ISSUED PER THE SCOPE OF WORK ATTACHED AND HEREBY INCORPORATED. THE MODIFICATION WILL PROVIDE NECESSARY PROFESSIONAL PRELIMINARY DESIGN SERVICES FOR BUILDING PERFORMANCE ENHANCEMENTS (IIA00013) AT THE NEAL SMITH FEDERAL BUILDING ON 210 WALNUT STREET IN DES MOINES, IA. |
Amount:
$10,890
Award Description: RECOVERY. SUBSTANCE, LLC WORK ORDER 28, MODIFICATION PS09 WILL PROVIDE NECESSARY PROFESSIONAL PRELIMINARY DESIGN SERVICES FOR BUILDING PERFORMANCE ENHANCEMENTS (IIA00013) AT THE NEAL SMITH FEDERAL BUILDING ON 210 WALNUT STREET IN DES MOINES, IA. |
Amount:
$629,283
Award Description: MODIFICATION (PS07) WILL PROVIDE ADDITIONAL NECESSARY PROFESSIONAL MANAGEMENT AND INSPECTION (M&I) SERVICES FOR BUILDING PERFORMANCE ENHANCEMENTS (IIA00013) AT BUILDING NUMBER IA0112ZZ (NEAL SMITH FEDERAL BUILDING ON 210 WALNUT STREET IN DES MOINES, IA). THE PURPOSE OF MODIFICATION PS07 IS TO PROVIDE THE FOLLOWING: COORDINATION OF CONSTRUCTION MANAGEMENT SERVICES, 46 ADDITIONAL WEEKLY SITE VISITS, 46 ADDITIONAL WEEKLY INSPECTION REPORTS TO GWH, AND ASSISTING IN THE PREPARATION OF CONTRACT PROPOSAL REQUESTS. GWH IS ALSO REQUIRED TO ATTEND SIX DOCUMENT REVIEWS AT THE NEAL SMITH FEDERAL BUILDING IN DES MOINES. THERE ARE THREE TENTATIVE DATES SET FOR THESE MEETINGS: MARCH 31, 2010 (25% DESIGN DOCUMENT SUBMITTAL), MAY 31, 2010 (50% DESIGN DOCUMENT SUBMITTAL), AUGUST 1, 2010 (95% DESIGN DOCUMENT SUBMITTAL). THE REMAINING THREE VISITS ARE TO BE SCHEDULED AT A LATER DATE WHEN THE PROJECT TEAM DEEMS NECESSARY. |
Amount:
$422,617
Award Description: RECOVERY: TAS::47 4543::TAS SUBSTANCE, LLC WORK ORDER NO. 28, MODIFICATION PS02, INCLUDES ARCHITECT-ENGINEER SERVICES FOR PROJECT IIA00013, HVAC UPGRADES AND ELECTRICAL SERVICE, AT THE NEAL SMITH FEDERAL BUILDING, 210 WALNUT STREET, DES MOINES, IA. THE WORK TO BE DELIVERED UNDER THIS MODIFICATION INCLUDES, BUT IS NOT LIMITED TO: DESIGN AND ESTIMATE COSTS FOR ADVANCED METERING, LIGHTING UPGRADES AND CONTROLS, COOLING TOWER SEWER ABATEMENT, AND MECHANICAL AND HVAC INFRASTRUCTURE UPGRADES. THE A/E WILL BE REQUIRED FOR PROJECT PLANNING AND EXECUTION TO PERFORM THEIR CONTRACT DUTIES REGARDING DESIGN AND DESIGN RELATED SERVICES. MANAGEMENT INFORMATION WILL INCLUDE CONSTRUCTION DOCUMENT SUBMITTALS. |
Amount:
$10,501
Award Description: RECOVERY TAS::47 4543::TAS - SUBSTANCE, LLC WORK ORDER 26, MODIFICATION PS05 IS ISSUED PER THE SCOPE OF WORK ATTACHED AND HEREBY INCORPORATED. THE MODIFICATION WILL PROVIDE NECESSARY PROFESSIONAL DESIGN SERVICES FOR HVAC MODIFICATIONS (RIA00075) AT THE US COURTHOUSE LOCATED AT 131 EAST 4TH STREET IN DAVENPORT, IA. PRELIMINARY DESIGN SERVICES INCLUDE BUT ARE NOT LIMITED TO: PROVIDING 100% DESIGN SUBMITTAL, FURNISHING DELIVERABLES AND PROVIDING DESIGN SERVICES FOR THE RECOMMENDATIONS NOTED WITHIN THE METERING REPORT COMPLETED BY EMC, ENGINEERS, INC. DATED 11/12/2009. |
Amount:
$35,077
Award Description: RECOVERY TAS::47 4543::TAS SUBSTANCE, LLC WORK ORDER 26, MODIFICATION PS06 IS ISSUED PER THE SCOPE OF WORK ATTACHED AND HEREBY INCORPORATED. THE MODIFICATION WILL PROVIDE NECESSARY PROFESSIONAL DESIGN SERVICES FOR HVAC MODIFICATIONS (RIA00075) AT THE US COURTHOUSE LOCATED AT 131 EAST 4TH STREET IN DAVENPORT, IA. PS06 WILL EFFECT THE FINAL SUBMITTALS MADE BY THE A/E AND TO MAKE IT POSSIBLE FOR THE A/E TO FACILITATE AND ATTEND MEETINGS WITH IDIQ CMC CONTRACTORS DURING THE PRE-CONSTRUCTION AND CONSTRUCTION PHASES OF THE PROJECT. IN ADDITION, THESE MODIFICATIONS PERMIT THE A/E TO PERFORM REQUIRED SERVICES WHICH INCLUDE BUT ARE NOT LIMITED TO RESPONDING TO CONTRACTOR+S RFIS, ATTENDANCE AT THE INSPECTION OF CONSTRUCTION FOR SUBSTANTIAL COMPLETION, AND MAKING CHANGES TO THE FINAL CONSTRUCTION DOCUMENTS MADE DURING CONSTRUCTION. |
Amount:
$21,788
Award Description: RECOVERY TAS::47 4543::TAS
BUILDING NO.: IA0027
PROJECT NO.; RIA00076
U.S. COURTHOUSE
131 EAST 4TH STREET
DAVENPORT IA 52801
SUBSTANCE WORK ORDER NO.: 26
CONTRACT MODIFICATION PS04
TESTING ,ADJUSTING AND BALANCING OF HVAC SYSTEMS
PROVIDE 5 COPIES OF TESTING, ADJUSTING AND BALANCING REPORT INCLUDING A CD COPY IN PDF FORMAT
|
Amount:
$12,684
Award Description: RECOVERY TAS::47 4543::TAS + SUBSTANCE, LLC WORK ORDER 31 IS TO PROVIDE NECESSARY PROFESSIONAL DESIGN SERVICES FOR A BOILER REPLACEMENT (RIA00072) AT THE IOWA CITY FEDERAL BUILDING (IA0119ZZ), 400 S. CLINTON ST., IN IOWA CITY, IA. THE FOLLOWING DELIVERABLES WILL BE REQUIRED FOR THIS PROJECT: RESOLVE AND ANSWER RFI+S AS PROVIDED BY THE CONSTRUCTION CONTRACTOR. FURNISH COPY OF ANSWERS FOR EACH RFI TO EACH PERSON IDENTIFIED BELOW ON THE DISTRIBUTION LIST. PROVIDE SUBMITTAL REVIEW FOR SUBMITTALS PROVIDED BY THE CONSTRUCTION CONTRACTOR. CHECK AND RECOMMEND FOR GOVERNMENT APPROVAL OR REJECTION SHOP DRAWINGS, SAMPLES, EQUIPMENT LISTS, AND DATA, RELATED TO THE A/E+S DESIGN DURING THE CONSTRUCTION PERIOD. FURNISH THE GOVERNMENT A COPY OF EACH REJECTION LETTER AND COPIES OF APPROVED LETTERS AND APPROVED SHOP DRAWINGS, EQUIPMENT LISTS, AND DATA. PER THE CONSTRUCTION CONTRACT, THE CONTRACTOR IS TO PROVIDE 10 COPIES OF EACH SUBMITTAL FOR REVIEW, WITH FOUR COPIES TO BE RETURNED TO THE CONSTRUCTION CONTRACTOR. THE A/E WILL REVIEW EACH SUBMITTAL, PROVIDE ONE COPY OF THE REVIEW TO EACH PERSON IDENTIFIED ON THE DISTRIBUTION LIST BELOW, AND KEEP TWO COPIES FOR THE A/E+S RECORDS. THE A/E SHALL MAINTAIN A SUBMITTAL LOG. DURING THE CONSTRUCTION PERIOD, THE A/E WILL PROVIDE COPIES OF THESE LOGS TO THE GSA PERSONNEL IDENTIFIED BELOW IN THE DISTRIBUTION LIST ON A WEEKLY BASIS. THE UPDATES MAY BE SENT ELECTRONICALLY VIA EMAIL. THE ENGINEER SHALL ATTEND THE PRE-CONSTRUCTION MEETING, MAKE TWO SITE VISITS DURING CONSTRUCTION, AND ATTEND THE PUNCH LIST WALK-THROUGH NEAR COMPLETION OF THE PROJECT. PREPARE RECORD DOCUMENTS PER THE A/E CONTRACT. PROVIDE CLOSE-OUT AND RECORD DOCUMENTS ON ONE (1) COMPACT DISC TO EACH GSA PERSON IDENTIFIED BELOW, EXCEPT TWO (2) DISCS WILL BE PROVIDED TO PERRY BOESCHEN. |
Amount:
$181,100
Award Description: RECOVERY. NEAL SMITH FEDERAL BUILDING, 210 WALNUT STREET, DES MOINES, IA. MODIFICATION PS10 IS ISSUED TO INCREASE THE CONSTRUCTION ADMINISTRATION SERVICES CURRENTLY BEING PERFORMED UNDER THIS WORK ORDER TO INCLUDE, BUT NOT LIMITED TO, THE FOLLOWING:
ASSIST COR WITH GATHERING INFORMATION NECESSARY TO CONDUCT WEEKLY PROGRESS MEETINGS.
ACCOMPLISH WEEKLY INSPECTION OF WORK ACTIVITIES AND A REPORT AND PHOTO PACKAGE FOR EACH OCCURRENCE.
COMPILE THE CONSTRUCTOR+S PUNCH LIST, COORDINATE/CONDUCT D&O INSPECTION AS THE PROJECT NEARS COMPLETION.
COMPLETE FINAL D&O REPORT AND ASSIST COR WITH PROJECT CLOSE-OUT DOCUMENTS.
PROVIDE CONSTRUCTION ADMINISTRATION SERVICE.
PROVIDE CHANGE ORDER ADMINISTRATION AND REQUIRED DOCUMENTATION TO THE GSA PROJECT MANAGER FOR MODIFICATIONS REQUIRED TO FIRM FIX PRICE THE CMC TASK ORDER. |
Amount:
$103,863
Award Description: SUBSTANCE, LLC WORK ORDER 28, MODIFICATION PS11 IS ISSUED TO PROVIDE A MOVE COORDINATOR FOR THE BUILDING PERFORMANCE ENHANCEMENTS (IIA00013) AT THE NEAL SMITH FEDERAL BUILDING ON 210 WALNUT STREET IN DES MOINES, IA. THE MOVE COORDINATOR WILL MANAGE THE RELOCATION/MOVING OF TENANTS RESIDING IN THE NEAL SMITH FEDERAL BUILDING (NSFB). THE NSFB IS COMPRISED OF 10 FLOORS. CONSTRUCTION GENERATED BY THE ARRA NSFB PROJECT WILL IMPACT EACH OF THE 10 FLOORS. THEREFORE, MOVE COORDINATOR SERVICES WILL BE REQUIRED FOR APPROXIMATELY 14 MONTHS, DURING THE PERFORMANCE PERIOD OF THE ARRA NSFB PROJECT. |
Amount:
$44,280
Award Description: SUBSTANCE, LLC WORK ORDER 28, MODIFICATION PS13, FOR THE BUILDING PERFORMANCE ENHANCEMENTS (IIA00013) AT THE NEAL SMITH FEDERAL BUILDING ON 210 WALNUT STREET IN DES MOINES, IA IS HEREBY ISSUED TO PROVIDE THE FOLLOWING PROFESSIONAL DESIGN AND CONSTRUCTION MANAGEMENT SERVICES:
PROVIDE ADDITIONAL PUNCH LISTS OF TENANT SPACES IN CONJUNCTION WITH WEEKLY SITE VISITS, WHICH TOTAL 50. COMBINE ALL TENANT PUNCH LIST ON EACH FLOOR TO THE +FLOOR PUNCH LIST+ AND VERIFY WHEN ITEMS ARE COMPLETED.
PROVIDE RE-DESIGN SERVICES FOR VALUE ENGINEERING (VE) ITEMS REQUIRED TO BRING THE SCOPE IN LINE WITH THE AVAILABLE FUNDING.
PROVIDE RE-DESIGN SERVICE FOR LEAVING THE INDUCTION UNITS AS RADIATORS IN THE CAFETERIA. |
Amount:
$102,967
Award Description: SUBSTANCE, LLC WORK ORDER 28, MODIFICATION PS14, FOR THE BUILDING PERFORMANCE ENHANCEMENTS (IIA00013) AT THE NEAL SMITH FEDERAL BUILDING ON 210 WALNUT STREET IN DES MOINES, IA IS HEREBY ISSUED TO PROVIDE THE FOLLOWING PROFESSIONAL DESIGN AND CONSTRUCTION MANAGEMENT SERVICES: PROVIDE EXTENDED CM SERVICES FOR AN ADDITIONAL 11.5 WEEKS. PROVIDE EXTENDED CM/MOVE COORDINATOR SERVICES FOR AN ADDITIONAL 19 WEEKS. |
Amount:
$7,234
Award Description: SUBSTANCE, LLC WORK ORDER 28, MODIFICATION PS15, FOR THE BUILDING PERFORMANCE ENHANCEMENTS (IIA00013) AT THE NEAL SMITH FEDERAL BUILDING ON 210 WALNUT STREET IN DES MOINES, IA IS HEREBY ISSUED TO PROVIDE THE FOLLOWING CONSTRUCTION MANAGEMENT AND MOVE COORDINATION SERVICES FOR 26 WEEKS. SERVICES INCLUDE THE FOLLOWING, BUT ARE NOT LIMITED TO: ACCOMPLISH INSPECTIONS OF TENANT SPACES TO VERIFY CONDITIONS BEFORE COORDINATING MOVE. MAINTAIN PROJECT SCHEDULE AND ASSIST WITH MOVE COORDINATION. PROVIDE CONSTRUCTION MANAGEMENT SERVICES FOR 104 WORK DAYS (WORK DAY CONSISTS OF 10 HOURS). ASSIST COR COMPLETE FINAL DEFECTS AND OMISSIONS REPORT WITH ALL PROJECT CLOSE DOCUMENTS. |
Amount:
$30,000
Award Description: SUBSTANCE, LLC WORK ORDER 28, MODIFICATION PS12 IS ISSUED TO PROVIDE COMMISSION SERVICES FOR THE BUILDING PERFORMANCE ENHANCEMENTS (IIA00013) AT THE NEAL SMITH FEDERAL BUILDING ON 210 WALNUT STREET IN DES MOINES, IA. COMMISSION SERVICES INCLUDE, BUT ARE NOT LIMITED TO, CREATING A COMMISSIONING PLAN, SCHEDULE, SPECIFICATIONS, AND ATTENDING MEETINGS. SUBSTANCE AND ITS+ SUB-CONSULTANT WILL COMMISSION THE HVAC, TEMPERATURE CONTROL, AND ELECTRICAL SYSTEMS. |
Amount:
$42,480
Award Description: WORK ORDER 34-PS01 FOR THE HIGH PERFORMANCE GREEN BUILDING PROJECT (IIA00017) AT THE SIOUX CITY FB AT 316-320 SIXTH STREET IN SIOUX CITY, IA IS HEREBY ISSUED FOR ADDITIONAL CONSTRUCTION ADMINISTRATION SERVICES. PROFESSIONAL SERVICES INCLUDE, BUT ARE NOT LIMITED TO, THE FOLLOWING: PHYSICALLY ATTEND BI-WEEKLY CONSTRUCTION PROGRESS/PAYMENT MEETINGS. ATTEND, VIA TELECONFERENCE, ALL CONSTRUCTION PROGRESS MEETINGS THAT ARE NOT SCHEDULED TO BE PHYSICALLY ATTENDED. PROVIDE 6 ADDITIONAL PROJECT SITE VISITS. REVIEW AS BUILT DRAWINGS. |
Amount:
-$259
Award Description: SUBSTANCE, LLC WORK ORDER 28, MODIFICATION PA19 IS ISSUED TO DEOBLIGATE FUNDING NOT REQUIRED TO BE UTILIZED IN THE EXECUTION OF THIS CONTRACT. |
| Location Information |
| Latitude, Longitude |
0º 0' 0",
0º 0' 0" |
| Congressional District |
05 |
| City |
WOODBURY |
| County |
WOODBURY |
| State |
IA |
| Zip |
51103 |
|