contract- RECIPIENT AWARD SUMMARY
APM LIMITED LIABILITY COMPANY
| AWARD OVERVIEW |
|
Agency Name: Department of Defense--Military |
Project Location:
GREENE |
|
Award Number: 5290 |
Project Location - State: OH |
|
Funding Amount:
$425,642 |
Project Location - Zip Code: 454335349 |
|
Ending Date:
2009-12-14 |
Congressional District: 07 |
RECIPIENT INFORMATION (AWARD)
| RECIPIENT INFORMATION (AWARD) |
|
Recipient Name:
|
APM LIMITED LIABILITY COMPANY |
|
Recipient Address:
|
42 N TORRENCE STREET |
|
Recipient City:
|
DAYTON |
|
Recipient State:
|
OH |
|
Recipient Zip Code:
|
454031155 |
|
Congressional District:
|
OH-08 |
DESCRIPTION OF WORK/SERVICE PERFORMED
TAS::57 3404::TAS
RECOVERY - ZHTV091886A - CONSTRUCT CANOPY-GATE 12A (20735)
SABER PROJECT NUMBER 09 1886A ARRA, PROVIDE EQUIPMENT AND MATERIAL TO DEMO LIGHTING POLES AND FIXTURES AND CONSTRUCT CANOPY STRUCTURES AT GUARDHOUSE GATE 12A ARRA::YES::ARRA
| Other Awards |
Amount:
$683,357
Award Description: TAS::57 3404::TAS RECOVERYPROJECT#::ZHTV091882C::RP# CONSTRUCT TRAFFIC CONTAINMENT - GATE 1B (20760); WRIGHT-PATTERSON AFB, OH SABER PROJECT NUMBER 09 1882C, ARRA, PROVIDE EQUIPMENT AND MATERIAL TO CONSTRUCT CONTAINMENT (WALL AND CABLES)FOR GATE 1B ARRA::YES::ARRA |
Amount:
$0
Award Description: TAS::57 3404::TAS RECOVERYPROJECT#::ZHTV091882C::RP# CONSTRUCT TRAFFIC CONTAINMENT - GATE 1B (20760); WRIGHT-PATTERSON AFB, OH SABER PROJECT NUMBER 09 1882C, ARRA, PROVIDE EQUIPMENT AND MATERIAL TO CONSTRUCT CONTAINMENT (WALL AND CABLES)FOR GATE 1B ARRA::YES::ARRA |
Amount:
$0
Award Description: TAS::57 3404::TAS RECOVERYPROJECT#::ZHTV091882C::RP# CONSTRUCT TRAFFIC CONTAINMENT - GATE 1B (20760); WRIGHT-PATTERSON AFB, OH SABER PROJECT NUMBER 09 1882C, ARRA, PROVIDE EQUIPMENT AND MATERIAL TO CONSTRUCT CONTAINMENT (WALL AND CABLES)FOR GATE 1B ARRA::YES::ARRA |
Amount:
$0
Award Description: TAS::57 3404::TAS RECOVERYPROJECT#::ZHTV091882C::RP# CONSTRUCT TRAFFIC CONTAINMENT - GATE 1B (20760); WRIGHT-PATTERSON AFB, OH SABER PROJECT NUMBER 09 1882C, ARRA, PROVIDE EQUIPMENT AND MATERIAL TO CONSTRUCT CONTAINMENT (WALL AND CABLES)FOR GATE 1B ARRA::YES::ARRA |
Amount:
$0
Award Description: TAS::57 3404::TAS RECOVERY - ZHTV091886A - CONSTRUCT CANOPY-GATE 12A (20735), WRIGHT-PATTERSON AFB OH ARRA::YES::ARRA |
Amount:
$0
Award Description: TAS::57 3404::TAS RECOVERY - ZHTV091886A - CONSTRUCT CANOPY-GATE 12A (20735); WRIGHT-PATTERSON AFB, OH; SABER PROJECT NUMBER 09 1886A, ARRA, CONSTRUCT CANOPY, GATE 12A ARRA::YES::ARRA |
Amount:
$425,642
Award Description: TAS::57 3404::TAS
RECOVERY - ZHTV091886A - CONSTRUCT CANOPY-GATE 12A (20735)
SABER PROJECT NUMBER 09 1886A ARRA, PROVIDE EQUIPMENT AND MATERIAL TO DEMO LIGHTING POLES AND FIXTURES AND CONSTRUCT CANOPY STRUCTURES AT GUARDHOUSE GATE 12A ARRA::YES::ARRA |
Amount:
$0
Award Description: TAS::57 3404::TAS RECOVERYPROJECT#::ZHTV091881C::RP# CONSTRUCT TRAFFIC CONTAINMENT - GATE 22B (20759); WRIGHT-PATTERSON AFB, OH SABER PROJECT NUMBER 09 1881C, ARRA, PROVIDE EQUIPMENT AND MATERIAL TO DEMO EXISTING GATES AND AREA, TO CONSTRUCT SING GATES, BASE, AND RETAINING WALL BLOCK, AND TO REWORK HILLSIDE; GATE 22B ARRA::YES::ARRA |
Amount:
$445,068
Award Description: TAS::57 3404::TAS RECOVERYPROJECT#::ZHTV091881C::RP# CONSTRUCT TRAFFIC CONTAINMENT - GATE 22B (20759); WRIGHT-PATTERSON AFB, OH SABER PROJECT NUMBER 09 1881C, ARRA, PROVIDE EQUIPMENT AND MATERIAL TO DEMO EXISTING GATES AND AREA, TO CONSTRUCT SING GATES, BASE, AND RETAINING WALL BLOCK, AND TO REWORK HILLSIDE; GATE 22B ARRA::YES::ARRA |
Amount:
$0
Award Description: TAS::57 3404::TAS RECOVERYPROJECT#::ZHTV091881C::RP# CONSTRUCT TRAFFIC CONTAINMENT - GATE 22B (20759); WRIGHT-PATTERSON AFB, OH SABER PROJECT NUMBER 09 1881C, ARRA, PROVIDE EQUIPMENT AND MATERIAL TO DEMO EXISTING GATES AND AREA, TO CONSTRUCT SING GATES, BASE, AND RETAINING WALL BLOCK, AND TO REWORK HILLSIDE; GATE 22B ARRA::YES::ARRA |
Amount:
$0
Award Description: TAS::57 3404::TAS RECOVERYPROJECT#::ZHTV091881C::RP# CONSTRUCT TRAFFIC CONTAINMENT - GATE 22B (20759); WRIGHT-PATTERSON AFB, OH SABER PROJECT NUMBER 09 1881C, ARRA, PROVIDE EQUIPMENT AND MATERIAL TO DEMO EXISTING GATES AND AREA, TO CONSTRUCT SING GATES, BASE, AND RETAINING WALL BLOCK, AND TO REWORK HILLSIDE; GATE 22B ARRA::YES::ARRA |
Amount:
$0
Award Description: TAS::57 3404::TAS RECOVERY - ZHTV091886B - CONSTRUCT PROTECTIVE KIOSK - GATE 12A (20737), WRIGHT-PATTERSON AFB, OH ARRA::YES::ARRA |
Amount:
$99,758
Award Description: TAS::57 3404::TAS
RECOVERY - ZHTV091886B - CONSTRUCT PROTECTIVE KIOSK - GATE 12A (20737)
ARRA SABER 09 1886B, CONSTRUCT KIOSK
THE WORK IS TO PROVIDE AND INSTALL PROTECTIVE KIOSK AT GATE 12A. I WILL INCLUDE THE DEMO AND REMOVAL OF ASPHALT, COMPACT AGGREGATE, EXISTING GEOTEXTILE DRAINAGE FABRIC, AND EXISTING EARTH. THE CONSTRUCTION PORTION WILL BE TO PROVIDE AND INSTALL RUFF FILL AND COMPACT, AGGREGATE FILL FOR BASE OF CONCRETE ISLAND, FORMS FOR INSTALL OF 8" CONCRETE ISLANDS. PROVIDE AND INSTALL 2 EA CONCRETE CRASH MASS STRUCTURES, 2 EA PERSONNEL PROTECTION BARRIER CONCRETE WALLS, 2 EA ENERGY ABSORBTION "QUADGUARD" SYSTEM, AND 3 EA NEW BOOTHS FOR THE SECURITY GUARDS. ARRA::YES::ARRA |
Amount:
$431,299
Award Description: TAS::57 3404::TAS RECOVERYPROJECT#::ZHTV090015::RP# REPLACE STEAM LINE - STM PIT S-90 TO BLDG 29/AREA B (SD- 2); WRIGHT-PATTERSON AFB, OH. RECOVERY- ARRA SABER 09 0015, REPLACE STEAM LINES. THIS PROJECT IS IS TO REPLACE THE FAILED STEAM LINNES AROUND BLDG 20029. THE WORK WILL INCLUDE THE EXCAVATION AND ROAD FINISHES AND CUT EXISTING PAVEMENT OF 600 FT 6+ DEEP. THE EXISTING LINES WILL BE REOMVED AND DISPOSED OF. DEMO AND DISPOSE OF EXISTING CONCRETE PIPE ANCHORS AND + + ROUND BOTTOMS, UNCOVER EXISTING BASIN, DEMO EXISTING MANHOLE. COMPACT SAND BEDDING, PLACE 3+ ASPHALT OVER NEW STEAMLINE, PROVIDE AND PLACE ASPHALT PAVEMENT OUTSIDE NEW STEAM LINE TRENCH. PROVIDE CONDUIT: MULTI-THERM 500-10 GUAGE STEEL W/1+ THICK POLYURETHANE FOAMTO EXTERIOR TO PROTECT FPR OUTERJACKET. PIPE: STEAM, ASTM A-53 GR. B, SCHEDULE 40 ERW, BLACK STEEL. HIGH PRTESSURE RETURN, ASTM A106, GRADE B. SCHEDULE 80. RETURN: ASTM A53, GRADE B, SCHEDULE 80, ERW. INSULATION: MINERAL WOOD. MECHANICAL INSULATION MATERIALS WILL ALSO BE PROVIDED AND INSTALLED. .016 ALUMINUM JACKETING FOR NEW HIGH PRESSURE SUPPLY, LOW PRESSURE RETURN, AND HIGH PRESSURE RETURN LINE, W/ NEW MEGA-WRAP REMOVABLE/RE-USABLE COVERS. ASBESTOS FAILED STEM LINES WILL BE DEMOLISHED AND DISPOSED OF. THE ORIGINAL PROJECT WAS SENT OUT FOR PROPOSAL UNDER FA8601-09-R-0020 AS A 8(A) SOLE SOURCE TO CMS, WITH A GOVERNMENT ESTIMATE IN THE AMOUNT OF $207,509.40. THE PROPOSAL WAS RETURNED WITH A RESPONSE IN THE AMOUNT OF $524,100.00. THE PROJECT WAS PULLED BACK IN ORDER TO MEET DIFFERENT SETASIDE GOALS THAT ARE REQUIRED TO BE SOLICITED FIRST. AFTER CAREFUL CONSIDERATION IT WAS DETERMINED TO BE IN THE BEST INTEREST OF THE GOVERNMENT TO AWARD THIS PROJECT UNDER SABER. AFTER A RESCOPE OF THE PROJECT AND A NEW PROPOSAL OFFERED BY THE SABER FOR $431,299.91. ARRA::YES::ARRA |
Amount:
$0
Award Description: TAS::57 3404::TAS RECOVERYPROJECT#::ZHTV090015::RP# REPLACE STEAM LINE - STM PIT S-90 TO BLDG 29/AREA B (SD- 2); WRIGHT-PATTERSON AFB, OH. RECOVERY- ARRA SABER 09 0015, REPLACE STEAM LINES. THIS PROJECT IS IS TO REPLACE THE FAILED STEAM LINNES AROUND BLDG 20029. THE WORK WILL INCLUDE THE EXCAVATION AND ROAD FINISHES AND CUT EXISTING PAVEMENT OF 600 FT 6+ DEEP. THE EXISTING LINES WILL BE REOMVED AND DISPOSED OF. DEMO AND DISPOSE OF EXISTING CONCRETE PIPE ANCHORS AND + + ROUND BOTTOMS, UNCOVER EXISTING BASIN, DEMO EXISTING MANHOLE. COMPACT SAND BEDDING, PLACE 3+ ASPHALT OVER NEW STEAMLINE, PROVIDE AND PLACE ASPHALT PAVEMENT OUTSIDE NEW STEAM LINE TRENCH. PROVIDE CONDUIT: MULTI-THERM 500-10 GUAGE STEEL W/1+ THICK POLYURETHANE FOAMTO EXTERIOR TO PROTECT FPR OUTERJACKET. PIPE: STEAM, ASTM A-53 GR. B, SCHEDULE 40 ERW, BLACK STEEL. HIGH PRTESSURE RETURN, ASTM A106, GRADE B. SCHEDULE 80. RETURN: ASTM A53, GRADE B, SCHEDULE 80, ERW. INSULATION: MINERAL WOOD. MECHANICAL INSULATION MATERIALS WILL ALSO BE PROVIDED AND INSTALLED. .016 ALUMINUM JACKETING FOR NEW HIGH PRESSURE SUPPLY, LOW PRESSURE RETURN, AND HIGH PRESSURE RETURN LINE, W/ NEW MEGA-WRAP REMOVABLE/RE-USABLE COVERS. ASBESTOS FAILED STEM LINES WILL BE DEMOLISHED AND DISPOSED OF. THE ORIGINAL PROJECT WAS SENT OUT FOR PROPOSAL UNDER FA8601-09-R-0020 AS A 8(A) SOLE SOURCE TO CMS, WITH A GOVERNMENT ESTIMATE IN THE AMOUNT OF $207,509.40. THE PROPOSAL WAS RETURNED WITH A RESPONSE IN THE AMOUNT OF $524,100.00. THE PROJECT WAS PULLED BACK IN ORDER TO MEET DIFFERENT SETASIDE GOALS THAT ARE REQUIRED TO BE SOLICITED FIRST. AFTER CAREFUL CONSIDERATION IT WAS DETERMINED TO BE IN THE BEST INTEREST OF THE GOVERNMENT TO AWARD THIS PROJECT UNDER SABER. AFTER A RESCOPE OF THE PROJECT AND A NEW PROPOSAL OFFERED BY THE SABER FOR $431,299.91. ARRA::YES::ARRA |
Amount:
$269,055
Award Description: TAS::57 3404::TAS
RECOVERY - ZHTV022093 - REPAIR HANGAR DOORS
ARRA PROJ#02 2093, REPAIR HANAGAR DOOR
THIS PROJECT IS TO REPAIR THE HANGAR DOORS AT BUILDING 20006. REMOVE AND REPLACE APPROX 4500 SF POLY WITH 3/8+ CABLE SUPPORT FOR WEATHER PROTECTION. REMOVE AND REPLACE 10 IDEL ROLLERS, BRAKE ROLLERS, AND BEARING AND RACE THE ROLEERS RUN ON, UPPER ROLLER TRUCK ASSEMBLIES. 18 CY (120+ X 4+ X 3+) OF EARTH WIL BE EXCAVATED, REPLACED WITH BASE-GRAVEL FOR INSTALL OF NEW DRAINAGE PIPE, AND COVERED WITH ASHPALT. INSTALLATION OF 120 LF OF 6+ CORRUGATED PIP, 720 SF OF NEW ASPHALT WHERE NEW DRAINAGE PIPE WAS INSTALLED TO INCLUDE A LARGE BASIN TIED TO DRAINAGE SYSTEM. INSTALL APPROX 50 CY CONCRETE TO FILL OVER EXISTING TRACK RAIL SYSTEM, AND IN FRONT OF RAIL SYSTEM. PROVIDE AND INSTALL APPROX 1100LF OF NEW NEOPRENE VERTICAL/HORIZONTAL DOOR SEAL. PROVIDE AND INSTALL APPROX 3800 SELF TAPPING FASTENERS. PROVIDE AND INSTALL APPROX100 LF OF 1+ CHANNEL CLAMPING STRIP. PROVIDE AND INSTALL APPROX100 LF ALUMINUM CLAMPING STRIP. ARRA::YES::ARRA |
Amount:
$132,731
Award Description: TAS::57 3404::TAS
RECOVERY - ZHTV052953 - INSTL CABLING FLIGHT LINE FENCE NEAR GATE 26C
ARRA PROJ# 05 2953, INSTALL FENCING
THIS PROJECT IS TO INSTALL ++ DIAMETER STEEL WIRE CABLE TO REINFORCE FLIGHTLINE FENCE ADJACENT TO GATE 26C AND PYLON GATE. USE SANDIA NATIONAL LABORATORIES ARRESTING CABLE CONCEPTUAL DESIGN, REVISION 2, 17 APR 2002 AS A TEMPLATE FOR DESIGN AND INSTALLATION. THE WORK IS TO INSTALL TWO 3/4+ DIAMETER CABLES CONFORMING TO MIL-W-83420 ALONG THE FENCE LINE BETWEEN FENCE POSTS AND THE CHAIN LINK FABRIC. FASTEN THE LOWER CABLE WITH 1/2" U-CLAMPS (SAE GRADE 3 OR BETTER) AT A HEIGHT OF 30 INCHES FROM THE GROUND LEVEL; THE SECOND CABLE WILL BE APPROX 5+ ABOVE THE FIRST CABLE AND ATTACH IN THE SAME MANNER. DEADMAN ANCHORS MUST BE INSTALLED EVERY 200 FT. THE DEADMAN ANCHOR WILL BE A CONCRETE CUBE 3+X3+X3+. EYEBOLTS CAPTURED IN THE DEADMAN ANCHORS WILL HAVE EITHER WELDED +T+ OR +L+ END EMBEDDED IN THE CONCRETE. TOTAL APPROX LENGTH OF CABLING IS 3,600 LF.
ARRA::YES::ARRA |
Amount:
$273,367
Award Description: TAS::57 3404::TAS
RECOVERY - ZHTV092951 - ANTITERRORISM SECURITY CABLING/ANCHORS - AIRFIELD NORTH
ARRA PROJ #09 2951, INSTALL CABLING/ANCH
THIS PROJECT IS TO INSTALL SECURITY CABLING AND ANCHORS IN THE PERIMETER FENCING AROUND THE NORTH AIRFIELD IN AREA A AND AREA C. THE WORK IS TO INSTALL TWO 3/4+ DIAMETER CABLES CONFORMING TO MIL-W-83420 ALONG THE FENCE LINE BETWEEN FENCE POSTS AND THE CHAIN LINK FABRIC, FORM THE NATIONAL MUSEUM OF THE AIR FORCE AND AREA B. FASTEN THE LOWER CABLE WITH 1/2" U-CLAMPS (SAE GRADE 3 OR BETTER) AT A HEIGHT OF 30 INCHES FROM THE GROUND LEVEL; THE SECOND CABLE WILL BE APPROX 5+ ABOVE THE FIRST CABLE AND ATTACH IN THE SAME MANNER. DEADMAN ANCHORS MUST BE INSTALLED EVERY 200 FT. THE DEADMAN ANCHOR WILL BE A CONCRETE CUBE 3+X3+X3+. EYEBOLTS CAPTURED IN THE DEADMAN ANCHORS WILL HAVE EITHER WELDED +T+ OR +L+ END EMBEDDED IN THE CONCRETE. TOTAL APPROX LENGTH IS 9,000 LF. ARRA::YES::ARRA |
Amount:
$0
Award Description: TAS::57 3404::TAS RECOVERY - ZHTV081821A - RECAULK EXTERIOR WALL EXPANSION JOINTS (F/20651) RECOVERY - ZHTV081821B - REPLACE WINDOWS & RECAULK EXPANSION JOINTS - 652 CONNECTOR RECOVERY - ZHTV081821C - RECAULK EXTERIOR WALL EXPANSION JOINTS (F/20653)SABER PROJECT 08-1821A, B, C ARRA, RECAULK EXTERIOR WALL EXPANSION JOINTS - BLDG 20651, REPLACE WINDOWS AND RECAULK EXPANSION JOINTS - BLDG 20652 CONNECTOR, RECAULK EXTERIOR WALL EXPANSION JOINTS - BLDG 20653
ARRA::YES::ARRA |
Amount:
$255,513
Award Description: TAS::57 3404::TAS
RECOVERY - ZHTV081821A - RECAULK EXTERIOR WALL EXPANSION JOINTS (F/20651)
RECOVERY - ZHTV081821B - REPLACE WINDOWS & RECAULK EXPANSION JOINTS - 652 CONNECTOR
RECOVERY - ZHTV081821C - RECAULK EXTERIOR WALL EXPANSION JOINTS (F/20653)
SABER PROJECT 08-1821A, B, C ARRA, RECAULK EXTERIOR WALL EXPANSION JOINTS - BLDG 20651, REPLACE WINDOWS AND RECAULK EXPANSION JOINTS - BLDG 20652 CONNECTOR, RECAULK EXTERIOR WALL EXPANSION JOINTS - BLDG 20653 ARRA::YES::ARRA |
Amount:
$0
Award Description: TAS::57 3404::TAS
RECOVERY - ZHTV070015 - REPLACEC CONTROLS - HTHW HEATING PLANT W.R. (HP-2)
SABER PROJECT 07-0015 ARRA
REPLACE BOILER CONTROLS AT HIGH TEMPERATURE HOT WATER (HTHW) HEATING PLANT, WEST RAMP. ARRA::YES::ARRA |
Amount:
$549,988
Award Description: TAS::57 3404::TAS
RECOVERY - ZHTV070015 - REPLACEC CONTROLS - HTHW HEATING PLANT W.R. (HP-2)
SABER PROJECT 07-0015 ARRA
REPLACE BOILER CONTROLS, WEST RAMP ARRA::YES::ARRA |
Amount:
$0
Award Description: TAS::57 3404::TAS RECOVERYPROJECT#::ZHTV091886C::RP# CONSTRUCT TRAFFIC CONTAINMENT - GATE 12A(20754); WRIGHT-PATTERSON AFB, OH SABER SABER PROJECT 09-1886C ARRA, INSTALL CONTAINMENT FOR GATE 12 A, INSTALL CONTAINMENT FOR THE GATE. CONTAINMENT SHOULD RUN FROM THE GUARDHOUSE THE ENTIRE LENGTH OF THE RESPONSE ZONE. A
CONTAINMENT ZONE IS REQUIRED IN UFC 4-022-01 (SECURITY ENGINEERING: ENTRY CONTROL FACILITIES/ACCESS CONTROL POINTS) AND SDDCTEA PAMPHLET 55-15 (ENTRY CONTROL FACILITY DESIGN GUIDE).
ARRA::YES::ARRA |
Amount:
$0
Award Description: TAS::57 3404::TAS RECOVERYPROJECT#::ZHTV091886C::RP# CONSTRUCT TRAFFIC CONTAINMENT - GATE 12A(20754); WRIGHT-PATTERSON AFB, OH SABER SABER PROJECT 09-1886C ARRA, INSTALL CONTAINMENT FOR GATE 12 A, INSTALL CONTAINMENT FOR THE GATE. CONTAINMENT SHOULD RUN FROM THE GUARDHOUSE THE ENTIRE LENGTH OF THE RESPONSE ZONE. A
CONTAINMENT ZONE IS REQUIRED IN UFC 4-022-01 (SECURITY ENGINEERING: ENTRY CONTROL FACILITIES/ACCESS CONTROL POINTS) AND SDDCTEA PAMPHLET 55-15 (ENTRY CONTROL FACILITY DESIGN GUIDE).
ARRA::YES::ARRA |
Amount:
$353,133
Award Description: TAS::57 3404::TAS RECOVERYPROJECT#::ZHTV091886C::RP# CONSTRUCT TRAFFIC CONTAINMENT - GATE 12A(20754); WRIGHT-PATTERSON AFB, OH
SABER SABER PROJECT 09-1886C ARRA, INSTALL CONTAINMENT FOR GATE 12 A, INSTALL CONTAINMENT FOR THE GATE. CONTAINMENT SHOULD RUN FROM THE GUARDHOUSE THE ENTIRE LENGTH OF THE RESPONSE ZONE. A
CONTAINMENT ZONE IS REQUIRED IN UFC 4-022-01 (SECURITY ENGINEERING: ENTRY
CONTROL FACILITIES/ACCESS CONTROL POINTS) AND SDDCTEA PAMPHLET 55-15 (ENTRY
CONTROL FACILITY DESIGN GUIDE).
ARRA::YES::ARRA |
Amount:
$459,013
Award Description: TAS::57 3404::TAS
RECOVERY - ZHTV091882A - CONSTRUCT CANOPY-GATE 1B (20740)
ARRA SABER 09 1882A, CONSTRUCT CANOPY
THIS PROJECT IS TO INSTALL A CANOPY OVER GATE 1B. REMOVE AND SAVE (FOR GOV) LIGHTING POLES AND FIXTURES THAT ARE CONFLICTING WITH THE CANOPY STRUCTURE. STRUCTURES WILL BE IN COMPLIANCE WITH IBC 2003 AND LOAD REQUIREMENTS OF THE MOST RECENT ASCE-7 WITH A BASIC WIND SPEED OF 90 MPH, EXPOSURE C. PROVIDE AND INSTALL A TENSIONED FABRIC STRUCTURE TO ACT AS SUN/RAIN/SNOW PROTECTION FOR SECURITY GUARDS. STRUCTURE WILL BE MADE UP OF TWO SMALLER SEPARATE STRUCTURES THAT WILL GIVE AN AIRFOIL TYPE CROSS SECTION. SUPERSTRUCTURE WILL BE COMPOSED OF MULTIPLE COLUMNC PER DRAWING. COLUMNS WILL SUPPORT TWO CANTILEVERED FRAME STO PROVIDE FIXED EDGES FOR THE FABRIC ROOF. HE CONFIGURATION WILL BE A LOW BARREL VAULT RISING OVER AN INVERTED BARREL VAULT FORM BELOW. PROVIDE FOOTER AND COLUMN FOUNDATIONS PER DRAWING AT THE LOCATIONS INDICATED IN THE DRAWINGS. ARRA::YES::ARRA |
Amount:
$0
Award Description: TAS::57 3404::TAS RECOVERY - ZHTV091882A - CONSTRUCT CANOPY-GATE 1B (20740), WRIGHT-PATTERSON, AFB OH ARRA::YES::ARRA |
Amount:
$0
Award Description: TAS::57 3404::TAS RECOVERY - ZHTV091882B - CONSTRUCT PROTECTIVE KIOSK - GATE 1B (20739), WRIGHT-PATTERSON AFB, OH ARRA::YES::ARRA |
Amount:
$0
Award Description: TAS::57 3404::TAS RECOVERY - ZHTV091882B - CONSTRUCT PROTECTIVE KIOSK - GATE 1B (20739); WRIGHT-PATTERSON AFB OH SABER PROJECT NUMBER 09 1882B, ARRA, CONSTRUCT KIOSK, GATE 1B ARRA::YES::ARRA |
Amount:
$99,758
Award Description: TAS::57 3404::TAS
RECOVERY - ZHTV091882B - CONSTRUCT PROTECTIVE KIOSK - GATE 1B (20739)
SABER PROJECT NUMBER 09 1882B, ARRA, INSTALL KIOSKS AT GATEHOUSE GATE 1B, GATE 1B ARRA::YES::ARRA |
Amount:
$619,066
Award Description: TAS::57 3404::TAS
RECOVERY - ZHTV090005 - REPLACE FAILING CHILLER - BASEWIDE TELECOMM SERVER
ARRA PROJ # 09 0005, REPLACE CHILLER ARRA::YES::ARRA |
Amount:
$69,814
Award Description: TAS::57 3404::TAS
RECOVERY - ZHTV041974 - REPLACE SWITCHGEAR LODGING FAC
REPLACE THE 15KV AMP LOADBREAK FUSED SWITCH IN THE BASEMENT OF BLDG 10826.
ARRA-PROJ #04 1974, REPLACE SWITCH GEAR ARRA::YES::ARRA |
Amount:
$0
Award Description: TAS::57 3404::TAS RECOVERY - ZHTV041974 - REPLACE SWITCHGEAR LODGING FAC; WRIGHT-PATTERSON AFB, OH REPLACE THE 15KV AMP LOADBREAK FUSED SWITCH IN THE BASEMENT OF BLDG 10826. ARRA-PROJ #04 1974, REPLACE SWITCH GEAR THE WORK TO BE ACCOMPLISHED IS TO REPLACE THE 15KV AMP LOADBREAK FUSED SWITCH AN THE 208/120 VOLT SWITCHGEAR IN THE BASEMENT OF BLDG 10826. BOTH SWITCH GEARS MUST BOLT-UP TO THE EXISTING TRANSFORMER. THE SECONDARY WILL HAVE A 1000 AMP MAIN BREAKER AND AT LEAST 15 THREE PHASE BREAKERS. THIS MODIFICATION IS TO PLACE THE DELIVERY ORDER INTO DORMANCY BECAUSE THE FACILITY IS IN USE BY ANOTHER GOVERNMENT AGENCY AND CON NOT BE DISPLACED AT THE CURRENT TIME.
ARRA::YES::ARRA |
Amount:
$590,708
Award Description: TAS::57 3404::TAS
RECOVERY - ZHTV042956 - REPLACE PERIMETER FENCE - GATE 26C ALONG E BANK OF MAD RIVER
ARRA-SABER PRO # 04 2956, CLEAR FENCELINE AND REPLACE FENCE FROM GATE 26C ALONG EAST BANK OF MAD RIVER. ARRA::YES::ARRA |
Amount:
$789,948
Award Description: TAS::57 3404::TAS
RECOVERY - ZHTV103205 - REPAIR/INSTALL SECURITY CABLIGHT/ANCHORS-AREA B AIRFIELD
INSTALL TWO 3/4" DIAMETER CABLES CONFORMING TO MIL-W-83420 ALONG THE FENCE LINE BETWEEN FENCE POSTS AND THE CHAIN LINK
FABRIC FOR THE NATIONAL MUSEUM OF THE AIR FORCE AND AREA B.
ARRA- SABER PROJECT NUMBER 10 3205 ARRA::YES::ARRA |
Amount:
$204,717
Award Description: TAS::57 3404::TAS
RECOVERY - ZHTV0618601 - REPLACE CEILING INSULATION - READINESS WAREHOUSE F/30257 (PH 2)
SABER PROJECT NUMBER 06 1860-1, ARRA
REPLACE CEILING INSULATION, PHASE 2, BLDG 30257 ARRA::YES::ARRA |
Amount:
$0
Award Description: TAS::57 3404::TAS RECOVERY - ZHTV091881A - CONSTRUCT CANOPY-GATE 22B (20751); WRIGHT-PATTERSON AFB OH; SABER PROJECT NUMBER 09 1881A, ARRA, CONSTRUCT CANOPY, GATE 22B ARRA::YES::ARRA |
Amount:
$557,783
Award Description: TAS::57 3404::TAS
RECOVERY - ZHTV091881A - CONSTRUCT CANOPY-GATE 22B (20751)
SABER PROJECT NUMBER 09 1881A, ARRA, TO PROVIDE EQUIPMENT AND MATERIAL TO REMOVE LIGHTING POLES AND FIXTURES AND CONSTRUCT CANOPIES AT GUARDHOUSE GATE 22B ARRA::YES::ARRA |
Amount:
$0
Award Description: TAS::57 3404::TAS RECOVERY - ZHTV091881A - CONSTRUCT CANOPY-GATE 22B (20751), WRIGHT-PATTERSON AFB OH ARRA::YES::ARRA |
Amount:
$0
Award Description: TAS::57 3404::TAS RECOVERY - ZHTV091873 - RESURFACE FITNESS TEST & TRAINING TRACK - KITTYHAWK FITNESS CENTER (20601); WRIGHT-PATTERSON AFB, OH; SABER PROJECT NUMBER 09 1873, ARRA, RESURFACE TEST AND TRAINING FACILITY, KITTYHAWK FITNESS CENTER ARRA::YES::ARRA |
Amount:
$74,701
Award Description: TAS::57 3404::TAS
RECOVERY - ZHTV091873 - RESURFACE FITNESS TEST & TRAINING TRACK - KITTYHAWK FITNESS CENTER (20601)
SABER PROJECT NUMBER 09 1873, ARRA, RESURFACE FITNESS TEST & TRAINING TRACK KITTYHAWK FITNESS CENTER, KITTYHAWK ASH STREET ARRA::YES::ARRA |
Amount:
$0
Award Description: TAS::57 3404::TAS RECOVERY - ZHTV091886D - CONSTRUCT DROP ARM-GATE 12A (20761), WRIGHT-PATTERSON AFB OH ARRA::YES::ARRA |
Amount:
$222,148
Award Description: TAS::57 3404::TAS
RECOVERY - ZHTV091886D - CONSTRUCT DROP ARM-GATE 12A (20761)
SABER PROJECT NUMBER 09-1886D, CONSTRUCT DROP ARM GATE, GATE 12A ROAD T, INSTALL GOVERNMENT OWNED ARM BAR GATES ON ROAD T OUTSIDE AFMC HQ. GATES ARE IN SF WAREHOUSE AND WILL BE SUPPLIED TO CONTRACTOR FOR INSTALLATION. CARD READER WILL BE RELOCATED FROM EXISTING GATE TO OPERATE THE INBOUND GATE. DETECTOR LOOP WILL BE INSTALLED IN OUTBOUND LANE TO OPERATE THE OUTBOUND GATE AUTOMATICALLY. NEW CONTAINMENT SHOULD BE INSTALLED FROM EXISTING CONTAINMENT LINE TO TREE LONE ALING CHIDLAW ROAD. PROJECT WOULD BE TO PROTECT THE DIRECT ACCESS TO THE AFMC HQ AREA FROM GATE 12A ON ROAD T. CARD READER WOULD ALLOW SELECT PEOPLE TO ACCESS THE AREA, BUT WOULD
PREVENT UNAUTHORIZED ACCESS.
ARRA::YES::ARRA |
Amount:
$9,000
Award Description: TAS::57 3404::TAS
RECOVERY - ZHTV080002 - RENOVATE FOR EXPLOSIVE ORDINANCE DISPOSAL (18932)
SABER PROJECT NUMBER 08 0002, ARRA, TO RENOVATE FACILITY 30163 TO SUPPORT THE EXPLOSIVE ORDINANCE DISPOSAL (EOD) UNIT CONSISTING OF UPDATING INTERIOR FINISHES, EFFICIENTLY ARRANGING THE SPACE TO OPTIMIZE PERFORMANCE OF THE EOD CORE MISSION, WALL RELOCATIONS AND MODIFICATIONS, NEW CEILING AND LIGHTING, FLOORING, ELECTRICAL, AND SOME AIR HANDLING SYSTEMS MODIFICATIONS. ARRA::YES::ARRA |
Amount:
$489,937
Award Description: TAS::57 3404::TAS
RECOVERY - ZHTV080002 - RENOVATE FOR EXPLOSIVE ORDINANCE DISPOSAL (18932)
SABER PROJECT NUMBER 08 0002, ARRA, TO RENOVATE FACILITY 30163 TO SUPPORT THE EXPLOSIVE ORDINANCE DISPOSAL (EOD) UNIT CONSISTING OF UPDATING INTERIOR FINISHES, EFFICIENTLY ARRANGING THE SPACE TO OPTIMIZE PERFORMANCE OF THE EOD CORE MISSION, WALL RELOCATIONS AND MODIFICATIONS, NEW CEILING AND LIGHTING, FLOORING, ELECTRICAL, AND SOME AIR HANDLING SYSTEMS MODIFICATIONS. ARRA::YES::ARRA |
Amount:
$0
Award Description: TAS::57 3404::TAS RECOVERY - ZHTV091881B - CONSTRUCT PROTECTIVE KIOSK - GATE 22B(20752), WRIGHT-PATTERSON, AFB OH ARRA::YES::ARRA |
Amount:
$0
Award Description: TAS::57 3404::TAS RECOVERY - ZHTV091881B - CONSTRUCT PROTECTIVE KIOSK - GATE 22B(20752); WRIGHT-PATTERSON AFB; OH; SABER PROJECT NUMBER 09 1881B, ARRA, CONSTRUCT KIOSK, GATE 22B ARRA::YES::ARRA |
Amount:
$143,040
Award Description: TAS::57 3404::TAS
RECOVERY - ZHTV091881B - CONSTRUCT PROTECTIVE KIOSK - GATE 22B(20752)
SABER PROJECT NUMBER 09 1881B, ARRA, INSTALL KIOSKS NEAR GATEHOUSE 22B, GATE 22B ARRA::YES::ARRA |
Amount:
$367,621
Award Description: TAS::57 3404::TAS RECOVERYPROJECT#::ZHTV050013::RP# REPLACE FAILED STEAM LINES FROM S-68 TO S-9 TO 18E (SD- 1); WRIGHT-PATTERSON AFB, OH. RECOVERY- ARRA SABER 05 0013, REPAIR STEAM LINES. THIS PROJECT IS IS TO REPLACE THE FAILED STEAM LINNES AROUND BLDG 20018. THE WORK WILL INCLUDE THE EXCAVATION AND ROAD FINISHES AND CUT EXISTING PAVEMENT OF 220 FT 6+ DEEP. THE EXISTING LINES WILL BE REOMVED AND DISPOSED OF. DEMO AND DISPOSE OF EXISTING CONCRETE, WALK, CURB, CONCRETE PIPE ANCHORS AND + + ROUND BOTTOMS, UNCOVER EXISTING BASIN, DEMO EXISTING MANHOLE. COMPACT SAND BEDDING, POUR 80 LINEAR FT OF 5+ SIDEWALK, W/4+ AGGREGATE BASE, POUR 60 LINEAR FT OF CURB W/ 8+ AGGREGATE BASE, RESOTRE GRASS AREA W/ 4+ TOPSOIL, SEED AND STRAW. PROVIDE CONDUIT: MULTI-THERM 500-10 GUAGE STEEL W/1+ THICK POLYURETHANE FOAMTO EXTERIOR TO PROTECT FPR OUTERJACKET. PIPE: STEAM, ASTM A-53 GR. B, SCHEDULE 40 ERW, BLACK STEEL. HIGH PRTESSURE RETURN, ASTM A106, GRADE B. SCHEDULE 80. RETURN: ASTM A53, GRADE B, SCHEDULE 80, ERW. INSULATION: MINERAL WOOD. MECHANICAL INSULATION MATERIALS WILL ALSO BE PROVIDED AND INSTALLED. .016 ALUMINUM JACKETING FOR NEW HIGH PRESSURE SUPPLY, LOW PRESSURE RETURN, AND HIGH PRESSURE RETURN LINE, W/ NEW MEGA-WRAP REMOVABLE/RE-USABLE COVERS. ASBESTOS FAILED STEM LINES WILL BE DEMOLISHED AND DISPOSED OF. THE ORIGINAL PROJECT WAS SENT OUT FOR PROPOSAL UNDER FA8601-09-R-0020 AS A 8(A) SOLE SOURCE TO CMS, WITH A GOVERNMENT ESTIMATE IN THE AMOUNT OF $207,509.40. THE PROPOSAL WAS RETURNED WITH A RESPONSE IN THE AMOUNT OF $456,100.00. THE PROJECT WAS PULLED BACK IN ORDER TO MEET DIFFERENT SETASIDE GOALS THAT ARE REQUIRED TO BE SOLICITED FIRST. AFTER CAREFUL CONSIDERATION IT WAS DETERMINED TO BE IN THE BEST INTEREST OF THE GOVERNMENT TO AWARD THIS PROJECT UNDER SABER. AFTER A RESCOPE OF THE PROJECT AND A NEW PROPOSAL OFFERED BY THE SABER FOR $367,621.02. ARRA::YES::ARRA |
Amount:
$0
Award Description: TAS::57 3404::TAS RECOVERYPROJECT#::ZHTV050013::RP# REPLACE FAILED STEAM LINES FROM S-68 TO S-9 TO 18E (SD- 1); WRIGHT-PATTERSON AFB, OH. RECOVERY- ARRA SABER 05 0013, REPAIR STEAM LINES. THIS PROJECT IS IS TO REPLACE THE FAILED STEAM LINNES AROUND BLDG 20018. THE WORK WILL INCLUDE THE EXCAVATION AND ROAD FINISHES AND CUT EXISTING PAVEMENT OF 220 FT 6+ DEEP. THE EXISTING LINES WILL BE REOMVED AND DISPOSED OF. DEMO AND DISPOSE OF EXISTING CONCRETE, WALK, CURB, CONCRETE PIPE ANCHORS AND + + ROUND BOTTOMS, UNCOVER EXISTING BASIN, DEMO EXISTING MANHOLE. COMPACT SAND BEDDING, POUR 80 LINEAR FT OF 5+ SIDEWALK, W/4+ AGGREGATE BASE, POUR 60 LINEAR FT OF CURB W/ 8+ AGGREGATE BASE, RESOTRE GRASS AREA W/ 4+ TOPSOIL, SEED AND STRAW. PROVIDE CONDUIT: MULTI-THERM 500-10 GUAGE STEEL W/1+ THICK POLYURETHANE FOAMTO EXTERIOR TO PROTECT FPR OUTERJACKET. PIPE: STEAM, ASTM A-53 GR. B, SCHEDULE 40 ERW, BLACK STEEL. HIGH PRTESSURE RETURN, ASTM A106, GRADE B. SCHEDULE 80. RETURN: ASTM A53, GRADE B, SCHEDULE 80, ERW. INSULATION: MINERAL WOOD. MECHANICAL INSULATION MATERIALS WILL ALSO BE PROVIDED AND INSTALLED. .016 ALUMINUM JACKETING FOR NEW HIGH PRESSURE SUPPLY, LOW PRESSURE RETURN, AND HIGH PRESSURE RETURN LINE, W/ NEW MEGA-WRAP REMOVABLE/RE-USABLE COVERS. ASBESTOS FAILED STEM LINES WILL BE DEMOLISHED AND DISPOSED OF. THE ORIGINAL PROJECT WAS SENT OUT FOR PROPOSAL UNDER FA8601-09-R-0020 AS A 8(A) SOLE SOURCE TO CMS, WITH A GOVERNMENT ESTIMATE IN THE AMOUNT OF $207,509.40. THE PROPOSAL WAS RETURNED WITH A RESPONSE IN THE AMOUNT OF $456,100.00. THE PROJECT WAS PULLED BACK IN ORDER TO MEET DIFFERENT SETASIDE GOALS THAT ARE REQUIRED TO BE SOLICITED FIRST. AFTER CAREFUL CONSIDERATION IT WAS DETERMINED TO BE IN THE BEST INTEREST OF THE GOVERNMENT TO AWARD THIS PROJECT UNDER SABER. AFTER A RESCOPE OF THE PROJECT AND A NEW PROPOSAL OFFERED BY THE SABER FOR $367,621.02. ARRA::YES::ARRA |
Amount:
$348,728
Award Description: TAS::57 3404::TAS
RECOVERY - ZHTV032958 - REPLACEC PERIMETER FENCE - GATE 26C STH ALONG ST RT 235
SABER PROJECT NUMBER 03 2958 ARRA, REPLACE PERIMETER FENCE FROM GATE 26C TO THE FUEL FARM NEAR THE FAIRBORN BASEBALL FIELDS ARRA::YES::ARRA |
Amount:
$321,365
Award Description: TAS::57 3404::TAS
RECOVERY - ZHTV052951 - REPLACEC SECURITY FENCE - MUNITIONS AREA
ARRA PROJ # 05 2951, INSTALL FENCING
THIS PROJECT IS TO INSTALL FENCING AROUND MUNITIONS STORAGE AREA, BLDG 40052. THE WORK IS TO INSTALL TWO 3/4+ DIAMETER CABLES CONFORMING TO MIL-W-83420 ALONG THE FENCE LINE BETWEEN FENCE POSTS AND THE CHAIN LINK FABRIC. FASTEN THE LOWER CABLE WITH 1/2" U-CLAMPS (SAE GRADE 3 OR BETTER) AT A HEIGHT OF 30 INCHES FROM THE GROUND LEVEL; THE SECOND CABLE WILL BE APPROX 5+ ABOVE THE FIRST CABLE AND ATTACH IN THE SAME MANNER. DEADMAN ANCHORS MUST BE INSTALLED EVERY 200 FT. THE DEADMAN ANCHOR WILL BE A CONCRETE CUBE 3+X3+X3+. EYEBOLTS CAPTURED IN THE DEADMAN ANCHORS WILL HAVE EITHER WELDED +T+ OR +L+ END EMBEDDED IN THE CONCRETE. TOTAL APPROX LENGTH IS 7,250 LF. ARRA::YES::ARRA |
Amount:
$0
Award Description: TAS::57 3404::TAS RECOVERY - ZHTV071899 - REPAIR SPALLING EXT CONCRETE - HISTORIC HANGAR (F/20006) SABER PROJECT NUMBER 07 1899, ARRA, REPAIR SPALLED CONCRETE, BLDG 20006. GENERAL SCOPE OF WORK IS TO REPAIR SPALLED CONCRETE AND FINISH CONCRETE SPALL REPAIR TO MATCH EXISTING PAINT COLOR.
ARRA::YES::ARRA |
Amount:
$266,998
Award Description: TAS::57 3404::TAS
RECOVERY - ZHTV071899 - REPAIR SPALLING EXT CONCRETE - HISTORIC HANGAR (F/20006)
SABER PROJECT NUMBER 07 1899, ARRA, REPAIR SPALLED CONCRETE, BLDG 20006. GENERAL SCOPE OF WORK IS TO REPAIR SPALLED CONCRETE AND FINISH CONCRETE SPALL REPAIR TO MATCH EXISTING PAINT COLOR. ARRA::YES::ARRA |
Amount:
$310,419
Award Description: TAS::57 3404::TAS
RECOVERY - ZHTV092953 - REPAIR/INSTALL SECURITY CABLING/ANCHORS - AIRFIELD W
ARRA PROJ#09 2953 THE WORK IS TO INSTALL TWO 3/4+ DIAMETER CABLES CONFORMING TO MIL-W-83420 ALONG THE FENCE LINE BETWEEN FENCE POSTS AND THE CHAIN LINK FABRIC, AROUND PERIMETER FENCE ALONG THE WESTERN EDGE OF THE AIRFIELD IN AREA A & C.. FASTEN THE LOWER CABLE WITH 1/2" U-CLAMPS (SAE GRADE 3 OR BETTER) AT A HEIGHT OF 30 INCHES FROM THE GROUND LEVEL; THE SECOND CABLE WILL BE APPROX 5+ ABOVE THE FIRST CABLE AND ATTACH IN THE SAME MANNER. DEADMAN ANCHORS MUST BE INSTALLED EVERY 200 FT. THE DEADMAN ANCHOR WILL BE A CONCRETE CUBE 3+X3+X3+. EYEBOLTS CAPTURED IN THE DEADMAN ANCHORS WILL HAVE EITHER WELDED +T+ OR +L+ END EMBEDDED IN THE CONCRETE. TOTAL APPROX LENGTH IS 9,000 LF. ARRA::YES::ARRA |
Amount:
$71,127
Award Description: TAS::57 3404::TAS
RECOVERY - ZHTV051929 - REPLACE PANELS & SWITCHGEAR (PDC-3 & LDC-1)
RECOVERY SABER PROJECT NUMBER 05 1929 ARRA, REPLACE SWITCH GEAR, BLDG 20071A. ARRA::YES::ARRA |
Amount:
$31,120
Award Description: TAS::57 3404::TAS
RECOVERY - ZHTV071898 - REPLACE BUS & TRANSF DIFF RLYS SUBS B & J
SABER PROJECT NUMBER 07 1898 ARRA REPLACE BUS AND TRANSFORMER DIFFERENTIAL RELAYS, SUBSTATIONS B, H, AND J. ARRA::YES::ARRA |
Amount:
$212,622
Award Description: TAS::57 3404::TAS
RECOVERY - ZHTV071959 - REPLACE 15 KV SWITCHGEAR
THIS PROJECT IS TO REPLACE A 15 KV SWITCH GEAR AT BLDG 20031. THE WORK REMOVE AND REPLACE AN OLD 15KV OIL SWITCH AND OLD 15 KV SWITCHGEAR WITH NEW EQUIPMENT. THE REQUIREMENT IS A LIFE-CYCLE REPLACEMENT 15KV SWITCHGEAR ARE PAST THE SERVICE LIFE AND MUST BE REPLACED, THE COMPONENT
REPLACEMENT IS REQUIRED TO SUSTAIN FUNCTIONALITY OF THE BASE ELECTRICAL SYSTEM.
ARRA- PROJ # 07 1959 REPLACE 15KV SWITCH ARRA::YES::ARRA |
Amount:
$0
Award Description: TAS::57 3404::TAS RECOVERY - ZHTV092803 - RESURFACE RUNNING TRACK - KITTYHAWK SABER PROJECT NUMBER 09 2803 ARRA, RESURFACE RUNNING TRACK, KITTYHAWK, IN ACCORDANCE WITH SOW DATED 22 JANUARY 2009.
ARRA::YES::ARRA |
Amount:
$191,643
Award Description: TAS::57 3404::TAS
RECOVERY - ZHTV092803 - RESURFACE RUNNING TRACK - KITTYHAWK
SABER PROJECT NUMBER 09 2803 ARRA, RESURFACE RUNNING TRACK, KITTYHAWK, IN ACCORDANCE WITH SOW DATED 22 JANUARY 2009. ARRA::YES::ARRA |
Amount:
$126,981
Award Description: TAS::57 3404::TAS
RECOVERY - ZHTV071903 - REPLACE ELEVATOR BLDG 15 AREA B - ADA COMPLIANCE
SABER PROJECT NUMBER 07 1903 ARRA, REPLACE PASSENGER ELEVATOR FOR USE BY HANDICAPPED EMPLOYEES, BLDG 20015. ARRA::YES::ARRA |
Amount:
$94,213
Award Description: TAS::57 3404::TAS
RECOVERY - ZHTV061862A - INCREASE SUBSTATION A LIGHTING (E-3)
RECOVERY - ZHTV061862B - INCREASE SUBSTATION B LIGHTING (E-3)
RECOVERY - ZHTV061862C - INCREASE SUBSTATION C LIGHTING (E-3)
RECOVERY - ZHTV061862D - INCREASE SUBSTATION D LIGHTING (E-3)
RECOVERY - ZHTV061862E - INCREASE SUBSTATION E LIGHTING (E-3)
RECOVERY - ZHTV061862F - INCREASE SUBSTATION F LIGHTING (E-3)
WRIGHT-PATTERSON AFB, OH
SABER PROJECT 06 8162 INSTALL EXTERIOR LIGHTING AT SUBSTATIONS A, B, C, D, E, AND F. ARRA::YES::ARRA |
Amount:
$0
Award Description: TAS::57 3404::TAS RECOVERYPROJECT#::ZHTV0418711::RP# REPAIR CRACKS IN TUNNEL STRUCTURE BLDG 14-15 - PH 1; WRIGHT-PATTERSON AFB, OH SABER PROJECT NUMBER 04 1871-1 ARRA REPAIR LEAKS AND WATER DAMAGE TO CONCRETE TUNNEL, BLDG 20014
ARRA::YES::ARRA |
Amount:
$61,347
Award Description: TAS::57 3404::TAS RECOVERYPROJECT#::ZHTV0418711::RP# REPAIR CRACKS IN TUNNEL STRUCTURE BLDG 14-15 - PH 1; WRIGHT-PATTERSON AFB, OH SABER PROJECT NUMBER 04 1871-1 ARRA REPAIR LEAKS AND WATER DAMAGE TO CONCRETE TUNNEL, BLDG 20014
ARRA::YES::ARRA |
Amount:
$0
Award Description: TAS::57 3404::TAS RECOVERYPROJECT#::ZHTV0418711::RP# REPAIR CRACKS IN TUNNEL STRUCTURE BLDG 14-15 - PH 1; WRIGHT-PATTERSON AFB, OH SABER PROJECT NUMBER 04 1871-1 ARRA REPAIR LEAKS AND WATER DAMAGE TO CONCRETE TUNNEL, BLDG 20014
ARRA::YES::ARRA |
Amount:
$117,607
Award Description: TAS::57 3404::TAS RECOVERYPROJECT#::ZHTV0418711::RP# REPAIR CRACKS IN TUNNEL STRUCTURE BLDG 14-15 - PH 1; WRIGHT-PATTERSON AFB, OH SABER PROJECT NUMBER 04 1871-1 ARRA REPAIR LEAKS AND WATER DAMAGE TO CONCRETE TUNNEL, BLDG 20014
ARRA::YES::ARRA |
Amount:
$282,506
Award Description: TAS::57 3404::TAS
RECOVERY - ZHTV082022 - REPAIR AIRMEN DINING HALL
SABER PROJECT NUMBER 08 2022 ARRA
RENOVATE AIRMEN+S DINING HALL, PITSENBARGER DINING HALL ARRA::YES::ARRA |
Amount:
$0
Award Description: TAS::57 3404::TAS
RECOVERY - ZHTV082022 - REPAIR AIRMEN DINING HALL
REPAIR INTERIOR OF PITSENBARGER DINING HALL, BLDG 31214. ARRA::YES::ARRA |
Amount:
$0
Award Description: TAS::57 3404::TAS
RECOVERY - ZHTV082022 - REPAIR AIRMEN DINING HALL
SABER PROJECT NUMBER 08 2022 ARRA, REPAIR INTERIOR OF PITSENBARGER DINING HALL, BLDG 31214. ARRA::YES::ARRA |
Amount:
$0
Award Description: TAS::57 3404::TAS RECOVERY - ZHTV082042 - RECONFIGURE POWER SYSTEM - HANGAR FACIL 30153 SABER PROJECT NUMBER 08 2042 ARRA, RECONFIGURE ELECTRIC AT AERO CLUB, BLDG 30153, IN ACCORDANCE WITH SOW DATED 26 FEB 2009. GENERAL SCOPE OF WORK IS TO PROVIDE AND INSTALL SIX 110 VOLT RECEPTACLES SUSPENDED AND HUNG FROM CEILING EXISTING WORK BENCHES AND ONE GFCI 110 VOLT RECEPTACLE TO EXISTING PARTS CLEANER. SABER PROJECT NUMBER 08-2042 ARRA ARRA::YES::ARRA |
Amount:
$8,228
Award Description: TAS::57 3404::TAS
RECOVERY - ZHTV082042 - RECONFIGURE POWER SYSTEM - HANGAR FACIL 30153
SABER PROJECT NUMBER 08 2042 ARRA, RECONFIGURE ELECTRIC AT AERO CLUB, BLDG 30153, IN ACCORDANCE WITH SOW DATED 26 FEB 2009. GENERAL SCOPE OF WORK IS TO PROVIDE AND INSTALL SIX 110 VOLT RECEPTACLES SUSPENDED AND HUNG FROM CEILING EXISTING WORK BENCHES AND ONE GFCI 110 VOLT RECEPTACLE TO EXISTING PARTS CLEANER.
SABER PROJECT NUMBER 08-2042 ARRA ARRA::YES::ARRA |
Amount:
$92,006
Award Description: TAS::57 3404::TAS
RECOVERY - ZHTV071860 - INSTL BOILER FOR CHILD DEVELOPMENT CTR
SABER PROJECT NUMBER 07-1860 ARRA INSTALL NEW HOT WATER BOILER AT BLDG 11403 CHILD DEVELOPMENT CENTER ARRA::YES::ARRA |
Amount:
-$222,148
Award Description: TAS::57 3404::TAS ARRA SABER PROJECT NUMBER 09-1886D, INSTALL DROP ARM GATE GATE 12A ARRA::YES::ARRA |
Amount:
$0
Award Description: RECOVERYPROJECT#::SABER09-1881C::RP# INSTALL TRAFFIC CONTAINMENT GATE 22B
|
Amount:
$0
Award Description: ::RECOVERYPROJECT#::ZHTV071886::RP# RECOVERY-VARIOUS CONSTRUCTION PROJECTS UNDER SABER |
| Location Information |
| Latitude, Longitude |
0º 0' 0",
0º 0' 0" |
| Congressional District |
07 |
| City |
GREENE |
| County |
GREENE |
| State |
OH |
| Zip |
45433 |
|