DESCRIPTION OF WORK/SERVICE PERFORMED
TAS::69 1304::TAS RECOVERY ACT TAS 69-9/10-1304 RECOVERY ACT - SITE SPECIFIC DESIGN/ENGINEERING SERVICES FOR THE NATIONAL AIR ROUTE TRAFFIC CONTROL CENTER CRITICAL AND ESSENTIAL POWER SYSTEM (ACEPS) DESIGN MODIFICATION IN ACCORDANCE WITH THE ATTACHED STATEMENT OF WORK FOR THE FOLLOWING SITES:
ARRA::YES::ARRA